You are on page 1of 28

New technology for

onshore seismic

Making the computing


environment simpler

Getting better data to


drillers

Connecting drillers and


Feb / Mar 2011 Issue 29 geophysicists

Finding the best offshore suppliers


Fitting your company to the DOF
Associate Member

 

Searching for oil?


The search engine for oil and gas

Whereoil Enterprise simplifies access to structured and unstructured


information, wherever it is, for every user.

• Files on network shares


• Document Management Systems
• Applications
• External data sources

Whereoil. Providing connectivity between you and the data you need.

www.kadme.com/whereoil
    
     

Time for onshore
wireless seismic David Bamford
Consultant Editor, Digital Energy Journal

Seismic technology is the main, some would say ern offshore exploration, integrating stratigraphy,
the only, means of interrogating the sub-surface sedimentology, facies prediction, rock physics,
in sufficient detail to allow insightful geological hydrocarbon phase prediction on the regional and
prediction and the precise location of wells. prospect scales, and then provides a ‘surgical’ tool
Feb/Mar 2011 Issue 29 for choosing exploration well locations.
The technology progresses via much incre-
mentalism, interspersed with a few real break- What is more, very complex geological
Digital Energy Journal throughs. problems, for example at great depth or beneath
2nd Floor, 8 Baltic Street East, London EC1Y 0UP, UK Given recent and future trends in explo- salt or basalt, can now be tackled, for example by
Digital Energy Journal is part of Finding Petroleum ration, what is the technology breakthrough that multi-azimuth, wide-azimuth, wide-angle record-
www.findingpetroleum.com we most urgently need? ing.
www.digitalenergyjournal.com So much for offshore and deepwater.
To give some structure to my thoughts, I
Tel +44 (0)207 017 3405
have been reviewing the hot exploration themes It is a fact that such integration is much rar-
Fax +44 (0)207 251 9179
that can be discerned by counting internet news er onshore; 3D plays a much lesser role. Here’s
Editor items and interrogating company presentations. an example I heard about the other day: explo-
Karl Jeffery Rough statistics I know but a reasonable ration in the Llanos foreland of Colombia where
jeffery@d-e-j.com guide to what companies are thinking about. everybody now explores with 3D seismic, lead-
As a result, my 4 hot themes are deepwater, ing to success rates as high as 75% - pretty re-
Consultant editor the Arctic, unconventionals and mid-continent markable in an onshore environment.
David Bamford offshore. The terrain is this area is moderately undu-
When one digs into these topics in detail, of lating ‘cow country’, so relatively straightforward
Technical editor course there is a long list of offshore areas that are for acquiring 3D, and yet the cost per sq km is
Keith Forward
forward@d-e-j.com being explored – Angola, Ghana, Liberia, Sierra roughly an order of magnitude, ten times, that of
Leone, Mauretania; the coast of South America offshore multi-client 3D. So we are talking $25-
Finding Petroleum London Forums from Guyana to Brazil; the Falkland Islands; west 30,000 per sq km.
Advances in exploration technology - February 15 of the Shetlands; Greenland and the Barents Sea; Step back into the Llanos fold belt itself, and
Improving recovery from existing fields - March 16 China; and so on. the cost is more like $100,000 per sq km.
Digital oilfield - subsurface data - April 20 Why so? Why these differences? How can
Equally, one can point to onshore areas –
Technologies to avoid another Macondo - May 17
Digital Oilfield IT infrastructure - June 2 shale gas and shale oil exploration in the USA; we pay so much!
Focus on unconventionals - Sept 20 Iraq in general and Kurdistan in particular; West My contention is that onshore seismic has
People and the digital oilfield - October 20 and East Siberia; the mid-continent of Africa in- simply not yet seen the acquisition technology
Onshore 3D seismic - Nov 9 cluding the rift system; even northwest England breakthrough that transformed offshore 3D over
Collaboration and the digital oilfield - Dec 1
(coal bed methane and shale gas). 15 years ago.
So I assert that onshore exploration is grow- As my old friend Ian Jack has pointed out
Social network
network.findingpetroleum.com ing in importance relative to offshore; and I am many times, supported by Bob Heath of iSeis,
going to state quite baldly that onshore explo- both at Finding Petroleum events, the absolute key
Advertising and sponsorship ration technology is miles behind offshore. is the slow pace and man-power intensive nature
John Finder of using cables, and that the first breakthrough we
Tel +44 (0)207 017 3413 Why is that? seek is the advent of light-weight, long-life, wire-
jfinder@onlymedia.co.uk
The availability of regional or ‘exploration’ 3D less systems.
has been the main driver of exploration success in What this means is that, in turn, onshore ex-
Digital Energy Journal - keeping you up to date deep water. ploration itself remains untransformed, with the
with developments with digital technology in Huge swathes of multi-client 3D, covering exception of the odd example such as that I have
the oil and gas industry. for example whole 5000 sq km blocks offshore quoted from Colombia, Tullow Oil’s activities in
Angola, are available at prices as low as $3000/sq Uganda, one or two others.
Subscriptions: Apply for your free print or elec- km, are turned around exceedingly rapidly, and I am fully aware that it would be unreason-
tronic subscription to Digital Energy Journal on able to expect onshore 3D seismic prices to drop
are interpreted at great speed.
our website www.d-e-j.com
The technology drivers have been: to the level of offshore multi-client data, largely
Super efficient and effective acquisition sys- because onshore seismic crews have to contend
tems based on vessels capable of towing many, with a variety of terrains and topographies and
many streamers and multiple guns. that significant numbers of people will inevitably
Simultaneous processing – to some extent be involved in deploying onshore seismic equip-
Cover photo: an oil and gas collaboration room.
on-board – but mainly via satellite transmission. ment.
Photo courtesy Kongsberg Intellifield
Powerful interpretation workstations, capa- A better message than a simplistic 'cheaper
ble of dealing with these vast surveys and deliver- please!' is that the cost of onshore 3D needs to be
ing both time and attribute-based interpretations. at the point where shooting it extensively - so it
As an ‘old codger’ I would simply point out can be used for regional and prospect work - fits
that this is an incredible transformation from the neatly into the 'gradually focussing your onshore
days of ‘postage stamp’ surveys in the North Sea exploration' approach which is actually the topic
that took two years to go from design to delivery of our next Finding Petroleum Forum on 15th
of a ‘final’ product…and then interpretation on February.
paper invariably meant that only 1 line in 10 or Thus I await with some excitement a year
maybe 5 was fully interpreted! in which cable-free onshore seismic might finally
Thus, modern 3D lies at the heart of mod- achieve a breakthrough.

Printed by Printo, spol. s r.o., 708 00 Ostrava-Poruba,


Czech Republic. www.printo.cz Feb/Mar 2011 - digital energy journal 1
Contents
Exploration
Shell – new technology for onshore seismic
Shell is developing two new technologies for onshore seismic – a new lightweight, low noise
wireless sensor together with HP, and a fibre optic recording system, ideal for permanent
monitoring, together with PGS 4
Using neural networks for seismic interpretation
Dr. Tom Smith, founder and former president of seismic interpretation software company
Seismic Micro Technology (SMT) has launched Geophysical Insights to help oil and gas
companies better understand seismic response data. The new company is currently
researching and applying Unsupervised Neural Networks, which have shown strong promise
in initial test cases 6
Digital Energy Journal December 9 conference report
Oracle – helping you answer critical business
questions
Imagine having a software tool, running on your iPad, which
can predict the impact of what a well intervention will have on
the overall business, not just the feasibility of doing the work.
This is what Oracle is trying to enable, says the company’s oil
and gas industry lead Hossam Farid 9
Microsoft – making computing environment
simpler
Microsoft has a mission to help oil and gas companies make
their computing architecture simpler, and put it together in a
standard way 12
Energistics – more information in public domain means better collaboration
Energistics’ goal for 2011 is to expand collaboration opportunities for standards development , said COO Jerry Hubbard 14
DOF: devil is in the details
The key to getting a digital oilfield project working is detailed planning, says Julian Pickering, director of Digital Oilfield Solutions Ltd 15
Drillers need better data – Kongsberg
Torbjørn Forthun, Managing Director of Kongsberg Drilling Management Solutions, believes that drilling contractors need access to better
data – and then they need to use it 17
Helping drillers and geophysicists talk
The most common tool for sharing information between
drilling and geophysics teams is still PowerPoint, says Jane
Wheelwright of Dynamic Graphics Ltd. 18
Epsis: Effective collaborative work processes by
sharing information, not by moving data
You don’t have to wait for comprehensive systems for sharing
data to start effective collaboration; you may start with
building effective collaborative work processes by combining
and sharing information (as screenshots), suggests Jan-Erik
Nordtvedt, CEO of Epsis of Norway 20
Production
ShipServ: finding the best suppliers Plans for Offshore
Maritime and offshore e-marketplace ShipServ
has developed tools to help marine purchasers
Europe
Attendees to Aberdeen’s
learn more about suppliers they are considering
doing business with 21 Offshore Europe event in
September 6-8 this year can
expect discussions on North
Making your company fit the digital Sea taxation, reducing CO2
oilfield from oil and gas operations,
When an oil company adopts the digital oilfield, new risk profiles and
it can mean changing some of the compay transparency of risk, says
existing work processes. Dutch Holland explains Samir Brikho, CEO of
how this can happen 22 engineering giant AMEC
and chairman of the
conference (left) 24
Feb/Mar 2011 - digital energy journal 3
Exploration

Shell – new technology for onshore seismic


Shell is developing two new technologies for onshore seismic – a new lightweight, low noise wireless
sensor together with HP, and a fibre optic recording system, ideal for permanent monitoring, together
with PGS
Shell is currently developing two new tech- monitoring capability on shore would be
nologies for onshore seismic recording, to very helpful in maximizing recovery, moni-
enable denser channel recording and perma- toring how oil is being extracted from the
nent recording over the life of the field, said reservoir and where it remains in place. “We
Wim Walk, manager of Shell’s geophysical need to get as much as possible out.” he said.
measurement research and development de- Permanent seismic monitoring can also
partment, speaking at the Jan 25 Finding Pe- be used for monitoring carbon dioxide un-
troleum London forum, “Advances in Seis- derground storage.
mic”. Shell has been looking for new onshore
With HP it is developing a new wire- seismic technologies for a number of years,
less lightweight wireless sensor. With PGS and decided to drive the technology devel-
it is developing a fibre optic land seismic opment itself, because it did not see the tra-
recording system. ditional seismic industry “enthusiastically
“We said, let’s see what we can do with driving into that direction,” he said.
these companies and develop partnerships,” “We decided to take the initiative and
he said. said, let’s see what can be done.”
The oil industry is tackling more and So far, both the HP and PGS projects
more complex and smaller reservoirs, and are on schedule. The feasibility stages are
looking for ever higher recovery percent- nearly completed, and modeling has been
ages, all of which means that better seismic done of the deployment efforts. Field tests Wim Walk, manager of Shell’s geophysical
data, which can provide a clearer and more are starting shortly. “Prototypes exist and ini- measurement research and development
accurate understanding of the subsurface, is tial tests confirm they meet the specifica- department
a great help, he said. tions” he said.
It will help enable exploration in the Shell is not planning to enter the seis-
subsalt plays in the Middle East, of which a mic instrument business itself, and compete “We identified two technologies with
significant part is still unlocked” he said. with other seismic technology providers. The the potential to increase the channel count
It will also be a great assistance in un- technology will be developed by PGS and but keep the deployment effort essentially
conventional gas operations in North Ameri- HP, with Shell in the driving seat. the same.”
ca, where Shell is greatly involved. Both HP-Shell and PGS-Shell partner- The technologies will ultimately stand
“The future reservoirs will have more ships plan to invite a traditional seismic or fall by whether they can be feasibly de-
complex fluid distributions - they'll be hard- provider to partner in the commercialization ployed.
er to detect and to model,” he said. phase, although there will initially be a peri- Shell has done modeling to see how
“It all needs a big leap forward in seis- od where Shell will have exclusive use of the easily the systems can be deployed, both
mic data quality and we need to do some- technology. computer modeling and small scale real
thing about that,” he said. “We need to step “We are not planning to keep the tech- modeling with dumb units in the desert,” he
up the amount of measurements and add nology to ourselves,” he said. “In the end, said. “It can be done if these things are light-
more data to get to where we want to be.” the whole point is to drive the industry for- weight, with an effort that is the same as we
A cost-effective permanent seismic ward in this.” currently make.”

