Professional Documents
Culture Documents
TUGAS KHUSUS
MENGHITUNG EFISIENSI PADA BADAN PENGUAPAN
Data – data :
Jumlah nira encer = 104.727,3 kg/jam
% brix nira encer = 13,50 %
Suhu pan pemanas = 103 – 110 oC
% brix nira kental = 60 %
Tekanan Ube = 0,5 kg/cm2
Suhu uap bekas = 115 oC
Suhu nira masuk = 105 oC
11 9,7
BP I ¿
40
BP III ¿
40
10,3 9
BP II ¿
40
BP IV ¿
40
11
Tekanan BP I = 112,764−( × 99,764)
40
= 85,329 cmHg.abs
= 1,160 kg/cm2.abs
Dari Table 41.1 A Properties of Dry Saturated Steam; Hugot hlm. 1034 :
T = 103,267 oC
10,3
Tekanan BP II = 85,329−( × 99,764)
40
= 59,640 cmHg.abs
= 0,811 kg/cm2.abs
Dari Table 41.1 A Properties of Dry Saturated Steam; Hugot hlm. 1034:
T = 93,338 oC
9,7
Tekanan BP III = 59,640−( × 99,764)
40
= 35,447 cmHg.abs
= 0,482 kg/cm2.abs
Dari Table 41.1 A Properties of Dry Saturated Steam; Hugot hlm. 1034:
T = 79,943 oC
9
Tekanan BP IV = 35,447−( ×99,764)
40
= 13 cmHg.abs
= 0,177 kg/cm2.abs
Dari Table 41.1 A Properties of Dry Saturated Steam; Hugot hlm. 1034:
T = 57,023 oC
Perhitungan air yang teruapkan :
Misalkan air yang teruapkan pada masing – masing badan = X.
Air yang teruapkan pada badan IV =X
Air yang teruapkan pada badan III =X
Air yang teruapkan pada badan II =X
Air yang teruapkan pada badan I =X
Total air yang teruapkan (W) = 4X
%bne
Total air yang teruapkan (W) = NE ×(1− )
%bnk
kg 13,5
= 104.727,3 ×(1− )
jam 60
= 81.163,658 kg/jam
W
X =
4
81.163,658
=
4
Y1 = 20.290,914 kg/jam
Sehingga :
Evaporator 1 = 20.290,914 kg/jam
Evaporator 2 = 20.290,914 kg/jam
Evaporator 3 = 20.290,914 kg/jam
Evaporator 4 = 20.290,914 kg/jam
TOTAL = 81.163,658 kg/jam
= 16,744%
104.727,3× 13,5 104.727,3 x 13,50
b) % brix evaporator II =
84.436,386−20.290,914 84.436,4−20.290,9
= 22,041%
C 0=1−(0,006 ×13,5)=0,919
C 1=1−(0,006 ×16,744)=0,900
C 2=1−(0,006 ×22,041)=0,868
C 3=1−(0,006 ×32,239)=0,807
C 4=1−(0,006 × 60,0)=0,640
Dimana :
mv = Massa uap (kg/jam)
mN = Massa nira (kg/jam)
Hv = Enthalpy uap (kkal/kg)
hl = Enthalpy liquid (kkal/kg)
t = suhu (oC)
c = panas jenis (kkal/kg.oC)
notasi 1 = menyatakan keadaan masuk
notasi 2 = menyatakan keadaan keluar
Dalam perhitungannya terdapat boiling point rice (BPR) untuk larutan nira yang
dihitung dengan persamaan :
BPR=1,78 x+6,22 x 2
(Geankolpis 3th edition, hlm 504)
Dimana x adalah %Brix larutan nira. Sehingga didapatkan hasil sebagai berikut :
FRAKSI SUHU SUHU
BADAN BPR
NIRA SATURATED SUPERHEATED
BP I 0,167 0,472 103,267 103,739
BP II 0,220 0,694 93,338 94,032
BP III 0,322 1,220 79,943 81,163
BP IV 0,600 3,307 57,023 60,330
Data – data yang dibutuhkan untuk menghitung neraca energy (Table 41.1 A
Properties of Dry Saturated Steam; Hugot 3rd halaman 1034):
EVAPORATOR I*
Energi masuk
Steam = ms ×644,3 = 644,3 ms
Nira = 104.727,3 ×0,919 ×105 = 10.105.660,814
10.105.660,814 + 644,3 ms
Energi keluar
Kondensat = m s ×115 = 115 ms
Vapor = 20.290,914 × 640,222 = 12.990.683,567
Nira = 84.436,386 ×0,9 × 103,739 = 7.879.335,869
Q Loss = 0,013 ×(10.105.660,814 +646=ms ) 131.373,591 + 8,376 ms
21.001.393,027 +123,376 ms
Nilai ms dicari dengan metode goal seek dengan mensetting selisih energy masuk
dan energy keluar sama dengan nol, dengan mengubah nilai m s. Sehingga
didapatkan harga ms = 20.901,560 kg/jam.
