Progress Report of Works under PMRP in System & Opertion Wing , Jammu ending 02/2011

S.No Name of Scheme Mode of Execution Scheme Cost Cumm. Expdtt. 3/2011 Outlay 2011-12 Expdtt. ending 01/2011 Expdtt. during 02/2012 Expdtt. ending 02/2012 2011-12 Cumm. Expdtt. ending 02/2012 since inception of Sch. Physical Status as on 02/2012 Physical progress during the month under report Bottlenecks in execution of works

I.
A. i.

Grid Stations Commissioned


220/132 KV Grid Stations
Barn (320 MVA) 2x160 MVA Departmentally T=4539.20 TK=Nil

3874.460

0.00

0.00

0.00

0.00

3874.46

2 Nos 160 MVA,220/132 KV Power Transmission commissioned. 2 Nos 160 MVA,220/132 KV Power Transformer's testing, commissioning and charging completed. 3x40 MVA, 220/132 KV & 1x20 Minor civil & MVA, 132/33 KV power electrical works transformers test charged on under progress. 20.10.2011

ii.

Bishnah (320 MVA) 2x160 MVA

Turnkey

T=3984.00 TK=3774.00 D=210.00 T=4783.30 (incl.132/33KV) TK=4065.00 D=718.30 Proposed Revised cost= 5436.55 T=383.50 TK=Nil T=593.40 TK=Nil T=383.50 TK=Nil

3100.350

1478.49 (Org) 916.30 (Rev)

25.00

0.00

25.00

3125.35

iii. Ramban
(120 MVA+20 MVA) 3x40 MVA+1x20 MVA

Turnkey

3996.725

786.59

419.825

2.389

422.214

4418.939

B. i. ii.

Aug. of 132/66 KV Grid Stations


Kathua (50 MVA) 1x50 MVA Departmentally Departmentally Departmentally

383.285 543.796 370.991

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

383.285 543.796 370.991

50 MVA transformer commissioned on 12/2007. 50 MVA transformer commissioned on 12/2007. 50 MVA transformer commissioned on 12/2007.

Samba (50 MVA) 1x50 MVA

iii. Hiranagar (50 MVA) 1x50 MVA C.


i.

132/33 KV Grid Stations


Bari-Brahamana -II (100 MVA) 2x50 MVA Gangyal (50 MVA) 1x50 MVA Katra (50 MVA) 1x50 MVA Departmentally T=2573.10 TK=Nil T=1785.30 TK=Nil T=1774.70 TK=1271.31 D=503.39 Proposed Revised cost= 1844.04 2328.845 0.00 0.00 0.00 0.00 2328.845 2 No. 50 MVA transformer commissioned on Nov' 2007. 50 MVA power transformer commissioned. 1x50 MVA, 132/33 KV power transformer loaded on 10.12.2011

ii. iii.

Departmentally Turnkey

1439.037 814.068

0.00 960.63 (Org) 780.00 (Rev)

0.00 738.669

0.00 1.086

0.00 739.755

1439.037 1553.823

Minor civil & electrical works under progress.

iv.

Bishnah (100 MVA) 2x50 MVA

Departmentally

T=2941.31 TK=Nil

2346.457

Shown at S.No.ii above

347.83

39.498

387.328

2733.785

2x50 MVA , 132/33 KV power transformer's testing, commissioning & charging completed.

Minor civil & electrical works under progress.

Progress Report of Works under PMRP in System & Opertion Wing , Jammu ending 02/2011
S.No Name of Scheme Mode of Execution Scheme Cost Cumm. Expdtt. 3/2011 Outlay 2011-12 Expdtt. ending 01/2011 Expdtt. during 02/2012 Expdtt. ending 02/2012 2011-12 874.56 Cumm. Expdtt. ending 02/2012 since inception of Sch. 1423.02 Physical Status as on 02/2012 Physical progress during the month under report Bottlenecks in execution of works

v.

Pounichak (50 MVA) 1x50 MVA

Turnkey

vi.