Crew size Lower frequencies


The biggest limitation on current seismic Being able to shoot and record seismic at
technology is the crew size. There are limits lower frequencies would help improve the
to how large a seismic crew can practically subsurface understanding.
be. Current seismic crews can already in- “Now we're shooting data to 7, 8 Hz
volve 200-300 people and involve and processing it, but we need to move
500,000kg of equipment. downwards in frequency,” he said.
“We can't just multiply the system we “We know that there will be a huge
have by a factor of 10 - we'll have 2000 peo- quality difference if we can go even further.
ple out there, that's just not acceptable,” he If we can go to as low as 1 Hz that would be
said. phenomenal.”
Crews spend most of their time moving
The sensor HP is developing together with equipment, so if you want to get more chan- HP
Shell has a tiny accelerometer made using nels of recording for the same number of With IT giant HP, Shell is developing a new
nano technology. The smaller it is, the less
power it needs, and so the smaller the battery crew, you need to reduce the weight of wireless unit to record, store and transmit
needs to be equipment per channel. seismic data.

4 digital energy journal - Feb/Mar 2011


Exploration
The most important component of the
unit is a sensor which has a wide bandwidth
and dynamic range, low noise, low weight
and low power consumption.
Because it has a low power consump-
tion, it does not need such heavy batteries,
and because it is wireless, it does not need
any cables.
As a result, the weight of equipment
which has to be carried out to the field is
much reduced, so less manpower is required
for the same number of channels. This all
makes a much bigger number of channels Inside the HP sensor - a moving mass is part of a tiny silicon chip
more feasible.
Shell is aiming to develop a system
with HP which can feasibly record a million The sensor is packaged into a unit lighter. This reduces the weight of the total
channels in the field. “Although you don’t which includes a sensor, a battery, wireless system, which means that it is easier and
always have to put out a million channels out communications, electronics, and a pin to faster to deploy.
there, of course,” he said. pin it into the ground. It is strong and light- For example, one optical fibre cable
The sensor was originally developed weight. could carry 4000 channels, so you can have
for a high density storage device. The sen- Managing a million channels of wire- a seismic line 40km long with sensors every
sor is built in HP’s Microelectromechanical less communications from all the sensors is 10 metres. You have a very dense and large
system (MEMS) technology for HP’s ink jet also a big challenge. “But a company like HP system that doesn't need any electric power
printer heads. Shell found out about it when is well positioned to deal with these chal- in the field,” he said.
it invited HP to an internal conference on lenges,” he said. “We have established that it fits the bill
new developments in nanotechnology. HP has a very different culture to Shell, in terms of noise, frequency response and
“When we first saw the MEMS sensor in particular because it is used to working to weight. This system has very interesting ad-
we were not sure that it could serve as a seis- much shorter time frames – HP works in vantages, options and possibilities.”
mic sensor. But there was a program and time frames of a few months between the lat-
project to modify the sensor, to see that it ac- est technology launch, Shell thinks in time Computer capability
tually works,” he said. frames of decades, he said. Another important technology development
“You have two different business cul- is the growth of computer processing capa-
tures which is both challenging and exciting. bility.
So we are very happy with the way things Until about 2010, the size of a seismic
are going,” he said. “It’s interesting and re- survey was limited by the cost of computer
warding how you can synergize both com- processing capability, he said.
panies’ capabilities.” But in 2010, the price of computer pro-
cessing capability reduced to the point that
PGS the limiting factor in size and density of seis-
Shell is working with PGS, to adapt its fibre mic surveys was the number of crew you
optic permanent ocean bottom seismic could deploy in the field and the amount of
recording technology for use on land. equipment they could carry.
The sensors do not need any electric “We want to re-claim the advantage of
Prototype of the PGS sensor in a recent field power and the fibre optic cable that carries this computing capability,” he said.
test in Oman the data from the sensors can be much

Finding Petroleum London Forums 2010


For latest developments, registration and to subscribe to our
newsletter see www.findingpetroleum.com
Limited free tickets available for each forum - exhibition and
sponsorship opportunities
• Improving recovery from existing • Focus on unconventionals
fields - March 16 - Sept 20
• Digital oilfield - subsurface data • People and the digital oilfield
- April 20 - Oct 20
• Technologies to avoid another • Onshore 3D seismic - Nov 9
Macondo - May 17 • Collaboration and the digital
• Digital Oilfield IT infrastructure - June 2 oilfield - Dec 1

Feb/Mar 2011 - digital energy journal 5


Exploration

Using neural networks for seismic


interpretation
Dr. Tom Smith, founder and former president of seismic interpretation software company Seismic Micro
Technology (SMT) has launched Geophysical Insights to help oil and gas companies better understand
seismic response data. The company is currently researching and applying Unsupervised Neural Networks,
which have shown strong promise in initial test cases

When working with seismic data, inter-


preters identify different “attributes” from
the data, such as coherence, azimuth, instan-
taneous amplitude, response phase and in-
stantaneous bandwidth.
The attributes are then used to analyze
the seismic response for subsurface condi-
tions.
Making inferences from just a few at-
tributes is challenging, but extracting signif- Figure 1: Typical seismic attributes
icance from 30 attributes simultaneously re-
quires a completely different approach.
Making the interpretation process more To illustrate what attributes are, figure
Unsupervised Neural Networks
challenging, seismic interpreters often devel- 1 below shows just five typical attributes; The term ‘neural network’ in the field of ar-
op their own idea of subsurface conditions however, sometimes as many as 30 different tificial intelligence means taking a complex
and look for data which supports this idea – attributes from the same block of seismic da- problem down to simple relationships and
like a detective following a hunch. ta will be available, all in three dimensions. understanding it from there.
Dr. Tom Smith and others have been re- It is called a neural network because the
searching the application of Unsupervised Making it simpler human brain operates in a similar manner.
Neural Networks to interpret multiple attrib- “When we combine say three attributes, it We achieve complex things, but it is all done
utes simultaneously and are confident of the gets very difficult for the interpreter to jug- by single neurons sending information be-
effectiveness of the technology. The gle all those numbers mentally,” says Dr. tween each other.
methodology is showing tremendous prom- Smith. Dr. Smith cites some examples from
ise in identifying subsurface ‘anomalies’, “Once we have more than three, the hu- nature. “For example, you can understand
which can be the presences of hydrocarbons. man mind has a difficulty appreciating the how a flock of birds fly by just understand-
After much iteration, the software ap- subtle nuances and information is lost.” ing that each bird wants to fly in the same
plication converges on general patterns in It is normal for seismic interpreters to direction as the bird close to it, and keep fair-
the data. If the seismic attributes have con- work with 20-50 different attributes. ly close, but not so close that it collides. Or
sistent relationships, this indicates that the “You have subtle nuances of combina- in the case of Geese flying in a V formation,
consistency of the subsurface in that region tions of attributes which are not appreciated each goose wants to keep behind the bird in
is roughly the same. Anomalies identify sub- by the human being, particularly when all of front, while remaining just to the left or right
surface regions where the neurons (neural those attributes are in 3D. While some of of it.
network analysis) cluster around those con- the attributes may be redundant or unimpor- “This is simple so far – but with many
ditions that are distinctly different than the tant, we can’t simply elect to eliminate at- birds in a flock each individually following
surrounding material. tributes without understanding their collec- these rules, you end up with something
Since the data is processed in a com- tive meaning to the interpretation,” he says. which looks extremely complex – a flock of
pletely unbiased way, there is less risk that “There may be combinations of attrib- birds flying across the sky.”
important reservoirs could be missed be- utes that we cannot initially appreciate. The “Another example of neural network
cause people are following the wrong hunch- neural networks reveal subtle combinations programming is in optical character recogni-
es. in the data that we may not initially appreci- tion. A great deal of computer processing is
For the rest of the subsurface volume, ate. The technology presents results in a involved in machine reading text or hand-
where the seismic attributes lack consistent low-dimensionality space that can be utilized writing, but it is done by doing a simple task
relationships, a human interpreter can ana- by the human interpreter. many times over – looking at each character,
lyze those regions more closely. “We cannot replace the interpreter in working out which way the line goes, and
The interpreter can also do analysis that the process, but we can equip the interpreter comparing that to a database of different
the software can’t do such as apply knowl- with tools that take fuller advantage of all characters to see which one makes the best
edge of petroleum geology to determine the the seismic response data. We believe the match.
presence of hydrocarbons. In this way Un- best technology for rendering the data in the “In the field of seismic interpretation,
supervised Neural Networks are another tool most usable form is unsupervised neural net- the neural network tools can simplify a com-
among many for seismic interpretation. works.” plex set of seismic data and seismic attrib-

6 digital energy journal - Feb/Mar 2011


/RQGRQ
+DOODP&RQIHUHQFH&HQWUH
$SULO

6XEVXUIDFHGDWDDQGWKHGLJLWDORLOILHOG
$BOZPVGJOENPSFPJMBOEHBTCZMPPLJOHIBSEFSBUZPVSFYJTUJOHTVCTVSGBDF 4QFBLFST
EBUB SBUIFSUIBODPNNJTTJPOJOHOFXTVSWFZT
0 R K D Q Q D G $ IWD E 
 0DQDJHU$SSOLFDWLRQVDQG.QRZOHGJH0DQDJHU
0VS"QSJMUIDPOGFSFODFFYQMPSFTQPTTJCMFXBZTUPEPJU5IJTJODMVEFT 209
PSHBOJTJOHZPVSTVCTVSGBDFEBUBBSPVOEBHFPHSBQIJDBMJOGPSNBUJPOTZTUFN 8VLQJ*,6 JHRJUDSKLFDOLQIRUPDWLRQV\VWHPV WR
PDQDJHVSDWLDOGDWDLQFOXGLQJVXEVXUIDFHPDSV
UBMLGSPN0.7
VTJOHTUBOEBSEGPSNBUTUPFYDIBOHFSFTFSWPJSEBUBCFUXFFO
TPGUXBSF UBMLGSPN#1
VTJOHTUBUJTUJDBMBOBMZTJTPOTVCTVSGBDFEBUBUPTIPX - R K Q  : LO OLD P V 
%3
VQOFXUIJOHT JNQSPWJOHTVCTVSGBDFEBUBTUPSBHFTZTUFNT JOUFHSBUJOH :KDW5(640/FDQGR
TFJTNJD XFMMBOE$4&.EBUB JOUFHSBUJOHEBUBGSPNESJMMJOHBOEHFPQIZTJDT
TPGUXBSFQBDLBHFT NBOBHJOHZPVSHFPUFDIOJDBMTPGUXBSFTPGUXBSFQPSUGPMJP  . H LWK 5  + R O G D Z D \
6$6*OREDO2LODQG*DV
VTJOHOFXQPTJUJPOTUBOEBSETJOTFJTNJDEBUB VTJOHQSPCBCJMJUJFTXIFO 6WDWLVWLFDODQDO\VLVRIGDWDVWUHDPVLQUHDOWLPHDV
XPSLJOHXJUITFJTNJDJOUFSQSFUBUJPOT BOEBOBMZTJOHESJMMDVUUJOHTUPGFFEEBUB XVHGE\RLOPDMRUVRQWKHLUUHVHUYRLUV

JOUPTVCTVSGBDFTZTUFNT ' X Q F D Q ,U Y L Q J 
 6HQLRU$QDO\VW2LODQG*DV
7HUDGDWD
$POUJOVJOHPVSTFSJFTPGEJHJUBMPJMGJFMEDPOGFSFODFT UIJTFWFOUJTBJNFEBU 0DNLQJVXEVXUIDFHGDWDVWRUDJHDQGFRPSXWLQJILWIRU
TVCTVSGBDFEBUBNBOBHFST *5NBOBHFSTBOEHFPQIZTJDJTUTXIPXBOUUPMFBSO SXUSRVH

