1. This design chart assumes industry standard aggregate and sand bulk densities and is for reference only.
2. See Mixer Calibration section of the manual in order to calibrate the machine for your exact materials.
3. Cement auger rotates 1.5 revolutions for every 1 revolution of conveyor belt and click of the counter.
4. Cement auger dispenses 4lbs powder per revolution of the screw.
5. Cement screw turns 1.5 times for every click of the counter.
6. 6 lbs of powder is produced per click of the counter.
7. 1:2 gear ratio for lower sack mix designs requires the FLOW FILL upgrade package. Call Factory for details.
8. 2:1 gear ratio for higher sack mix designs requires the HIGH CEMENT CONTENT upgrade package. Call Factory for details.
Ticket Layout
Inputs
Date Output
Start Time Output
End Time Output
Total Concrete (CU YD) Output
Total Cement (LB) Output
Total Coarse Agg (LB) Output
Total Fine Agg (LB) Output
Total Water (GAL) Output
Date Output
Start Time Output
End Time Output
Total Concrete (CU YD) Output
Total Cement (LB) Output
Total Coarse Agg (LB) Output
Total Fine Agg (LB) Output
Total Water (GAL) Output
Date Output
Start Time Output
End Time Output
Total Concrete (CU YD) Output
Total Cement (LB) Output
Total Coarse Agg (LB) Output
Total Fine Agg (LB) Output
Total Water (GAL) Output
Date Output
Start Time Output
End Time Output
Total Concrete (CU YD) Output
Total Cement (LB) Output
Total Coarse Agg (LB) Output
Total Fine Agg (LB) Output
Total Water (GAL) Output
Drop Down List Notes
no
no
no
no
no
yes
yes (use sack mix column from design table)
no
no
no
no
no
From computer
From computer
From computer
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
yes
yes (use sack mix column from design table)
no
no
no
no
no
From computer
From computer
From computer
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
yes
yes (use sack mix column from design table)
no
no
no
no
no
From computer
From computer
From computer
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
yes
yes (use sack mix column from design table)
no
no
no
no
no
From computer
From computer
From computer
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Calculated from mix design table
Batch Mix Design Table
Cement
# of input LB of LB of Course LB of Fine Gal of
pulses/YD of cement/input Agg/input Agg/input Water/input
Sack Mix Concrete pulse pulse pulse pulse
3 1/2 55 6 27 30
4 63 6 23 26
4 1/2 71 6 20 23
5 78 6 18 20
5 1/2 86 6 16 18
6 94 6 14 16
6 1/2 102 6 13 15
7 110 6 12 14
7 1/2 118 6 11 12
8 125 6 10 11
Fly Ash
3 1/2
4
4 1/2
5
5 1/2
6
6 1/2
7
7 1/2
8