Neraca Energi
Nira 7.879.335,869
Q Loss 294.656,698
Total 23.572.535,830 Total 23.572.535,830
Neraca Massa
MASUK JUMLAH KELUAR JUMLAH
Steam 20.901,560 Kondensat 20.901,560
Nira 104.727,300 Vapor 20.290,914
Nira 84.436,386
Total 125.628,860 Total 125.628,860
EVAPORATOR II*
Energi masuk
Uap = 20.290,914 × 640,222 = 12.990.683,567
Nira = 84.436,386 ×0,9 × 103,739 = 7.879.335,869
20.870.019,436
Energi keluar
Kondensat = 20.290,914 × 93,338 = 1.893.905,811
Vapor = Y 2 ×636,710 = 636,710 Y2
Nira = =
(84.436,386−Y 2) ×0,868 × 94,032 6.889.743,275 + 81,597 Y2
Q Loss = 0,01 ×20.870 .019,436 = 208.700,194
8.992.349,281 +718,306 Y2
Nilai ms dicari dengan metode goal seek dengan mensetting selisih energy masuk
dan energy keluar sama dengan nol, dengan mengubah nilai Y2. Sehingga
didapatkan harga Y2 = 21.396,859 kg/jam.
Neraca Panas
Nira 5.143.826,907
Q Loss 208.700,194
Neraca Massa
MASUK JUMLAH KELUAR JUMLAH
Uap 20.290,914 Kondensat 20.290,914
Nira 84.436,386 Vapor 21.396,859
Nira 63.039,526
Total 104.727,300 Total 104.727,300
EVAPORATOR III*
Energi masuk
Uap = 21.396,859 ×636,710 = 13.623.586,524
Nira = 63.039,526 ×0,868 × 94,032 = 5.143.826,907
18.767.413,430
Energi keluar
Kondensat = 21.396,859 ×79,937 = 1.710.398,696
Vapor = Y 3 ×631,765 = 631,765Y3
Nira = =
(63.039,526−Y 3) ×0,807 × 81,163 4.126.780,411 + 65,463Y3
Q Loss = 0,008 ×18.767 .413,430 = 140.755,601
5.977.934,708 +697,229Y3
Nilai ms dicari dengan metode goal seek dengan mensetting selisih energy masuk
dan energy keluar sama dengan nol, dengan mengubah nilai Y3. Sehingga
didapatkan harga Y3 = 22.584,210 kg/jam.
Neraca Panas
Nira 2.648.341,728
Q Loss 140.755,601
Neraca Massa
MASUK JUMLAH KELUAR JUMLAH
Uap 21.396,859 Kondensat 21.396,859
Nira 63.039,526 Vapor 22.584,210
Nira 40.455,317
EVAPORATOR IV*
Energi masuk
Uap = 22.584,210 ×631,765 = 14.267.917,405
Nira = 40.455,317 × 0,807 ×81,163 = 2.648.341,728
16.916.259,134
Energi keluar
Kondensat = 22.584,210 ×56,923 = 1.285.565,933
Vapor = Y 4 × 623,332 = 623,332 Y4
Nira = =
( 40.455,317−Y 4)×0,64 × 60,330 1.562.039,189 + 38,611 Y4
Q Loss = 0,005 ×16.916 .259,134 = 84.581,296
2.932.186,418 + 661,944 Y4
Nilai ms dicari dengan metode goal seek dengan mensetting selisih energy masuk
dan energy keluar sama dengan nol, dengan mengubah nilai Y4. Sehingga
didapatkan harga Y4 = 23.915,816 kg/jam.
Neraca Panas
Nira 638.614,405
Q Loss 84.581,296
Total 16.916.259,134 Total 16.916.259,134
Neraca Massa
MASUK JUMLAH KELUAR JUMLAH
Uap 22.584,210 Kondensat 22.584,210
Nira 40.455,317 Vapor 23.915,816
Nira 16.539,500
Total 63.039,526 Total 63.039,526
Total uap = Y 1 +Y 2 +Y 3 +Y 4
= 20.290,914+21.396,859+22.584,210+ 23.915,816
= 88.187,800 kg/jam
= 88,188 ton/jam
teoritis
Efisiensi energy = × 100 %
aktual
20.901,560
= ×100 %
24.000
= 87,090%