BCPVUOFXXBZTBOEOFXJEFBTGPSHFUUJOHNPSFPVUPGUIFJSTVCTVSGBDFEBUB 
5 L F K D U G & R R S H U 
VTJOHUIFDPNCJOFEFYQFSUJTFPGUIF*5 HFPQIZTJDTBOEEBUBNBOBHFNFOU &(2
EJTDJQMJOFT 2IIVKRUH+\GURFDUERQ0DSSLQJ
,QWHJUDWLQJVHLVPLFZHOODQG&6(0GDWD

$IBJSFECZ%BWJE#BNGPSE FYIFBEPGFYQMPSBUJPOBOEIFBEPGHFPQIZTJDT - D Q H : K H H O Z U LJ K W
7HFKQLFDO$SSOLFDWLRQ6SHFLDOLVW
XJUI#1 '\QDPLF*UDSKLFV
,QWHJUDWLQJVXEVXUIDFHGDWDVWRUHGLQGLIIHUHQW
SDFNDJHV

( G ( Y D Q V 
&R)RXQGHUDQG0DQDJLQJ'LUHFWRU
1HZ'LJLWDO%XVLQHVV
&RQWUROOLQJWKHJHRWHFKQLFDODSSOLFDWLRQVSRUWIROLR

- LOO / H Z LV
0DQDJLQJGLUHFWRU
7URLND,QWHUQDWLRQDODQG6RFLHW\RI([SORUDWLRQ
*HRSK\VLFLVWV
1HZSRVLWLRQVWDQGDUGVIURPVHLVPLFVXUYH\VDQG
KRZLWKHOSV\RXPDNH\RXUVHLVPLFGDWDZRUNKDUGHU

1 L F N  3 L OOD U 
%FMFHBUFTSFHJTUFSFEJODMVEF4"40- 0SBDMF #1BOE$FOUSJDB ,NRQ6FLHQFH
$VVHVVLQJSUREDELOLW\\RXUVHLVPLFLQWHUSUHWDWLRQVDUH
DFFXUDWH
3FHJTUFSBUEJTDPVOUFEQSJDFPGbXJUIWPVDIFSDPEF%&+WBMJEVOUJMUIF 
FOEPG'FCSVBSZ + n N R Q  5 X H V O n WWH Q 
 %XVLQHVVGHYHORSPHQWPDQDJHU
1XPHULFDO5RFNV
&YIJCJUJPOPQQPSUVOJUJFT $QDO\VLQJGULOOFXWWLQJVWRJHWDEHWWHUXQGHUVWDQGLQJRI
$POUBDU+PIO'JOEFSPOKGJOEFS!POMZNFEJBDPVLUPEJTDVTTGVSUIFS WKHVXEVXUIDFH

2WKHU8SFRPLQJ)LQGLQJ3HWUROHXP(YHQWV

7HFKQRORJLHVWRSRWHQWLDOO\KHOSDYRLGDQRWKHU0DFRQGR
7XHVGD\0D\
7KH*HRORJLFDO6RFLHW\)UHH

'LJLWDO2LOILHOG,7LQIUDVWUXFWXUH
7KXUVGD\-XQH
+DOODP&RQIHUHQFH&HQWUH
…

6HHWKHODWHVWSURJUDP
UHJLVWHUWRUHFHLYH
([SORUDWLRQWHFKQRORJ\DQGEXVLQHVV FRQIHUHQFHXSGDWHVDQG
IRFXVRQXQFRQYHQWLRQDOV MRLQRXUVRFLDOQHWZRUNDW
7XHVGD\6HSWHPEHU
7KH*HRORJLFDO6RFLHW\)UHH
)LQGLQJ3HWUROHXPFRP
Exploration
utes by distilling it down to simple relation-
ships between one set and another set, and
processing that many times over. Rather
than write a grandiose algorithm, you can do
processing of many pieces of data at a sim-
ple level.”
Illustrating the application of Unsuper-
vised Neural Networks, Figures 2 and 3 be-
low compare a conventional seismic inter-
pretation to one using the new technology.
Figure 1 is seismic data for an existing
gas field being developed by Auburn Energy
in Wharton County, Texas. The image is
comprised of seismic reflection data and
fault interpretation using conventional, com-
Figure 2: Section using conventional seismic interpretation software. Courtesy of Auburn Energy
mercially available software.
In Figure 3, the original data are re-
placed with Neural Network analysis by
Geophysical Insights, which has been based
on the simultaneous analysis of 13 seismic
attributes. Figure 3 reveals two likely loca-
tions (in white) of hydrocarbons.
The processing requires only a high-
end laptop computer or equivalent, as it is
only processing 20 sets of 3D volumes of da-
ta at fairly low resolution, even if the vol-
ume is many cubic kilometers. Processing
time is typically 1 to 8 hours. It can require
large data storage, which is inexpensive to-
day. “I’ve got 8 TB of data storage that eas- Figure 3: Section using Neural Network analysis. Courtesy of Auburn Energy
ily contains the seismic data we typically
use,” Dr. Smith says.
panies. safety and equipment reliability. If all of the
Geophysical Insights “Having devoted a couple of years to data from an offshore facility is put through
www.geoinsights.com researching the technology, I’m now almost an unsupervised neural network that ana-
Dr. Smith investigated the unsupervised neu- an evangelist for applying these methods in lyzes it for clusters, the software it could
ral networks and became so excited about our industry,” he says. “I am convinced that give a simple indication if everything is OK
the possibilities that he decided to launch this is a tool that can dramatically reduce the (running normally), or there are anomalies
Geophysical Insights in 2009 to apply the time and risk of exploration.” worthy of further investigation. This could
technology to Oil & Gas exploration and provide warning of potential anomalous con-
production. The new company is engaged Offshore safety ditions before there is an incident or excur-
in research, consulting and training of geo- Dr. Smith believes that the same technology sion, providing more time for analysis and,
sciences teams at oil and gas operating com- could also be used to help improve offshore if necessary, corrective action.

Data recorders on platforms


Oilteams, an oil and gas software company operational purposes or streamed real-time Rutter Technologies of Canada, a company
in Milan, believes that there could be a busi- to remote locations. All data is also synchro- which has developed and marketed some
ness providing marine style voyage data nized in time and can be replayed for inves- 4000 voyage data recorders for the deep sea
recorders, or 'black boxes' for offshore oil tigation, operational and training purposes. maritime industry - ships were required to
and gas operations, to continually record Enrico Saperdi, managing director of install them over the past decade.
what is going on, including sound recordings OilTeams, notes that in the Macondo case, "It looks logical to us that the oil and
(to record what people said to each other) recordings of what people said to each other gas offshore industry can use the experience
and instrumentation data. in the hour before the rig was evacuated accumulated in other sectors, mainly in the
The system does not store every piece could have been helpful in the investigation. naval and commercial marine industries,
of data in perpetuity, but is designed to delete It is also possible to record data from making a similar effort to ensure that inci-
data which is older of a certain age, so after equipment. Some automation systems are dent investigators can have the necessary in-
any incident you can always retrieve data for tricky to connect to a data recorder, but it is formation," he says. "This can help to avoid
the previous (for example) 48 hours or more usually possible with some effort and assis- future incidents, reaching an higher level of
depending on storage availability. The in- tance from the system manufacturer. safety and reducing risks for the environ-
strumentation data can also be archived for The company is working together with ment.

8 digital energy journal - Feb/Mar 2011


Digital Energy Journal December 9 conference report

Oracle – helping you answer critical


business questions
Imagine having a software tool, running on your iPad, which can predict the impact of what a well
intervention will have on the overall business. This is what Oracle is trying to enable, says the company’s
oil and gas industry lead Hossam Farid
Imagine having a computer system which to blame,” he said, “In their bid to retain cus-
can easily help you answer questions such tomers and protect their own competitive ad-
as, what is happening right now, what is the vantages, they designed their solutions using
impact of what I am about to do, how will proprietary technology that kept them
doing this intervention change the compa- closed.”
ny’s overall portfolio, or what does this “Over the last two decades, develop-
change in the oil price mean for all of the ment tools and new approaches to architec-
projects currently on the drawing board. ture have presented numerous pilots around
Oracle is trying to help companies re- digital initiatives. Those pilots have uncov-
architect their systems to answer questions ered, however, one common theme revolv-
like these, said Hossam Farid, vice president ing around the quality and completeness of
and global oil and gas lead with software gi- the local information management solutions
ant Oracle, speaking at the Dec 9th Digital and the difficulty in integrating new solu-
Energy Journal conference in London, titled tions into legacy applications and work
“Collaboration and the Digital Oilfield.” processes,” he said.
Companies may already have the nec- “It is undoubtedly the responsibility of
essary data stored somewhere deep in their IT solution providers to make it more open
systems. They may also have the applica- and easy to use.”
tions and tools capable of computing the an-
swers, but they lack what is needed in be- Point to point integrations
tween – the agility to capture, condition and “Point-to-Point is the most commonly used
move the data from various sources to the approach to applications integration, which The iPad is demonstrating to people what a
business management applications, in time- in turn made systems susceptible to the in- good digital oilfield system should look like for
the end user, says Hossam Farid, vice president
ly manner to optimise business performance cremental evolution to complex environ-
and global oil and gas lead with Oracle
or to respond to an urgent demand. “Isn’t ments of inter-application connections,” he
that what the Digital Oil Field Initiatives said. “In such scenario, it’s not uncommon
were all about in the first place?” asks Mr. for the scale and complexity of the intercon- workovers and complementary information
Farid. nections to become barriers to the deploy- about the subsurface which the well inter-
“The current state of information ment of new business solutions,” he added. sects. Now combine that with risk calcula-
stores, application solutions, and field infra- “The most crippling factor is that in tors, forecast capabilities and approval work-
structure are aligned with traditional func- many cases not all the dependencies are well flows. Similarly, consider a role-specific app
tional requirements they were designed for, known or well documented, which ultimate- serving up information for each discipline as
but don’t necessarily integrate to provide ly leads to situations where the architecture required without the need to constantly wor-
broader perspective of full asset manage- becomes inflexible.” ry about security or about the underlying in-
ment,” he said. “And although each system continues frastructure.
This often led to the common com- to function separately, changes to any com- And finally consider an app that is
plaint that “people have direct access to on- ponent can have unpredictable consequences completely designed and built by the very
ly 20 per cent of the data they require to ef- on other steps in the business process.” same user who will eventually use it, on the
fectively complete their tasks, while the rest very same platform he uses every day. “Isn’t
is owned by someone else and difficult to ob- The iPad that the idea of Cloud Computing we all
tain.” Meanwhile, Mr Farid believes that the suc- dreamt of?” he asked.
cess of the iPad is a demonstration of what “The future is those little applications
Software as a barrier collaboration tools can do when the right running on smart devices, only focusing on
“Oil and gas companies are increasingly standards are introduced, and how the mar- the function that you are responsible for, but
finding out that the best gusher to discover ket can drive and reward those standards. capable of accessing and computing 100%
after oil is data. There is certainly no short- Similar to many popular applications of the data you require to effectively com-
age of desire for information by people that run on smart devices like iPad, iPhone plete your tasks.”
working in the industry, nor there is short- and BlackBerry today – consider an oil and “This is the future of applications and
age of data – So are software systems and gas industry app capable of presenting infor- collaboration tools, where the user is taking
collaboration platforms the real obstacles?” mation about a specific well, including cur- back the control. The market is simply go-
he asked. rent and historical production information, ing to dictate the standards - a message we
“Many software solution providers are data from the well logs, core samples, are hearing loud and clear.”

