You are on page 1of 15

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 1 1 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $321,400 $849,500

1 Clearlake 2 Fort Bragg

Old Highway 53 between Olympic Dr. and Lakeshore Dr.; Old Highway 53/Austin Ave. Various locations throughout the city

Burns Valley ES, Clearlake SDA Christian Fort Bragg MS, Redwood ES

Widen roadway and add bike lanes; install crosswalks Construct sidewalks, bulb-outs, raised intersections (speed tables), raised crosswalks, speed cushions, traffic circle, and pedestrian refuge islands; install signs and striping; install LED stop signs

3 Humboldt County

Multiple Schools in the Fortuna Union Elementary School District and Eureka City School District in Humboldt County

4 Redding

5 Shasta County

Bidwell Rd. between Bonny View ES and N. Bonnyview Rd.; north side N. Bonnyview Rd. from Bidwell Rd. to E. Bonnyview Rd. Multiple Schools in the City of Anderson, Redding, and Shasta Lake

South Fortuna ES, Alice Birney ES, Grant ES, Lafayette ES, Washington ES, Catherine L Zane MS Bonny View ES

Develop a crossing guard program

$472,200

Construct sidewalks and curb ramps; install bike lanes Provide a bike and pedestrian safety education curriculum for 4/5 graders; implement a walking school bus program; provide regional conference

$485,400

6 Tehama County 7 Butte County

2 3

Stanford Ave. between Palm St. and Grant St. Las Plumas Ave. between Walmer Rd. and Autrey Ln.; Walmer Rd. between Lincoln Blvd. and Rosedale Ave. Fremont St./7th St. and Fremont St./3rd St.

Burney ES, Anderson Heights, Cypress School, Shasta Lake School, Turtle Bay School, Meadow Lane Los Molinos ES

$405,000

Construct pedestrian path and curb; install crosswalks, signs and striping Oakdale Heights School Construct sidewalks, curb and gutter, curb ramps, and AC tie-in; install speed humps, and speed feedback signs; upgrade crosswalks Install traffic signals with loops, pedestrian countdown heads Conduct walk/bike audits; vehicle speed feedback signs; save a gallon scan + notify system; website improvements

$500,000 $941,400

8 Colusa 9 Davis

3 3

10 Elk Grove

George T. Egling MS, James M Burchfield ES Multiple Schools in the Davis Joint Union School Birch Lane ES, Cesar District Chavez ES, Fred T Koresmatsu ES, Marguerite Montgomery ES, North Davis ES, Patwin ES, Robert E Willett ES Multiple Schools in the Elk Grove Unified Anna Kirchgater ES, School District Arlene Hein ES, Arnold Adreani ES, Arthur C Butler ES, Barbara Comstock Morse ES, CW Dillard ES, Charles E Mack ES

$356,700 $283,800

Implement Project AWARE (Advancing Walk and Roll Environments); needs assessment for each school/community through parent surveys and walk audits; hire a full-time SRTS Coordinator to train staff and parents

$472,800

Page 1 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 3 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $519,600

11 Lincoln

East side East Ave. between SR 93 (McBean Twelve Bridges MS, Park Dr.) and 12th St.; east side E. Joiner Pkwy. Carlin C Coppin ES between 12 Bridges Dr. and Westview Dr. Multiple Schools in the Roseville City School District Stevenson Ave. from the southeast corner of Anna Kirchgater ES to the existing sidewalk near Marjon Way Multiple Schools in the Washington Unified School District in West Sacramento

Construct sidewalk, curb and gutter, curb ramps; install bike lanes

12 Roseville

Stoneridge ES, Diamond Expand SRTS toolkit Creek ES, Junction ES Anna Kirchgater ES Construct sidewalk, curb, gutter, and curb ramps Create citywide SRTS Parent Corps by training one parent champion to implement education and encouragement programs at their schools; provide pedestrian and bicycle safety skills training; implement walk- and bike-to-school events, frequent walker/rider miles contests, and distribution of safe routes to school maps Construct sidewalks, curb and gutter, and curb ramps; install crosswalks

$295,000

13 Sacramento County 14 West Sacramento

$768,700

Bridgeway Island ES, Bryte ES, Elkhorn Village ES, Riverbank ES, Southport ES, Stonegate ES, Westmore Oaks ES

$496,000

15 Wheatland

"E" St. between Wheatland Rd. and Third St.; Hooper Rd. between Wheatland Rd. and Olive St.; SR 65 between Hooper Rd. and McDevitt Dr.; SR 65 from Evergreen Dr. to 210' south of Evergreen Dr.

Bear River MS, Wheatland ES

$304,600

16 Wheatland

Wheatland Rd. between "G" St. and Wheatland Bear River MS, Park Dr. Wheatland ES Gibbons Dr./Northwood Dr. /Southwood Dr. Multiple Schools in East and West Oakland Lincoln MS, Edison ES

Construct bike path; upgrade pedestrian path, curb ramps and driveway approaches Construct raised medians and curb ramps; install stop controls and striping Conduct SRTS educational assemblies to complement SRTS efforts; implement the Golden Sneakers program; provide safety patrols; conduct walking school buses, bike rodeos, and events.

