20,000 people work on site a busy day = s Rock Werchter 5 Runways and Taxiways - BRU offers 3 runways and parallel taxiway system. Brucargo - 130 ha of land - 120,000 sqm of cargo tarmac: simultaneous operations for 9 B747 aircraft - 150 forwarders and brokers - Office building - Perishables centre.
20,000 people work on site a busy day = s Rock Werchter 5 Runways and Taxiways - BRU offers 3 runways and parallel taxiway system. Brucargo - 130 ha of land - 120,000 sqm of cargo tarmac: simultaneous operations for 9 B747 aircraft - 150 forwarders and brokers - Office building - Perishables centre.
20,000 people work on site a busy day = s Rock Werchter 5 Runways and Taxiways - BRU offers 3 runways and parallel taxiway system. Brucargo - 130 ha of land - 120,000 sqm of cargo tarmac: simultaneous operations for 9 B747 aircraft - 150 forwarders and brokers - Office building - Perishables centre.
Agentschap Economie HUSA PRESIDENT PARK HOTEL February 3 rd , 2009 Kristoff De Winne Brussels Airport 2 Content 1. Brussels Airport seems to have a lot of space... 2. Careful land usage how? 3. Case study Master Plan Brucargo 3 s12km Careful use of space?! s12km Careful use of space?! 4 1 runway = s3.5 km 1 aircraft B777 = s 1 Soccer field 12km seems a lot, but... 20,000 people work on site A busy day = s Rock Werchter 5 Runways and Taxiways - BRU offers 3 runways and parallel taxiway system - Stands: - 110 aircraft stands - Most of which equipped with Fuel Hydrants, PCA & 400Hz - Technical and maintenance facilities available Runway Length (m) 02/20 2.984 07L / 25R 3.638 07R / 25L 3.211 6 7 A Modern Terminal - Terminal - Pier A - Schengen - 31 contact gates - Pier B - Non-Schengen - 23 contact gates - Direct access to major road network - Rail connection in terminal - >12,500 car parkings 8 9 Brucargo - 130 ha of land - 120,000 sqm of cargo tarmac: simultaneous operations for 9 B747 aircraft - 150 forwarders & brokers - Office building - Perishables centre 10 11 Whats left? s12km = Careful use of space! s12km = Careful use of space! 12 Careful use of space By a Careful master planning process 13 Purpose of an Airport Master Plan A strategic airport master plan provides a road map for efficiently meeting aviation demand through the foreseeable future while preserving the flexibility necessary to respond to changing industry conditions. 14 Airport Master Plan Vision Objectives Internal Analysis External Analysis Stakeholder Analysis Airport Development Plan Financial Plan Strategic Marketing Plan Operating Plan Commercial Plan Aviation & Commercial strategy Opportunities & Threats Strengths & Weaknesses Feedback Feedback 15 Purpose of an Airport Master Plan - The definition of a successful master plan includes the following characteristics: - Financially feasible - the phasing of the plan's capital projects should be aligned with identified need and the ability to secure available funding - Environmentally compatible - the plan should minimize potential environmental impacts - Balanced - the plan should maintain a balance between airport development needs and community impacts - Technically sound - the plan should comply with Federal, Regional, and local requirements and it should be able to be constructed efficiently and cost effectively - Responsive - the plan should address the physical and operational needs of stakeholders - Flexible - the plan should consider changes in industry dynamics which will enable to be responsive and prospers 16 Case Study Master Plan Brucargo 17 Brucargo 18 Master Plan Brucargo - Trends and opportunities - Security becomes more important - Integration and mergers - Network alliances between airlines and handlers - Logistic activities as catalyst for airfreight - Goal - Become the logistical platform for the region - Service, hospitality and solutions - Focus on shipper, the forwarders and the logistic service providers - Active role - Partner in development - Real estate management and facility management 19 Master Plan Brucargo Based on a Strategic Vision Vision Strategic Airport Development Plan Strategic Study (VIL) Framework Study Masterplan BruCargo 2025 Technical Studies REALISATION 20 Master Plan Brucargo 1. Develop capacity on all process steps 2. Maximally group activities 21 Master Plan Brucargo Accessibility and Mobility 3. USP: Direct access to/from motorway 22 Master Plan Brucargo Accessibility and Mobility 4. Split local traffic from through traffic 5. Improve way-finding 6. Optimize road structure between buildings 23 Master Plan Brucargo Operational Traffic Flows 7. From "villa to "city centre - E.g. group buildings - E.g. group car parking 8. Optimal operational flows - E.g. Forwarders perpendicular to handlers 9. Allow future security measures 24 Master Plan Brucargo 10. Realize future growth - Develop Brucargo West: - Increase in warehouse surface with 119,000 m - Of which 54,000 m handling building - Of which 65,000 m forwarding and logistic building - Redevelop Central Brucargo - Increase in warehouse surface with 50,000 m - Resulting in 87,000 m handling surface - Resulting in 76,000 m forwarding and logistic surface - Boosting surface utilization degree by 30% 25 Brucargo West 27 1 runway = s 1 aircraft B777 = s Soccer field 28 European Efficient Welcoming 29 Master Plan Brucargo Master Plan Brucargo Careful land usage - Short term meets long term - Room for growth - Value creation - Environmentally sound - Improved operations - Customer focus