Petrofac

RISK ASSESSMENT / JOB SAFETY ANALYSIS


No JSA No.:JSA-2008-002
SteeI Structure Erection #' No 3

1


SA TitIe:
SteeI Structure Erection
Date: 3 February 2010
Project Name: AR DEVELOPMENT PROECT (Stage 3 ) Project No: 191 Work Location: AR GTP
Permit/s Required: (circIe beIow)
AdditionaI PPE Requirements:
(list on pre-start)
SpeciaI TooIs or Equipment Required
(e as detection, fall protection, ventilation fans,
litin, i pressure water blastin, scaffoldin etc)
onfined Space ntry
'eicle
cavation
#adiorapy
Hot Work
old Work
lectrical work certificate
1 Safety footwear & Hat 1 Full body arness wen workin at more tan 2
meters eit
2 Safety lasses
3 Gloves as applicable
4 ust Mask/ #espirators
5 Spats
PotentiaI EnvironmentaI azards
(CircIe beIow)
azardous MateriaIs
(attac MSS)
Fire/Emergency Equipment Requirements
(e fire etinuiser, rescue ear etc)
X Air Pollution (dust) Fumes 1- Fire tinuiser at works area
Spills to round
X Noise
Soil erosion
Spills to water
Hazards to flora and fauna

lectrical emical Lit/ark/'isibility ter omments
x Pressure (air, water, as) x Heat/old x ust and/or fume onduct tool bo talk
Proper housekeepIng
SImultaneous operatIons

Mecanical (crus points) x nition Sources x ter Trades
x Manual Handlin x Ground ondition x Wind







Petrofac

RISK ASSESSMENT / JOB SAFETY ANALYSIS


No JSA No.:JSA-2008-002
SteeI Structure Erection #' No 3

2



Steps Task/Activity azard
Risk Consequence

SoIution/ControI Measure
Mitigation
ResponsibIe
Person

1
Structural steel erection,
liftin operation for steel
structures usin crane
Fallin from eits ,
slips, trips, wind
velocity
Serious incident, fatality,
permanent disability for
personnel, and entire
damae to property and
equipment
Secure te load properly, fasten your
safety arness all times of work,
uide te load by tow ropes to direct
it Hold tool bo talk before startin
work to your work force Make sure
tat SWL is applied
Supervisor,
2
Fiin te nuts and bolts
(Hand tools and PP)
Fallin objects from
te eits, finers
injury, personnel
injury for people
workin below,
damae to te
equipment under te
steel structure sed
severe personnel injury
,cuttin finer, fatiue to te
worker, fatality
Use safe and appropriate tools for job
bein done, use Site PP (includin
Full body arness wit lanyard and
sock absorber) Warn workers
below of fallin objects and display
sinae or Workin at eit
Supervisor,
Lead
manaement
3
rane peration, rane fit
for work
Mecanical failure to
te crane, ook
damae, crane out
riers on te
round, enine oil
leak, unqualified
operator, no certified
crane, no load test
acieved, rotatin
parts problem, anle
indicator failure,
approacin to
power line, ook lock
problem
Total damae to te crane,
ook failure to old its
responsibility tat may
results load fallin on te
round on te workers
causin fatality, fire, touc to
over ead line tat leads to
catastrope
Good maintenance to crane reularly,
ook inspection in daily basis,
clearance certificate from autorised
3 rd party, certify te crane and te
operator nsure tat te visibility
ood Take te sinals only from te
man assined
Supervisor,
equipment
operator,
maintenance
sop
4
slin damae ut /damae slin,
slin failure under
lifted load
Load fallin from te top
causin fatality
Make sure te slin is properly
inspected and certified, keep te
slin clean and free from corrosion,
Supervisor,
operators,
maintenance







Petrofac

RISK ASSESSMENT / JOB SAFETY ANALYSIS


No JSA No.:JSA-2008-002
SteeI Structure Erection #' No 3

3

avoid te slin over-tension Use


softeners to protect web slins
and safety dep
5
Ground stability rane out riers
ave way in te soil
causin crane roll
over turn associated
wit load
rane damae, personnel
injury, fatality
nspect/compact te soil properly,
place out rier on solid surface
ut-rier wooden mats proper size
and tickness
Supervisor,
equipment
operator, safety
dep #ier
crane operator
6
Man basket
Also See: Usin Man-lift for
workin at eits JSA
Basket failure, fallin
from eits,
unqualified operator,
no ookin up of
safety belt to basket
amae to te basket,
personnel injury, fatality
o proper maintenance to te crane
basket, provide safety awareness to
all workers doin te job Use
qualified operator, ook safety belt to
basket
perators and
supervisors,
safety dep
7
Wind velocity Wind affects load Load damae, property
damae
Stop te job durin stron wind,
adere to safety instructions,
follow Project procedures
reardin wind strent, obey te
stoppae limits
O 9 m/sec and 30 km/h no
criticaI/Iong reach Iifting
O 13 m/sec and 40 km/h no
Iifting
Supervisor,
equipment
operators,
safety dep
8
Sand storm Sand affects
people workin in
elevate position
Personnel injury, eye
irritation, tick dust May
fall from elevate position
Put on your PP, Stop elevate
work and instruct workers to come
down
Lead
supervisor,
safety dep
9
Housekeepin Slips, trips and falls Personnel injuries fatality nsure ousekeepin is done
continuously durin and at
completion of job
Supervisor
10
Trainin Workers not trained
properly
Personnel injuries fatality Workers done HS nduction
trainin, Workin at Heits and craft
specific trainin
Lead
supervis
or,
safety
dep
Attacment 522







Petrofac

RISK ASSESSMENT / JOB SAFETY ANALYSIS


No JSA No.:JSA-2008-002
SteeI Structure Erection #' No 3

4





RECORD OF ACCEPTANCE PREPARED BY REVEWED BY APPROVED BY
NAME MOAMAD NADER ALSEBAEE AMAD ASSAD ANDRE L. KOLVER
POSTON LEAD SUPERVSOR LEAD SSE MANAGER PEC SSE MANAGER
DATE
SGNATURE