Proyecto:
Fecha de Corte: dia/ mes / año
1.2 100 Edificio B 18,450,500 1,220,759 19,671,259 9,104,347 8,662,502 8,602,431 46.28% 44.04% 0.95 1.01 -441,846 -5% 60,071 1%
1.2.1 105 Prelimiares 105,012 105,012 105,012 105,012 110,800 100.00% 100.00% 1.00 0.95 0 0% -5,788 -6%
1.2.2 110 Cimentación 337,646 337,646 337,646 337,646 305,100 100.00% 100.00% 1.00 1.11 0 0% 32,546 10%
1.2.3 115 Estructura 4,838,709 350,678 5,189,387 5,189,387 4,929,917 5,005,780 100.00% 95.00% 0.95 0.98 -259,469 -5% -75,863 -2%
1.2.4 120 Albañileria Gruesa 520,299 520,299 416,239 416,239 325,678 80.00% 80.00% 1.00 1.28 0 0% 90,561 22%
1.2.5 125 Recubrimientos 2,207,425 182,871 2,390,295 956,118 836,603 798,356 40.00% 35.00% 0.88 1.05 -119,515 -14% 38,247 5%
1.2.6 130 Acabados 1,436,283 1,436,283 0 0 0 0.00% 0.00% 0.00 - 0 0% 0 0%
1.2.7 135 Tablaroca 1,272,535 1,272,535 254,507 190,880 198,345 20.00% 15.00% 0.75 0.96 -63,627 -33% -7,465 -4%
1.2.8 136 Azotea 167,508 167,508 0 0 0 0.00% 0.00% - - 0 0% 0 0%
1.2.9 137 Cisterna 188,564 188,564 94,282 75,426 68,500 50.00% 40.00% 0.80 1.10 -18,856 -25% 6,926 9%
1.2.10 140 Carpinteria y Cerrajeria 1,361,699 1,361,699 0 0 0 0.00% 0.00% - - 0 0% 0 0%
1.2.11 141 Escalera de Emergencia 392,433 392,433 117,730 137,352 130,267 30.00% 35.00% 1.17 1.05 19,622 14% 7,085 5%
1.2.12 145 Herreria 381,243 687,210 1,068,453 213,691 213,691 198,456 20.00% 20.00% 1.00 1.08 0 0% 15,235 7%
1.2.13 150 Aluminio y Vidrio 476,687 476,687 0 0 0 0.00% 0.00% - - 0 0% 0 0%
1.2.14 155 Instalaciones 4,676,645 4,676,645 1,402,993 1,402,993 1,450,349 30.00% 30.00% 1.00 0.97 0 0% -47,356 -3%
1.2.15 160 Señalización 4,102 4,102 0 0 0 0.00% 0.00% - - 0 0% 0 0%
1.2.16 165 Limpiezas 83,710 83,710 16,742 16,742 10,800 20.00% 20.00% 1.00 1.55 0 0% 5,942 35%
DIRECCIÓN DE OBRA PUBLICA
Programa, Control y Seguimiento de ejecución de obra.
25000000
Proyecto:......................................................................................................
Fecha de Corte:.............................................................................................
15000000
Costo Financiero
Valor Devengado
Costo Planeado
$9,223 Costo Planeado
10000000
Valor
Devengado
(avance fisico)
$8,662
5000000
Costo Financiero
$8,602
0
1 2 3 4 5 6 7 8 9
Semanas
DIRECCIÓN DE OBRA PUBLICA
Programa, Control y Seguimiento de ejecución de obra.
DIRECCIÓN DE OBRA PUBLICA
Programa, Control y Seguimiento de ejecución de obra.
AVANCE FINANCIERO
(pago por estimación)
DIRECCIÓN DE OBRA PUBLICA
Programa, Control y Seguimiento de ejecución de obra.