Chandak (Poonch) (20 MVA) 1x20 MVA

Turnkey

T=1672.00 TK=1313.51 D=358.49 Proposed Revised cost=1700.43 T=1388.10 TK=1115.00 D=273.10

548.46

1123.53 (Org) 600.00 (Rev) 780.59 (Org) 490.00 (Rev)

859.70

14.86

50 MVA, 132/33 KV Power Transformer Commissioned on 15.12.2011.

Minor civil & electrical works under progress.

607.513

496.317

4.008

500.325

1107.838

Testing & commissioning of 20 MVA, 132/33 KV power Transformer completed and charged on load.

Testing & commissioning of 20 MVA, 132/33 KV power Transformer completed and charged on load. Minor civil & electrical works under progress.

II. Grid Stations under construction


A. i. 132/33 KV Grid Stations Kishtwar (40 MVA) 2x20 MVA
Turnkey T=2005.30 TK=1547.00 D=458.30 Proposed Revised cost=2220.75

1831.051

174.25

33.707

0.00

33.707

1864.758

Equipment foundations, Gantry foundations, Transformer foundations,Earth mat, cable duct completed. Erection of equipment structures, structures & beams completed. Construction of control room building 99%, Construction of Store shed under progress. SBA's qtr. 50%, Road to SBA's Qtr 80% Chain link mesh fencing (95%) Cabling of equipment 100% completed. Testing of equipments under progress.

Testing of eqipments Inter-connected under progress. tr.Line under Cabling of progress. equipments 5%

ii.

Bhalesssa (20 MVA) 2x10 MVA

Turnkey

T=13888.10 TK=1258.00 D=130.10 Proposed Revised cost=1593.429

1173.205

214.90

92.618

0.00

92.618

1265.823

SBA's /JE's qtrs 70% completed. Testing of Equipment foundations, Gantry equipments under foundations, transformer progress foundations, Earth mat, Cable duct completed. Construction of control room building 100% , Chain link mesh fencing completed. Stringing of yard 100% Cabling of equipments & gravelling completed. Testing of equipmentys under progress.

Inter-connected tr.Line under progress.

Progress Report of Works under PMRP in System & Opertion Wing , Jammu ending 02/2011
S.No Name of Scheme Mode of Execution Scheme Cost Cumm. Expdtt. 3/2011 Outlay 2011-12 Expdtt. ending 01/2011 Expdtt. during 02/2012 Expdtt. ending 02/2012 2011-12 Cumm. Expdtt. ending 02/2012 since inception of Sch. Physical Status as on 02/2012 Physical progress during the month under report Bottlenecks in execution of works

iii. Siot (50 MVA) 1x50 MVA

Turnkey

T=2007.90 TK=1588.69 D=419.21

393.561

0.00

0.00

0.00

0.00

393.561

Civil Works. Construction of compound wall, residential quaerters SBA/JE's chain link fencing around yard. Electrical Works:Providing of earth mat and equipment earthing completed. LOA issued on 30-11-2009 to M/S Technofab Engineeer Ltd. matter is sub judicious. Procurement of flat and MS rod. Turnkey :Civil works: Outer fencing completed 95%. JE's Fixing of C&R Pannels in progress. /SBA's Qtr 100% completed , Fabrication of main gate, door & windows. Gantry foundation, Equipment foundations, Transformer foundation completed. Control room building 100% completed. Earthing mat in 124 x 104 mt area laid with earthing spikes.laying of addtional Earth mat 90 % completed. 132 KV cable duct 95% and 33 KV 90%. Erection of Gantry structures , Gantry beams completed. Erection of equipment structure 90% completed including earthing. Stringing of bus bar in 132 & 33 KV yard completed except connectors. Erection of equipments in 132 7 33 KV sites completed.

Case is sub judicious in the court.

iv

Battal Manwal (50MVA) 1x50 MVA

Turnkey

T=1774.70 TK=1250.00 D=524.70 Proposed Revised cost=1829.25

984.579

790.12 (Org) 450.00 (Rev)

270.44

67.66

338.10

1322.679

III. Transmission lines completed / commissioned A. i. 220 KV Trans. Lines Barn-Kishenpur 37.4 Kms 105 towers
Departmentally T=1583.40 TK=Nil

1583.319

0.00

0.00

0.00

0.00

1583.319

Line Commissioned on 6/2008

Progress Report of Works under PMRP in System & Opertion Wing , Jammu ending 02/2011
S.No Name of Scheme Mode of Execution Scheme Cost Cumm. Expdtt. 3/2011 Outlay 2011-12 Expdtt. ending 01/2011 Expdtt. during 02/2012 Expdtt. ending 02/2012 2011-12 Cumm. Expdtt. ending 02/2012 since inception of Sch. Physical Status as on 02/2012 Physical progress during the month under report Bottlenecks in execution of works

ii.

