Professional Documents
Culture Documents
Debra Rahn
Headquarters, Mashington, D.C.
(Phone.: 202/755-3897)
Jim Lacy
Goddard Space Flight Center. Greenbelt, Md.
(Phone: 30J./.34.4-8955)
HELEASE No)t
.. 82-126
-more-
-2-
-more-
LAUNCH ,VEHICLE
-At liftoff six Castor IV solid rocket motors are ignited sec- on
the launch pad and complete their burn at 57 seconds. At 62
onds -the remaining three Castor IV solid rocket motors are of ignited
with their burnout occur.ing a.t 1.19 seconds. The first set six
ground ignited solid- motors are Jettisoned in groups of three .at
70 and 71 .seconds with the final set of three solids jettisoned at
at 122 seconds. .Main.engine cutoff occurs at.224 seconds. First
stage separation occurs at 232 seconds with the spacecraft fairing
jettisoned at 245 seconds.
At second state cutoff (SECO), .672 seconds, the vehicle is
injected into an elliptic 225 by 187 km ( 121.6 by 101.1 n.mi.)
transfer orbit designed-to provide a 185 km (100 n.mi.) altitude
near the equator. Following SECO), pitch and yaw commands are exe-
cuted by the Delta vehicle to provide the r'equired burn attitude
for the PAM-D third stage. The seconds toprior to stage 11-III
separation, the.third stage is spun up 50 rpm.
-more-
Xith the separation of -the payload *thWrd stage (PAM) and
spacecraft) from the second stage, NASAAD6lta responsibilities are
.concluded. Payload Assist Module ignition occurs &t .1,297. seconds
and burn~s for 86 seconds placing -the payload into the specified
geostationary transfer orbit.
ANIK-D SPACECRAFT MISSION TRAJECTORY MARK EVENTS
EVENT .TIME (SEC
Stage I Liftoff 0
..
Second Engine Cutoff Command .. 672
-more-
-5-I
TRAJECTORY
SECOND STAGE DEP.LETION BURN
PRO(GRAM
SEQUENCE OF EVENTS AND.CONTROL
TIME (SEC.)
EVENT
1,288
Stage II-III Separation
4,.190
Begin Coast Phase Roll Program
(Roll -Rate = 0.55896 Deg/Sec)
4.340
End Coast Phase Roll Program
.4,350
Begin Second Coast Phase Pitch Rate
(Pitch Rate = 0.56690 Deg/Sec.)
4,550
End Coast Phase Pitch Program
4,700
Restart-Stage II
4,700
Start of Steady State Burn
2.) 4,71.7
Final Cutoff - Stage II (SECO
-more- , -
.V
.
NASA/TELESAT TEAM
NASA HEADQUARTERS
KENNED'(.SPACE CENTER
Richard G. -Smith D.irector
-more-
A .. . ,.,
ty6fRt-
............
.9* =&G
-7-
TELESAT CANADA
Eloon Thompson JPresidant
William .Zatychec Director-, Satellite Systems
Division
Dave Griffiths Manager, Launch Services
John Korda Space Managers Anlk-.D
Ray. Miles Ran4e .Coordinator.. .Anlk-D
7end-