OUTLINE OF PRESENTATION
LAKE ELEVATION STATUS OF POWER PLANTS DEMAND & SUPPLY ASSUMPTIONS POWER PLANTS MAINT. SCHEDULE 2012 LOAD CURVE & RESERVE PROFILES FEB 2012 LOAD TO MAINTAIN MATRIX 2011-2014 POWER PROJECTS
701.2
M E T E 700.8 R
700.6 701.
S
700.4
700.2
700. 1-Jan
8-Jan
15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 4-Mar 11-Mar 18-Mar 25-Mar
699.5
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEPT
OCT
NOV
DEC
TOTAL
Agus 7 unit 2 (27mw) on forced outage since October 28, 2010 Agus 6 unit 2 (25mw) on forced outage since January 15, 2011
PB104 unit 3 - on forced outage since March 2011; PB 104 unit 4 - on PMS February 06-27, 2012 WMPC unit 7&8 - on PMS February 13-25, 2012; *75mw - Aggregate Demand delivered by Mobile 1 to customers with BPS contract **48mw - NGCP contracted ASPA with Mobile 2 (until February 28, 2012 only)
PLANT TYPE
INSTALLED CAPACITY, MW
PEAKING CAPABILITY, MW
Assumptions
CY2012 Demand Forecast as per DOE -> 1,347mw System Capability excludes 200mw TMI Power Barges effective March 2012 IDPP assumed to operate as follows: Jul-25mw Aug-35mw Sep-35mw Oct-50mw Nov-80mw Dec-100mw Transfer of 2 power barges from Visayas in Oct. 2012 & Nov. 2012 (firm capability10mw/barge) Agus 6 unit 2 (25mw) & Agus 7 unit 2 (27mw) on forced outage. Est. time of commencement (ETC) March 2012 for Agus 6 Unit 2 and May 2012 for Agus 7 unit 2. Hydro Plants' capability based on NPC-Mingen nomination 2012 GOP considered : Pulangi 4 HEP (255mw) total plant shutdown April 09 May 09, 2012
Holy Week
Agus 4 , Agus 5 & Agus 6 one unit each on scheduled PMS June 2012
Agus 1 , 5, 6 PMS one unit each Plant & Mt Apo 1 on scheduled PMS June 2012
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
(81)
(152)