You are on page 1of 61

QUALITY CONTROL

SYSTEMS USED IN APPAREL


INDUSTRY

Page
1
PROJECT SUPERVISOR:

MR.BABIR RAMZAN

PROJECT MEMBERS:

Syed khuram Hassan bet-sp07-003

DEPARTMENT OF TEXTILE ENGINEERING

THE UNIVERSITY OF FAISALABAD

PAKISTAN

Page
2
We hereby declare that this project, neither as a whole nor as a part therefore has been
copied out from any source. It is further declared that we develop this project and this
report entirely on the basis of our personal efforts made under the sincere guidance of our
project supervisor Sir Babar Ramzan.

We further declare that this project and all associated documents and records and partial
requirement for the degree of Bachelor of Science in Textile Engineering (Garments
technology)

Page
3
WITH THE DEEP SENSE OF HONOUR

TO OUR BELOVED AND DEAREST

PARENTS & BROTHERS

RESPECTED TEACHERS

AND ALL THOSE

WHO DEVOTED THEIR YESTERDAY FOR

OUR

BRIGHT TODAY

Page
4
With the blessings of almighty ALLAH and prayers of our parents we made this humble
attempt to achieve the goal that we set for us in the beginning of final year. Although it
was not an easy task but with the devotion of our project team and cooperation of our
respected teachers we have at least succeeded in completion of our project.

The support and encouragement rendered by our CHENAB TEXTILE MILL staff was
very vital in the completion of this project, their guidance and encouragement played a
key role in the planning and completion of this project.

We are also very thankful to the Head of Department of Textile Engineering


Mr.NAVEED AKHTAR for facilitating us. We are very thankful to our project advisor
MR.BABIR RAMZAN for his guidance and providing us the facilities which was the real
source of inspiration for the completion of this project.

In the end we are thankful to all the lab attendants and staff members without the
cooperation of whom the achievement of this goal would have been a dream only.

Page
5
Page
6
Contents
Contents............................................................................................................................... 7
Chapter#1.......................................................................................................................... 11
INTRODUCTION TO QUALITY AND COST OF QUALITY..........................................................11
1.0. INTRODUCTION.........................................................................................................12
1.1.PRINCIPLES OF QUALITY CONTROL............................................................................14
1.2.THE ROLE OF QUALITY CONTROL...............................................................................15
1.3. QUALITY TERMS........................................................................................................ 15
1.4.RESPONSIBILITIES OF QUALITY ASSURANCE DEPATMENT..........................................15
1.5.DIMENSIONS OF QUALITY...........................................................................................16
1.6.THE COST OF QUALITY...............................................................................................18
1.6.0.Introduction......................................................................................................... 18
1.6.1.Importance of Cost of Quality in Apparel Sector..................................................19
1.7.THE ATTACK ON COSTS.............................................................................................20
1.8.CONTROLLING COSTS................................................................................................21
1.8.0.Classification of Cost of Quality in Apparel Sector...............................................22
Chapter#2.......................................................................................................................... 24
FABRIC INSPECTION SYSTEMS..............................................................................24
2.1. FABRIC QUALITY INSPECTION....................................................................................25
2.2. Four- Point System....................................................................................................25
2.1.0Advantages...........................................................................................................26
2.3.TEN POINT SYSTEM....................................................................................................28
2.3.0.Advantages..........................................................................................................29
2.3.1.Disadvantage.......................................................................................................29
2.4.GRANITEVILLE’78 SYSTEM.........................................................................................29
2.5. DALLAS SYSTEM .......................................................................................................30
2.6. CONCLUSION............................................................................................................30
Chapter #3......................................................................................................................... 31
SPREADING AND CUTTING QUALITY CONTROL SYSTEM......................................................31
........................................................................................................................................... 31
3.1. QUALITY CONTROL BEFORE SPREADING...................................................................32
3.2. SPREADING QUALITY SPECIFICATIONS......................................................................32
3.3. Fabric Spreading Objective.......................................................................................32

Page
7
3.4. THE REQUIREMENTS OF THE SPREADING PROCESS..................................................33
3.5. Type of Spreads........................................................................................................ 34
3.6. General Fabric Spreading System.............................................................................34
3.7. Conclusion................................................................................................................ 36
3.8.1Cutting (Manual)...................................................................................................36
3.8.2. Cutting (Auto).....................................................................................................36
3.9. Cut components inspection...................................................................................37
3.10. Cutting Room Functions......................................................................................37
3.11. Requirements of Pattern Cutting.........................................................................37
3.16. Safety Instructions in Handling Cutting...............................................................38
3.13.Numbering............................................................................................................ 39
3.14.Sorting, Bundling, Storage and transfer for Production........................................39
3.15. Panel Checking System.......................................................................................39
3.16. Conventional cut parts inspection System...........................................................39
3.17. Conclusion........................................................................................................... 40
Chapter #4......................................................................................................................... 41
STITCHING QUALITY CONTROL SYSTEMS............................................................................41
4.1. STITCHING................................................................................................................ 42
4.2. 7-0 system................................................................................................................42
4.2.1. Advantages.........................................................................................................42
4.2.2.Disadvantages.....................................................................................................42
4.3. TRAFFIC LIGHT SYSTEM............................................................................................43
4.3.1. Advantages.........................................................................................................45
4.3.2. Disadvatages......................................................................................................45
4.4. Conventional Quality Control System.......................................................................46
4.5. Random Inspection System:.....................................................................................46
4.6. GUIDE LINES TO QUALITY CONTROL IN STITCHING DEPARTMENT............................46
4.7. Conclusion................................................................................................................ 47
Chapter#5.......................................................................................................................... 48
SAMPLING & FINAL INSPECTION METHODS.........................................................................48
5.1. Cutting...................................................................................................................... 48
5.2.Sewing.......................................................................................................................49
5.2.1.Potential Major faults ..........................................................................................49

Page
8
5.2.2.Potential minor faults..........................................................................................50
5.3. Embroidery...............................................................................................................51
5.4. Printing.....................................................................................................................52
5.5. Finishing and packaging...........................................................................................53
5.6. Final Audit................................................................................................................. 54
5.7. Clipping Inspection................................................................................................... 54
5.8. Final inspection.........................................................................................................54
5.9. Pressing Inspection ...........................................................................58
5.10. SPECS INSPECTION................................................................................................. 58
5.11. Folding and Presentation (or Hanger Pack).............................................................58
5.12. Packing inspection..................................................................................................59
5.13. Conclusion.............................................................................................................. 59
References .........................................................................................................................60
From Websites:................................................................................................................60
From Persons:.................................................................................................................. 61

Page
9
Page
10
Chapter#1
INTRODUCTION TO QUALITY AND
COST OF QUALITY

Page
11
1.0. INTRODUCTION
Garment manufacturing is quit different to any other conventional manufacturing. it is not a continuous
production method. Each style is different product that requires different type of fabric color buttons
thread etc.

Hence requirement of product integrity at every stage requires detailed knowledge about the quality
parameters, quality problems, their causes and remedies. For quality production it is better to know the
complete process of garment making (selection of yarn-fabric production and garment manufacturing)
so that quality level can be improved.

If one say "improve quality improve productivity" with out showing how when and where we can
improve it. That will not solve the problem. Instead of that we should try to draw the attention of work
force towards the shortcomings inherent in the quality systems and processes.

To ensure a quality product the first step that manufacturer should take is the quality control and the
evaluation of input material.

The factories that control/ensure the fabric quality level don’t have worers with necessary skill level and
understanding. They don’t understand the types and inherent nature and characteristics of the fabric.
Some characters, which appear as fabric defect, may be nature of another type of fabric. There were
many instances where fabric is rejected due to this misunderstanding. There are no proper training
facilities courses, and material available in our country to enhance the knowledge of workers engaged in
knitwear production.

At present technological level, it impossible for any fabric mil to manufacture absolutely defect free
fabric. To control and evaluate the fabric and garment quality.

What is Quality?
Quality is unusually slippery and difficult to come to grip with. Therefore some might say “Quality is
something I know when I see it.

To some Quality is difficult to be explained like love or happiness. Once the concept of Quality is
understood fundamentally it stops being slippery and becomes something which can hold by its tail.

