Brussels Airport

Aim for Careful Land Usage


Agentschap Economie
HUSA PRESIDENT PARK HOTEL
February 3
rd
, 2009
Kristoff De Winne
Brussels Airport
2
Content
1. Brussels Airport seems to have a lot of space...
2. Careful land usage how?
3. Case study Master Plan Brucargo
3
s12km Careful use of space?!
s12km Careful use of space?!
4
1 runway = s3.5 km
1 aircraft B777 = s 1 Soccer field
12km seems a lot, but...
20,000 people work on site
A busy day = s Rock Werchter
5
Runways and Taxiways
- BRU offers 3 runways and
parallel taxiway system
- Stands:
- 110 aircraft stands
- Most of which equipped
with Fuel Hydrants, PCA &
400Hz
- Technical and maintenance
facilities available
Runway Length (m)
02/20 2.984
07L / 25R 3.638
07R / 25L 3.211
6
7
A Modern Terminal
- Terminal
- Pier A - Schengen
- 31 contact gates
- Pier B - Non-Schengen
- 23 contact gates
- Direct access to major
road network
- Rail connection in
terminal
- >12,500 car parkings
8
9
Brucargo
- 130 ha of land
- 120,000 sqm of cargo
tarmac: simultaneous
operations for 9 B747
aircraft
- 150 forwarders &
brokers
- Office building
- Perishables centre
10
11
Whats left?
s12km = Careful use of space!
s12km = Careful use of space!
12
Careful use of space
By a
Careful master
planning process
13
Purpose of an Airport Master Plan
A strategic airport master plan
provides a road map
for efficiently meeting aviation demand through the
foreseeable future
while preserving the flexibility necessary to respond to
changing industry conditions.
14
Airport Master Plan
Vision
Objectives
Internal
Analysis
External
Analysis
Stakeholder Analysis
Airport Development Plan
Financial Plan
Strategic Marketing Plan
Operating Plan Commercial Plan
Aviation & Commercial strategy
Opportunities &
Threats
Strengths &
Weaknesses
Feedback Feedback
15
Purpose of an Airport Master Plan
- The definition of a successful master plan includes the
following characteristics:
- Financially feasible - the phasing of the plan's capital
projects should be aligned with identified need and the
ability to secure available funding
- Environmentally compatible - the plan should minimize
potential environmental impacts
- Balanced - the plan should maintain a balance between
airport development needs and community impacts
- Technically sound - the plan should comply with Federal,
Regional, and local requirements and it should be able to
be constructed efficiently and cost effectively
- Responsive - the plan should address the physical and
operational needs of stakeholders
- Flexible - the plan should consider changes in industry
dynamics which will enable to be responsive and prospers
16
Case Study
Master Plan Brucargo
17
Brucargo
18
Master Plan Brucargo
- Trends and opportunities
- Security becomes more important
- Integration and mergers
- Network alliances between airlines and handlers
- Logistic activities as catalyst for airfreight
- Goal
- Become the logistical platform for the region
- Service, hospitality and solutions
- Focus on shipper, the forwarders and the
logistic service providers
- Active role - Partner in development
- Real estate management and facility
management
19
Master Plan Brucargo
Based on a Strategic Vision
Vision
Strategic Airport
Development Plan
Strategic Study (VIL)
Framework Study
Masterplan BruCargo 2025
Technical Studies
REALISATION
20
Master Plan Brucargo
1. Develop capacity on all process steps
2. Maximally group activities
21
Master Plan Brucargo
Accessibility and Mobility
3. USP: Direct access to/from motorway
22
Master Plan Brucargo
Accessibility and Mobility
4. Split local traffic from through traffic
5. Improve way-finding
6. Optimize road structure between buildings
23
Master Plan Brucargo
Operational Traffic Flows
7. From "villa to "city centre
- E.g. group buildings
- E.g. group car parking
8. Optimal operational flows
- E.g. Forwarders perpendicular to handlers
9. Allow future security measures
24
Master Plan Brucargo
10. Realize future growth
- Develop Brucargo West:
- Increase in warehouse surface
with 119,000 m
- Of which 54,000 m handling
building
- Of which 65,000 m forwarding
and logistic building
- Redevelop Central Brucargo
- Increase in warehouse surface
with 50,000 m
- Resulting in 87,000 m
handling surface
- Resulting in 76,000 m
forwarding and logistic surface
- Boosting surface utilization
degree by 30%
25
Brucargo West
27
1 runway = s
1 aircraft B777 =
s Soccer field
28
European Efficient Welcoming
29
Master Plan Brucargo
Master Plan Brucargo
Careful land usage
- Short term meets long term
- Room for growth
- Value creation
- Environmentally sound
- Improved operations
- Customer focus