$341,200

17 Alameda 18 Alameda County

4 4

$184,600 $500,000

19 Albany

Multiple Schools in the City of Albany

Bella Vista ES, Bridges Academy, Fruitvale ES, Global Family ES, Greenleaf ES, Hoover ES, Manzanita Community School Cornell ES, Marin ES, Hire a SRTS Program Coordinator and continue Ocean View, Albany MS the activities of the established SRTS Program Rio Vista ES, Shore Construct sidewalk, minor drainage, curb and Acres ES, Riverview MS gutter

$185,000

20 Contra Costa County

North side Pacifica Ave. between Mariners Cove Dr. and Inlet Dr.

$849,000

Page 2 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 4 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $225,500

21 Danville

Multiple Schools in the San Ramon Valley Unified School District

22 East Palo Alto

23 Emeryville

Country Club ES, Creekside ES, Greenbrook ES, John Baldwin ES, Live Oak ES, Rancho Romero ES, Vista Grande ES Fordham St. between Notre Dame Ave. and Costano ES, Cesar Purdue Ave.; Bay Rd. between Newbridge St. Chavez Academy, Aspire and SR 109 (University Ave.); Pulgas East Palo Alto Charter Ave./Runnymede St.; Pulgas Ave. between School, Eastside O'Conner St. and Myrtle St. Preparatory, SR 123 (San Pablo Ave.) between 43rd St. and Anna Yates ES, Escuela 47th St. Bilingue Internacional

Expand the existing Street Smarts Program to include storybook poster contest, video contest, traffic safety assembly and bike rodeo programs; develop walking school buses, enforcement and encouragement by police and sheriffs office Construct sidewalks, curbs and gutters; install LED in-pavement crosswalk lights

$579,700

24 Petaluma

25 Redwood City

La Tercera ES, Miwok Valley ES, Kenilworth MS, Petaluma MS, Mcdowell ES, McKinley ES, Valley Vista ES Charter St. between Stambaugh St. and Spring Hoover ES St. Multiple Schools in the Redwood City School District

Multiple Schools in the City of Petaluma

Install in-pavement crosswalk lights, Rapid Flashing Beacons, audible pedestrian countdown heads, signs, and stop (bar) markings; construct bulb-outs and median tip Create a Safe Routes to School (SRTS) plan

$748,000

$129,600

26 Redwood City

27 San Anselmo

Various locations throughout the city

28 San Carlos

Phelps Rd. between Palm Ave. and Arundel Rd.; Wellington Ave. between Clifton Ave. and San Carlos Ave.; San Carlos Ave. between Phelps Rd. and Arundel Rd. Multiple Schools in the San Francisco Unified School District

Adelante Spanish Immersion, Roy Cloud School, Fair Oaks School, Garfield School, John Gill School, Hawes School Wade Thomas ES, Install crosswalks and pedestrian safety barrier; Brookside ES, Sait construct raised intersection (speed table), Anselmo ES sidewalks, and curb ramps; upgrade traffic signals and crosswalks Arundel School Construct sidewalks, curb ramps, and roundabout; install crosswalks and all-way stop control

Construct raised crosswalks, bulb-outs, and curb ramps; install minor safety lighting and trees; upgrade crosswalks and signs Create a SRTS Task Force; conduct walking and cycling assessment and provide tools evaluate behavioral changes

$634,500

$204,000

$619,200

$340,800

29 San Francisco Department of Public Health

Buena Vista ES, El Dorado ES, ER Taylor ES, Fairmount ES, Leonard Flynn ES, Garfield ES, George Washington Carver ES

Provide pedestrian safety education to 2nd grade; provide bicycle safety education to 4th grade; distribute walk & bike maps; conduct walking school bus trainings; outreach and encouragement activities in San Francisco

$500,000

Page 3 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 4 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $922,200

30 San Francisco Municipal Transportation Agency 31 San Francisco Municipal Transportation Agency

Alemany Blvd./Onondaga Ave. and Ocean Ave./Otsego Ave.

James Denman MS

Remove free right-turn lanes and decrease turning radius; construct bus bulb, bulb-outs, and curb ramps Construct bus bulbs, bulb-outs, and curb ramps; upgrade traffic signals and crosswalks; install pedestrian countdown heads and advance stop (bar) lines

Turk St. between SR 101 (Van Ness Ave.) and Tenderloin Community Polk St. School

$904,500

32 San Jose

North side Bucknall Rd. between Mayfield Ave. Gussie M. Baker ES and Lantana Ave. Multiple Schools in the City of San Leandro

33 San Leandro

Construct sidewalk, curb and gutter, and curb ramps; install crosswalks, minor safety lighting, landscaping and drainage facilities Madison ES, Roosevelt Implement pedestrian and bicycle safety ES, Monroe ES, Garfield education; school pedestrian and bicycle safety ES, McKinley ES, Wilson rodeo ES, Washington ES Construct sidewalks; install median fencing, speed feedback sign, signs and striping Provide annual half day training and recognition workshops for professionals, school staff and volunteers countywide; develop manuals and training materials Conduct countywide walking school bus and bicycle train encouragement program; train parent and volunteers to support the program

$343,000

$410,000

34 San Rafael

35 Santa Clara County

36 Solano Transportation Authority

Lindaro St. between Woodland Ave. and James B Davidson MS Andersen Dr.; Andersen Dr. east of Lindaro St. at Mahon Creek Trail Multiple Schools in the City of Campbell Campbell MS, Capri ES, Castlemont ES, Rosemary ES, Village School, Braley ES, Ponderosa ES Multiple Schools within Solano County Joe Henderson ES, Mary Farmar ES, Matthew Turner ES, Robert Semple ES, Anderson ES, Gretchen Higgins ES, Anna Kyle ES

