FEDERATION INTERNATIONALE DES INGENIEURS-CONSEILS.
PART I GENERAL CONDITIONS
WITH FORMS OF TENDER AND AGREEMENT
oii ume MLAFEDERATION INTERNATIONALE DES INGENIEURS-CONSEILS
CONDITIONS OF CONTRACT
FOR WORKS OF CIVIL
ENGINEERING CONSTRUCTION
PART I GENERAL CONDITIONS
WITH FORMS OF TENDER AND AGREEMENT
FOURTH EDITION 1987
Reprinted 1988 with editorial amendments
Reprinted 1992 with further amendmentsFOREWORD
The terms of the Fourth Edition of the Conditions of Contract for Works of Civil
Engineering Construction have been prepared by the Fédération Initemationale
des Ingénieurs Conseils (FIDIC) and are recommended for general use for the
purpose of construction of such works where tenders are invited on an
international basis. The Conditions, subject to minor modifications, are also
suitable for use on domestic contracts.
The version in English of the Conditions is considered by FIDIC as the official
and authentic text for the purpose of translation,
Im the preparation of the Conditions it was recognised! that while there are
numerous Clauses which will be generally applicable there are some Clauses
which must necessarily vary to take account of the circumstances and locality of
the Works. The Clauses of general application have been grouped together in this
document and are referred to as Part | — General Conditions. They have been
printed in a form which will facilitate their inclusion as printed in the contract
documents normally prepared.
The General Conditions are linked with the Conditions of Particular
Application, referred to as Part 1, by the corresponding numbering of the
Clauses, so that Parts 1 and TI together comprise the Conditions governing the
rights and obligations of the parties.
Part TI must be specially drafted to suit each individual Contract.
When dredging and certain types of reclamation work are involved special
‘consideration must be given to Part IT.
To assist in the preparation of Part TI explanatory material and example clauses
are published with the Conditions in a separately bound document entitled
“Conditions of Contract for Works of Civil Engineering Construction, Part 1 —
Conditions of Particular Application, with Guidelines for preparation of Part II
Clauses, Fourth Edition”
FIDIC has published a “Guide to the Use of FIDIC Conditions of Contract for Works
of Civil Engineering Construction” which includes comments on the provisions of the
Fourth Edition of the Conditions. Users of the Fourth Edition may find it
helpful to refer to this Guide,
Tt may also be helpful for users to refer to other FIDIC publications, such as:
Tenclering Procedure (First Edition 1982)
Construction, Insurance and Law (1986)
FIDIC gratefully acknowledges the suggestions and comments it has received
Guring the preparation of this edition from European Intemational Contractors
(EIC) a5 mandatory of Confederation of Intemational Contractors Associations
(CICA) with participation of Associated General Contractors of America
(AGC).