Page
12
According to dictionary Quality is: - an essential character: nature, an ingredient or distinguishing
attribute: property, a character trait, superiority of kind, degree of grade or excellence.

Different people have different views about quality.

• The best money can buy

• Meeting a specification or conformance to specifications.

• Craftsmanship

• The degree of excellence that an item possesses.

• Product with no defect found

• Absence of variation in its broad sense.

• Meeting or exceeding customer expectation.

These responses depend on people’s perception of the value of a product or service under consideration
and their explanation of performance, durability, reliability etc. of that product or service.

Customer satisfaction
The key is to know accurately customer expectations on a continuing basis. Unless you know customer
expectations how could you satisfy a customer or meet or exceed their expectations.

For this it is essential to understand the 5w’s

Why

When

Where The customer is not satisfied???

What

Who

Therefore understanding the customer need is the priority in the Quality of a product.

Why do we buy a product?


We buy a product because we want to use that product.If the product that you bought has some
deficiency you will not be satisfied. Then you say that the product that you bought is defective, and you

Page
13
will be mentally worried every time you make use of the product and physically too you may not feel
comfortable. Therefore Quality is also defined as “fitness for use”.

“The fitness for use” concept can be applied to garments too. For a garment to be fit for use provided its
style is acceptable: -

• It must be free from defects such as stain, material (fabric) defects, open seams, loose hanging
broken stitches, Skip/Slip stitches, puckered seams, misaligned components/buttons/buttonholes,
defective trims and accessories etc.

• It must fit properly for the label size.

• It must look attractive.

• It must perform satisfactorily in normal use that a garment must be able to withstand normal
laundering/dry cleaning/pressing cycles. Without loss of color or shrinkage; seams must not
come apart; fabric must not tear, etc.

“Quality is a matter of your taste, training and attitude, and your understanding of taste, culture and
attitudes of your buyers.

The better the understanding between two, the better the quality”

1.1.PRINCIPLES OF QUALITY CONTROL


The essential requirements for producing a reliable product has been stated as follows:-

A satisfactory design of product, thoroughly proved by adequate development testing in order to


establish its reliability under the conditions to which it will be subjected in use. This is the Requisite
Quality of the product. A full specification of the requirements of this quality, which must be clearly
understood by everyone concerned with the production of the constituent parts and of the complete end
product. Confirmation that the manufacturing processes are capable of meeting these requirements. Full
acceptance, by all those concerned with production, of the responsibility for meeting the standards set by
the specification. Checks on the product at every stage of manufacture to detect any departures from the
specification. Record essential information derived from these checks to provide accurate evidence for
action. Establishment of lines of communication, - i.e. Feedback to Production, - to ensure that this
action is taken to effect the appropriate adjustments to materials, process and operatives to maintain

Page
14
FUTURE production within the specification. Instruction in the use, applications and limitations of the
product. A study of user experience, feedback to the department's concerned, and rapid remedial action.

1.2.THE ROLE OF QUALITY CONTROL


In a total quality control scheme, the total involvement of all personnel is required as a philosophy.

The staff concerned in all duties must be given authority to carry out their functions. These functions
should be defined.

Lines of communication and responsibility should be established to carry out an effective policy.
Horizontal communication at all levels of personnel between Quality Control, Production and other
departments is needed. Also there must be vertical lines, which follow the lines of responsibility and
authority. In order to achieve this aim, the terms of reference under which staff work, must be
established. This is, perhaps, best accomplished by job descriptions. It is the job of Quality Control to
establish the correct information concerning a quality situation, and present this clearly to their
colleagues. Persons outside Quality Control must be authorised to make the commercial decisions
involved from a pre-established series of options, the consequences of each being fully understood.
Payment schemes should be re-examined where necessary to reward quality as well as production, in a
balanced way, since both are commercially important.

1.3. QUALITY TERMS


Quality
“ It is defined as that combination of design and properties of materials of a product which are needed
for the intended end use and level of the market in which it is sold”

Quality Control
"The systems required for programming and co-coordinating the efforts of the various groups in an
organization to maintain the requisite quality" As such Quality Control is seen as the agent of Quality
Assurance or Total Quality Control.

Quality Assurance
"The establishment and maintenance of all activities and functions concerned with the attainment of
requisite quality"

1.4.RESPONSIBILITIES OF QUALITY ASSURANCE DEPATMENT


INDULGE AND MONITOR QUALITY SYSTEMS

Page
15
The Q/A dept is required to induce the Q/C dept to implement standard quality systems required by
buyers to improve and maintain a very good OQL.The implemented quality system should be
monitored on a daily basis. So that the system runs without any failure. Under no circumstances the
systems should be changed or stopped.The quality system should be very strong so that nothing could
penetrate through and result in failure of audits or re-screening.

TRAINING AND EVALUATING QUALITY STAFF

It is the prime responsibility of the senior quality staff to train all the Q/A staff toAchieve skilled
levels within a short frame of time.The Q/A dept in coordination with the production dept and Q/C dept
should train the Q/C team to achieve skilled levels.A training program should be designed which will
enable to execute simple and proper training to enhance the skill levels of Q/C and Q/A staff up to
standard.The Q/A department will evaluate all the inline and final quality control inspectors on their
performance.The evaluation will be based on the over all quality level less than 4 % for any merit or
reward systems.

ASSURE THE QUALITY OF PRODUCTS

Q/A will performance audits at cutting stage to assure the cut products to confirm required quality
standard at OQL 1.5 %.The inline Q/A Auditor will perform random audits to assure stitching quality of
products. The objective will be to inspect and identify the problems and give Corrective action to the
root cause of the problems, The Q/A auditor will highlight the problems to the Q/C dept for corrective
action. The inline audits will be conducted at A.Q.L 1.5 with a view of preventing re-occurrence of the
problems. The Finishing Q/A officers will audit finished goods before packing with the same .Objective
and concentrate more on the presentation of the final products. The audit will be conducted at A.Q.L 1.5.

The Final Q/A Auditor will conduct audit for quality and specs. The final auditor will also conduct
packing audit to ensure the Ratio, Color, Cartoning, Packing accuracy, Presentation, Packing
accessories, CTN marks and numbers etc.

1.5.DIMENSIONS OF QUALITY
Dimension 1: Performance

Does the product or service do what it is supposed to do, within its defined tolerances?

Page
16
Performance is often a source of contention between customers and suppliers, particularly when
deliverables are not adequately defined within specifications.

The performance of a product often influences profitability or reputation of the end-user. As such, many
contracts or specifications include damages related to inadequate performance.

Dimension 2: Features

Does the product or services possess all of the features specified, or required for its intended purpose?

While this dimension may seem obvious, performance specifications rarely define the features required
in a product. Thus, it’s important that suppliers designing product or services from performance
specifications are familiar with its intended uses, and maintain close relationships with the end-users.

Dimension 3: Reliability

Will the product consistently perform within specifications?

Reliability may be closely related to performance. For instance, a product specification may define
parameters for up-time, or acceptable failure rates.

Reliability is a major contributor to brand or company image, and is considered a fundamental


dimension of quality by most end-users.

Dimension 4: Conformance

Does the product or service conform to the specification?

If it’s developed based on a performance specification, does it perform as specified? If it’s developed
based on a design specification, does it possess all of the features defined?

Dimension 5: Durability

How long will the product perform or last, and under what conditions?

Durability is closely related to warranty. Requirements for product durability are often included within
procurement contracts and specifications.

For instance, fighter aircraft procured to operate from aircraft carriers include design criteria intended to
improve their durability in the demanding naval environment.

Dimension 6: Serviceability

Is the product relatively easy to maintain and repair?

Page
17
As end users become more focused on Total Cost of Ownership than simple procurement costs,
serviceability (as well as reliability) is becoming an increasingly important dimension of quality and
criteria for product selection.

Dimension 7: Aesthetics

The way a product looks is important to end-users. The aesthetic properties of a product contribute to a
company’s or brand’s identity. Faults or defects in a product that diminish its aesthetic properties, even
those that do not reduce or alter other dimensions of quality, are often cause for rejection.

Dimension 8: Perception

Perception is reality. The product or service may possess adequate or even superior dimensions of
quality, but still fall victim to negative customer or public perceptions.

