You are on page 1of 13

Attendance recording application

through biometric finger print

BY:-

Manish Naithani(25) Monali Kharat(28) Navin Kumar(33) Pravin Junnarkar(38)

1. Test plan identifier:ARA (Attendance recording application through biometric finger print ) Version:- Jaguar FP4000 Developed By: Zenon Infotech

2.

References:1. Project plan for ARA. 2. System Requirements specifications. for ARA. 3. High level design

3 . Introduction:This document is a Test Plan for the Attendance recording application through biometric finger print, produced by Quality Assurance. It describes the testing strategy and approach to testing QA will use to validate the quality of this product prior to release. It also contains various resources required for the successful completion of this project List of the features: Security with advanced fingerprint minutiae matching . Eliminates proxy punching. TCP/IP Ethernet networking

4. Objective of test plan:1. 2. 3.

Determine wheather the RFI is working with 125 kHz Frequency. Determine wheather the system is Egronomical or not. Define the schedule for project.

5. Test Item:1. 2. 3. 4.

Localization testing. Time Scanner testing. Finger print scanner testing RFI testing.

6. Software Risk Issues:- CRO and winrunner. - Finger print scanner Inherent software risks: - Safety. - Interoperability

7. What features to be tested:-

RFI card - Security with advanced fingerprint minutiae matching - Supports greasy, oily, wet, smeared and even stained fingers. - Fast and Perfect Identification through excellent Algorithm. - Eliminates proxy punching. - TCP/IP Ethernet networking

8. What features not to be tested:- Time scanner - Finger print scanner

9. Overall Test Strategy:- CRO and Winrunner tools are used for RFI testing and User Interface testing. - Training for CRO and Win runner will be provided by HP. - Finger print recognition algorithm will be used. - Localization testing and Space testing - Security testing. - MTBF, Mean Time Between Failures - if this is a valid measurement for the test involved and if the data is available.

10. Item Pass/Fail Criteria:

11. Entry & Exit Criteria:Entry-> 1) All personnel involved in the system test effort must be trained in tools to be used during testing process. 2) A separate QA environment must be available. 3) All test hardware platforms & software must have been successfully installed configured and functioning properly. 4) All documentation and design of the architecture must be made available. Exit-> 1) Ensure all application documentation has been completed and is up to date. 2) Planned deliverables are ready. 3) High severity defects are fixed.

12.Suspension/Resumption Criteria:Criteria that will justify test suspension are: Hardware/Software is not available at the time indicated in the project schedule. Source code contains one or more critical defects, which seriously prevents or limits testing progress. Assigned test resources are not available when needed by the test teams.

13 .Test Deliverables
1) All the test cases. 2) Inspection reports. 3) Defect log & risks encountered and solution provided. 4) Different testing related reports.

14.Remaining Test tasks :Space testing Time scanner Finger print scanner

15.Environmental Needs:Workstation(s) Standard PC. Intel Pentium IV processor. 256 mb RAM. 80 GB Hard Disk. Windows XP Operating System. Flat Bed Scanner. Palm Print Scanner. Winrunner. CRO.

Server: Dual Processor Server. Intel Xeon Processor 2 GB RAM Sufficient Hard Disk Standard Unix/ Linux or Windows Advanced Server Dedicated LAN with Ethernet Switch or Hub for the connectivity of the Workstation and Server Staffing and Training needs: Training on CRO & win runner by HP. Training on Finger print algorithm.

16.Responsibilities:Person A will do admin related testing. Person B will do inspection. Person C will do performance testing Person D will do integration testing.

Planning risk & Contingencies


Schedule. Training. Requirement. Personnel.

17.Approvals:

All the test cases designed by test lead will be approved by test manager. All the test cases designed be test engineers will be approved by test lead. All the reports generated by test engineers will be approved by test leads. Final test plan will be approved by the test manager and project manager.

18.Glossary:

LAN - Local area network CRO - cathod ray oscilloscope We can measure frequency on CRO. RFI-Radio frequency indentifier. ARA - attendance recording application through biometric finger print