$565,000

$500,000

$500,000

37 Sonoma County

38 South San Francisco

West Ave. between Sebastopol Rd. and Hearn Sheppard ES, Roseland Install crosswalks, two flashing "Entering School Ave. ES, Roseland Charter Zone" signs, fence/barrier, bike storage lockers, MS, Bellevue ES and signs; construct bulb-outs and curb ramps; upgrade crosswalks "C" St./W. Orange Ave. and "B" St./W. Orange Los Cerritos ES Construct curb extensions (bulb-outs); speed Ave. feedback sign

$284,400

$119,300

Page 4 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 4 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $820,000

39 Sunnyvale

Various locations throughout the city

Columbia MS, Peterson MS, SVA ES, Cupertino MS,

Construct sidewalks, bulb-outs, and curb ramps; install in-pavement crosswalk lights, signs, and pavement markings; upgrade (reduce) corner radius.

40 Windsor

Multiple Schools in Windsor Unified School District

41 Lompoc

Various locations throughout the city

42 Lompoc

Multiple Schools in the City of Lompoc

Windsor MS, Cali Calmecac Language Academy, Brooks ES, Windsor Creek ES Arthur Hapgood ES, Clarence Ruth ES, La Canada ES, La Honda ES, Leonora Fillmore ES, Lompoc Valley MS, Miguelito ES Arthur Hapgood ES, Clarence Ruth ES, La Canada ES, La Honda ES, Leonora Fillmore ES, Lompoc Valley MS

Conduct pedestrian and bicycle safety education training.

$310,000

Construct sidewalks, curb ramps, and bulb-outs

$388,500

Provide community education and outreach; recruit SRTS taskforce members; hold "walk n roll" to school encouragement as part of International Walk to School and Bike to Work and School Months; conduct SRTS pedestrian and bicycle education and trainings; increase traffic enforcement in school zones Construct sidewalks, curb and gutter, curb ramps, pedestrian refuge islands; minor safety lighting

$402,800

43 Santa Barbara

Clifton St. between Salinas St. and Canada St. Cleveland ES

$225,000

44 Santa Barbara County 45 Santa Cruz

5 5

South side Clark Ave. from west of SR 135 to east of Norris St. Various locations throughout the city

46 Santa Cruz County

47 Santa Cruz County

Bush St.; Harmon St. between Oak St. and Bush St.; Laurel St. between Harmon St. and Lomond St.; Lomond St. between Laurel St. and SR 9 (Central Ave.) Multiple Schools in 4 Santa Cruz School Mintie White ES, Bay Conduct bicycle and pedestrian education, Districts View ES, Ann Soldo ES, encouragement, traffic safety enforcement and HA Hyde ES, Del Mar evaluation ES, Westlake ES, Shoreline MS

Orcutt MS, Patterson Rd Construct sidewalk, curb and gutter ES Westlake ES Construct sidewalks, smaller radius curb returns, curb ramps, pedestrian refuge islands; install raised crosswalks Boulder Creek ES Construct pedestrian path and retaining wall

$350,000 $503,100

$250,000

$399,800

Page 5 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 6 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $393,600

48 Delano

49 Dinuba

Cecil Ave./Albany St.; Albany St./15th Ave.; Albany St./14th Ave.; Albany St./13th Ave.; SR 155 (Garces Hwy.)/Austin St.; SR 155/Belmont St.; SR 155/Dover St. Alta Ave./North Way and El Monte Way/Palm Dr.

Valle Vista ES, Almond Tree MS, Freemont ES

Construct raised crosswalk, bulb-outs, curb ramps; install signs and striping

50 Firebaugh

Various locations throughout the city

John F Kennedy, Washington MS, Lincoln ES, Jefferson ES, Roosevelt ES Arthur E Mills MS, Firebaugh MS

Install (solar powered) in-pavement crosswalk lights, signs, and pavement markings

$161,000

Construct pedestrian path, sidewalks, curb and gutter, and curb ramps; upgrade crosswalk striping; install in-pavement crosswalk lights Construct sidewalk; install (high visibility) crosswalk Install traffic signal; construct curb ramps Install traffic signal Construct sidewalks, curb and gutter, curb ramps, and A.C. tie-ins

$439,200

51 Fresno 52 Fresno County 53 Fresno County 54 Kern County

6 6 6 6

55 Kern County

56 Kings County 57 San Joaquin 58 Taft

6 6 6

59 Visalia 60 Visalia

6 6

Molly S Bakman ES, Kings Canyon MS Madre St. between Golden Hills Blvd. and Park Golden Hills ES Rd.; Park Rd. between Santa Barbara Dr. and Golden Hills Blvd.; Sierra Ave. between Santa Barbara Dr. and Madre St. Fairview Rd. between Gary Pl. and Don St.; Fairview ES west side Sparks St. between Fairview Rd. and Garden Dr.; Don St. between Fairview Rd. and Don St.; Garber Way between Fairview Rd. and Garden Dr. General Petroleum Ave. between SR 41 and 5th Kettleman City ES St. Various locations throughout the city San Joaquin ES Various locations throughout the city Taft ES, Parkview ES, Roosevelt ES, Lincoln MS Houston Ave./Mooney Blvd. Green Acres MS La Vida Ave. between Chinowth St. and Linwood St.; Victor Ave. between Chinowth St. and Linwood St. Beech Ave./West St.; Pinkham St. between Laura Ave. and Walnut Ave.; Tulare Ave. between Pinkham St. and S. Goddard St.; Woodland St. between Tulare Ave. and Dartmouth Ave. 4th St./Birch Ave. and 4th St./Griffith Ave.