As an example, a high quality product may get the reputation for being low quality based on poor
service by installation or field technicians. If the product is not installed or maintained properly, and
fails as a result, the failure is often associated with the product’s quality.

Summary

It should be obvious from the discussion above that the individual dimensions of quality are not
necessarily distinct. Depending on the industry, situation, and type of contract or specification several or
all of the above dimensions may be interdependent.

When designing, developing or manufacturing a product (or delivering a service) the interactions
between the dimensions of quality must be understood and taken into account.

While these dimensions may not constitute a complete list of relevant dimensions, taking them into
consideration should provide us with a better understanding of the slippery concept of quality.

1.6.THE COST OF QUALITY


1.6.0.Introduction
A manufacturer stays in business only as long as his product quality satisfies his customers at the price
they are prepared to pay.

Failure to maintain an adequate quality standard can therefore be disastrous. But maintaining an
adequate standard of quality also costs effort. From the first investigation to find out what the potential
customer for a new product really wants, through the processes of design, specification, controlled
manufacture and sale, to the arrangements for sales service to the customer, effort is being spent on

Page
18
ensuring that the company's product - and reputation - are good. If it is spent wisely, it can result in
savings greater than the increase in costs, and hence in an improvement to profits.

The costs represented by this effort can be a significant proportion of the products sales value (Do you
know what the total is in your Company? In some instances the cost of scrap, rework and inspection
costs alone has been found to be as high as 20% of turn-over) and any manufacturer should be interested
in making sure that he is getting good value for his expenditure. He cannot feel sure unless he has
studied what the costs are, how they are incurred and what they ought to be. If they are higher than they
should be, he must consider ways in which they can be reduced.

1.6.1.Importance of Cost of Quality in Apparel Sector


Cost of Quality (COQ) in the apparel sector is still a widely understood misconception. The term often
gets associated incorrectly with the price of creating quality merchandise. Actually, it is the other way
round i.e. the amount of money incurred because the product was not manufactured right at the first
time. Thus, the concept of quality costs in the garment industry is a means to quantify the total cost
involved in quality-related efforts and deficiencies pertains to a manufactured apparel product.

Although it is not very easy to calculate COQ for any industry, research shows that the costs of poor
quality can range from 15%-40% of business costs (e.g. rework, returns or complaints, reduced service
levels, lost revenue). Most of the apparel units do not know what their quality costs are because they do
not keep records on a daily basis. A large portion of resources is consumed in finding and correcting
mistakes in the merchandise or related processes. Typically, the cost to eliminate a failure in the
customer phase is five times greater than it is at the merchandise development or manufacturing phase.
Every time work is redone, the cost of quality increases. The obvious examples in the apparel sector
include:

• The reworking of a garment

• The retesting of performance of apparel

• The rebuilding of a garment machine

• The correction of an apparel size specification sheet or change of care label

• The reprocessing of garment to improve dimensional stability after wash or the replacement of a
trim to fulfill the requirement of a customer or to meet safety issues.

Page
19
In general, the cost of quality has two main components: the cost of good quality (or the cost of
conformance) and the cost of poor quality (or the cost of non-conformance) according to Philip B
Crosby in his book Quality Is Free.

The cost of poor quality affects internal and external costs resulting from failing to meet the
requirements specified for an apparel product by the garment industry. On the other hand, the cost of
good quality affects the cost for investing in the prevention of nonconformance to requirements and the
costs for appraising the apparel product for conformance to requirements.

1.7.THE ATTACK ON COSTS


Obviously, the most significant improvements will usually be achieved by concentrating effort on the
areas of high cost. For this purpose an analysis of the principal costs is required. Studies have shown that
a fairly typical ratio between the three main groups of costs in a manufacturing company is:

• Prevention Costs 5%

• Appraisal Costs 30%

• Failure Costs - 65%

Failure Costs, because they are typically the largest, will usually give the largest return for the effort
involved in reducing them. An effective way of attacking Failure Costs is through a temporary increase
in prevention and appraisal costs.

Appraisal Costs - for example, the cost of production and inspection - might be reduced by more
attention to Value Engineering, which would to some extent increase prevention costs, and a closer
control of the manufacturing process, which would increase appraisal costs.

Appraisal Costs will usually be the next to come under attack. An analysis of all essential quality control
operations will often show opportunities for reducing expenditure without reducing effectiveness. For
example, statistical sampling techniques may be used as a means of control, indicating trends in
performance and assisting to maintain quality. By improving the control of the process, 100 per cent
inspection may no longer be necessary.

Total costs will be lowest when design staff are aware of the cost implications of their work. Good
design saves cost not only at the design stage itself but throughout production and testing: products
become easier to make "right first time". Good design is needed not only when conceiving the product

Page
20
but also when conceiving systems for production and quality control. After failure and appraisal costs
have been reduced by attention to the prevention aspect, it may be possible to reduce prevention costs as
well.

We have seen that the process of reducing failure costs may well involve increasing expenditure on the
design, developing, testing, manufacturing and inspecting processes. However, there must clearly be a
point beyond which it would be uneconomic to incur additional expense. Failure costs might possibly be
eliminated but at considerable, possibly prohibitive, costs in other areas. There is a point at which the
aggregate of all costs is at a minimum for the intended selling price. Achieving this minimum cost will
involve reviewing product designs, and improving planning processes, facilities and methods.

When the initial attack on costs has been successful, it will be logical to provide a means for analysing
costs and for reporting on them in order to keep a close watch on progress so that, firstly, a worthwhile
reduction in the attacked cost is achieved; and secondly, the expected increase in other costs is not
exceeded.

1.8.CONTROLLING COSTS
The only purpose of reporting costs is to provoke action. Without action the money spent on deriving
and reporting data is wasted.

Action is required whenever there is a significant difference between an actual cost and the budget set
for it. Action is also required to discover the reason for the difference and to eliminate it. If cost reports
are to be effective in provoking this type of action they must be

- presented at suitably short intervals

- presented quickly following the period they represent

- presented in simple, direct, intelligible form

- presented to the people who have the authority and knowledge to act effectively.

It is often effective for reports to be sent both to the person who is expected to take action and also to his
immediate superior.

It is important to remember that the actual costs revealed by control reports are the result of joint action
by quality control staff and by the design or manufacturing functions. Action to correct undesirable

Page
21
trends may therefore have to be taken by all these groups in co-operation. Action by any one group may
well be fruitless.

1.8.0.Classification of Cost of Quality in Apparel Sector


However, no standard relationship exists among the four parameters of quality costs. One can expect to
reduce the internal and external failure costs by increasing prevention and appraisal costs. But it is also
well understood that, in spite of excellent quality of raw materials and good inspection coverage, the
quality of a garment also depends on workmanship, which may be a prime factor of hindrance in the
attainment of quality owing to poor training, poor maintenance of machines, and lack of requisite skill.

1.8.1.Prevention Costs
The costs of all activities specifically designed to prevent poor quality in an apparel product or
associated processes. Examples of prevention cost:

• New merchandise review

• Quality planning

• Supplier capability surveys

• Process capability evaluations

• Quality improvement team meetings

• Quality improvement projects

• Quality education and training

Minimum neck stretch must meet the required measurements specified. Sample complies measures
22".Monofilament thread is not permitted for use in children's clothing. For all the paints and other
coatings used on hardware including buttons, the lead content must be tested for permissible limit. All
buttons must be machine lock stitched and withstand pull test.

1.8.2.Appraisal Costs:
The costs associated with measuring, evaluating apparel merchandise or auditing related production
factory to assure conformance to quality standards and performance requirements.

Examples of Appraisal Costs

Page
22
• Incoming and source inspection/test of purchased material.
• In-process and final inspection/test.
• Product. Process or service audits.
• Calibration of measuring and test equipment.
• Associated supplies and materials.

1.8.3.Internal Failure Costs


Failure costs that arise before an apparel company supplies its product to the customer i.e. prior to
delivery or shipment of the merchandise. These are due to deficiencies discovered before delivery and
are associated with the failure (non-conformance) to meet the needs of customers. If internal quality
failures of defective merchandise are identified before shipping then optimistically there may be no
external failure costs.