LILO of KPTL for Ramban Grid 2.00 Kms towers

Departmentally

T=140.80 TK=Nil

140.792

0.00

0.00

0.00

0.00

140.792

Commissioned

6
Departmentally T=528.20 TK=Nil Proposed Revised cost=670.30 T=567.90 TK=423.56 D=144.34

iii. Stringing of conductor on Iind ckt.Thein-Hira Nagar Trans. Line 40.4 Kms iv. Miran Sahib- Bishnah 9.73 Kms 29 towers. A. i. 220 KV Trans. Lines Hira-Nagar-BarnBishnah 82.59 Kms. 250 towers. Hiranagar- Bishnah136 towers Barn- Bishnah -114 towers

528.156

0.00

0.00

0.00

0.00

528.156

Stringing of conductor 100% completed

Material adjustment pending with P&MM wing.

Turnkey

379.906

188.00

45.442

0.00

45.442

425.348

Line Commissioned on 25.03.2011

IV. Transmission lines under execution


Turnkey T=4684.00 TK=3570.00 D=1114.00 Proposed Revised cost=5300.42

3213.546

1470.46 (Org) 735.23 (Rev)

126.284

2.646

128.93

3342.476

A/ Material Received a/ Tower Meterial - 1466.631 MT b/ Nuts & Volts- 79.391 MT c/ ACSR Zebra Cond.- 500.00 KM d/ Disc Insulators-120 KN 23600 Nos. & 70 KN 11600 Nos. B/ Progress on ground Civil Works160 No. of tower foundation laid. Electrical Works.138 No. tower erected . Stringing of line 44.923 Kms. Hiranagar-Bishnah section test charged on 21.06.2011

ROW Problem in location No& 14 (Kargil Bihar Colony) 15-18, 22,32,36,39-41, 48-48-49,52,5659,60,62-65,7176 (SKUAST land), 77,78,83-87, 8990, 92-95, 113

V. Transmission lines completed / commissioned


A. i. 132 KV Trans. Lines LILO of GladniHiranagar for BB -II 2.7 Kms 11 towers Rajouri-Draba Tr.Line 35.00 Kms Original 35.12 Kms Revised 122 No. Original 123 No. Revised
Departmentally T=159.20 TK=Nil

133.471

0.00

0.00

0.00

0.00

133.471

Commissioned on 12/2007

ii.

Departmentally

T=1548.498 TK=Nil

1548.498

0.00

0.00

0.00

0.00

1548.498

Ckt-I of the 1 line commissioned on 29-11-2008 & 2nd Ckt. On 7.2.2009.

Progress Report of Works under PMRP in System & Opertion Wing , Jammu ending 02/2011
S.No Name of Scheme Mode of Execution Scheme Cost Cumm. Expdtt. 3/2011 Outlay 2011-12 Expdtt. ending 01/2011 Expdtt. during 02/2012 Expdtt. ending 02/2012 2011-12 Cumm. Expdtt. ending 02/2012 since inception of Sch. Physical Status as on 02/2012 Physical progress during the month under report Bottlenecks in execution of works

iii. Barn-Katra Tr. Line including stringing of 2nd ckt. of Barn-Reasi Tr. Line 60.74 Kms (39.74 Kms & 21.00 Kms) 64 towers iv LILO of Gladni-MiranSahib for Gangyal G.St. 1.0 Kms. 2 towers Re-conductoring of 132 KV Ring Main around Jammu City 23.5 Kms.

Departmentally

T=1094.40 (870.20) & (224.20) TK=Nil

1004.528

0.00

0.00

0.00

0.00

1004.528

Barn-Katra section completed & charged

Departmentally

T=39.50 TK=Nil

17.960

0.00

0.00

0.00

0.00

17.960

Completed & test charged on 29.02.2009 with charging og Grid Station Gangyal.

v.

