1) As per IS 1893 : 1984,

VB = K.C.h.W Where, K = Performance factor 1.0 for SMRF (IS:4326 detail) and 1.6 for OMRF (IS:456 detail) C = Fundamental time period dependant coefficient = 1.0 for T <= 0.35 sec and 0.5/T(2/3) for T > 0.35 sec h = .I.0 = Soil-foundation system dependant coefficient = 1.2 for isolated footings without tie beams in medium soils, piles in soft soils, combined or isolated footings with tie beams in soft soils = 1.5 isolated footings without tie beams in soft soils I = Importance factor = 1.5 for hospitals, schools, cinema halls, monumental structures, telephone exchange, radio, fire, railway power stations and 1.0 for others 0 = Zone dependant design seismic coefficient Zone II III IV V 0 0.02 0.04 0.05 0.08

Time period of the proposed building is calculated as below, T = 0.075 * (22.5)^0.75 = 0.775 sec As also mentioned in the report, building is SMRF because of ductile detailing. K=1 C = 0.5 / (0.775)(2/3) = 0.5926 h = .I.0 = 1.2 * 1.0 * 0.05 = 0.06 i.e. VB = 1 * 0.5926 * 0.06 * W = 0.0356W

VB = 0.036 W

2) As per IS 1893 : 2002,


VB = Ah.W [Z/2].[Sa/g] --------------[R/I]

Where, Ah =

Z = Zero period acceleration value for the Maximum Considered Earthquake Zone II III IV V Z 0.10 0.16 0.24 0.36 Sa/g = Spectral acceleration coefficient for Hard, Medium or Soft soil, 5% damping = 2.5 for T <= 0.40 and 1.00/T for T > 0.40 (Hard: GP,GW,SP,SW,SC with N>30) = 2.5 for T <= 0.55 and 1.36/T for T > 0.55 (Medium: All with 10<N<30 SP with N>15) = 2.5 for T <= 0.67 and 1.67/T for T > 0.67 (Soft: All except SP with N<10) I = Importance factor = 1.5 for hospitals, schools, cinema halls, monumental structures, telephon exchanges, television, radio, fire, railway power stations and 1.0 for others R = Response reduction factor Ordinary RC Moment Resisting Frame (OMRF) 3 Special RC Moment Resisting Frame (SMRF) 5 Ordinary RC Shear Walls 3 Ductile RC Shear Walls 3 Time period of the proposed building is calculated as below, T = 0.075 * (22.5)^0.75 = 0.775 sec As also mentioned in the report, building is SMRF because of ductile detailing. Z/2 = 0.24/2 = 0.12 Sa/g = 1.36/0.775 = 1.7548 R = 5, I = 1 i.e. VB = 0.12 * 1.7548 * W / (5/1) = 0.0421 W

VB = 0.042 W

As per both the codes, W = Seismic weight of building = Dead load + appropriate amount of live load = Dead load + 25% for LL up to 3 kN/sq.m 50% for LL > 3 kN/sq.m 0% for LL on roof