Examples of Internal Failure Costs


• Scrap
• Rework
• Re-inspection
• Re-testing
• Material review
• Downgrading
• Returning garment for re-work

1.8.4.External Failure Costs


These are typically due to errors found by customers. Failure costs that arise after a garment unit
supplies the product to the customer, such as cost of returned merchandise, cost of quality claims, cost of
transportation for the defective merchandise, personnel costs associated with these activities. These costs
can be much higher than internal failure costs, because the stakes are much higher.

Examples of External Failure Costs


• Processing customer complaints
• Customer returns
• Product recalls

Page
23
Chapter#2

FABRIC INSPECTION
SYSTEMS

Page
24
2.1. FABRIC QUALITY INSPECTION
The quality of a final garment depends on the quality of a fabric when it is received as a roll. Even the
most outstanding manufacturing methods cannot compensate for defective materials. They inspect 20%
of the rolls that they receive and evaluate them based on a four-point system. This way, we can avoid
fabric related quality problems before it is put into production.

2.2. Four- Point System


It was published in 1959 by the National Association of Shirt Pajama Sportswear Manufacturers. Widely
adopted and used in knitted fabric.

Amount to select
Inspect at least 20% of the total rolls of the shipment.

Selection of rolls
Select at least one roll of each color. If more than one role must be selected, then choose the additional
roles in proportion to the total number of roles per color received.

Defect Classification (Four- Point System)


Size Defect Penalty .
3 inches or less 1 Point
Over 3 inches, but less than 6 2 Points
Over 6 inches, but less than 9 3 Points
Over 9 inches 4 Points

The length of the defect is used to determine the penalty point. Only major defects are considered. No
penalty points are assigned to minor defects. (A major defect is any defect that would cause a final
garment to be considered a second.)

Major Defects
• Major woven fabric defects include but are not limited to slubs, holes, missing yarns, yarn
variation, end out, soiled yarns, and wrong yarn.

• Major dye or printing defects are out of register, dye spots, machine stop, color out, color smear,
or shading.

Page
25
Acceptance Criteria and Calculation
• 40 points per 100 yards is the acceptable defect rate

• # of Points per 100 yds = # of penalty points x 100

Yds inspected

Inspection Procedure
• Determine the amount to inspect 20%).

• Select the rolls to inspect.

• Put the rolls on the inspection machine or other viewing device.

• Cut off a 6 inch piece across the width off the end of the roll. Mark the right and left side of the
strip. Stop the inspection process every 50 yards and use the strip to check for any shading
problems. Also make sure to check the end of the role.

• Inspect for visual defects with the light on at a speed slow enough to find the defects. (The
fabric must be checked at a slow rate in order to effectively find flaws). Sometimes you may
have to turn the light off to see how a flaw will affect the appearance of a garment.

• Check that the roll contains the correct yardage as stated by the piece goods source.

• Check for skewed, biased, and bowed fabric.

• Mark any defects to the side with colored tape so that they can be easily found and noted.

• Record any defects.

The weaving division functions under the principles of the internationally acclaimed American 4 point
system to reduce wastage and ensure quality. Under this system, fabric inspection and grading is carried
out as per ASTM standard.

2.1.0Advantages
• 4 point system has not width limitation.

• Worker can easily understand it.

Page
26
Page
27
Quality Control Inspection Report

Fabric Supplier:_______________ Total Rolls Recv'd:______________

Style #:_______________ Points Per 100 yds:______________

Penalty
Width Length Color Shade Points Point

Roll Color Ordered A c t ual On Dye Def. Fab. Total Per Rej

100
# Min. Max Roll Actual Yards Yards Hole Soil Def. Points yd (x)

2.3.TEN POINT SYSTEM


The ten point system for piece goods evaluation was approved by the Textile distributors institute and
the National Federation of Textile, in 1955. The earliest inspection system and is designed to identify
defects and to assign each defect a value based on severity of defect. The system assigns penalty points
to each defect depending on its length and whether it is in the warp (ends) or weft (fill) direction. While
sounding simple, it can get quite complicated in practical use. The following table shows the assignment
of penalty points.

Warp defects Points Weft defects Points

Under 1” 1 Under 1” 1
1” - 5” 3 1” - 5” 3
5” - 10” 5 5” – ½ width of goods 5
10”- 36” 10 Over ½ the width of goods 10

The grading is done as a piece or roll of fabric is considered good if the total penalty points, assessed to
that piece or roll, do not exceed the length of fabric on it. If the points exceed the length, then the roll
considered seconds, and may be rejected.

Page
28
For example if we had a roll of 50 yards of fabric and if we found defects totaling to less than 50 points,
then the roll was considered good. If there were more than 50 penalty points, then the piece was
considered seconds.

There have been some questions raised about the fairness of the system based on the argument that this
system does not allow for the inspection of various widths. If one will study the system closely, it can be
seen that apparent inequity of the system is just that, apparent although stringent.

This method is still used by some manufacturers.

2.3.0.Advantages
• Oldest and most used in woven finished fabric.

• In it length of fabric is used and along the length of warp and weft defects are identified.

2.3.1.Disadvantage
• It has width limitation.

• It is difficult in practical use

2.4.GRANITEVILLE’78 SYSTEM
It was introduced in 1975 for the field of fabric grading. The system divided defects into major and
minor types .The major defect was one which was very obvious and lead the goods to second quality.
The minor defect was one may or may not have cause garment to second, depending on its location in
the end use item.

PENALTY POINT ASSIGNMENT OF GRANITEVILLE’78

Defect Length Penalty Points

9” 1

9”-18” 2

18”-27” 3

27”-36 4

Page
29
The principle was established in garment cutting piece, which the short length defects (less than 9”) will
normally be removed. The system tries to balance the importance of longer defects (over 9”) and put
less weight on 1-10” defects such as slubs .The system also suggests the viewing distance of 9 foot
instead of normal 3-foot viewing distance. The system tends to eliminate very small defects from the
total penalty score.

Disadvantages:

• As this system is used on cutting pieces according to my point of view it also increase the cost of
production. We should control problems before cutting.

2.5. DALLAS SYSTEM


There is also a Dallas System published in the 1970's. That system was developed specifically for knits.
According to this system, if any defect was found on a finished garment the garment would then be
termed a second. In regard to fabric, this system defines a second as "more then one defect per ten linear
yards, calculated to the nearest ten yards." For example, one piece 60 yards long would be allowed to
have six defects.

Disadvantage

• It increases the cost of production as defect is located after the garment is finished.

2.6. CONCLUSION
4 point system is most widely used system in apparel industry.4 point system is best as compared to
other systems since it is easy to teach and learn.4 point system usually used for knitted fabric and 10
point system is used for woven fabric.Other systems are like Graniteville’78 and Dallas system has
some problems such as viewing distance and they affect the cost of production as defects are located
after cutting and on finish garments.

Page
30
Chapter #3

SPREADING AND CUTTING


QUALITY CONTROL SYSTEM

Page
31
3.1. QUALITY CONTROL BEFORE SPREADING
The inspector should receive a swatch of lab-dip approval to evaluate the correctness of GSM,
Construction and shade of fabric. Ensure that the lot received is for the concerned P.O and style.Lab
report for shading, color fastness, crocking, and all other tests (spectrophotometer, delta-e, shrinkage,
torque effect, pilling and performance) should be received. Color continuity should be established by
making a color continuity swatch card. Shade blankets should be made to evaluate shading after
washing. Then lots should be segregated according to dye lot #‘s.Lots should be segregated according to
width of fabric (according to marker width) Fabric inspection report should be received. If the spreading
process is manual and without under-bed blowers, the fabric (knit) should be relaxed at least 6 hrs before
spreading. If auto spreading is used, ensure that the under-bed blowers are functioning properly.

3.2. SPREADING QUALITY SPECIFICATIONS


Spreading quality must be measured with respect to the following factors:

• Ply alignment: length and width

• Ply tension: stretch, slack edge

• Grain alignment: bowing

• Splicing: waste and precision;

• Damage placement: economy of placement;

• Surface direction; and

• Static electricity

3.3. Fabric Spreading Objective


The objective of spreading is
• To place a number of plies of fabric under the marker according to the planning process.

