Appendix 3

DURATION: 1 Month (31 Days)


Scope of Work 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3
1 2 3 4 5 6 7 8 9
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
Demolition Works
Masonry Works
• 4" CHB Laying with Rebars
• Plastering Works
Carpentry Works
• Cashier Counter
• Display Hooks
• Stockroom Cabinet
• Floating Shelves
Ceiling Works
• Flat Ceiling using
• Drop Ceiling-Circular
• Drop Ceiling-Cashier Counter
Wall Finishes
• Stockroom Partition
• Drywall Partition
• Fitting Room Partition
• Mirror on Plywood Backing
• Glass Panel
Floor Finishes
• Vinyl Planks
• Carpet Roll
• Elevated Floor Using Plywood
Painting Works
• Ceiling- Flat Enamel
• Wall- Semi Gloss Latex
• Elevated Floor- Semi Gloss
• Cashier Counter- Duco
• Display Hooks- Duco
• Stockroom Cabinet- Duco
• Floating Shelves- Duco
Other Finishes
• Roll-Up Door
• Cashier CountertopLaminated
Electrical Works
• Wiring and Conduit
• Switches and Outlets
• Lighting Fixtures
• Flourescent- Cove Light
• Panel Box and Accessories