Axis bank in Gurgaon already has 27 ATMs at present in the city. For the next quarter Axis bank
plans to open new ATMs so as to cater the increasing number oI IootIall and Axis bank has
allocated Rs 1, 80, 00,000 Ior the same. It plans to open single machine ATMs as well as
multiple machine ATMs, with constraints oI at least 4 ATMs and at most 8 ATMs including both
types. It would like to open at least 3 single machine ATMs and 2 multiple machine ATMs. The
cost associated with single machine and multiple machine ATMs are as Iollows:-
Type Single(in rupees) Multiple(in rupees)
Cost oI ATM machine 4,00,000 15,00,000
Land 10,00,000 22,00,000
Genset 1,00,000 3,00,000
Miscellaneous 1,00,000 4,00,000
Find optimum solution to minimize the cost.

Solution------

ASSUMPTION
no. oI single atm machines x
no. oI multiple atm machine y

OB1ECTIVE
Minimize Z700000x4400000y

CONSTRAINTS
xy~4
xy7
x~3
y~2

x,y~0

ANS-minimum cost is rs 10900000