Florence Ave. between Balderas ES and Chestnut Ave. Lincoln Ave. approximately 725' east of Elm Ave. Belmont Ave./Helm Ave.

Ezequiel Balderas ES Washington Colony ES

$103,900 $357,800 $546,300 $213,000

Construct sidewalks, curb and gutter, curb ramps, AC tie-in and cross-drains

$263,000

Construct sidewalks, curb and gutter, cross gutters; install signs Construct bulb-outs; install signs and striping Construct curb ramps; install speed feedback signs, in-pavement crosswalk lights, striping and pavement markings Install traffic signal; construct intersection improvements and curb ramps Linwood ES, La Joya MS Construct sidewalks and curb ramps; install crosswalks Construct crosswalk, sidewalk and curb ramps

$453,600 $244,000 $457,400

$389,000 $123,600

61 Visalia

Royal Oaks ES, Mountain View ES, Pinkham ES, Annie R Mitchell ES Thomas Jefferson MS

$219,400

62 Wasco

Install in-pavement crosswalk lights

$359,100 ** ES = Elementary School MS = Middle School

Page 6 of 15 10/11/2011

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 6 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $165,000

63 Wasco

Multiple Schools in the City of Wasco

64 Arcadia

Various locations throughout the city

65 Azusa

Citrus Ave./Gladstone St.; Gladstone St. between Citrus Ave. and Barranca Ave.; Fairvale St./Gladstone St.; Little Dalton Wash between Citrus Ave. and Gladstone St.

Karl F Clemens ES, Palm Develop SRTS plan modeled by the National Ave ES, Thomas Center for Safe Routes to School. Jefferson MS, Teresa Burke ES, John L Prueitt ES, North Kern Christian School Hugo Reid ES Construct sidewalks, bulb-outs, and curb ramps; install crosswalks, pedestrian countdown heads, and signs Gladstone ES Construct pedestrian refuge islands, bulb-outs, curb ramps; install crosswalks, pedestrian countdown heads, advance stop (bars) markings, signs and striping.

$647,700

$1,000,000

66 Azusa

Multiple Schools in the Azusa Unified School District

Henry Dalton ES, Alice M Provide safety education and encouragement Ellington ES, Gladstone programs and conduct enforcement activities Street ES, Victor F across the district Hodge, Charles H Lee ES, Magnolia ES, Clifford D Murray ES Ernest R Geddes ES, Jerry D Holland MS, Margaret Health ES, Pleasant View ES, Santa Fe ES Bell Gardens ES, Cesar E Chavez ES, Garfield E, Suva ES, Bell Gardens MS, Suva MS Thomas Edison ES, Saint Finbar Construct sidewalks, bulb-outs, and curb ramps; install crosswalks and bike lanes; upgrade traffic signals, signs and striping

$500,000

67 Baldwin Park

Maine Ave. between SR 83 (Arrow Hwy.) and Los Angeles St.

$1,000,000

68 Bell Gardens

Multiple Schools in the City of Bell Gardens

Hold 12 events for safe practices of walking and bicycling to school; 16 page bilingual magazine; develop website Install bike lanes, bike detection, bike boxes, and crosswalks; construct traffic circles, bulbouts, curb ramps, and (entry) pedestrian refuge islands

$170,000

69 Burbank

Keystone St. between Pacific Ave. and Riverside Dr.

$689,100

70 Calabasas

Various locations throughout the city

Alice C Stelle MS, Chaparral ES, Arthur E Wright MS

Construct crosswalks and upgrade existing crosswalks, signs and curb ramps; install inpavement crosswalk lights, flashing beacons, signs and striping.

$327,800

Page 7 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 7 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $500,000

71 Culver City

Multiple Schools in the City of Culver City

El Marino Language School, El Rincon ES, Farragut ES, La Ballona ES, Linwood Howe ES, Culver City MS

Provide safety classes and assemblies for pedestrians and bicyclists; bicycle skills courses and pedestrian rodeos; printed materials such as educational brochures and maps; train-thetrainer courses; conduct walk/bike pledge campaigns; bike-and-walk safety web site; walkto-school day events; implement walking school buses and bicycle trains Construct sidewalks, pedestrian refuge islands, and bulb-outs; install crosswalks, pedestrian countdown heads, advanced stop (and yield) markings Form a city-wide SRTS advisory council and school-level committees; pedestrian and bicycle safety curriculums, helmet fittings, bicycling skills courses; enforcement Conduct bicycle and pedestrian education, encouragement, traffic safety enforcement and evaluation Construct crosswalks, bike loop detectors, sharrows, signs, speed humps, pedestrian refuge and median islands, and street closure