Feb/Mar 2011 - digital energy journal 9


Digital Energy Journal December 9 conference report
Standards the load, and finally segmenting it for “Structured, unstructured and real-time
“In the past, standards were often confused billing. data have completely different nature and
for regulations, and many considered stan- “I think this is the natural evolution of use. The volume and speed of real-time data
dards as hindrance for innovation. There is the IT infrastructure and it will be tough for captured from sensors and SCADA systems
even still a minority who see open standards those who are still stuck in closed architec- are completely different from intervention
as a threat to their job security, or organiza- tures and proprietary systems” he said. and workover related data.”
tional power”. “Marrying those different types of da-
But, the iPhone / iPad phenomenon Business drivers ta, as well as accounting for unstructured for-
showed how the market rewards open stan- According to BP's Deepwater Horizon Acci- mats of maps, drawings and other documents
dards, he said. dent Investigation Report, on September, is a colossal task.”
Companies now see standards as the 2010, "Indications of an influx with an in- Oracle is trying to resolve the complex-
foundation for optimising their business. It crease in drill pipe pressure are discernable ity and simplify the task by offering a mid-
is becoming more and more acceptable to in real-time data from approximately 40 dleware architecture which can serve as an
look into standards, and soon will become minutes before the rig crew took action to intermediate layer between the data sources
the only way to attract younger talents to the control the well. The rig crew did not rec- and the business management tools that turns
industry, he added. ognize the influx and did not act to control the data into meaningful information.
“Such game changers compelled us in the well until hydrocarbons had passed Oracle’s Digital Oilfield Solution con-
Oracle to look beyond the automation tools through the BOP and into the riser." sists of a master data hub and integration
of field operations, and to invest in building “The recent Macondo disaster was un- tools that takes a snapshot of the data from
the necessary open architectures that enable doubtedly another game changer that various sources, uses a standard data model,
the fusion of applications and tools on smart stressed the needs for better collaboration such as PPDM model (developed by the Pro-
devices, communicate with other data tools equipped with artificial intelligence fessional Petroleum Data Management As-
sources on similar or different platforms,” he and built based on open standards,” Mr. sociation) to condition it, and serve it up
said. “We are serious about how the market Farid said. ready to business management tools. Oracle
is going to dictate the standards and we are Site Hub also leverages spatial technology
ready when the industry transitions into the Where to start? to reference all data and transactions to GIS
standards-based architectures.” Oracle focuses on transforming organiza- coordinates to facilitate the usage of maps.
Mr Farid believes that Oracle differen- tions into Information-Driven Enterprises, The solution also includes a complex
tiates itself by creating open integration plat- by increasing the reliability, speed and event processor to handle real-time data
forms and data management tools that ad- breadth of data collection, analysis, and de- streamed directly from sensors and SCADA
heres to industry standards such as PPDM, cision making “simply integrating tools and systems, analyse it in comparison with his-
PRODML, WITSML and others. capabilities,” he said. torical data to spot trends, and finally reacts
“We focus on connecting stakeholders based on a form of artificial intelligence
IT as a service to timely, accurate, and actionable informa- stored in the rules engine. This enables send-
There is no doubt that transformation into tion which fulfils the following conditions. ing alerts to the business management tools,
services will be the natural evolution of the “The criteria are that information or kicking off various business processes.
IT industry. “We have seen it in the banking should be: Oracle also bundled multi-dimensional
sector, the telecommunication and the utili- “Trusted and Reliable – information analytical, risk management and business
ties industries. 50 years ago when you built must be available when needed, latency de- process management tools to the solution to
or bought a new house, you needed to pay stroys the ability to act quickly to business create an end-to-end collaborative work en-
for extending a new power cable, arrange for events vironment and to accelerate the realization
adjusting and balancing the load, ensure con- “Secure – access must be secure and of value.
stant supply and follow up for correct billing. confidential information must be protected. “Our goal is to increase productivity by
Today, you just pay for a service and in many “At Lower Cost – reduce the cost of eliminating manual oilfield activities; im-
cases you don’t even know who generates managing information so that savings can be prove the decision making process by inte-
that power, who transmits it, how they bal- directed towards strategic initiatives.” grating financial, technical and operational
ance the load or eliminate outages. You sim- Oracle solution is built based on new KPI’s with risk management and collabora-
ply pay a billing company.” and existing IT platforms. It focuses on tion tools; reduce costs by establishing a
Meanwhile, a large complex operation leveraging real-time and near-real time data reusable platform that can be deployed
is happening behind the scene, from upgrad- to improve both, short term operational per- quickly in new operations or projects; and
ing the grid, collecting data about household formance and long term reserve recovery. improve the management of knowledge and
consumption, aggregating it with local and “One of the biggest challenges that the establishment of best practices across or-
regional data to ensure that the national grid Digital Oil Field projects have faced is inte- ganizational and geographical domains.”
can provide enough power for all, then shar- grating the different types of data in use
ing it with transmission units for balancing within the organization,” he said.

You can watch online videos of all the presentations at


our December 9 conference "collaboration and the
digital oilfield" at www.bit.ly/fvQAk6
or see all our past videos in the 'past events' section on
www.findingpetroleum.com
R E D E F I N I N G I N T E R P R E TAT I O N

AGILE
Interpreting and Accessing
essing
g
Local and Remote Data
ata

REDEFINING INTERPRETATION TO MEET YOUR CHALLENGES

Designed to be agile, the Paradigm Epos® 4 data management and interoperability framework
offers the most versatile capabilities for accessing geoscience and engineering data. Share seis-
mic, wells, interpretation and more across projects while spanning multiple vendor
databases. Collaborate between remote locations or in pack-and-go mode. Avoid data
duplication. And solve geoscience and engineering challenges with greater agility.

Get agile results. Find out how at pdgm.com

This is your Paradigm.


Digital Energy Journal December 9 conference report

Microsoft – making computing


environment simpler
Microsoft has a mission to help oil and gas companies make their computing architecture simpler, and
put it together in a standard way

The Microsoft Oil and Gas team has em- ics and Schlumberger, and system integra-
barked on a project to help the oil and gas tors Accenture, Infosys and Wipro Tech-
industry simplify its computing environ- nologies.
ments, said Paul Nguyen, industry technol- Now there are 29 companies involved.
ogy strategist for oil and gas at Microsoft, “We were exploring the idea: what if
speaking at the Digital Energy Journal con- we work together as an industry and come
ference in London on Dec 9, “Collaboration up with this common architecture?” he said.
and the Digital Oilfield”. The architecture is intended to contin-
A simplified computing environment uously evolve as new technologies and best
will cost less to build, be easier to use, easi- practises emerge.
er to maintain, easier for newcomers to the Having a standard architecture should
oil company to understand, and companies help companies reduce overall costs of their
can get a wider choice of which software IT, particularly when it makes it much
companies they work with after the system quicker and easier to install software from
is built. different vendors.
Employees will have a “dashboard” The standard architecture won’t speci-
type application providing all the informa- fy which vendors to use – the idea is that
tion necessary for them to do their role, such different vendors can provide all of the dif-
as managing drilling or production. ferent components and compete against A simplified computing environment will cost
less to build, be easier to use, easier to
The current IT infrastructure most oil each other, and the customer can choose,
maintain, easier for newcomers to the oil
and gas companies have is often unable to and everything will be interoperable. company to understand, says Paul Nguyen,
cope with the enormous recent increase in Oil companies will probably end up industry technology strategist for oil and gas
data going through the systems, Mr Nguyen working with many different software com- at Microsoft
said. panies in a mesh, rather than using gigantic
For example, every time a company in- software systems provided by the same soft-
stalls a fibre optic cable to an offshore plat- ware company, as many of them do now.
form to replace a satellite link, people find There will be no need for anyone to what is most important in order to deliver a
much more data that they want to send back write any integrations between different “highly interoperable environment,” he said.
to shore. software packages – everything will work
“How do you consume that? You can't together straight away, just like consumer Survey
use the existing same traditional way of pro- IT does. In August 2010, Microsoft and Accenture
cessing that,” he said. “We need things like This will encourage a competitive en- co-sponsored a survey about oil and gas
automated workflow to handle the data vol- vironment in the software industry, some- computing trends.
ume.” thing oil companies particularly like, he People were asked, “who do you see as
Microsoft has oil and gas business in said. Software companies can compete to most capable of creating a simpler and more
more than 70 countries. It has had a dedi- create tools which give better capabilities to unified computing environment across the
cated oil and gas team since 2002, but has their users. upstream oil and gas sector?”
been serving the oil and gas industry for There has been a recent change in the 13 per cent said they thought it was up-
over 30 years. attitudes of oil operators over the past few stream operating companies; 15 per cent
years, in that they are getting less tolerant said industry IT standards organisations; 18
Standard architecture of companies who want to try to lock them per cent said IT product and service
An important step at simplifying the com- into their software, he said. providers; 19 per cent said oilfield product
puting environment is encouraging all oil The actual architecture is “fairly gener- and service providers; and 35 per cent said
and gas companies to put together their IT ic” he said, with data layers, integration an industry wide collaboration of all of the
architecture in a standard way. services, business processing tools, and a above.
To try to encourage this, Microsoft for- presentation layer. When asked which IT standard tech-
mally launched its standard IT architecture There will be cloud-type cluster of PCs nologies will help improve efficiency in
project, called “Microsoft Upstream Refer- which can serve people the data they need. computing, 57 per cent said more extensive
ence Architecture (MURA) Initiative”, in It could be operated by the oil company or upstream industry standards (WITSML,
June 2010, following a number of discus- by a third party. PRODML); 57 per cent said SOA approach;
sions it had held with different software Microsoft is working closely with oil 30 per cent said cloud computing; and 30
companies during early 2010, including oil- and gas standards body Energistics on the per cent said social media.
field software providers Landmark Graph- project, with monthly meetings to talk about However not so many companies are

12 digital energy journal - Feb/Mar 2011


Digital Energy Journal December 9 conference report

Microsoft's declarative integration concept: build a software tool showing the information an individual in a specific role needs to do their job

actually using these technologies – for ex- At the same time, a bottom up ap- based navigation in applications, he said.
ample, only 24 per cent of people said they proach is needed, gradually connecting to- This geospatial component is inherently the
were using upstream IT standards such as gether the data infrastructure, so it can de- same within various applications, making it
WITSML and PRODML. liver data to where it is needed, or looking easier to compose these types of solutions.
at ways to make software applications easi- The third concept is “event aggrega-
Top down and bottom up er to ‘wire up’. tion”, where “events” (such as a piece of da-
To make it all work, you need to look at the ta being updated) can be shared from one
system from both a top down and bottom up 3 bottom up concepts computer across to other geotechnical soft-
approach, he said. Microsoft is looking at three different ‘bot- ware tools like SeisWorks and Petrel, or
Senior IT management can look at the tom up’ concepts. shared across the whole company. Open-
entire company from the ‘top down’, and The first is called “declarative integra- Spirit has tools to make event aggregation
see what kind of IT services are required, tion,” which means making it easier for soft- work between different geotechnical soft-
and what needs to be brought together to ware tools to be adjusted by the people who ware tools.
create it. use them, rather than programmers. To make all of this work you need a
For example, if a company is putting For example, if someone in an asset range of different IT infrastructure ‘ser-
together a drilling and production optimisa- management team has a change to their role, vices’ embedded – for example Esri, which
tion solution, they might be gathering real which means they need different informa- helps manage map-based systems, and
time data from OSIsoft, and use surveillance tion on their main portal, this can be created PointCross, which can ‘orchestrate’ differ-
tools from Schlumberger, some planning without any new coding – users can do it ent services together.
components from Landmark Graphics, and themselves. “The idea is that all of these compo-
maybe their own algorithms. The top down A second concept is making it easier nents will drop into this canvas,” he said.
approach is looking at ‘what sort of facility for people to put together dashboards using
we need to provide’. maps. There is an increasing trend for map

Feb/Mar 2011 - digital energy journal 13


Digital Energy Journal December 9 conference report

Energistics – more information in public


domain means better collaboration
Energistics’ goal for 2011 is to expand collaboration opportunities for standards development , said COO
Jerry Hubbard

