Professional Documents
Culture Documents
GEOLOGI, SURVEY & PLANING SUPERINTENDENT GEOLOGI, SURVEY & PLANING SUPV GEOLOGI EKSPL CREW SURVEYOR
K3 & LINGKUNGAN SUPERINTENDENT SAFETY OFF & ENVIRONT SUPV SAFETY & CONTROLING CREW REVEGT & PEMBIBITAN
BENGKEL & GUDANG SUPERINTENDENT BENGKEL & GUDANG SUPV MECHANIC ELECTRIC HELPER CREW OPERATOR CREW SUPLAY EQUIPT
PENGOLAHAN & SHIPMENT SUPERINTENDENT PENGOLAHAN & SHIPMENT SUPV CREW CHEKER CREW PICKER CREW DRAFTMAN
ADM SUPV
ELECTRIC
TECHNICAL MANAGER
ADM MANAGER
GEOLOGI, SURVEY & PLANING SUPERINTENDENT GEOLOGI, SURVEY & PLANING SUPV GEOLOGI EKSPL CREW SURVEYOR
K3 & LINGKUNGAN SUPERINTENDENT SAFETY OFF & ENVIRONT SUPV SAFETY & CONTROLING CREW REVEGT & PEMBIBITAN
BENGKEL & GUDANG SUPERINTENDENT BENGKEL & GUDANG SUPV MECHANIC ELECTRIC HELPER CREW OPERATOR CREW SUPLAY EQUIPT
ADM SUPV
BESAR
Kabag Tambang
Kabag Teknik/Enginering
Kabag CHP/CCP
Supersivor Teknik/Enginering
Staff Administrasi
SEDANG
DAFTAR TENAGA KERJA No. URAIAN KARYAWAN JABATAN TERTENTU Direktur Manager Tambang/Kepala Teknik Tambang Manager Teknik Manager Adm Manager Operasi & Produksi Sub Jumlah =
Jml 1 1 1 1 1 5
TENAGA KERJA TECHNICAL & ADM No. URAIAN A. KARYAWAN JABATAN TERTENTU Superintendent Geologi, Survey & Planing Superintendent Tambang Superintendent K3 & Lingkungan Superintendent HRD, Adm & Humas Paramedis (Dokter) Paramadis (Perawat) Sub Jumlah = B. KARYAWAN Supervisor Geologi, Survey & Planing Supervisor Pit Supervisor Safety Officer & Environt Supervisor HRD & Humas Supervisor Administrasi Geologi Eksplorasi Crew Surveyor Crew Checker Crew Revegatasi & Pembibitan Safety & Controling Satpam Cleaning Service Tukang masak Sub Jumlah TOTAL =
Jml 1 1 2 1 1 4 10 1 1 1 1 1 1 1 2 2 1 5 2 2 21 31
TENAGA KERJA OPERASI DAN PRODUKSI No. URAIAN A. KARYAWAN JABATAN TERTENTU Superintendent Bengkel dan Gudang Superintendent Pengolahan & Pengapalan Sub Jumlah = B. KARYAWAN Supervisor Bengkel & Gudang Supervisor Pengolahan Supervisor Shipment Foreman Bengkel Foreman Gudang - Mekanik - Helper - Welder - Elektrik Operator & Sopir = - Excavator Cat 375 - Bulldozer D155A-2/D8R - Excavator Cat 320 - Wheel Loader CAT 926 - Centrifugal pump 20 m3 - Grader Cat 120 H - Genset 150 KVA - Nissan CWA - Truck Mitsubishi PS 120 - Truck Mitsubishi PS 120 - Mobil Karyawan - Mobil Operasional - Mobil Penyiram Jalan - Crew Suplay Equipt - Crew Picker - Elektrik Pengolahan - Crew Draftman Pengapalan - Crew Cheker Sub Jumlah = TOTAL DAFTAR TOTAL TENAGA KERJA No. URAIAN A. KARYAWAN JABATAN TERTENTU B. KARYAWAN TOTAL