72 Glendale

73 Glendale

74 Long Beach

75 Los Angeles

76 Los Angeles

Chamlian Armenian School, Valley View ES, Bnjamin Franklin ES, Thomas Edison ES, Cerritos ES Multiple Schools in the Glendale Unified School Balboa ES, Columbus District ES, Dunsmore ES, Abraham Lincoln ES, Glenoaks ES, Horace Mann ES, Cerritos ES Multiple Schools in the City of Long Beach Addams ES, Barton ES, Birney ES, Bixby ES, Bryant ES, Buffum ES, Burcham ES Beverly Blvd. between Loma Dr. and Rampart Esperanza ES, Liechty Blvd.; Union Dr. between 11th St. and 4th St.; MS, Union Avenue ES Union Ave. between 4th St. and Beverly Blvd.; 4th St. between Union Dr. and Union Ave.; 3rd St. between Columbia Ave. and Rampart Blvd.; 6th St./Grandview St. The area bordered/bounded by Martin Luther Menlo Avenue ES King Jr. Blvd., Hoover St., Vernon Ave., and Vermont Ave. 11th St. between Harvard Blvd. to Vermont Ave. Berendo MS

Various locations throughout the city

$999,900

$500,000

$500,000

$686,000

Construct road diet with bike lanes, crosswalks, and median refuge islands and bulb outs

$548,000

77 Los Angeles

78 Los Angeles County

Multiple Schools in Los Angeles County

Thirty (30) ES

Construct roundabouts, crosswalks, bulb-outs, pedestrian crossing warning devices, bike loops, signs and striping and bike racks Conduct bicycle and pedestrian safety skills for students in each grade level

$972,400

$500,000

Page 8 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 7 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $500,000

79 Los Angeles County

Multiple Schools in the Los Angeles Unified School District

Leo Politi ES, Tenth Street ES, John Adams MS, Charles White ES, Kingsley ES, Dayton Heights ES, Los Feliz ES

Provide a SRTS Program Coordinator that would provide outreach and technical support to develop SRTS programs; form school-based SRTS committees to coordinate education, encouragement, evaluation and enforcement activities; train the trainer programs Install crosswalks, flashing beacons at existing crosswalks, speed feedback signs, bike facility, signs, pavement markings and raised pavement markings, and flexible delineators; Construct bulb-outs and curb ramps

80 Manhattan Beach

Various locations throughout the city

81 Palmdale

82 Pasadena

83 Pico Rivera

Install traffic signals and bike lanes; upgrade crosswalks, signs, and pavement markings; construct sidewalks, bulb-outs, curb ramps Lincoln Ave. between Idaho St. and Washington Cleveland ES, Construct sidewalk, crosswalks, curb ramps, Blvd. Washington MS raised medians; install pedestrian countdown heads; upgrade crosswalks Various locations throughout the city Alice M Birney ES, Install traffic signals, flashing beacons, Durfee ES, Lawrence T pedestrian countdown heads, crosswalks; Magee ES, North Rancho construct sidewalk, curb and gutter ES, Rio Vista ES, Rivera ES, South Ranchito ES, Valencia ES, Osburn Burke MS, Rivera MS Multiple Schools in the City of Pico Rivera Alice M Birney ES, Durfee ES, Lawrence T Magee ES, North Ranchito ES, Rio Vista ES, Rivera ES, Valencia ES Emma W Shuey ES, Mildred B Janson ES Implement pedestrian safety action plans; walkability audits, holding SRTS workshops with a stakeholder task force; develop suggested route maps for each school, and creating an online library of walking and biking safety resources for PTA and teacher use. Install crosswalks, minor safety lighting, pedestrian activated flashing beacons, median fencing, pedestrian countdown heads, signs, speed feedback signs; construct sidewalks and bulb-outs at wide-radius corners

American Martyrs School, Grand View ES, Manhattan Beach MS, Meadows Avenue ES, Pacific ES, Opal Robinson ES Ave. R-8 from just west of E. 37th St. to E. 43rd Mequite ES St.; E. 40th St. between Ave. R-8 and Triton Dr.

$490,600

$925,700

$306,000

$998,600

84 Pico Rivera

$275,000

85 Rosemead

Various locations throughout the city

$860,000

Page 9 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 7 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $621,300

86 San Buena Ventura

College Dr./Telegraph Rd.

Anacapa MS

Install traffic signal, crosswalks, bike lanes, signs, striping, and pavement markings; construct curb ramps, upgrade bicycle parking

87 San Gabriel 88 San Marino

7 7

Walnut Grove Blvd. between Broadway and Roosevelt ES Frandsen St. Huntington Dr. between Granada Ave. and San K L Carver ES, Gabriel Blvd. Huntington MS, William L Valentine ES Pamplico Dr. between Myrin Ct. and Fenwall Dr.; Hardesty Ave. between Ermine St. and Aldbury St.; Lotusgarden Dr./Flowerpark Dr. Rose Ave./Collins St.; south side Rose Ave. between Collins St. and Orange Dr. Yucca Loma Rd. between Mohawk Rd. and Rancherias Rd.; Rancherias Rd. between Yucca Loma Rd. and Powhatan Rd. Yorba Ave. between Fairway Blvd. and Bird Farm Rd.; south side Los Serranos Blvd. between Pipeline Ave. and Bird Farm Rd.; Pomona-Rincon Rd. (Bird Farm Rd.) between Banbury Ct. and Fairway Blvd. Various locations throughout the city Skyblue Mesa ES, Pinetree, James Foster ES Rio Del Valle MS

