Professional Documents
Culture Documents
UI Sys Site AnalysisSM
UI Sys Site AnalysisSM
HARVARD STATION!
o Relocated on September 6, 1983! o Interim station built during the relocation: Harvard/Brattle (abandoned)!
PORTER SQUARE!
o Opens December 8, 1984! o Station is around 110 below Mass Ave (served by 3 long, 224-step escalators) !
PORTER SQUARE!
PORTER SQUARE!
PORTER SQUARE!
PORTER SQUARE!
PORTER SQUARE!
DAVIS SQUARE:!
o Opens on December 8, 1984!
DAVIS SQUARE!
DAVIS SQUARE!
DAVIS SQUARE!
ALEWIFE STATION:!
o Opens on March 30, 1985! o Originally designed to have 7 levels! o Were supposed to be added on shortly after! o MBTA has still yet to nd the funding (surprise) to add 2 levels! o Garage is at max capacity every day! o Stair/Elevator core is 7 stories! o Elevators have extra buttons/indicators for 7 oors due to preordering! o Immediately after the decision to build Alewife, the City of Cambridge zoned the surrounding area for high-rise commercial use.! o Because of this, the area around Alewife became home to many highly !advanced technology and bio-med rms such as E-Ink, Pzer, and !Cambridge Systematics to name a few.!
ALEWIFE!
ALEWIFE!
ALEWIFE!
ALEWIFE!
ALEWIFE!
oTesting ground for MBTA signage o Eurostyle vs. Helvetica! o Yellow vs. White o Cambridge7s Helvetica w/ White from 1960s wins! o Futuristic signage is conned to Alewife
ALEWIFE!
DEPTH DIAGRAM!
DEPTH DIAGRAM!
RELATIONSHIP TO GRID!
QUESTIONS/OBSERVATIONS?!