• In the color required

• Correctly aligned as to length and width

• At correct tension

Page
32
3.4. THE REQUIREMENTS OF THE SPREADING PROCESS
Spreading must achieve a number of specific objectives:
Alignments of the plies
Every ply must comprise at least the length and width of the marker. In addition it should have
minimum possible extra outside those measurements. Because nature of fabric is such that fabric width
varies piece to piece

Elimination of the Fabric Flaws


Fabric flaws may be identifies by the supplier or by the spreader. It must be eliminated by different
methods.

Correct Ply direction


For fabrics designated both one way only and one way either way, the spread should contain plies whose
surface direction is compatible with the pattern facing of the marker.

Correct Ply Tension

If the plies are spread with too slack a tension they will lie in ridges with irregular fullness. If plies are
spread in a stretched state they will maintain their tension while held in a lay, but will contract after
cutting or during sewing, thus shrinking the garment parts to a smaller size than the pattern pieces. Thus
tension in the plies should be optimum.

Elimination of Static Electricity


In spreading plies of fabric containing man made fibers, friction may increase the static electricity in the
fabric. The spreader will experience in laying a ply neatly on top of the others due to either attraction or
repulsion of those plies according to how they are charged.

Method to reduce static electricity:

- Change the method of threading the fabric through the guide bars

- increase the humidity of the atmosphere in the cutting room

- arrange to earth the lay

Avoidance of distortion in the spread

Page
33
A layer of glazed paper, laid glazed upside down, is normally placed at the bottom of the spread. This
helps to avoid disturbing the lowest plies on the material in the spread when the base plate of a straight
knife passes underneath. Also gives stability to the lay if it is to be moved on a table.

Avoidance of Fusion during cutting


Anti-fusion paper may be used in the same way as interleaving. It contains a lubricant which lubricates
the knife blade as it passes through the spread.

3.5. Type of Spreads


There are two types of spreads with respect to alignment:
Straight Edge
A straight-edge spread has all the ply edges on one side of the spread superposed perfectly in a vertical
line. The ply edge alignment on the other side of the spread may not be superimposed in a vertical to the
table. This will depend on the variations in cloth width among the bolts of fabrics used in the spread. If
there is no width variation, both sides will form vertical lines to the table surface in a straightedge
spread. If the fabric width varies from bolt to bolt, or within each bolt, only one side of a straight-edge
spread will have vertical superposing. The greater the width variation, the greater the unevenness in the
no straight edge. This is also true for both sides of a straight-edge spread, which has poor side edge
alignment on the supposed straight-edge side.

Centered Edge
A centered spread is one in which the plies are spread with their longitudinal centers superposed in a
vertical line. In a perfect quality spread of this type both side edges of every ply are equidistant from the
lengthwise center of the spread. Width alignment refers to the superposing precision at the sides of the
spread. The greater the variation in width or length alignment, the greater the waste in precision cutting
since the ends and sides must be trimmed to the narrowest and shortest plies. Precise cutting of a spread
of superposed plies demands that each cut side of a components block be a vertical line to the table
surface.

3.6. General Fabric Spreading System


Before spreading some parameters must be keep in mind.

Mark the Splice Zone on the Spreading Table

Page
34
Fabrics usually contain many defects. The defects in pieces which are cut into patterns are highly
undesirable. To avoid this, the spreading operator must identify and cut out defects as the material is
being spread on the table. However, if the material is cut in the mid of the pattern, it will lead to more
material wastage.

To avoid this, zones are defined called splice zones, where cuts can be made by the spreading operator.
Also it is also required to decide about the overlap of the next section of cloth. Thus there are two lines
in a splice zone: One line shows how far the previous piece of cloth must extend and one line shows
where the next piece of the cloth must begin, i.e. how much overlap is needed.

Thus when a flaw is encountered, the spreader is stopped, the operator moves back to the nearest splice
point, cuts the flaw out and moves the spreader back to overlap the cut line with the required overlap.

Apart from cutting out defects, splices are also used to achieve proper shade matching when starting a
new roll of cloth.

Thus the splicing points are marked by means of a chalk or paint.

• Use Paper for the first ply in case the table surface is rough or when fine fabrics are being
spread

• Identify the defects noticed in the fabric by means of stickers

Use lubricated paper for separating layers

To prevent scorching in the natural fibers (coarse fabrics).To prevent fusing in the synthetic fabrics.

• Ensure that decided number of ply count and height of the spread is achieved.

How to spread

• Pull the fabric to far end position

• Position the fabric at the far end (with our without weight or pins)

• Align the ply (width on one side)

• Cut the ply after each lay

• Repeat this process from until the entire roll is spread.

• Check ply count

Page
35
• Repeat a and then b to g till the decided number of ply are spread

• Mark the remnants of the rolls with length in meters and roll number and stack separately at the
given place.

3.7. Conclusion
Spreading is the main operation where quality can be control before cutting.Spreading effects the shape
of cut parts so lay must be in standard form before cutting.

3.8. CUTTING
Cutting is irreversible process in garments cutting, so it must be done carefully.

There are two types of cutting.

• Manual

• Automatic

3.8.1Cutting (Manual)
Ensure small parts are cut first starting from one end of the folding. Ensure marker position is not
disturbed in the cutting process. Ensure shapes are accurate after cutting (this could be achieved if
correct cutting mode is followed).Ensure miss-cuts, Ragged cuts, Narrow goods are not resulted in cut
components. Ensure cut-marks and notch marks are accurate. Shaping should be done immediately if
necessary.

3.8.2. Cutting (Auto)


Ensure that the vacuum suction device functions properly. Ensure that correct gauge of polythene is
used, and also ensure that the polythene is not damaged. Ensure that no foreign matter is on the folding.
Ensure that the laser indicator is correctly focused.

Ensure that the blades are timely and properly sharpened (if straight knives are used).

If laser cutting is used ensure that the laser device functions correctly. Ensure that the folding moves
smoothly on the table without any obstacle. Ensure that the cut parts and off cuts are removed from table
immediately during the process. Ensure that no ragged cutting or miss cutting takes place. Shaping
should be done immediately if necessary.

Page
36
3.9. Cut components inspection
Check quantity in bundles for correctness (randomly all sizes) (should be in accordance to cutting
ticket/job card) randomly select 20% of the cuts covering all sizes for inspection. Check for correctness
of specs by checking the first part, middle part, last part of all the bundles selected for inspection.(on
hard approved pattern).The total 20% selected should undergo fabric quality and cutting quality (shade,
specs, etc) inspection on all components. This inspection should be done without disturbing the
sequence of the bundles. Any defective component should be replaced immediately with the same shade,
and component cut from the balance fabric of the same lot. If any replacement cannot be found, all
parts/components in the bundles at the same sequence count, should be taken out and job card amended
accordingly. The components should be discarded as rejects according to the above.

3.10. Cutting Room Functions


• Apply the following principles of marker-making:

• Proper pattern placement

• Attention to order requirements

• Cost effective fabric yield

• Accuracy and neatness

• Identify the characteristics of lay-up fabric.

• Avoid waste of lay-up fabric.

• Use various spreading techniques and equipment.

• Follow a production order form.

• Operate industrial fabric cutting machines and related equipment.

• Maintain industrial fabric cutting machines and related equipment.

3.11. Requirements of Pattern Cutting


The following items are required to enable the cutter to create clear, correct and accurate patterns.

• Good quality white pattern paper.

• Large sheets or roll of cardboard (for basic blocks)

Page
37
• A Perspex square with 45° and 90° markings as well as centime measurement.

• A 15cm plastic ruler (useful for marking seam allowances)

• A pair of sharp paper cutting scissors

• A good-quality tape measure (with metal ends)

• Clear sticky tape

• A Soft rubber

• 3 H or 4H pencils (no softer) and pencil sharpener

• Dress marker’s pins

• Fine felt-tip pens or hard crayons (to outline ports of draft)

• A meter stick

• A tracing wheel would also be found useful, as would a dressmaker’s stamped

• Although French curves are an easy method of drawing curved lines it is far better to achieve the
skill of freehand drawing, which comes with practices.