The 2011 goal of oil and gas standards body


Getting vendors involved
Energistics is to make more information It has been proving hard to convince many
about its standards development process vendors to embed the standards in their prod-
available in the public domain through our ucts, even if their customers, the oil compa-
website, rather than only available to active nies, are demanding that they do, Mr Hub-
members on its collaboration site, said COO bard said.
Jerry Hubbard, speaking at the December 9 “It sounds like a good idea if you have
Digital Energy Journal conference “Collab- an energy company that says ‘you will use
oration and the Digital Oilfield”. WITSML’ but that’s not as easy as it seems
“For standards to work, they need to be with the vendors. You have to have a com-
freely available for use and for review dur- mitment from everybody.”
ing the development phase,” he said. Many software companies believe that
“If you develop standards in a propri- by adopting standards they can lose their
etary fashion they have no business value,” competitive advantage, and if they really be-
he said. “You have to have them widely lieve that, then it is hard to argue with them.
adopted to get the return on investment. “We can’t step on anyone’s competitive ad-
That’s the only way we’ll see the benefit and vantage,” he said.
the wider adoption.” “But at the same time, any where we
Energistics has many working groups can standardise that doesn’t step on some-
developing various aspects of its standards, one’s competitive advantage is a plus to the
For standards to work, they must be freely
who use an online collaboration tool based industry.” available for use - Jerry Hubbard, COO at
on Microsoft Sharepoint, where they can One example of an oil company which Energistics
place documents and exchange information. is doing well with digital technology is Pio-
Energistics wants to be able to bring neer Natural Resources, Mr Hubbard said.
more of this information available on its “They are very involved in developing stan-
website so that anybody can use it, and also dards at Energistics and very involved in Many of the benefits are very intangi-
emphasise how open the organisation is. adopting the standards. They are finding ble, such as making it easier for products de-
Energistics currently has 11 energy open standards very useful in building oper- veloped for one company to be used at an-
companies (oil and gas operators) as mem- ational efficiencies. other, and giving oil companies more choice
bers, and 100 others, including all the major as to which products they use.
oilfield service companies and many regula- Getting users involved If everybody uses a data exchange stan-
tory agencies. There is also a push to get the people who dard, it also means they have consistent ways
The organisation is 20 years old, and actually use the software products involved of labelling the data – consistent schema
was named POSC until 2006. in development of the standards. structures, naming conventions and patterns,
Energistics is structured geographically Until now, standards development has he said.
around 8 global regions: Africa, Asia Pacif- been done by IT people from oil companies
ic, Eastern Europe including former Soviet and product development people from ven- WITSML
Union countries, Latin America, Middle dors. WITSML is Energistics’ most well known
East, North America, South Asia and West- Energistics is trying to develop an ‘op- standard, for exchanging data associated
ern Europe. In each region, people have been erators’ group’ – people who will use the with drilling.
given the role of promoting Energistics standard, so they don’t get left out of the It is now embedded in 40 different soft-
there. process. ware products. “Many organizations don’t
The biggest web traffic on the Energis- even know they are using it as it is transpar-
tics website is from the US, followed by UK, Business value ent to them,” he said. “All of the major oil-
India, China and Russia, Canada and Nor- Finding a way to quantify the benefits of de- field service companies have embedded the
way, France, Australia and Germany, he said. veloping a standard, with a calculation standards in their products.”
A few years ago, Energistics realised method everyone agrees on, is difficult. However most people only use a small
that there was no point in developing stan- “We have to have a way to measure the part of it – there are more aspects of the stan-
dards if no-one was using them – it would business value of what we’ve done,” he said. dard, known as ‘data objects’ which are not
need to encourage the use of the standards “I don’t think we’ve settled on a singular being widely used. “We’re trying to commu-
as part of its core mission. way to say, we’ve brought a value to this par- nicate to the industry what’s out there and
ticular process.” what’s available,” he said.

14 digital energy journal - Feb/Mar 2011


Digital Energy Journal December 9 conference report
There are 51 companies involved in the with optimising production. It is currently them to SEG for review.”
WITSML special interest group (SIG), with being commercialised with large service Energistics is working together with the
a number of different committees having a companies. International Association of Oil and Gas Pro-
number of different meetings every month. Version 2.1 of PRODML is on track for ducers (OGP), which develops standards for
The company built a new ‘object’ release in the second quarter of 2011, and position information in seismic data.
called StimJob, covering data associated will include objects for communicating data
with fracturing jobs, which will be included from wireline formation testing and facili- National data repositories
in WITSML 1.4.1, the next release. It was ties, he said. Energistics is helping develop standards for
also released as a stand-alone standard in National Data Repositories (NDR). These
December 2010. RESQML are data stores which governments maintain,
Energistics is also looking at extending RESQML is a project to develop a standard with information about their oil and gas seis-
WITSML to include drilling automation to communicate reservoir data. It builds on mic surveys, reserves, drilling and produc-
standards, working with the International the work by an organisation called RESCUE, tion.
Association of Drilling Contractors (IADC). which had no relationship with Energistics The NDR standards are based in
The earlier versions of WITSML have until 1.5 years ago, when the RESCUE WITSML and PRODML, the existing Ener-
proven to be not tightly enough defined to group asked Energistics if it could take over gistics standards for drilling and production
be certain that one WITSML –compliant the standard, with RESCUE becoming a spe- data.
software package can communicate with an- cial interest group at Energistics. Around 100-150 people are expected at
other. A number of slightly different versions Version 1.0 of RESQML was released the next 3 day meeting of the National Data
emerged, which are referred to as ‘dialects’. in January 2011. Repositories group, in Rio de Janeiro in
Many software companies have config- March 2011.
ured the standards in their products in a man- Geophysics
ner that slightly changes the functionality. There is a geophysics special interest group EnergyML
While still ‘WITSML compliant’ their prod- in Energistics which was re-invigorated in ENERGY ML is a concept that started about
ucts are not interoperable with other soft- 2008, following efforts and funding from In- 2 years ago, to try to link together
ware vendors’ products. dia’s oil company ONGC. It is looking at PRODML, WITSML and RESQML. “We
This is something which Energistics is standards for data exchange about seismic thought there was a better way to go about
aiming to address with the next release of the velocity. this in terms of how we connect the dots,”
standard, 1.4.1, which is defined much more Here any standards developed will ulti- he said. “We’re trying to bring a broader
tightly. “That’s one of the issues we are mately be handed onto the Society of Explo- spectrum of these standards – and to have
struggling with,” he said. ration Geophysicists (SEG), because it al- connectivity end to end.”
ready manages a number of standards relat- “So you can use the same dictionary for
PRODML ed to seismic data. WITSML and PRODML. The same schemas
PRODML is probably the second most well “They won’t be our standards, they will be used. That’s a work in progress right
known standard, covering data associated will be SEG standards, we’ll be handing now.”

DOF: devil is in the details


The key to getting a digital oilfield project working is detailed planning, says Julian Pickering, director of
Digital Oilfield Solutions Ltd

Every reader of Digital Energy Journal They want to know how much work it standing of what the benefits and barriers
knows that digital technology can help make will take to get the project implemented – will be, “you’re in a position to do imple-
well planning and drilling operations much particularly if it involves redefining people’s mentation, scope and requirements,” he said.
more efficient, with better collaboration, roles. “You’ve got the project up and running.”
things getting done faster, better understand- For example, will there be people who
ing of risks, better decision making, better suddenly have to work closely with teams Not enough preparation
response time and more likelihood of hitting halfway around the world, something they A common problem is that people rush in to
the payzone. have never done before? deploy a solution and skip all the preparato-
But you can’t just show your manage- Will there be people who usually live ry work which needs to be done.
ment a PowerPoint slide saying that, and ex- most of their lives on a plane, who suddenly This means that many digital oilfield
pect them to greenlight a digital oilfield proj- find they have to spend more time at home, projects meet a great deal of resistance from
ect, said Julian Pickering, director of Digital communicating electronically? employees who are affected by them. “I
Oilfield Solutions and previously head of Will there be staff who find that their can’t believe there’s anyone who hasn’t met
digital technology for drilling and comple- responsibilities have increased from looking some element of resistance.”
tions with BP, at the Dec 9 Digital Energy after one or two wells locally to looking af- To get around this, you need to do more
Journal conference. ter hundreds of wells remotely? preparatory work. “We’ve got to get some
Management expect a detailed under- “There’s a whole raft of things that input from the people who are going to use
standing of what the project will earn for need to be put in place,” he said. the technology,” he said.
them. But once you have a detailed under- “The business needs to decide what it

Feb/Mar 2011 - digital energy journal 15


Digital Energy Journal December 9 conference report
actually wants, instead of drifting to the idea company is making all the money whilst an-
that it would be good to implement digital other contributor is losing out. The business
oilfield technology.” value process needs to be thought about in
“The important people to influence are the widest possible sense.”
the people who will be working with the
technology,” he said. “Some engineers Meeting today’s challenges
equate their influence to the specific knowl- Many people need better digital oilfield tech-
edge that they have and with this type of nologies just to meet their needs today.
thinking they can be reluctant to collabo- “The way oil and gas companies oper-
rate.” ate is changing,” he said. “Decisions have to
“So there is an important exercise in be made very much in real time. We have to
making people comfortable with knowledge make decisions as wells are being drilled.”
sharing and helping them to recognise that “We need to become increasingly col-
this enables them to use their knowledge laborative. The industry is now truly inter-
more effectively.” national and faces challenges to work across
“Don’t just go straight in and say ‘as of geographical boundaries, multiple languages Don't just drift towards a digital oilfield - the
March 1st you’ll be sitting in a wonderful and diverse cultures.” business must decide what it actually wants,
says Julian Pickering, director of Digital
new collaborative environment’.” “We’ve actually got a shortage of ex-
Oilfield Solutions Ltd
Dr Pickering said he has visited a few perts, which has been talked about widely.”
companies which have invested large “This is creating new demands. In-
amounts of money on collaboration centres creasingly experts are required to interact mation and making decisions on it, not
which are only used as “glorified meeting with operations not by being there but knowing that it is incorrect.
rooms”. through IT technology. They are looking at Also, people will become very depend-
Collaboration centres must not be tech- real time data far more and interacting re- ent on the new data streams, which means
nology showcases – they must be demanded motely with site personnel. This is a very that rapidly they will become business criti-
by the business and support operational different way of working.” cal. If the data becomes unavailable for any
workflows. This will usually require new “We are making increasingly large de- length of time operations can be severely
business processes.” mands on digital technology to make that hampered.
“Don’t go and build exotic collabora- happen.”
tion centres unless you’ve done your home- As offshore drilling operates in deeper Pushed by vendors?
work first.” and deeper water this will introduce greater There is still a large perception that a lot of
Many people have become frustrated technical challenges and will be “a catalyst the drive for digital oilfield technology is
with digital oilfield projects because they to improve uptake of digital technology,” he coming from vendors, he said.
have not delivered to promises. said. “I approach a lot of exploration and
“Perhaps in many ways digital technol- production departments and it feels as
ogy has been oversold,” he said. “Is digital Connectivity though you’re a second hand car dealer try-
oilfield the answer to all the oil and gas prob- One of the easiest ways to convince people ing to flog them a dodgy motor.”
lems that we have? I think the answer to that that digital oilfield is a good idea is to en- We are still some way in E&P from the
is no.” able better connectivity between different importance of digital technology and au-
“We have to paint a realistic picture so systems in different places. tomation being recognised. In contrast, there
that people understand what it can deliver.” Most people accept that hardware and are other industries where it has become the
software for their home and office PCs con- normal way of working, frequently driven
Assessing value nects together easily. So why is it that con- by business pressures. “In the automotive in-
All the time, it is important to calculate what necting digital oilfield hardware and soft- dustry, for example, no-one builds a standard
business value the project will actually pro- ware together is often so complicated? production car at western labour rates with-
vide, taking into consideration how it “This must change. End users will not out robots and plant automation - it would
changes the risk profile, the effort needed to be willing to tolerate a lack of connectivity,” not be economic,” he said.
get the business using the new technology he said. “It is not reasonable to expect an end “When you actually think about the de-
(“business alignment”) and the success fac- user to buy one device from a vendor and gree to which digital technology has embed-
tors. thereafter be committed to buying every- ded itself in the medical, automotive and
“It’s amazing how many large projects thing else from that same vendor just to en- space industries, they don’t even have spe-
do very little in terms of assessing business sure connectivity.” This is a critical area that cialist conferences on digital technology be-
value and so how do you know whether they is being addressed by data standards in the cause it is part of normal business,” he said.
have been a success?” he said. oil and gas industry. “We are still talking about DOF as though it
It is far more engaging if those people is something slightly different from routine
who will need to put effort into the project IT risks oil and gas operations.”
also get something out of it. Just influenc- You need to ensure that the IT is secure and “We want to get to the point where we
ing the overall company bottom line feels that people will believe it is secure. If a sys- don’t talk about DOF as a separate subject,
very remote. “Most projects in oil and gas tem creates new IT security risks, that will we just talk about oil and gas operations and
are very large and involve many stakehold- “negate a lot of the value statements that digital technology is an enabling compo-
ers. We need to create a win-win environ- you’re putting forward,” he said. nent,” he said. “Most of us would agree that
ment,” he said. This doesn’t just mean hacking, it can DOF is not embedded as much as it should
“You can’t have a process where one also mean people being fed incorrect infor- be.”