89 Santa Clarita

Relocate crosswalk; construct sidewalks; install speed feedback signs. Install pedestrian countdown heads and minor safety lighting, advance warning signs, flashing beacons; construct bulb-outs; upgrade crosswalk striping Construct sidewalks and bulb-outs; install crosswalks and speed feedback signs Install traffic signals, crosswalks, and bike lanes; construct sidewalks Widen roadway; construct sidewalk, curb and gutter, curb ramps, and driveway approaches at school entrance; upgrade crosswalks Construct sidewalk, curb and gutter, and curb ramps; minor safety lighting and drainage

$342,000 $726,600

$587,200

90 Ventura County

$425,000

91 Apple Valley

Yucca Loma ES

$358,600

92 Chino Hills

Chaparral ES, Glenmeade ES

$523,700

93 Coachella

94 Corona

Fullerton Ave. between Ridgewood Dr. and Monarch Dr.

Coral Mountain Academy, Palm View ES, Peter Pendleton ES, Valley View ES, Bobby Duke MS, Cesar Chavez ES John Stallings ES

Install crosswalks, advanced stop (and yield) markings, rapid flashing beacons, bike lanes, and signs; construct curb ramps, bulb-outs or tapered curb extensions, chicanes, pedestrian refuge islands Install traffic signals with pedestrian countdown heads and interconnect to local TMC, crosswalks, and striping; construct curb ramps Construct sidewalk, curb and gutter, and bulbouts; install crosswalks and advanced stop (bars) markings

$496,100

$159,300

95 Desert Hot Springs

West side Cactus Dr. between 4th St. and 8th St.; 4th St. between West Dr. and Cactus Dr.; Cactus Dr./4th St.

Edward L Wenzlaff ES

$470,400

Page 10 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 8 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $500,000

96 Desert Hot Springs

Multiple Schools in the City of Desert Hot Springs

97 Hesperia

Willow St. between Third Ave. and Eighth Ave.

98 Highland

McKinley St. between 9th St. and Base Line; Base Line/Valaria Dr. 9th St. between Cunningham St. and Palm Ave.; Church Ave./Norwood St. Various locations throughout the city

Cabot Yerxa ES, Julius Corsini ES, Two Bunch Palms ES, Edward N Wenzlaff ES, Desert Springs MS, Painted Hills MS Joshua Circle ES, Cypress School of the Arts, New Life Christian Academy, Hesperia MS, Mesa Grande ES, Eucalyptus ES, Lucy E Siegrist ES, Maple ES, Hesperia Christian, Pathways to College Lankershim ES

Hire A SRTS Coordinator; provide safety education assemblies; bicycle and pedestrian rodeos; printed materials; SRTS workshops; increased law enforcement during school pickup and drop-off times Construct multi-use path, curb and gutter, curb ramps; install crosswalks, signs, and pavement markings

$834,900

99 Highland

Cypress ES, Thompson ES Machado ES, Elsinore ES, Elsinore MS, Terra Cotta MS, Tuscany Hills ES, Canyon Lake MS, Cottonwood Canyon ES

100 Lake Elsinore

Construct sidewalks, curb and gutter, and curb ramps; install in-pavement crosswalk lights and flashing beacons Construct sidewalks, curb and gutter, and curb ramps; install in-pavement crosswalk lights and flashing beacons Install speed feedback signs

$677,200

$510,700

$355,400

101 Rancho Cucamonga

North side 9th St. from 100' west of Vineyard Ave. to 800' west of Vineyard Ave.

Los Amigos ES, Rancho Construct sidewalk, curb and gutter; Cucamonga MS bicycle/skateboard rack

$90,800

102 Rancho Cucamonga

Multiple Schools in the City of Rancho Cucamonga

103 Riverside County

Whittier Ave. between Yale St. and Cornell St.

Vineyard MS, Alta Loma MS, Day Creek MS, Summit MS, Ruth Musser MS, Ramona ES

Conduct bicycle and pedestrian safety education, promotional events like Walk to School Days, contests; increased traffic enforcement Widen roadway; construct sidewalks and curb ramps; install signs and pavement markings

$298,400

$510,300

Page 11 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 8 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $500,000

104 Riverside County

Multiple Schools in Mecca, Thermal, Thousand Mecca ES, Saul Martinez Conduct traffic safety education activities; Palms and Cathedral City ES, John Kelly ES, Las facilitate resource sharing and networking by Palmitas ES, Toro expanding the regional SRTS coalition Canyon MS, Della S Lindley ES, Rio Vista ES Multiple Schools in the Cities of Lake Elsinore, Wildomar, and Menifee Convene a Western Riverside County SRTS Coalition; conduct SRTS workshops; provide pedestrian and bicycle safety education at target schools; pilot a regional bicycle ambassador program; participate in and/or organize health and ped/bike safety community outreach events Adams ES, S Christa Conduct workshops by implementing pedestrian McAuliffe ES, Rosemary safety measures, educating students, parents, Kennedy ES, Twinhill ES and teachers Construct sidewalks and curb ramps; install crosswalks; upgrade signs and pavement markings Elsinore ES, Wildomar ES, Machado ES, William Collier ES, Ronald Reagan ES, Quail Valley ES, Boulder Ridge MS

