Professional Documents
Culture Documents
2008
Content
• Location Strength
• Manufacture Strength
•OEM/ODM Products
Location Strength
Shenzhen Port
The Pearl River Delta
• The Pearl River Delta is one of the most prosperous areas with the
fastest developing speed in China, and it has become one of the
world’s leading centre for assembling manufacturing of high-tech
electronics products.
• The Pearl River Delta’s greatest strengths include low land and
labor cost, productive workforce, reasonable infrastructure,
improving technical skills, and a supportive policy regime.
Shenzhen International Airport
Shenzhen Port is adjacent to HK. The city’s 260km coastline is divided by the
Kowloon Peninsula into two halves, the eastern and the western. Shenzhen’s
western port area lies to the east of Lingdingyang in the Pearl River Estuary and
possesses a deep water harbor with superb natural shelters.
It is about 20 sea miles from Hong Kong to the south and 60 sea miles from
Guangzhou to the north. By passing pearl river system, the western port area is
connected with the cities and counties in pearl river delta networks; by passing On
See dun waterway, it extends all ports both at home and abroad. The eastern port
area lies north of Dapeng Bay where the harbor is wide and calm and is regarded as
the best natural harbor in South China.
Hong Kong is also very accessible and less than a one-hour train trip.
Manufacture Strength
• Organization Structure
• Workshop Introduction
• Production Process
Organization Structure
Manufacture
Center
General
SMT Dep. Assembly Dep. Packing Dep. Technical Dep. Administration Dep.
LIN E6
LIN E2
LINE3
SMT
LIN E5
LINE4
LINE1
LIN E4
LINE12
LINE5
LIN E3
LINE11
LINE6
LIN E2
LINE10
LINE7
QA
LIN E1
LINE8
Line 9
Administration Area
• Process of Department
Solder Paste Thickness Tester
PCB
Automatic Solder Printer SMT placement machine
Nitrogen device
QC Visual
Inspection
Whole Process
Process of SMT
PCB
Automatic Solder Printer SMT placement machine
Nitrogen device
QC Visual
Inspection
• Each line can produce 100 PCS of two way radio devices per
hour. Each month more than 150,000 devices are produced.
Reflow Oven
Advantages:
• Oxidation prevention;
• Improved soldering quality;
• Enlarged Process Window;
• Visual appearance of the solder joint surface will
be smoother and shinier,
• Larger surface tension can hold larger and
heavier components on bottom side when
performing double reflow.
Process of Assemble
Total Test
Microfocus Digital X-Ray Systems
Low maintenance
Point-and-click operation
HP Test Set
WI (Work Instruction)
5S Management
Quality Assurance Strength
ATEX FM FCC CE
1.Certificates & Patents
to be continued
1.Certificates & Patents
continuous
17 An Method of Digital Signaling Encoding and Decoding Invention 25-Jul-05 200510036187 Being reviewed P.R.C
18 A Moblie Radio(TM-600) Outlook Design 01-Jan-06 200630049710.X Being reviewed P.R.C
19 A Repeater(TR-800) Outlook Design 01-Jan-06 200630049713 Being reviewed P.R.C
20 A SM07R1 Keypad Microphone Outlook Design 01-Jan-06 200630049711 Being reviewed P.R.C
21 A SM08 Series Remote Speaker Microphone Outlook Design 01-Jan-06 200630049715 Being reviewed P.R.C
22 A Portable Two-way Radio(PT-300) Outlook Design 01-Jan-06 200630049715 Being reviewed P.R.C
23 A Dual-Slot Charger(for Li-ion battery) (PT300) Outlook Design 01-Jan-06 200630049713 Being reviewed P.R.C
24 A Digital Trunking Terminal 1 Outlook Design 30-Apr-06 200630016650 Being reviewed P.R.C
25 A Digital Trunking Terminal 2 Outlook Design 30-Apr-06 200630016655 Being reviewed P.R.C
26 A Digital Trunking Terminal 3 Outlook Design 29-Apr-06 200630016632 Being reviewed P.R.C
27 A Digital Trunking Terminal 4 Outlook Design 30-Apr-06 200630016654.X Being reviewed P.R.C
28 A Key of Two-way Radio Practical innovation 01-Aug-06 200620017378 Being reviewed P.R.C
29 A Frequency Synthesizer Invention 31-Aug-06 200610062407 Being reviewed P.R.C
and Its Synthesizing Method
30 An Apparatus for Modulateing CPFSK Signal Invention 13-Oct-06 200610063122 Being reviewed P.R.C
31 A Digital Trunking Two-way Radio ( PT-790 Portable Outlook Design Being reviewed EU
Radio/Interphone) applied in EU
32 A Portable Two-way Radio(TC1600) Outlook Design 07-Nov-06 200630154390 Being reviewed P.R.C
33 A Portable Two-way Radio(TC3000S) Outlook Design 06-Nov-06 200630154355 Being reviewed P.R.C
34 A Portable Two-way Radio(TC3600S) Outlook Design 07-Nov-06 200630154389 Being reviewed P.R.C
35 A Portable Two-way Radio(TC-900) Outlook Design 07-Nov-06 200630154389 Being reviewed P.R.C
36 A Frame Synchronization System and its Operational Invention 07-Nov-06 200610063519.x Being reviewed P.R.C
Method for the Link of Digital Communication Systrem
2.Quality Management : ISO9001:2000
3.Reliability
Rotary switch
PTT button
Socket
Microprocessor
Memory
Amplifier
Transistor
Diode
Resistor, Capacitor
Crystal Filter
Speaker FOSTER
Battery Cell
3.Reliability
Adhering to our quality objective of ‘customer satisfaction’, HYT
established perfect quality assurance and control system.