Departmentally

T=494.90 TK=Nil

495.031

0.00

0.00

0.00

0.00

495.031

Completed.

vi. Draba-Chandak S/C on D/C towers 28.60 Kms 73 towers vii Barn -Siot-Kalakot (a) (Akhnoor- Kalakot section)53.87 Kms.153 towers vii Barn -Siot- Kalakot Tr. (b) Line along with LILO at Akhnoor Grid (Bran Akhnoor section). viii LILO of Ring Main to Pounichak 2.58 Kms. 7 towers ix LILO of CSTL -I for Ramban G/.Stn. 3.50 Kms 11 towers

Departmentally

T=1007.70 TK=Nil

869.967

137.73

15.55

3.207

18.757

888.724

Transmission Line charged on 19.12.2011.

Turnkey

T=2165.60 TK=2039.64 D=125.36 Proposed Revised cost=2720.52 T=990.80 TK=933.20 D=57.60 Proposed Revised cost=770.36 T=121.30 TK=Nil T=161.40 TK=Nil Proposed Revised cost=406.10

Turnkey

2864.331

292.06 (Org) 242.06 (Rev)

Barn-Akhnoor section of this line commissioned on 12-07-2010. Akhnoor-Kalakot section of this line commissioned on 17.11.2011

277.74

1.370

279.11

3143.441

Departmentally

112.532

8.760

8.63

0.00

8.63

121.162

Commissioned on 15.12.2011

Departmentally

161.11

0.00

0.00

0.00

0.00

161.11

LILO arrangement stands electrically charged.

Sheme is revised & payments are pending.

Progress Report of Works under PMRP in System & Opertion Wing , Jammu ending 02/2011
S.No Name of Scheme Mode of Execution Scheme Cost Cumm. Expdtt. 3/2011 Outlay 2011-12 Expdtt. ending 01/2011 Expdtt. during 02/2012 Expdtt. ending 02/2012 2011-12 Cumm. Expdtt. ending 02/2012 since inception of Sch. Physical Status as on 02/2012 Physical progress during the month under report Bottlenecks in execution of works

VI. Transmission lines under execution


A. i. 132 KV Trans. Lines Ramban -Khellani Kishtwar 82.25 kms. 232 towers.
Turnkey T=3764.80 TK=3525.29 D=239.51 Proposed Revised cost=5217.415

2745.152

1019.66 597.711 (Org) 631.85 (Rev)

1.074

598.785

3343.937

A/ Material Received :Protection Work a/ Tower material -1419.166 MT 500.00 Cu. M b/ Nuts & Bolts- 68.663 MT c/ ACSR Panther Cond.-507.94 Kms d/ Earth Wire -85.00 Km e/ Tower accessories 100% Disc Insulators :a/ 90 KN 35041 Nos. b/ 70 KN 486 Nos B) Progress on ground: Civil works: 229 No. towers foundations laid & 5 under progress. Electrical Works:202 No. tower erecated & 1 No. under progress. Forest Compensation paid. Stringing of conductor 44.75 Kms completed & 2.75 Kms under progress. Protection work 9750.00 Cu. M.

ii/

S/C Transmission Line from Thathri to Bhellessa 24.00 Kms. 69 towers

Turnkey

T=842.60 TK=806.41 D=36.19 Proposed Revised cost=1617.00

457.43

385.17 (Org) 235.17 (Rev)

235.42

0.00

235.42

692.85

A/ Material Received :4 No. tower a/ Tower material -3330.267 MT erecated & 2 No. b/ Nuts & Bolts- 16.4133 MT c/ ACSR Panther Cond.-74.20 Kms under progress. d/ Earth Wire -24.70 Km e/ Tower accessories 100% e/ Disc Insulators :- 90 KN 7029 Nos. B) Progress on ground: Civil works: 64 No. towers foundations laid & 2 under progress. 33 No. tower erecated & 2 under progress. Forest Compensation paid. Protection work 3000 Cu. M. Electrical Works :Re-conductoring 60.82 D/ Ckt. Kms completed. 475.30 Kms of ACSR Panther conductor Procured. 4000 disc insulators procured. Re-Conductoring 1.918 D/CKT. Kms completed. Procurement ACSR panther=1.30 KMS

iii. Re conductoring of 132 KV CSTL from Udhampur to Thathar (Banihal) 80.00 Kms.