16 digital energy journal - Feb/Mar 2011


Digital Energy Journal December 9 conference report

Drillers need better data – Kongsberg


Torbjørn Forthun, managing director of Kongsberg Drilling Management Solutions, believes that drilling
contractors need access to better data – and then they need to use it

“A drill crew today is more or less the same grated operations so far in Norway.
crew that has been there since 1950, said The first generation – videoconference
Torbjørn Forthun, CEO of Kongsberg between shore and the rig – had “limited op-
Drilling Management Solutions (previously erational impact really”, he said.
Odfjell Consulting), speaking at the Decem- The second generation was building so-
ber 9 Digital Energy Journal conference phisticated integrated operations rooms.
“Collaboration and the Digital Oilfield.” “The management like to take people to see
“It hasn’t been changed at all. Neither these environments. It looks fancy but it
have the work processes.” doesn’t impress me, unless you change the
“Drilling speeds haven’t increased in way you actually do the operations,” he said.
the past 40 years, while non productive time In one generation B room, a company
has actually increased, yet there is so much manager offshore said he would permit peo-
technology on the market which can help.” ple onshore to listen and watch meetings
Drilling companies do not gain any re- from their collaboration rooms, but not to
ward if they drill faster, so they don’t ask that join in the conversation. “They didn’t want
question. any influence from onshore,” he said.
“It would be very nice for the drillers The third generation is when people ac-
to have technology to see things in a 3D or tually change the way they work, where the
4D perspective.” onshore team proactively help the offshore
“But the problems for the drilling con- team prepare their operation for next day and With Macondo.. the industry has been caught
with its pants down" - Torbjørn Forthun, CEO
tractors are actually not these issues, it is ac- make their lives easier. of Kongsberg Drilling Management Solutions
tually to have relevant information at all “The crew offshore can focus on stay-
times.” ing on the drill floor and perform on the drill
“Real time data is important to the floor. They are not supposed to sit in their
driller himself, but for his crew on the drill- offices and work with their spreadsheets.” You also meet people who were recruit-
floor and people involved in next day plan- “The onshore team ensures that there ed into senior management from working on
ning onshore, – it is more right time data. If are no outstanding maintenance tasks for the drill floor, who have learned what they
you sort out right type of data for a driller, critical equipment – they are on top of it.” know from experience. These people can be
that is maybe the biggest issue in order to “HSE is improving because of the on- less likely to believe that there can be better
prevent [accidents],” he said. shore awareness,” he said. ways of doing things. “They say, we know
Reading the investigation reports from “[Offshore personnel] can focus on op- what we do and we’ve been doing it like this
the Macondo disaster, the “industry has been erations issues. “The operational cost is ex- for 30 years,” he said.
caught with its pants down,” he said. “It’s tremely affected by this – especially on the “It’s not that they’re not willing to
nothing more than that. It’s a lack of use of logistics side.” change but you have to speak their language
good technology in terms of integrating in- to make them understand,” he said.
formation and sharing plans between the par- Areas of difficulty There are still very low levels of stan-
ties involved in the drilling operations.” One of the biggest difficulties with integrat- dardisation in oil and gas IT, he said. One oil
Mr Forthun was involved in some of ed operation projects is getting service com- major has 36 different drilling operations,
the drilling industry’s early plans to develop panies involved, when they are already tied and only 2 of them have the same drilling
integrated operations, working at Odfjell into tight contracts with oil companies, software. “The North Sea has been a labora-
Drilling in 2003. He helped Odfjell become which leave little room for trying new things tory for new inventions.”
one of the leading drilling contractors on the out. “But elsewhere in the world, some oil
Norwegian continental shelf in use of inte- “These companies work on fixed con- companies are saying, they want to install
grated operations, he said, working together tracts and they have to deliver on these con- new software, but just choose the best of
with many different oil companies. tracts,” he said. “They say, we don’t have whatever is available and standardise on
His group, formerly known as Odfjell time to do these changes, we don’t have time that.
Consulting but now acquired by Kongsberg, to stop operations, we can’t do piloting all Norway has a general policy to encour-
provides a software tool called RigManager, the time on our operations. The demand for age integrated operations, following a gov-
which enables people from all disciplines in- delivering on a corporate level is too high,” ernment study showing the potential savings.
volved in drilling a well at the drilling com- he said. But there has also been a fight-back
pany, together with the drilling departments Another source of tension is between from some people, who don’t believe it and
in oil companies, to share as much informa- the software engineers and the rig crew. The think it is a waste of time.
tion as possible. rig crew can’t believe that a software engi- “It is very easy to say, ‘I don’t believe
neer can help him to better drilling, and the in IO,’” he said. “You don’t have to under-
3 generations of IO software engineer doesn’t believe that the rig stand it to say it – you can just say it.”
There have been three generations of inte- crew understand him.

Feb/Mar 2011 - digital energy journal 17


Digital Energy Journal December 9 conference report

Helping drillers and geophysicists talk


The most common tool for sharing information between drilling and geophysics teams is still PowerPoint,
says Jane Wheelwright of Dynamic Graphics Ltd.

The most common tool for geophysics teams voir. “It gives more confidence in well po-
and drilling teams to share data with each sitioning in terms of hitting targets and colli-
other is PowerPoint, said Jane Wheelwright, sion avoidance,” she said.
technical application specialist with Dynam- Drillers also generate a lot of data about
ic Graphics, talking at the December 9 Digi- the subsurface while they are drilling, which
tal Energy Journal conference “collaboration could be fed back into the geophysics mod-
and the digital oilfield”. els and used to update them.
Very few companies have integrated
software systems which would enable Software tool
drilling and geophysics personnel to work Dynamic Graphics has developed the soft-
directly on the same data. ware packages “WellArchitect” and “CoViz
The drilling and subsurface teams “tra- 4D”, which bring subsurface data out of both
ditionally don’t communicate,” she said. drilling and geophysics software packages
“Data is sent iteratively back and forth be- into a tool both groups can work on simulta-
tween the groups. It can take months to plan neously, for planning, drilling and managing
a well.” drilling surveys. “Data can be brought from
The subsurface community pick targets a myriad of software packages into the same
and send them to the drillers; the drillers plan area,” she said.
a drillable trajectory, and send their plan At one oil major, a group of 24 people Drilling and subsurface teams traditionally
back to the subsurface community for ap- was trained to use the 4D visualisation sys- don't communicate - Jane Wheelwright,
technical application specialist with Dynamic
praisal. This is then reassessed in terms of tem, including reservoir engineers, geolo-
Graphics
additional subsurface data and returned to gists, geophysicists, data managers, well
the drillers and the cycle begins again. planners and drillers.
It would be much better if drillers and “All the information is used and every- cellular data, seismic data, all the targets, all
subsurface personnel could share their actu- body has access to it,” she said. the hazards, faults, and “any other informa-
al data. “Users say it can save up to 90 per “It is easy to use – and the easier it is tion that can be incorporated as part of the
cent of the time traditionally spent,” she said. to use, the easier it is to understand, “she well planning process,” she said.
“To me it makes a lot of sense to inte- said. “It promotes increased communication Using a covisualized system, you can
grate this data. But in reality it is very rare between the well planning team and the sub- see the drilling slot, the targets, data from
for this to happen.” surface community. It removes the brick wall any offset wells (including well logs), seis-
“We’ll never be able to see our reser- for collaboration and sharing. It gives the re- mic amplitudes, geology and reservoir simu-
voirs. You can’t peel back the earth and look sults of all the packages to the entire com- lation data, for example.
at them. You can’t ever truly visualise them. munity “It can be picked up and used rarely You can also see the data which
So it’s imperative that we use all the data that or on a day to day basis.” changes over time, such as the well status,
we have available,” she said. “It has to work in Windows and Lin- production, how the simulation model
But unfortunately most of the raw data ux, and be something that different groups changes and the varying levels of gas or wa-
is hard to move out of the software packages can all use effectively.” ter.
in which it resides – and because geophysi- “The drillers I'm working with are real- You can view the unswept area at any
cists and drillers use different software, that ly keen to have the seismic, have any infor- moment in time, where there is oil which
means that the only time data is exchanged mation because they feel that enhances what hasn’t been produced yet. You can see your
is screenshots of the software sent as Power- they can do and gives them more control in planned well path going through the differ-
Point slides, she said. terms of how they plan the well. Otherwise ent targets.
The fact that there is so much money in they haven’t got a lot of control.” The system can show up useful incon-
the oil and gas industry can mean people The system means that people can work sistencies. For example in one well which
don’t make the initial effort required to im- with data generated from other packages was about to be drilled, the software super-
plement new systems which can provide a without investing in their expensive software imposed data from two different files, which
long term benefit. “There hasn’t always been and learning how to use it. For example, a made it clear that there was a mismatch be-
the incentive to do things in the most effi- reservoir engineer can work with a seismic tween the depth both files took as depth =
cient way,” she said. volume. zero. This was due to a Kelly bushing adjust-
If data from both drilling and geophys- “A lot of users, particularly in the reser- ment not being made on a simulation model.
ical systems could be used in the same covi- voir engineering world, will use it in prefer- “The well could have been drilled on
sualized environment, it could highlight new ence to their own systems – they can load the basis of information from a simulation
things about the subsurface, or inconsisten- data very quickly and see what they want grid. But without a cross check against this
cies between the data could highlight where from it,” she said. data, it wouldn’t have been picked up until it
there are potential problems within the reser- The software can demonstrate all geo- was too late,” she said.