• Consumption Calculations

3.16. Safety Instructions in Handling Cutting


Areas near cutting tables should be clearly marked, and their access restricted should be restricted by
barriers.On motorized and automatic cutting tables the warning signals should be fitted to indicate when
blade is in motion.The machine ideally should be fitted with automatic adjustable guards to fully cover
the exposed part of the cutting blade. The five finger chain blades should be available to all the operator
working on knife and should be worn on all times during cutting work.There should be a regular check
on the condition of the light, guard, and table fittings.Only fully trained operatives should be allowed to
work on knives.The operators' standards should be checked against the published operating practice on a
regular basis and should be corrected wherever a deviation is found. There should be an effective
cleaning system in operation that prevents build up of fluff, fly and off cuts, thus reducing fire, health &
trip hazards.

Page
38
3.13.Numbering
Numbering plan must be given by the numbering incharge, specifying the style #, color, P.O No., Serial
No., No. Of garments cut, sizes.All the parts shall be numbered in a pre determined sequence and at pre
determined location.Numbering stickers gum strength (Light/Medium/Heavy) has to be decided keeping
in mind the kind of fabric being cut.

3.14.Sorting, Bundling, Storage and transfer for Production


After the completion of the cutting process the spread is first sorted out in respect of different sizes and
the components of the pattern and than these sorted out components are handled according to the
production policy and the needs of the plant. The manner of folding or superposing the plies in the
bundles should be such that there is (a) minimum or no creasing, and (b) minimum or no disarraying of
the cut alignment. Any deviation from these two principles increases the pick-up and positioning time
for the sewing operator. If the bundle must be tied securely because of movement before the operator
gets the bundle care should be taken not to use card or other ties which may mar the surface or edge of
the cut plies. Boxes are an excellent means for bundling and transporting cut sections without the
necessity of bundle tying. This saves tying and untying time.

3.15. Panel Checking System


The checkers carried out panel checking by placing the cut panels on the pattern and checking for
accuracy of notches, grain lines, nap direction, crocked cutting, measurements & tolerance. Mark the
pattern on a board (Acrylic. Card Board) along with +/- tolerance as dotted lines around the outline
marked. Place the cut panel (component) on this marked area. It becomes easier to asses if the cut panel
is within or out of tolerance. This inspection board has to verified and approved by pattern maker before
usage. Once the fabric is cut, they shall be bundled and marked with inspection status. When a bundle is
checked, they shall be marked with green as “c”.When cut panels are inspected they shall be marked
with green as “I”. All panels shall be checked for fabric defects.

3.16. Conventional cut parts inspection System


In conventional cutting system cut parts inspection is one according to military standard system. There
are two types of inspection first one is 100% inspection which is carried out for less then 200 pieces &
other is 20% inspection which is carried out for that lot which has more than 200 pieces.

Page
39
3.17. Conclusion
Cutting is irreversible process so it must be according to given parameteres.Cutting affects the overall
Quality of a finished garment. Cut parts inspection helps in improving the quality product for go ahead
in stitching. During cut parts inspection shade, shape and other faults are removed and on the basis of
rejected pieces report a lot is hold or go ahead for stitching, so by controlling quality at this stage is
fruitful in spite of we stitch a garment and after stitching that garment is rejected due to flaws.

Page
40
Chapter #4

STITCHING QUALITY CONTROL


SYSTEMS

Page
41
4.1. STITCHING
It is process of interlacing of sewing thread in a specific repeated unit.

Generally used quality control systems are here under.

4.2. 7-0 system


In lines 7-0 system is applied by Quality Control Inspector. The machine output undergoes 2.5 Observed
Quality Level. Not a single piece is allowed to reach the Finishing Section unless audited by the
Auditor.56 pieces are checked in eight hour shift if there are no defects and if there are defects then
more pieces are checked.

Quality controllers and Supervisors regularly meet and assist each other to achieve the desired quality
level. Quality efficiency of each Operator, each Line and each Supervisor are recorded in computer and
their performances frequently monitored. The factory has in House Washing Plant; well enough for
Stone Washing, enzyme wash and Bleach Wash. Production capacity of the Washing Unit is perfectly
matched with the Production Capacity of the Machines.

In the Finishing Section, Rotary Type of Quality Check or two-tier Checks, is Applied depending upon
the style. In any case, No Piece is allowed to go inside the polybag unless audited by the Final Auditor.

4.2.1. Advantages
• Quality is improved

• Operator hourly capacity is checked

• Machine capacity is hourly checked

• Hourly efficiency is checked

• Quality assurance is improved

• Quick feedback

4.2.2.Disadvantages
• It is not properly implement

• Training is hard

• Measurement of garment is not checked hourly

Page
42
• Fabric faults are not checked

4.3. TRAFFIC LIGHT SYSTEM

Aim
To build in quality at the point and to quickly identify problem areas in order to reduce defects
reworking and to improve factory efficiency.

Process
The traffic signal system is based on three lights red, amber and green. The lights are used to symbolize
the quality status at the operation and make supervisor aware of where problems are occurring and give
the in line controllers an idea where they have to spend more time.

Green Good

Amber Isolated defects found

Red Recurring defects or major defects found

In line QC has to check a minimum of 10 piece each visit to the work station. The In line controller will
monitor the inspection and record it. The traffic lights must work in sequence unless the frequency of
defects it too high.

If the inspector finds.

Defects Color Code Frequency of Signatures Action


QC visit

None Green Once pr hour QC None

One Amber Twice per hour QC/Supervisor Inform


supervisor

Two Red Twice per hour QC/QC Exce./Line Operator


supervisor/Manager shown correct
method from
supervisor
mechanic
called.

Two or more 2 Red Operation stop

Page
43
Sequence of Colors

1st Color Time 2nd Color Time 3rd Color Time 4th Color
check check check check

0 Green 1 None Green Etc..


fault hour

1 Amber 2 None Green 1 Etc..


fault hour hour

1 Amber 2 1 Red 2 None Amber 2 hour None Green


hour hour

1 Amber 2 1 Red 2 1 Red If 2 red


hour hour and you have
Stop to stop
and
inform
the line
manager
and QC
Exec
and then
follow
sequence
as
normal

2 or Red 2 None Amber 2 Etc


more hour hour
red

2 or Red 2 1 or Red Etc..


more hour more and
red stop

Page
44
The In line inspector will then determine where their time is most needed. After the inspector has
completed all checks in line then they must walk to the front of the line check who is on amber and red
lights and then return to them. This will ensure that the correct number of checks are done.

4.3.1. Advantages
• Quality is build at needle point

• Fault is quickly identified

• Defects reworking reduce

• Improve overall efficiency

4.3.2. Disadvatages
• It is costly as we install it

• Not easy for workers to understand

Page
45
4.4. Conventional Quality Control System
In this system in line quality inspector check the garments after each hour the output of a operator
according to military standard system and faults are identified. With the help of standard card inspector
take the sample and check that according to requirement.

4.5. Random Inspection System:


This system is old system and used at local level in small factories. QC person check the output of a
operator by taking random ly sample size and check the quality parameters.

4.6. GUIDE LINES TO QUALITY CONTROL IN STITCHING


DEPARTMENT

Feeding/Loading System
In the process of feeding/Loading the feeder/loader should ensure that the sequences in the bundles are
not disturbed.

At the time of feeding/Loading any conspicuous defect should be discarded or replaced with part of
same shade.

The feeding/Loading quantity should be counted and ensured that it is correct according to quantity
mentioned in the bundle.

On the spot defect recovery system


• All these four systems will be working together at the time of implementation.
• All machines will be having green flags at starting time.

• The rowing Q/C or Q/C inspector should randomly select seven pieces. From each bundle, of all
operations.

• The 7 pieces should pass at (0) zero defects. If a single defect is found the total bundle fails
(Rejected).

• Then the green flag is replaced by a yellow flag. The first part of the 5 part ticket is issued to the
machine operator at this time.

• Operator who stitched the bundle will have to inspect the full bundle for faults in his operation,
and rectify defects immediately (on the spot) up to specification or discard the defective pieces,
what ever appropriate.