105 Riverside County

$500,000

106 Riverside County

Multiple Schools in the City of Riverside

$250,000

107 Wildomar

North side Union St. between Trailwood Ct. and William Collier ES Corydon St.; Trailwood Ct./Union St.; Trailwood Ct./Mayhall Dr.; Trailwood Ct. between Alderbrook Rd. and Mayhall Dr.; Alderbrook Rd. between Mayhall Dr. and Mapleleaf Ct. 12th St. between Ave. "E" and Kentucky St.; Dunlap ES 13th St. between Ave. "E" and Oak Glen Rd.; Oak Glen Rd. from 13th St. to existing trail along Wilson Creek North side Meridian Blvd. from the end of a multi Mammoth ES, Mammoth use path near Joaquin Rd. to Sierra Park Rd. MS where the project meets the schools Las Flores Ave./Downs St.; Sierra View Gateway ES, Las Flores St./Kevin Ct.; Sierra View St./Mary Ann St.; ES, James Monroe MS Upjohn Ave. between Forrest Knoll St. and S. Fountain St.; Gateway Blvd. between White Oak Dr. and Langley Ave. ; Warner St. between Church Ave. and W. Ridgecrest Blvd. Central Ave. (corridor) between Glenda Rd. and Caswell ES Academy Pl.

$503,900

108 Yucaipa

Construct sidewalks, curb ramps, section of multi-use path; install (school zone) signs and pavement markings Construct sidewalk and curb ramps; install bike lanes

$508,600

109 Mammoth Lakes

$961,400

110 Ridgecrest

Construct sidewalks, curb ramps, and a bus turnout; install crosswalks, speed feedback signs, and bike lane signs and pavement markings

$583,400

111 Ceres

10

Install LED in-pavement crosswalk lights, speed feedback signs; upgrade crosswalks; striping

$453,000

Page 12 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 10 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $203,000

112 Ceres

Multiple Schools in the City of Ceres

Caswell ES, Don Pedro ES, M Robert Adkison ES, Sinclear ES, La Rosa ES

113 Mariposa County

10

114 Merced

10

115 Ripon

10

5th St. between SR 140 and Bullion St.; Bullion Mariposa ES St. between 5th St. and 8th St.; 6th St. between Bullion St. and Jones St.; 7th St. between Bullion St. and Jones St.; Jones St. between 6th St. and 7th St. Mercy Ave./Mansionette Dr.; Paulson Rd. Herbert H Cruickshank between E. Donna Dr. and Gazelle Ct.; Buena MS, Allan Peterson ES, Vista Ave. between "R" St. and San Rafael Ct.; Rudolph Rivera MS, Coffee Rd. between Childs Ave. and Dinkey Weaver MS Creek Ave. Fulton Ave. between W. Shasta Ave. and Cindy Park View ES Dr.; Cindy Dr./Calhoun Ave.; W. Shasta Ave. between N. Ripon Rd. and Fulton Ave. Alpine Ave. between El Pinal Dr. and Sanguinetti Ln. Harrison ES

Recruit SRTS Taskforce members representing each school; develop SRTS maps; provide pedestrian, cyclist and driver safety forum; conduct walking-school-bus assemblies, pedestrian and bicycle safety assemblies and bike rodeo demonstrations Construct sidewalks, curb ramps, minor drainage; add school zone signage and crosswalks

$341,200

Install crosswalks, safety lighting, and flashing beacons; construct sidewalks, curb and gutter, curb ramps

$980,900

Install crosswalks, LED in-pavement crosswalk lights, speed feedback signs, signs and striping; construct bulb-outs

$493,000

116 Stockton

10

117 Stockton

10

Construct sidewalks, minor drainage, curb and gutter, raised median, stamped concrete; minor AC work; install in-pavement crosswalk lights and speed feedback signs Multiple Schools in Stockton, Lincoln, Lodi andf Brookside ES, Claudia Pilot SRTS program expansion to provide Manteca Unified School District Landeen, Podesta Ranch bicycle and pedestrian safety education ES, Wagner-Holt ES, Parklane ES, August Knodt ES, Madison ES Johnson Ave. between Grant Ave. and Renette EJE Acadamies Charter Ave.; Grant Ave. between Johnson Ave. and School Emerald Ave.; Renette Ave. between Johnson Ave. and Emerald Ave.; Emerald Ave. between Grant Ave. and Renette Ave. Greenfield Dr. between Gorsline Dr. and Haden Greenfield MS Ln. Various locations throughout the city Flora Vista ES Construct sidewalk, curb and gutter, and curb ramps; install speed feedback signs; upgrade pedestrian countdown heads, upgrade crosswalks, signs

$686,900

$463,000

118 El Cajon

11

$362,900

119 El Cajon

11

120 Encinitas

11

121 Imperial County

11

East side Baseline Rd. between San Pasqual Rd. and Arnold Rd.