18 digital energy journal - Feb/Mar 2011


&DOHQGDURI(YHQWV

$GYDQFHVLQ([SORUDWLRQ7HFKQRORJ\
7XHVGD\)HEUXDU\
7KH*HRORJLFDO6RFLHW\)UHH


,PSURYLQJ5HFRYHU\IURP([LVWLQJ)LHOGV
:HGQHVGD\0DUFK
7KH*HRORJLFDO6RFLHW\)UHH


6XEVXUIDFHGDWDDQGWKHGLJLWDORLOILHOG
:HGQHVGD\$SULO
+DOODP&RQIHUHQFH&HQWUH …


7HFKQRORJLHVWRSRWHQWLDOO\KHOSDYRLGDQRWKHU0DFRQGR
7XHVGD\0D\
7KH*HRORJLFDO6RFLHW\)UHH


'LJLWDO2LOILHOG,7LQIUDVWUXFWXUH
7KXUVGD\-XQH
+DOODP&RQIHUHQFH&HQWUH …


([SORUDWLRQWHFKQRORJ\DQGEXVLQHVV
IRFXVRQXQFRQYHQWLRQDOV
7XHVGD\6HSWHPEHU
7KH*HRORJLFDO6RFLHW\)UHH


3HRSOHDQGWKHGLJLWDORLOILHOG
7KXUVGD\2FWREHU
+DOODP&RQIHUHQFH&HQWUH…


2QVKRUH'VHLVPLF
:HGQHVGD\1RYHPEHU
7KH*HRORJLFDO6RFLHW\)UHH


&ROODERUDWLRQDQGWKHGLJLWDORLOILHOG
7KXUVGD\'HFHPEHU

+DOODP&RQIHUHQFH&HQWUH …


$GYDQFHG6HLVPLF
-DQXDU\
7KH*HRORJLFDO6RFLHW\)UHH

6HHWKHODWHVWSURJUDPVUHJLVWHUWRUHFHLYH
FRQIHUHQFHXSGDWHVDQGMRLQRXUVRFLDOQHWZRUNDW
"OOVBM4QPOTPS

)LQGLQJ3HWUROHXPFRP
Digital Energy Journal December 9 conference report

Epsis: effective collaborative work processes


by sharing information, not by moving data
You don’t have to wait for comprehensive systems for sharing data to start effective collaboration; you
may start with building effective collaborative work processes by combining and sharing information (as
screenshots), suggests Jan-Erik Nordtvedt, CEO of Epsis of Norway

Norwegian software company Epsis has suc- collaboration. We don’t think that needs to
cessfully helped many oil companies inte- be the case. We have an alternative approach
grate their work processes – but mainly by based on enabling work processes.”
helping them combine and share software There is no doubt that a system to share
applications, not the underlying raw data, data across the company is the best idea over
said Jan-Erik Nordvedt, CEO of Epsis, the long term, the question is whether peo-
speaking at the December 9 Digital Energy ple should solely rely on this when it is so
Journal conference in London. hard to do at the moment.
The company builds systems where Mr Nordvedt has been working with in-
companies can combine and share the tegrated operations for 10 years. [sharing da-
screenshots of several software tools, so peo- ta across the company] is not an easy prob-
ple can effectively collaborate from geo- lem,” he said. “It’s hard enough to do it
graphically dispersed locations and across within the company. It is even harder when
organizational boundaries. Its clients include multiple companies are involved.”
FMC Technologies, M-I Swaco, Aker Solu- There are many challenges with shar-
tions and Chevron, which has a license to use ing data between systems, including differ-
its products worldwide. ent data historians (systems for storing real
If you just build systems to share software
time data), different tag structures, different screenshots, it can be much easier than
Common data integration challenges data formats and firewalls. Not to mention building a system to share the underlying
To settle for a system which just shares any legal aspects. data, says Jan-Erik Nordtvedt, CEO of Epsis of
screenshots, not the underlying data, you Norway
have to admit that building a system to share Integrating various software tools
data around the company is just too compli- Until it is possible to share underlying data
cated a task. around the company, perhaps it would be mation (including video streams) from many
Too right, says Mr Nordvedt. Building better just to focus on sharing and combin- different software applications at once.
a system to gather all corporate data into one ing screenshots of the software tools re- People can integrate the different data
standardised system is almost too complex a quired for a specific work process. feeds together in their heads, rather than by
problem to comprehend. By sharing just pixels rather than the seeing all the data together in one applica-
Which business should embark on a underlying data, you can build systems tion.
project without knowing how long it will which achieve the desired objectives, such With so many different software pack-
take? “You need to know how far it is to the as enabling external experts to provide a ages in use in the industry, it is much easier
other end so you can be sure you’re taking contribution to rig operations. It may also en- if you can settle for just sharing screenshots,
the right medicine. And you might lose some able the transfer of specific tasks away from rather than try to build systems to share the
flexibility once it’s built.” the platform so it can be done in an onshore underlying data.
“We might be over emphasising the da- support center. Within a company there can be 20-40
ta management pieces,” he said. Many companies might be reluctant to different applications for each engineering
“As far as we can see, data integration share raw data with experts from outside the discipline.
is often complicated and reduces the oppor- company, but feel more comfortable with It is often impossible to reduce the
tunity for end users to be involved,” he said. sharing screen images, he said. number of different applications, because
“Data integration is frequently seen as The large screens in collaboration cen- they are all needed for specific tasks. “You
an absolutely necessity for cross company tres can be used to visually integrate infor- need that specialist application there to make

You can watch online videos of all the presentations at


our December 9 conference "collaboration and the
digital oilfield" at www.bit.ly/fvQAk6
or see all our past videos in the 'past events' section on
www.findingpetroleum.com

20 digital energy journal - Feb/Mar 2011


Production
that decision,” he said. to that specific individual. M-I SWACO example
There have been many efforts to build For M-I SWACO, Epsis built a solution for the
‘portal’ solutions to try to connect the appli- Building effective work processes company to share data with participants and
cations together, but these can restrict flexi- Epsis has built software systems which or- subject matter experts about their projects,
bility. “Whenever there is a change – and un- chestrates work processes. who can be sitting anywhere around the world,
fortunately the response from the subsurface Many work processes in our industry including at the customer oil company.
is changing all the time – there needs to be a are repetitive and described in company spe- The only piece of data which is flowing
change in the portal too, so it’s often a nev- cific guiding documents. This means that for (as data) is the drilling data; but all the infor-
er-ending story,” he said. a specific step in a work process, the gather- mation from the software tools can be shared
“You will not get away from the prob- ing of information from the same different as screenshots. The company head office in
lem of a large number of applications”. software solutions is required each time, re- Houston and drilling centre in Stavanger can
A second problem which almost all as- gardless of who is working there at the time. be effectively involved as required.
sets have is difficulty finding information. Epsis has build solutions that automatically “They are not doing a massive data inte-
“It’s really hard to find the information you start all the required applications pre-loaded gration work – they are using the collabora-
need when you need it. Very often, what with the relevant data. It places these live ap- tion solution to achieve the same thing,” he
you’ll find is what’s going to be put in the plications side by side on the screen in the said.
decision making process. This may depend collaboration room and allows for the shar- The workflow system is built up to do a
on who’s on duty, so it’s very hard to get ing of the screen with team members at oth- specific corporate task – not the other way
consistency. er locations. It is also possible to give the re- around, when the data is connected together
In many cases, the data they are using mote participants the control of the local ap- in the hope that it will make it easier to do the
is coming from a spreadsheet that is private plications. work.

ShipServ: finding the best suppliers


Maritime and offshore e-marketplace ShipServ has developed tools to help marine purchasers learn more
about suppliers they are considering doing business with

Maritime and offshore e-marketplace $1.7bn transactions container carrying capacity and 43 per cent
ShipServ, has developed new services to help The total volume of supplies traded over of world's LNG fleet. Shipowners connected
marine purchasers learn more about new sup- ShipServ during 2010 was worth $1.7bn, to the network put on average 80 per cent of
pliers they are considering doing business with 4 million transactions (which includes all of their shipboard purchasing require-
with. requests for quotation, purchase orders and ments through the network.
A purchaser looking for spare parts for order confirmations), a 31 per cent increase The company is also expanding into the
products from a certain manufacturer will compared to 2009. offshore and oil and gas industry. Offshore
soon be able to see if the supplier has been ShipServ currently has 155 shipowners companies using the system include DOF,
verified by that manufacturer and is autho- and 36,000 suppliers on the system. REM Offshore, RK Offshore Management,
rised to sell genuine spare parts. New shipowners signing up with the SeaCor, Solstad Shipping, TideWater Ma-
The purchaser can already see which company in 2010 included ABCmaritime, rine, Vroon Offshore Services.
other marine purchasers that supplier has Alpha Shipmanagement, BW Gas, Chel-
transacted with recently, either the full name laram Shipping, Mowinckel Ship Manage- Merseyside Ship Stores
of the purchasing company, or the name in ment, OSM Ship Management, Pacific Merseyside Ship Stores, one of the largest
general terms (such as ‘a ship management Basin, Prestige Cruise, Reederei F. Laeisz, suppliers to UK vessels (including provid-
company in Germany’). SeaCor Dubai, Regent Seven Seas Cruises, ing 40 per cent of supplies to offshore ves-
The purchaser can also see reviews from Star Cruises, Tai Chong Cheang Steamship, sels in Aberdeen), currently takes around 30
other purchasers who have actually transact- Tolani Ship- per cent of its orders through ShipServ, says
ed with that supplier. ping and director of sales Ulfar Norddahl.
All of this should help improve confi- Wah 80 per cent of all its enquiries are con-
dence in electronic commerce – a lack of trust Kwong. verted into orders, he said, despite the fact
between trading partners is usually one of the The that most purchasing managers send requests
biggest obstacles to online trading - if a buyer company for quotes to three different suppliers.
is asked to transact with a supplier they don’t claims that The company aims to be a top quality
know at all, just on the basis of a low quote. it now has supplier, providing only top quality prod-
“We're building mechanisms where 24 per cent ucts, and ShipServ’s reviews and ratings pro-
trustworthy suppliers can float to the top,” of world's vide an objective means to telling this to the
says ShipServ CEO Paul Østergaard. cruise ship market, he says.
Marine purchasers often have to find capacity “Good clean business is what we're
new suppliers, to provide a new product in a connected promoting, and ShipServ is the best way for
new port, and don’t have time to investigate to the net- shipowners to have good clean business. It’s
them fully. This service should speed the work; 40 Paul Østergaard, ShipServ a guarantee that you're dealing with good
process up. per cent of CEO people.”

Feb/Mar 2011 - digital energy journal 21


Production

Making your company fit the DOF


When an oil company adopts the digital oilfield (DOF), it can mean changing some of the compay existing
work processes. Dutch Holland explains how this can happen

When an upstream organization decides to The heart of any DOF strategy is to im- further. With-
“go for it” to maximize the use of digital prove these processes by enabling them with out measures
technology for business value, the enter- digital technology. on process
prise’s architecture, i.e., its moving parts, But, first, a powerful and robust work steps as well
must be altered and configured specifically process architecture is needed. as on process
for digital technology. Five organizational elements must be outcomes, it
When an upstream company decides to aligned by senior managers to get DOF into is impossible
make digital oilfield (DOF) exploitation a full play: Work process maps, integrated to do any kind
higher priority for the enterprise, myriad metrics, aligned organization and incen- of in-depth
work processes in the operations side of the tives, Business Improvement Opportunity analysis for
business must be seen as process maps that development processes and a Business generating
can be the basis of DOF success. Readiness methodology. and evaluat-
Operations? What does operations have ing the poten-
to do with DOF? Isn’t this a “technology Work process maps tial of Busi-
It’s not enough to build a
play?” There must be a comprehensive map of core ness Improve- DOF to fit the company -
Not really. DOF is a Business Improve- processes is in place. Want to know where ment Oppor- sometimes the company
ment play exploiting digital technology. to place that well? Wouldn’t a map be im- tunities. With- has to change to work
The business focus of DOF puts the ul- portant? out metrics, better with a DOF, says Dr
timate responsibility squarely in the court of Similarly, if you want to use digital operations Dutch Holland, Holland
Management Coaching
the business’ operations side. technology to improve upstream operations, will not be
Unfortunately, many organizations start with a map of myriad work processes able to gener-
have assumed that DOF means the ball is in comprising upstream business operations. ate performance targets that would allow
technology’s court. The net result of this as- Smart mapping with the right level of technologists to identify and select digital
sumption has been easy to spot: technical detail in the most potentially fruitful parts of solutions.
success but business failure. the work process map is the goal, not infi-
nitely detailed workflows. And work Aligned organisation and incentives
DOF architecture process mapping must comprehend all three Aligned structure, roles and incentives are in
Let’s go back to the beginning. In the first of kinds of upstream processes because pots at place and in use around integrated goals and
this article series, DOF Enterprise Architec- the end of the rainbow will likely come from work processes. Key to making a DOF strat-
ture (DOF EA) was described as a combina- all three processes types: egy is an organization structure on the oper-
tion of three different structures that must be Value-added processes … sometimes ations side that puts a senior manager on
aligned and integrated to maximize the busi- called physical processes that drill holes and point to leverage digital technology for up-
ness potential of digital technology. move product through pipes stream. More than just an appointment, this
Strategic Business Architecture - in- Management processes … frequently job should be given to “a comer,” one of the
cluding the company’s DOF vision and called decision processes that product orders top two or three senior managers in line for
strategic goals, measures and incentives and directions for running the upstream op- movement even further up the organization-
Work Process Architecture - includ- eration al chain.
ing the matrix of technical and business Enabling processes … frequently In addition, all asset managers must
work processes needed to achieve DOF omitted from DOF discussion altogether, have key performance indicators and incen-
strategic goals such as supply chain. tive structures focusing some of their prime
Technical Process Architecture - in- time on supporting DOF initiatives. Every
cluding the processes inside the IT or R&D Integrated metrics manager in operations is in a position to
organization to manage digital resources You need integrated goals with metrics are identify potential business improvement op-
used across work processes. Heard the old portunities (BIOs).
Work Process Architecture saying, “If you can’t measure it, you can’t In addition, all managers must clearly
Work Processes are the steps organization manage it.”? That’s still true. understand their charter to lead their part of
members take to do the company’s work. Unfortunately, many have taken that to the organization to business readiness when
Included are the technical steps associ- mean dollar (revenue and/or cost) “Measure- a business improvement, enabled by digital
ated with production engineering as well as ment by organization, by department or by technology, will be implemented with their
what may be called the business steps of individual producer.” personnel.
“making economic decisions about produc- Not only are these not the kinds of
tion.” measures needed, they frequently get in the Business Improvement Opportunity
Day-in/day-out completion of these way of metrics actually needed for exploit- A proven method for targeting and develop-
many steps moves an organization toward its ing DOF. ing business improvement opportunities
business goals. “Measure it to manage it” goes even (BIOs) and requirements must be is in place.