Departmentally T=1273.60 TK=Nil 1106.953

166.64

34.056

21.57

55.625

1162.578

Progress Report of Works under PMRP in System & Opertion Wing , Jammu ending 02/2011
S.No Name of Scheme Mode of Execution Scheme Cost Cumm. Expdtt. 3/2011 Outlay 2011-12 Expdtt. ending 01/2011 Expdtt. during 02/2012 Expdtt. ending 02/2012 2011-12 Cumm. Expdtt. ending 02/2012 since inception of Sch. Physical Status as on 02/2012 Physical progress during the month under report Bottlenecks in execution of works

iv. Hira-Nagar- Battal Manwal 38.192 Kms. 109 towers

Turnkey

T=1650.10 TK=1353.00 D=297.10 Proposed Revised cost=2022.13

938.22

711.88 (Org) 400.00 (Rev)

337.503

22.44

359.943

1298.163

A/ Material Received :a/ Tower material -584.546 MT b/ Nuts & Bolts- 30.444 MT c/ ACSR Panther Cond.-240.634 Kms d/ Disc Insulators :- 90 KN 19034 Nos. & 70 KN 378 No. B) Progress on ground: Civil works: 91 No. towers foundations laid. Electrical work :73 No. tower erecated . String of line 15.696 Kms. Forest Compensation paid.

4 No. tower foundation laid. 5 No. tower erecated . String of line 1.476 Kms.

Contruction of 220 KV Line Bays 06 Nos

Departmentally

T=1072.30 TK=Nil

426.217

648.39 (Org) 324.20 (Rev)

120.468

4.79

125.258

551.475

Grid Station Hirnagar : 2 No. line bays for HiranagarBishnah TL commissioned & 2 No.line bays for Thein -Hiranagar TL under progress. Grid Station Barn : Civil works Completed. Erection of equipment Structures, bus bar /earth wire , 8 No. isolators, 2 No. LA's sets 1 Set of CT 's & 2 No. SF6 breaker completed. Concrete flooring of 2 No. line bays & strips completed.
Grid StationAkhnoor : 2 No. line bays commissioned. Grid Station Miran Sahib : 2 No. line bays commissioned. Grid Station Draba (Chandak) : 2 No. line bays commissioned. Grid Station Khellani : 2 No. line bays completed & ready for commissioning. Grid Station Hirnagar : 2 No. line baysunder execution.

vi

Construction of 132 KV Departmentally T=1165.50 TK=Nil 1021.947 line bays 10 No.s (2 each at Grid Station Khellani, Akhnoor, Miran Sahib , Draba (Chandak) & Hiranagar.

143.55

49.72

6.104

55.824

1077.771

Laying of foundation & Erection of euipments for 2 No. 132 KV line bays at G/Stn. Hiranagar progress.

Total :-

Original Cost59033.91 Proposed Revised Cost :- 64197.058

44485.447

11481.40 (Org) 7625.23 (Rev)

5132.63

192.701

5325.331

49810.778

Chief Engineer, S&O wing, PDD, Jammu

Progress Report of Works under REC in System & Opertion Wing Jammu ending 02/2012
S. No. Name of the Scheme Scheme Targets No. MVA Scheme Cost Cumm. Expdtt. 03/2012 Outlay 2011-12 Exptd. ending 01/2012 Exptd. during 02/2012 Expdtt. Cumu. ending Exptd. ending 02/2012 02/2011 since inception of scheme Physical Status as on 02/2011 Physical Bottlenecks progress in execution during the of works month under report

1 i/

132/33 KV Grid Station Jourian-Kaleeth 20 MVA, 132/33 KV Grid Station 1 20

T=2972.385 TK=1275.00 D=1697.00

1907.134

Rs. 45973769.08

282.682

21.729

304.411

2211.545 Civil Works. Development of land under progress. 1 No.20 MVA , 132/33 KV Power Transformer Foundation , Gantry Foundations & Equipment Foundation completed. Electrical Works. Construction of control room building 100% completed. Laying of earth mat 100% completed. Cable duct 100% completed. Yard fencing 100% completed. Eraction of coloum 132KV 16 No. & 33 KV 28 No. completed. Bus bar stringing 100%. Erection of equipment 100% completed.Auxillary Transformer Foundation 100%, Erection of 20 MVA 132/33 KV Transformer 100%, Cabling of 132 KV, 33 KV and tranformer yard 100% completed.