Page
46
• If the rowing Q/C or Q/C inspector identifies the same mistake for the second time (in same
operator) the yellow flag is replaced by red flag and second part of the 5 part ticket is issued. The
operator has to fallow the same procedure as before. Now the rowing Q/C or Q/C inspector will
do a follow up of inspections of 3 consecutive bundles of the same operator, by issuing the
balance 3 follow up tickets (one at a time).If the 3 follow up inspection results passes, the green
flag is re-installed. If any of the follow up inspection results fails, the 3 follow up re-starts from
that point.

• The rowing Q/C or Q/C inspector should inspect critical operations every hour. Other operations
could be confined to an inspection of once, twice or thrice according to the criticality of
occurrence of faults.

Inspection of every 5th piece of operation by the operator


The operator should inspect his part of operation, on every 5th piece to determine any faulty stitching.
End –line Inspection (100% inside-out)
All pieces that complete all operation should be checked inside out by end line inspectors.

4.7. Conclusion
Over all according to our observation 7-0 system is most suitable to our industry because it is easy to
implement and results are better than other systems .Traffic signal system is also a good system but it is
costly and other system s have there own importance but regarding to quality 7-0 system is most
effective as quick feedback is get by this system efficiency and quality is improved by this system.

Page
47
Chapter#5

SAMPLING & FINAL INSPECTION


METHODS

5.1. Cutting
The cut bundles received from cutting department are inspected 100% for visual defects such as the
following:

1. Knitting defects such as holes, barre, needle line, yarn shade variation, repeat difference etc.
2. Processing defects such as water marks component shading, compactor shoe marks, dead cotton
slubs etc.
3. Mis-cuts, improper notching etc.
4. The front and back panel are matched as per the requirement of the buyer.
5. In case of design/repeats of parts same should match.
6. Sampling Quantity:

Visual Inspection 100%

Page
48
Measurement Check 2 out of 10 pieces

In case of any variation in the above parameters, the complete bundle is returned to the cutting
department for correction/replacement.

Acceptance Standard:
Bundle Size Defects allowed
Up to 5 Pieces 0
6 to 10 pieces 1
11 to 15 pieces 2
16 to 20 pieces 3
More than 20 pieces 4

Where it is possible to change the defective part by replacement, the quality inspector checks the
exchanged part for shade variation, and measurement and ensure to put the same number that of the
damaged part.

Reporting defects Rate:


Defects rate in cutting= The total defects found / No of bundle checked

5.2.Sewing
The QA follows the parameters stated below

1. Fabric pattern, design, weight etc.


2. Stitch details
3. Placement accessories and trims
4. Folding and packing details

5.2.1.Potential Major faults

1. Any surface hole or weakening defects which could develop into a hole
2. Visible flaws
3. Shading within the garment
4. Dye spots, misprints
5. Cuts and tears
6. Non matching checks and stripes
7. Bowing of fabric, if it effects the appearance of the garment
8. Spots or stains
9. Deviation in measurement specs more than the given tolerance
10. Twisted or puckered seam
11. Broken stitches or open seam
12. Seams not bar tacked unless covered by another seam
13. Irregular or uneven top stitching and contrast stitching

Page
49
14. Run-off in top stitching in visible areas.
15. Incorrect stitch counts
16. Incorrect seam allowance
17. Twisted hems and uneven hems
18. Missing bar tack
19. Uneven fronts, sleeves and other symmetric components
20. Poorly done and objectionable mending.
21. Broken/skip stitch

5.2.2.Potential minor faults.

1. Removable stains
2. All other temporary defects other than listed above.

In-line quality audit


The quality inspector conducts in-line quality audit as per the steps mentioned below:

1. Pick up one bundle after any operation at random


2. Check the quality level of that particular operation
3. Repeat this procedure for minimum of 3 times of the same operation within a day

In case some type of rejection is encountered repeatedly, production is held temporarily until corrective
action is ensured by line supervisor.

End of the line quality


Quality inspector station at the end of all sewing operation and check the following:

1. Stitch formation
2. Component shade variation
3. Sewing alterations and variations
4. Damaged parts
5. Size label jumping
6. Missed sewing operation
7. Broad measurement specification

Pilot run

Depending on the size of the order, pilot run is carried out. All the pieces are visually inspected and
measurement for any quality defects. The sample sizes for pilots runs are as follows.

Order Quantity Pilot Strike Off


Up to 3000pcs 25pcs
3001 to 6000pcs 40pcs
6001 to 9000pcs 60pcs

Page
50
9001 to 15000pcs 75pcs
Above 15,000pcs 100pcs

Any major deviation in measurement or style is incorporated in the pattern/sewing line before the bulk
production start.

5.3. Embroidery
The QA ensure quality through sample embroidery sew-out. Sample of a garment along with placement
details is made before going in to mass production, parameters are strictly followed to ensure quality
embroidery

Parameters

1. Right shade of threads


2. Positioning of the embroidery
3. Coverage, stitch density is as per the order
4. Embroidery alignment
5. Fraying of thread
6. Clarity in the design as per original
7. Right tension of the threads
8. Holes due to needle
9. Skip/missed threads
10. Shade variation within the box of thread

The pilot quantity of strike off.

Order Quantity Pilot Strike Off


Up to 2000pcs 15pcs
2001 to 5000pcs 25pcs
5001 to 8000pcs 35pcs
8001 to 15000pcs 50pcs
Above 15000pcs 60pcs

Page
51
The pilot strike off panels/garments are 100% visually inspected and changes are incorporated in the
bulk production.

5.4. Printing
The QA ensures that an approved strike off of the print with the shade card giving the pantone
references number. Is available with the Department. Sample of the garment along with the placement
details must be available. Before starting bulk production, pilot strike off of using the actual garment
/panel is taken and inspected for the following quality.

Parameters

1. Right shade of colors


2. Positioning of the print
3. Proper registration
4. Print alignment
5. Clarity in the design as per original
6. Properly cured surface
7. Stains
8. Skew ness of print

The pilot quantity of strike off .

Order Quantity Pilot Strike Off


Up to 2000pcs 15pcs
2001 to 5000pcs 25pcs
5001 to 8000pcs 35pcs
8001 to 15000pcs 50pcs
Above 15000pcs 60pcs

The pilot strike off panels/garments are 100% visually inspected and changes are incorporated in the
bulk production.

Page
52
5.5. Finishing and packaging
The purpose of pressing a knit/woven fabric product is to eliminate the wrinkle and yield original
feeling. The following points are ensure by the QA inspector while ironing is in process:

1. Knit product must be iron finished at proper temp


2. The system press must have Teflon shoe and must be cleaned periodically
3. Areas such as collar, embroidery, printing, etc. should not be hard ironed.
4. No small wrinkles, defective luster and iron-pressed marks should be observed on the surface
5. The size of the iron finished product must conform to order specification
6. The garment must be allowed to be cooled for at least 1 hour before putting in poly bag.
7. The ironing table top cloth must have marking for horizontal and vertical markings matching the
outline size of the garment.

Packing is an important aspect of a given garment. The following aspects are checked by the inspector:

1. The price ticket, hangtag, bar code stickers.


2. The right size of the poly bag should be used for the garment
3. After the garment is inserted in the poly bag, it should not be sloppy or too tight.

Page
53
4. The ratio of pre-packs and qualities per carton must be checked randomly.
5. The garment through the poly bag must be visually symmetric
6. All carton markings must conform to the order requirement

5.6. Final Audit


The purpose of the final, audit is to establish the quality level of the final pieces goods before it leaves
the factory.

The QA manager has to conduct a final quality audit of the packed goods and this has to done at two
stages:

1. Once 50% of the shipment is packed


2. Other when 100% of the shipment is packed

In case there is any quality problem at the above stages, the packed goods have to be screened for the
specific quality aspects
Once corrected the above procedure has to be repeated again.

5.7. Clipping Inspection


Clipping (Trimming of Thread) should be inspected for cut stitches and cut holes. This is a 100%
inspection.

5.8. Final inspection


Garment inspection is a vital process of quality control for measuring the quality of the product,
comparing with requirements and acting on the variations.

There are three types of final inspection

• Step wise inspection

• Batch inspection

• 100% inspection

Stepwise inspection

Page
54
Stepwise inspection has two types one is final inspection and other is super final inspection. In final
inspection we sort out sewing faults and in super final inspection we check specs, shade and shape of
the garment.