22 digital energy journal - Feb/Mar 2011


Production
This is it: the bullseye, the engine, the
process that develops the organization’s
“battle plan” for improvement.
No amount of digital technology will
be useful if not used on the most critical (or
fruitful) business opportunities.
Unfortunately, those BIOs with the
most potential don’t self-identify but must
be dug out of mapped processes.
The general idea is that every work
process and every step in every process has
a “digital economic potential,”an assessment
of how productive it would be, in ROI terms,
to invest in a digital solution.
The only way a BIO development
process will work is with valid and robust
BIO selection methodologies, experienced
operations leaders and appropriate subject
matter experts from both the operations side
and the technology side, all focused on work
process maps.

Business readiness
You need a Robust Business Readiness im-
plementation method (for processes, tech-
nology and people) including comprehensive If you don't have all the components in place (cols 1-5) you get problems (col 6)
risk management.
Despite almost two decades of “doing
it wrong,” many companies implementing ship and accountability. The Business Readi- only reside inside an operations side of the
new IT still depend on the one-big-techni- ness Project can only be owned and led by business that is committed to growth using
cal-project approach, with tons of technical the senior management of the business’ op- digital technology as a key means.
support and almost no business support, erations side. Period. The Technology Readi-
which practically guarantees a “technical ness Project can be owned and led by senior More information
success but a business failure.” management of the Technology organiza- This is the third article in a five-part se-
For a DOF implementation to have a tion. ries that defines and explores the ways an
real chance to do any good at all, there upstream organization would need to be
should be two adequately staffed and re- All or Nothing re-configured to fully leverage the use of
sourced interdependent projects ongoing si- Fail to complete one category of work digital technology to improve the busi-
multaneously: process architecture and the end result will ness. This article puts the responsibility
Technology Readiness Project … to be greatly disappointing from both an opera- for exploiting digital technology squarely
get the technology Ready for the organiza- tional and economic point of view. in the court of the operations organization.
tion dutch@hollandmanagementcoaching.com
Business Readiness Project … to get Future Vision Tel: +1 281-657-3366
the business Ready to use the technology The future Vision for DOF is bright for com- www.hollandmanagementcoach-
Critical to the success of this two proj- panies recognizing that the key to success, ing.com/digitaloilfield
ect approach is the right ownership, leader- the heart and soul of the digital strategy, can

Finding Petroleum London Forums 2010


For latest developments, registration and to subscribe to our
newsletter see www.findingpetroleum.com
Limited free tickets available for each forum - exhibition and
sponsorship opportunities
• Improving recovery from existing • Focus on unconventionals
fields - March 16 - Sept 20
• Digital oilfield - subsurface data • People and the digital oilfield
- April 20 - Oct 20
• Technologies to avoid another • Onshore 3D seismic - Nov 9
Macondo - May 17 • Collaboration and the digital
• Digital Oilfield IT infrastructure - June 2 oilfield - Dec 1

Feb/Mar 2011 - digital energy journal 23


Production

Plans for Offshore Europe


Attendees to Aberdeen’s Offshore Europe event in September 6-8 this year can expect discussions on
North Sea taxation, reducing CO2 from oil and gas operations, new risk profiles and transparency of risk,
says Samir Brikho, CEO of engineering giant AMEC and chairman of the conference

The Offshore Europe conference and exhi- providers, consumers and government,” he their risk
bition, which claims to be the largest oil and said. profile
gas event outside North America, is likely In order to satisfy public environmen- changes.
to include extensive discussions about meet- tal concerns about oil and gas and enable It is
ing future UK energy demands and reduc- new projects to be built, the oil and gas in- very impor-
ing carbon dioxide emissions, says Samir dustry needs to be better at telling its story, tant that
Brikho, CEO of engineering giant AMEC he said. everybody
and chairman of the conference. The industry will also need to consider has a thor-
In particular, it will look at the future if there will be changes in the mix of energy ough under-
demand at a consumer level of electricity demand between electricity and consumer standing of
and hydrocarbons; how changing North Sea use of gas and oil, as electricity is increas- the risks
taxation levels could increase North Sea in- ingly used for transportation and heating. they are un-
vestment; how a tendency by independent dertaking.
Samir Brikho, CEO of
oil and gas companies to outsource more ac- Encouraging North Sea production Fol-
engineering giant AMEC and
tivities could change the risk profile differ- If the UK is to provide more oil and gas, then lowing the chairman of the Offshore
ent companies are under; ways to make risks it is important to maximise production from Deepwater Europe conference
more transparent; making carbon capture the North Sea and access its remaining esti- Horizon
and storage finally happen; and reducing mated 30 billion barrels. disaster, Mr
CO2 emissions of upstream operations. Here there are concerns about how Brikho be-
Many of these topics have been under North Sea operations are increasingly run by lieves that there will be much more questions
discussion for many years, so the focus will independent oil companies rather than oil about the roles the different organisations
be on getting things done, rather than just majors, and how changing the tax regime play in drilling, and what liabilities they take,
discussing them, he said. would make it different. and where the risks are.
AMEC is a company which knows “When it comes to mature assets, the “It is a wake up call for the industry,”
how to get jobs done. It provides consultan- oil majors jump off at a certain stage and sell he said. “But we need to get on top of these
cy, engineering and project management it to someone else,” he said. things and not be a victim of these things.”
services in oil, nuclear, renewables water North Sea operators are currently “I think responsibility will be more
and related sectors, employing 23,000 peo- charged 50 per cent tax on their oil and gas transparent in the future. You need to under-
ple. sales. This is low compared to some parts of stand the risks behind it,” he said.
Mr Brikho is not shy about talking the world, where it is 95 per cent. But the
about renewables. AMEC’s power division question is, if investment would increase if Carbon dioxide
has seen its revenues from conventional the taxation level was reduced. “We believe Concerns around the world about climate
power station engineering drop in recent it would,” he said. change are staying fairly constant, as you can
years, as environmental concerns have made On the subject of nuclear industry, there see by looking up the term ‘climate change’
new plant construction much more difficult. is a need for a more evolved industrial sup- on google.com/trends he said.
But these revenues have been replaced by ply chain in the UK, with the small compa- Reducing carbon dioxide emissions is
growing revenues from renewables, includ- nies and expertise to make it work, but the “most likely to happen in the supply end, not
ing biofuels. business is not yet large enough to support the consumer end,” he said.
it. By converting an old inefficient coal
Meeting energy demand fired plant to a modern efficient gas plant,
The biggest question for the UK energy in- Operating models you can reduce carbon emissions per kilo-
dustry is how the UK’s energy demands will The industry is also gradually changing its joule by 70 per cent, he said. “The more we
be satisfied over the coming decades. operating models, with a growing role and understand gas, we see it is a great fuel for
“Any power installation has a lifetime responsibility for contractors, particularly calorific value and emissions.”
of 30-40 years,” he said. “Today's power when serving independent oil and gas com- On the subject of carbon capture and
generation is a result of decisions made 30- panies, he said. There will be a panel session storage, there has still been very little
40 years ago. It is very crucial to think very about this. progress in the UK despite many years of
hard about how and what we install now.” For example, many independent oil and talking. But people are also not very clear
The industry will be under much more gas companies have a much lower number of about how much money they can make from
pressure in coming decades, as it is expected employees per well than the oil majors, but it.
to make more energy available with fewer rely much more on contractors for their op- There will be discussions at Offshore
resources. It will have to become much more erations. Europe about how the upstream oil and gas
efficient, which will require “much better This could mean that the contractors are industry will reduce the carbon dioxide emis-
alignment between operators, service more deeply involved in an operation, and sions of their operations.

24 digital energy journal - Feb/Mar 2011


2GVTQNGWO0GVYQTM'FWECVKQP%QPHGTGPEGU
A Division of Philip C. Crouse and Associates Inc.

1 5 th I N T E R N AT I O N A L C O N F E R E N C E O N
2'641.'7/&#6#+06')4#6+10
+0(14/#6+10#0& 
&#6#/#0#)'/'06

CONFERENCE AND EXHIBIT


M AY 1 7 - 1 9 , 2 0 1 1
R E N A I S S A N C E H O U S T O N H O T E L – G R E E N W AY P L A Z A
HOUSTON, TEXAS USA

&'(+0'±&'5+)0±&'('0&±&'.+8'4
Increasing query rates for the right data and information at the critical time continue to provide challenges
to the E&P industry. With all the changes in tools, data, people, processes, the dilemma of “Your Data is
Here Somewhere” is frontline to efficiencies and success, while preventing costly mistakes and failure. Data
integration of all those silos within the enterprise is still a daunting problem - yet is low hanging fruit that
will continue to greatly improve efficiencies in the E&P enterprise.
Enabling e-discovery can help personnel dig for data. Many approaches can meet the challenge, and
while no one approach is the “magic” way, attendees to this conference will hear real-world best practices
and implementations from those companies leading the efforts to knock down data and information
management barriers that confront our industry – seismic, G&G, well, field, production and reservoir data
and information. It’s all about making quality data driven decisions.

+06')4#6+10+557'5#6(14'(41061(1+.#0&)#5+0&7564;%*#..'0)'5
:: Integration & Processes :: Proactive Data Sharing
:: Cost Effective Solutions :: Interoperability
:: IM and Knowledge Management :: Quantity Management
:: Security and Archival :: Enterprise Architecture
:: Web-Based Options :: Standards

Presentation authors are global. This event has been designed for
data and information management practitioners and users.

6JCPMUVQ1WT%QPHGTGPEG5RQPUQTU

,QKP[QWTCUUQEKCVGUHQTVJGDGUVXCNWGKPVGTPCVKQPCNRQYGTRCEMGFEQPHGTGPEG
;QWYKNNRTQ¿VHTQOVJGOKZQHVGEJPQNQI[HWVWTGRQVGPVKCN
CPFEWTTGPVCRRNKECVKQPTGCNKVKGURTGUGPVGF

REGISTER EARLY AND SAVE!


REGISTER 2 OR MORE FOR EXTRA SAVINGS!
Visit us Online at www.pnecconferences.com
Roxar Building Blocks - Build Your Future

Innovation, usability, quality and knowledge are core building blocks in Roxar. Building blocks
we use to develop and deliver state of the art software for 3D reservoir modelling, reservoir
simulation and history matching.

Software which enables you to model the past and build the future!

www.roxarsoftware.com

The Emerson logo is a trademark and service mark of Emerson Electric Co.
Emerson Process Management. ©2011 Roxar.

You might also like