0 0
5 D 12 0 12 G 17 0
5 7 12 12 5 17
0 2 0 0
2 B 5 0 5 E 8 9 17 H 18 0 18 K 24
0
0 A 2 0 2 3 5 7 3 10 17 1 18 18 6 24
0 2 2
0 0 0 0
2 C 5 0 5 F 10 0 10 I 15 0 15 J 18 0
2 3 5 5 5 10 10 5 15 15 3 18
DURACION
MODIFICADA
COSTO 1ER COMPRESION 850 + 30 880 C SE REDUCE 1 DIAS C = 4
COSTO 2DA COMPRESION 880 + 60 940 F SE REDUCE 2 DIAS F = 6
COSTO 3ER COMPRESION 940 + 20 960 H SE REDUCE 1 DIAS H = 1
960 + 30 990 F SE REDUCE 1 DIAS F = 5
COSTO 4A COMPRESION 990 + 200 1190 A SE REDUCE 3 DIAS A = 2
COSTO 5A COMPRESION 1190 + 100 1290 B SE REDUCE 1 DIAS B = 3
1290 + 30 1320 C SE REDUCE 1 DIAS C = 3
COSTO 6A COMPRESION 1320 + 23 1343 G SE REDUCE 1 DIAS G = 9
1343 + 133 1476 I SE REDUCE 1 DIAS I = 7
COSTO 7A COMPRESION 1476 + 23 1499 G SE REDUCE 1 DIAS G = 8
1499 + 150 1649 J SE REDUCE 1 DIAS J = 4
COSTO 8A COMPRESION 1649 + 46 1695 G SE REDUCE 2 DIAS G = 6
1695 + 267 1962 I SE REDUCE 2 DIAS I = 5
COSTO 9A COMPRESION 1962 + 150 2112 J SE REDUCE 1 DIAS J = 3
2112 + 23 2135 G SE REDUCE 1 DIAS G = 5
COSTO 10A COMPRESION 2135 + 200 2335 K SE REDUCE 1 DIAS K = 6
COMPRESION MAXIMA =24 DIAS; COSTO MINIMO, POR ESA COMPRESION DE TIEMPO = $2,335.00
DIRECCIÓN DE OBRA PUBLICA
Programa, Control y Seguimiento de ejecución de obra.
FASE ACTIVIDAD DECREMENTO INCREMENTO COSTO TIEMPO DEL COSTO DEL COMPRESION MAXIMA =24 DIAS; COSTO MINIMO, POR ESA COMPRESION DE TIEMPO = $2,335.00
A ACELERAR DE TIEMPO EN EL COSTO ACUMULADO PROYECTO PROYECTO
0 38 850 TIEMPO 38 37 35 35 34 31 31 30 30 29 29 28 28 26 26 25 24
1 C 1 30 30 37 880 COSTO 850 880 940 960 990 1190 1290 1320 1343 1476 1499 1649 1695 1962 2112 2135 2335
2 F 2 60 90 35 940
3 H 0 20 110 35 960
3 F 1 30 140 34 990 TRUEQUE, TIEMPO/COSTO
4 A 3 200 340 31 1190 2500
5 B 0 100 440 31 1290
2000
5 C 1 30 470 30 1320
6 G 0 23 493 30 1343 1500
COSTO
BALANCEO DE RECURSOS
Ejemplificación de balanceo de Recurso Mano de Obra.
ago-2009 sep-09 Personal requerido, por semana
3 4 5 6 7 8 10 11 12 13 14 15 17 18 19 20 21 22 24 25 26 27 28 29 31 1 2 3 4 5 7 8 9 10 11 12 14 15 17 18 19
10
Dias 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Actividad A 2 2 2 2 8
Actividad B 4 4 4 4 4 4 4
Actividad C 3 3 3 3 3 3 3 3 6
Actividad D 2 2 2 2 2 2 Personal requerido, por
4 semana
Actividad E 4 4 4 4 4 4 4 4 4
Actividad F 4 4 4 4 4 4 4 4 4 4 4 4 2
Actividad G 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Actividad H 5 5 5 5 5 5 5 5 0
1 4 7 10 13 16 19 22 25 28 31 34 37 40
Personal requerido, por semana
2 2 2 2 9 9 9 9 9 9 7 3 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 4 4 4 4 4 4 5 5 5 5 5 5 5 5
Se considera mejor opción contratar cuatro personas más el sábado, que contratar cuatro más el lunes e inmediatamente despedirlos; adicionalmente, se tiene-por la idiosincrasia
de los obreros-, mayor posibilidad de que trabajen el sábado-como único día-que otro día entre semana
DIRECCIÓN DE OBRA PUBLICA
Programa, Control y Seguimiento de ejecución de obra.
ELABORACIÓN
PLANEACIÓN
DE PROYECTO
LICITACIÓN
EJECUCIÓN
LICITACIÓN
finiquitos
Octubre
Noviembre
Diciembre
Febrero
Marzo
Mayo
Junio
Julio
Agosto
Abril
Enero
Septiembre
Octubre
Noviembre
Diciembre