Disadvantage

• It is time consuming

• Man power increased

Batch inspection

In it a team of final inspectors check the pieces and make batch for example a batch is consist of 100
garments from those batches randomly some batches are inspect by auditor and pass, fail report is made
on type of fault and occurrence of faults.

100% Inspection

Once the garment has been fully assembled, then it must pass though a final inspection. In the final
inspection, 100% of the garments manufactured are checked for defects. Any defects found will be
returned to the original operator for repair. Inspectors are expected to not only check for defects, but are
also required to cut threads as they see necessary.
• Each inspector should have his/her own pair of scissors. These should always be used to cut
long threads. There is no tolerance for repairs caused by pulling threads instead of cutting them.
• Each inspector should be given a bag of her own number. The numbers are to be inserted into
one of the front pockets. This way they are easy to locate incase the identity of the inspector in
needed. There is no tolerance for an inspector who refuses to put numbers into the pockets.
• Inspectors are expected to follow inspection procedures to ensure that the entire garment has
been inspected.

Inspection Procedures:
• Garments should enter the End of Line inspection process inside out.
• Begin with the front of the garment and work down and to the back. Establishing a routine is the
most effective way to ensure that no operations are missed.
• All long threads should be cut as seams are being checked for defects.
• The garment should then be turned outside in.

Page
55
• All exterior threads should be clipped.
• Pockets, tacks, and any fabric defects should be checked. Any defects found should be marked
with red tape and set aside for repairs.
• Check the zipper to ensure that it zips and unzips freely.
• Check the buttons and button holes. Make sure they line up and are functional.
• Inseam and waist should be measured. Check measurement results against the label to be sure
that the garment is the same size as stated on the label.
• After inspection and thread trimming, the inspector’s number should be placed in the pocket and
the garment should be neatly stacked.
• The stacks should be picked up by the End of Line auditor. He will then check the garments
once more. (This is a more general check to ensure that inspectors are effectively inspecting
their garments.)
• Once this last audit is done, the garments can be stacked and taken to pressing.

Inspection is Conducted to evaluate the First passed yield (FPY).That is the first time past percentage,
on an hourly basis.

End Line Audit Report


2.5 AQL Inspect 7 Reject on 1 Defect

Line Hour Accept Reject Reason Minor Defects Improvements

Auditor Name:________________________________________

Date:____________________

Page
56
The defects identified are segregated into 3 main categories.

• Rafu

• Stain

• Alteration

A) Rafu
Rafu is minor fabric faults which are mend-able.
Very Important Factors
• Darning is not accepted on body.

• Operational darning could be accepted. If it is not conspicuous.

• Any fabric fault mended by Knitting needle (Knitted) and not prominent to the naked eye could
be accepted.

• Any defect that is not according to the above factors should be discarded as totally rejected
items.

B) Stain
• If any dust spot, oil spot or any other stain spot could be removed by either stain removers or
light washing, without, effecting the color, appearance, hand feel, and specs could be
accepted.

• Any slight patch dispersed as a result of the above process, should be discarded as a reject.

C) Alteration
• If any sewing defect could be recovered by re-work, without effecting seams or body quality
standards, it is acceptable.

• If the reworking results are miss-shape, specs variation, miss alignment, or any other defect the
product should be discarded as a reject.

Page
57
• Any uncut thread or loose thread should be taken care of before OK garments passed to the
folding stage.

5.9. Pressing Inspection


Pressing tables should be marked with length and breadth of all sizes of garments according to Buyers
specifications.

Pressing Inspection is done to evaluate.

• Correctness of shape of Neck/Shoulder/Sleeve/ Side Seam/ bottom hem in uppers; and shape of-
waist/ Hip/ Side Seam/ inseam/ leg opening in bottoms.

• No shiny marks /crease marks on seams

• No Excessive moisture by steam.

• No Color fading

• No Dust marks/Stain marks/oil marks

• Pressing as required.

5.10. SPECS INSPECTION


100% of garments should undergo critical specs inspection. (For Tops-Body length, Chest, Sleeve
length, neck, arm hole and, shoulder) (For Bottoms-Side seam, inseam, hip,waist and leg opening) .All
other measurements as defined by the particular buyer should undergo random specs inspection at least
10% of the total quantity. Any garment that is not within the specified tolerance limit should be
discarded as a rejected item..Please note this does not mean that all garments should be within tolerance.
This tolerance limit is allowed to accommodate any human error which rearly occurs.

5.11. Folding and Presentation (or Hanger Pack)


The inspector should ensure that there is no dust, fluff or loose thread in the presentation of the
garments. Appearance should be attractive and eye catching. The folding should be even and balanced,
and according to the specifications of folding. The correctness in the position of label, accurate shape
after folding, not looking miss-aligned after folding and all other factors pertaining to folding should be

Page
58
given more emphasis. Correctness of labels, stickers, Tags or any other attachments and aids of
attachments should be ensured. Correctness of poly bags, measurements of poly bags, marks and
numbers an poly bags, sealing of poly bags, poly bag mouth, should be ensured. Correctness of size and
sticker or any other accessories on poly bag should be ensured. Correctness of Hangers and sizes, size of
hanger quality of hangers, printing, emboss, carvings, alignment, packing performance should be
ensured.

5.12. Packing inspection


After final inspection, the garments are poly-packed, dozen-wise, color wise, size ratio wise, bundled
and packed in the cartoon. The cartoon is marked with important information in printed form which is
seen from outside the cartoon easily. The cartoons of the manufactured garments are delivered or placed
in the dispatch department or finished product godown, from where the garments lot is delivered for
shipment.

There is no margin for any packing error. Packing should be 100% correct. Correctness of Quantity in
CTNS should be ensured. Correctness of sizes in CTNS should be ensured. Correctness of pre-packs,
ratio packs, catalogue packs, mix packs (if allowed) should be ensured. Correctness of style and P.O
should be ensured. Correctness of color and size assortments should be ensured.CTNS size, CTN marks
and numbers, CTN quality, packing capability, No of plies, shade, sealing ability, hanger pack
capability...etc. should be ensured. Ensure that security slip (white) is fixed while sealing CTNS with
inspector signature, Id number, unit number, and P.O. code Ensure that CTN tape/adhesive tape/Gum
tape sealing tape adheres properly to CTN without bubbling or detaching. Ensure that CTNS look
attractive, clean, without bulking, un-smashed, without damage, without excessive CTN tape protruding
at the corners and stackable without disturbance. Ensure the correction of CTN stickers (ASN, DTS,
OCR, ETC) and undamaged stickers are fixed.

5.13. Conclusion
By final inspection of garments at all stages like clipping, final inspection, pressing and packing we
have full confidence on our shipment.

Page
59
References
From Websites:
http://www.textileguides.com/garments-pattern
http://www.cutplan.com/nestplan-nesting-parts-material.htm
http://mytextilenotes.blogspot.com/2007_12_01_archive.html

http://articles.textileclass.com/methods-of-cutting-fabric-uses-of-scissor/

http://www.wmolaw.com/files/The_8_Dimensions_of_Quality.pdf

http://lssacademy.com/2008/05/28/8-dimensions-of-quality/

http://www.apparelkey.com/ApparelKey/Document/Cate2/2.3.6.4/casestudy3-
prabirjana.pdf?TABLENAME=Cate2&PARENTNODE=2.3.6.4

http://www.accordiausa.com/cat-24-1- 17/Product_Quality_Inspection.htm

Page
60
http://www.fibre2fashion.com/industry-article

http://articles.textileclass.com/garments-manufacturing-sequence/

http://www.tpingzhi.asp.htm

From Persons:

 Mr.Sohail from fabric dept. Chenab Textile Mill Faisalabad.

 Mr.Subasinghe from cutting dept. Chenab Textile Mill Faisalabad.

 Mr.Awais from PPC dept. Chenab Textile Mill Faisalabad.

 Mr.Ali from Stitching dept. Chenab Textile Mill Faisalabad.

 Mr.Rasika from quality control dept. Chenab Textile Mill


Faisalabad.

 Mr.Sajid/Mr.Qammer from pressing & folding dept. Chenab


Textile Mill Faisalabad.

From Books

Page
61

You might also like