San Pasqual Valley ES, San Pasqual Valley MS

Construct sidewalk, curb and gutter, and curb ramps; install speed feedback signs, pedestrian countdown heads, and signs Construct raised medians, raised crosswalks, (staggered) pedestrian refuge islands, bulbouts, and curb ramps Construct sidewalk, curb and gutter

$406,400

$331,200

$508,400

Page 13 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 11 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $323,400

122 La Mesa

Various locations throughout the city

123 Lemon Grove

11

Multiple Schools in the City of Lemon Grove

Rolando ES, Maryland Avenue ES, La Mesa Dale ES, La Mesa MS Golden Avenue ES, Monterey Heights ES, San Miguel ES, Palm MS, San Altos ES, Mount Vernon ES

Construct sidewalk, bulb-outs, and curb ramps; install in-pavement crosswalk lights, crosswalks, pedestrian countdown heads Form a SRTS Steering Committee and form SRTS Coalitions at each school; conduct pedestrian/bike education courses; hold SRTS Workshops, conduct walk/bike audits; develop Suggested Routes to School Maps, training and education for parents and staff, National Walk to School Day activities, and form walk/bike groups. Conduct community and school-based safety education; unique partnership with school nursing and SRTS program; establish a technology-driven sustainable incentive program including a community safety campaign

$451,500

124 National City

11

Multiple Schools in the City of National City

Central ES, El Toyon ES, Ira Harbison ES, Kimball ES, Las Palmas ES, Lincoln Acres ES, John A Otis ES Beyer ES, Willow ES, La Mirada ES, Sunset ES, Smythe ES, Ocean View Hills School

$500,000

125 San Diego

11

Multiple Schools in the City of San Ysidro

126 San Diego

11

Multiple Schools in the City of San Diego

Conduct comprehensive education and safety awareness strategies; implement "Walk and Wheel to School," an outreach effort; conduct walk audits, develop informational brochures, conduct workshops Bell MS, Gompers Create a SESD Safety Resource Network, a Charter MS, Keiller formalized partnership with local communityLeadership Academy MS, based governmental, and enforcement Memorial Preparatory for organizations Scholars and Athletes, O'Farell Community MS Lakeview ES Construct sidewalk, curb and gutter, and curb ramps Install traffic signal, speed feedback signs, signs, and striping; construct sidewalk, curb and gutter Construct raised median, pedestrian island refuge, and curb ramps; install signs Construct (8' wide) sidewalk and curb ramps; install bike lane Construct sidewalk, curb and gutter, and minor drainage facilities

$494,700

$500,000

127 San Diego County

11

128 San Marcos

11

East side Lakeview Rd. (along the school frontage); west side Lakeview Rd. between W. Lakeview Rd. and Lakeview Granada Dr. Borden Rd./Richland Rd. and Richland Rd./Rose Ranch Rd. Mast Blvd./Jeremy St.

$670,800

Richland ES

$489,500

129 Santee 130 Anaheim 131 Anaheim

11 12 12

Hill Creek ES

$407,000 $426,600 $530,000

Ball Rd. between Magnolia Ave. and Dale Ave. Mattie Lou Maxwell ES South side La Palma Ave. from East St. to 500' Sycamore MS, Thomas west of East St. Edison ES

Page 14 of 15 10/11/2011

** ES = Elementary School MS = Middle School

Caltrans Local Assistance

Approved Project List for Cycle 3 of the Federal Safe Route to School (SRTS) Program Fiscal Year 2011/12
Caltrans District 12 Project Location** School Name(s)** Project Description

Sorted by Caltrans District

No.

Local Agency

Federal Funds $273,600

132 Brea

"Tracks at Brea" trail/Brea Blvd.; "Tracks at Brea" trail/State College Blvd.; State College Blvd./Avocado St.

Laurel ES, Brea MS

Install traffic signal with bike (video detection)/pedestrian traffic control devices, crosswalks, signs; upgrade/modify traffic signals

133 Costa Mesa

12

E. 19th St. between Newport Blvd. and Irvine Ave. Various locations throughout the city

134 Costa Mesa

12

Mariners ES, Woodland ES, Heinz Kaiser ES, Horace Ensign MS Adams ES, California ES, College Park ES, Maude B Davis ES, Heinz Kaiser ES, Killybrooke ES, Paularino ES, Pomona ES, Everett A Rea ES Helen Stacey MS, Ada E Clegg ES Plaza Vista MS, Woodbury ES, Canyon View ES, Brywood ES, Alderwood Basics Plus ES, Bonita Canyon ES Walker MS

Construct raised medians and chokers; minor landscaping and signs Install (solar powered) speed feedback signs and retrofit existing speed feedback signs, pedestrian countdown heads, (solar powered) flashing beacons, signs and striping

$855,900

$796,200

135 Huntington Beach 136 Irvine

12 12

Various locations throughout the city Multiple Schools in the City of Irvine

Install traffic signal, bike lanes, signs and striping; construct curb ramps. Conduct traffic safety education and implement a comprehensive walking/biking to school program

$478,500 $500,000

137 La Palma

12

138 Mission Viejo

12

Walker St. between Crescent Ave. and La Install speed feedback signs Palma Ave.; Crescent Ave. between Walker St. and Moody St. Various locations throughout the city Bathgate ES, Castille ES, Construct sidewalk and curb ramps Viejo ES, Newhart MS, Barcelona ES, Carl Hankey ES, La Paz MS, Montevideo ES, De Portola ES, Cordillera ES Multiple Schools in the City of Santa Ana All ES in Santa Ana Provide pedestrian safety educational campaign and continued encourgement of safety practices Totals

$174,000

$141,400

139 Santa Ana

12

$338,900

$66,373,600

Page 15 of 15 10/11/2011

** ES = Elementary School MS = Middle School

You might also like