R&D quality assurance policy :
Compliant with National and Industry Standard and US Military Standard.
2.Reliability
Environmental Engineering
Shielded laboratory
3.Reliability
RF Lab
Trunking
System Lab
General Lab
3.Reliability
Rain Test
Dust Test
Vibration Test
determine radio's resistance to
vibration stresses encountered in Vibration test platform
shipment and application
environment. Max vibration frequency
4000Hz,acceleration 70g
3.Reliability
ESD Test
Evaluate the radio and component’s
ability to resist ESD in both air
discharge and contact discharge
mode.
Monitor
MFG to Goals
Certify
Technology and
Qualify Product
Design In
Quality and
Reliability
Document
Goals & Use
conditions
Identify
Market Customer Feedback
Segment
5. Quality Organization Chart
Quality Organization
A I
P
U P Q IQC SQE CQE QS
P Q
A T Q A
/
S I C
E
Q O
S / T
A C
T E
A S TRUNKIN
T G SQA : Software Quality Assurance
SYSTEM A/ST : Accessory/Structure Test
LAB PI/CA : Parts Identification/ Circuit
Analysis
6. Quality Management Circle
R&D
TEST
BURN-IN
Manufacturing
IQC Process
PROJECT REVIEW Control
to be continued
6. Quality Management Circle-ITB
0 1 2 3 4
Concept Plan Research and Development (R&D) Verification Product Release
SCM
- Changed in Facility/Location Stage
SQE/IQC Visual/Dim.
First Article Evaluation
ME Function
PMC Reliability
- A few samples/Drawing
- Pass--> AVL-->Purchase
Incoming Quality Ctrl Report
IQC/SQE Material Inspection Control
LAR/DPPM
- P/N
- QAI
SUPPLIER QUALITY
Monitoring/Feedback
System
SQE
Supplier SQE/IQC Supplier Process Engineer SQBR SQE
Corrective Purchase Change Request Purchase S Purchasing/PMC
SCAR Supplier S
Supplier PCR Engineering
QBR
*Non-Conforming Parts *Supplier quarterly rating system
(IQC, Prod Floor, Customer) *Major Changes in Specs/Drawing *Drive suppliers for continuous
*Major changes in mfg flow/process improvement.
Receiving Store
Received Qty. Incorrect
Reject
IQC Inspection MRB
Accept
Store UAI Sorting Rework RTV
FIFO
Production
11. Flow Chart of Two-way radio
Incoming Material
Reject
START
NG
IQC
Import purchase order Concession Application
OK
Storage
Product configuration Scrap Material that confirmed store
SMT in the scrap storage ,and fill the
Auto generate Item, BOM and
Scrap Application.
craftwork of the product
Oven Flow
Auto generate production After approved by the Plant Mgr. or
tasks Deputy Mgr. , the Administration
Single PCB NG will handle in sort.
Tuning :
Production Packing
NG
QA QC Inspection
OK
Storage
Shipment
12. MFG Quality Management Focal point
Assembly
QC QC
IQC P1 P2 Before After
Oven Oven
P3
P4
Solder Paste Change Line Before After
Printer & Material Oven Oven
IPQC
First Article
12. MFG Quality Management Focal point
Attachment Assembly
P1 P2 P3 P4 P5
VCO Tuning RX Tuning TX Tuning Function Test QC
IPQC
First Article
12. MFG Quality Management Focal point
Work closely with MFG Engineering team to design and define MFG
process and process control as well.
Look into the line fallout systems, specially focus on commodity high
fallout rate. Fix the parts related quality problem
Specially focus on Boxline induced failure analysis and work with PE and
MFG to define the right operation
12. MFG Quality Management Focal point
Specially focus on closed loop analysis of commodity defects and work with
related team or vendor to final resolution
MFG also set up a control chart process in each line to track timely quality
performance and get support from related team to fix problems
13. Customer Quality Management Focal point
Information Feedback
Information
Feedback
Visual Function Visual Function
Inspection Inspection Inspection Inspection
CSA
13. Customer Quality Management Focal point
Management
committee
Champion Champion
MBB
BB BB
BB BB
BB
14. Quality Culture Progress----6Sigma Project