S. No.

Name of the Scheme

Scheme Targets No.


Kms

Scheme Cost

Cumm. Expdtt. 03/2012

Outlay 2011-12

Exptd. ending 01/2012

Exptd. during 02/2012

MVA
No. of Towers

Expdtt. Cumu. ending Exptd. ending 02/2012 02/2011 since inception of scheme

Physical Status as on 02/2011

Physical Bottlenecks progress in execution during the of works month under report

ii.

132 KV Barn Jourian Trans. Line.

28.5

87

Civil Works: 87 No. foundations laid. Electrical works: 87 No. towers erected. Stringing of conductor 28.52 Kms. Fixing of anticlimbing devices 87 Nos

Stringing of Line 0.842 Kms. String of Earth Wire 2.314 Kms. Fixing of anti climbing devices 45 Nos. Laying of foundation 1 No. Erection of Tower 1 No.

Total :-

2972.385

1907.134

Rs. 45973769.08

282.682

21.729

304.411

2211.545

Chief Engineer, S&O Wing PDD , Jammu

Progress Report of Works under T&D in System & Opertion Wing , Jammu ending 02/2012
S. Name of the Scheme No. Scheme Targets No. MVA Scheme cost Revised Cumm. Expdtt. 03/2011 Outlay 2011-12 Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012 Cumu. Exptd. ending 02/2012 since Physical Status as on ending 02/2012 Physical progress during the month under report

1 i

220/132 KV Grid Station


Procurement of new 1 No. new transformer & repair of & 2 Nos. damaged transformers repairs (for restoration of power supply for Grid Station Gladni, Jammu). 150 MVA New & 2 Nos. 133.334 MVA
1300.00 3699.272 1756.448 (+) Rs. 605.76 Natural calamity. Total = Rs. 2362.208 0.00 0.00 0.00 0.00

1756.448 Commissioned 160 MVA power


transformer procured from BHEL and is running in parallel operation with already commissioned 400 MVA transformer bank. Erection of 220 KV SF6 breakers, Isolators & CT,s u/p. Laying of cement concrete in 220 KV new bay & spreading of crushed bajri, laying of 220 KV CT foundation in new 220 KV bay, spreading of stone aggregate in all 220 KV bays, laying of left over cable duct in new 220 KV bay, isolation of 220 KV 133.334 MVA transformer bearing S. No. 2012915 in circuit, putting of 220/132 KV, 133.334 MVA transformer bearing S. No. 2012917 in circuit, laying of conductor from 220 KV gantry structure to 132 KV gantry structure. Laying of 132 KV CT, LA, and breaker foundation for 220/132 KV 150 MVA transformer on 132 KV side of Hiranagar bay. Dismantling of 150 MVA, 220/132 KV transformer. Erection, Testing & Commissioning of 220/132 KV 160 MVA Power transformer. Laying of foundation of illumination tower is under progress. Laying of cables for 220 KV equipment under progress. Construction of cable duct, trays and cable duct covers under progress. Leveling and disposal of excavated soil in open area of 132 KV & 33 KV bay completed.

2 i.

132/33 KV Grid Stations (New) 1 X 50 MVA Grid Station Mahanpur. 1 50


609.60 1336.22 1126.935 0.00 0.00 0.00 0.00 1126.935 The station commissioned on
7.8.2009. Minor Civil & Electrical Works under progress.

S. Name of the Scheme No.

Scheme Targets No. MVA

Scheme cost

Revised

Cumm. Expdtt. 03/2011

Outlay 2011-12

Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012

3 i.

