You are on page 1of 1

TRANSFORMER GENERATOR

TURBINE N6-3.79/390 5872KW TO GRID 27.16 0.00736 29.93 3.79 AIR 2566 390 SPRAY DRYER CONDENSOR FD FAN 81.70 SUPERHEATER 27.16 0.00736 167.3 20 ID FAN PAC 325.44 200 70.25 BAGHOUSE 2386.3 40

MAIN CONTROL ROOM

STACK

WASTE HEAT BOILER 3X9.98t/h 0.61 1089 204 81.81 1482 1000 BLOW DOWN CONDENSE PUMP BURNER SECONDARY CHAMBER 167.3 20 27.16 0.55 WATER SUPPLY CHEMICAL WATER SYSTEM

CRANS OPERATION

SEAL DOOR LOADING HOPPER BURNER DEARATOR

MSW 12.5 9211

DUMP HALL

STORAGE PIT

PRIMARY CHAMBER 3X4.17t/h CHARGER 30.54 6.0 440.3 104

FEED PUMP

SLUDGE ASH RESIDUE 0.94 257 371 MAGNET METAL RECOVERY TANK ASH HOPPER

WASTERWATER PUMP

PURE WATER

LEGEND
AIR/GAS LINE WATER/STEAM LINE

WASTERWATER TREATMENT SYSTEM AIR SUPPLY

HYDRAULIC UNIT

QUENCH TANK

ASH

HYDRAULIC LINE

SOLID LINE t/h MPa kJ/kg C

Process Flow and Heat Balance Diagram for 300ton/day Waste-to-energy Plant

PROCESS FLOW DIAGRAM


300TPD CAPS WASTE TO ENERGY PLANT ANTHENS, GREECE
Anthens-GA-010.0 0