Aug. of existing Grid Stations 132/66-33 KV Augmentation of 1 50 132/33 KV Grid Station Gladni from 100 to 150 MVA

Cumu. Exptd. ending 02/2012 since


359.82

Physical Status as on ending 02/2012

550.55

869.80

159.83

200.00

199.99

0.00

199.99

Development of land under Common Misc. progress. Construction of works under retaining wall for extension of 132KV yard completed. progress Erection of 132 KV gantry, col. & beam of 132 KV line bay completed. Laying of earth mat in 132 KV new bay. Procurement of Cement. Laying of 50 MVA transformer foundation and other allied works completed. 50 MVA, 132/33 KV transformer received at site.
Construction of rail track. Laying of foundations for installation of 20 MVA transformer completed. Strengthening of earthing of 20 MVA, 132/66 KV power transformer. Erection of 132 KV gantry C1 & 2 Nos. Beam in 132 KV bays. Precommissioning test of 132 KV isolators in 20 MVA Transformer bay, 66 KV isolators in 66 KV addl. Bay, strengthening of earthing of equipments & laying of bus bar, jumpers & droppers to isolators in 66 KV addl. Bay. Pre-commissioning testing of 66 KV CTs in 66 KV bays. Pre-commissioning & testing of 20 MVA, 132/66 KV power Transformer in 66 KV side.

Physical progress during the month under report

ii

Augmentation of 132/66 KV Grid Station Kathua from 100 to 120 MVA.

20

211.38

211.38

147.96

Original= 40.00 Revised =15.00

34.70

0.00

34.70

182.66

S. Name of the Scheme No.

Scheme Targets No. MVA

Scheme cost

Revised

Cumm. Expdtt. 03/2011

Outlay 2011-12

Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012

Transmission Lines: Kms. 4 i. 220 KV Trans. Line Gladni Udhampur. 47.47 165
1755.75 2075.00 1915.536 20.00 18.948 0.00 18.948

Cumu. Exptd. ending 02/2012 since

Physical Status as on ending 02/2012

Physical progress during the month under report

No. of towers
1934.484 TLCD-I:
Tower foundation laid = 165 nos. Tower erected = 165 nos. Stringing of line = 47.254 Kms. TLMD-II: Providing & laying of bus bar main & reserve upper & lower tyres, jumpers & droppers 80%. Constt of cable duct covers 243 Nos. Installation & erection of 220 KV SF6 breakers. Earthing of equipments structures & gantries structure 80% completed. Procurement of material.

Shifting of span of Salal-II dead end tower completed.

5 i.

132 KV Trans. Line Barn Canal 12.285 44


390.05 636.36 461.356 10.00 0.00 0.00 0.00 461.356
Tower foundation laid = 100%. Tower erected = 41 Nos. Stringing of conductor with out earth wire 7.52 Kms. Procurement of cement & 11 KV disc insulators 70 KN etc. Tower material procured- 148.33 MT. Procurement of 20.00 ACSR panther conductor. Earth wire 13.00.

S. Name of the Scheme No.

Scheme Targets No. MVA

Scheme cost

Revised

Cumm. Expdtt. 03/2011

Outlay 2011-12

Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012

6 i

Other departmental works Stabilization of KPTL.

Cumu. Exptd. ending 02/2012 since


206.954

Physical Status as on ending 02/2012

Physical progress during the month under report


Protection work at different locations.

267.82

267.82

167.044

Original= 25.00 + 20.00 =45.00 Revised = 20.00

24.554

15.356

39.91

This is a continuous process. Protection works of different nature at location Nos. 8, 66, 77, 232, 237, 238, 247-248, 259-260 and 270 completed. Replacement of damaged conductor at location Nos. 232-33, 241-242, 265-266, 266-267, 301-302 & 306-307. Replacement of damaged Jumper at location Nos. 225 & 239. Construction of B/wall of Loc. KP-220., KP-255, KP-272, 277. Anchoring of KP 278. Protection work at Loc. KP-9 & KP-108 under progress. Construction of tower foundation for KP-9 tower.

ii

Renovation of Control Room Building complex of 50 MVA, 220/132 KV G/S Gladni.

26.96

26.96

19.91

0.00

0.00

0.00

0.00

19.91

Procurement & fixing of false ceiling in control room & corridor under progress. Procurement & installation of illumination for control room & corridor under progress. Providing & fixing of vitrified tiles in battery room, AEE-I room is under progress. Procurement & fixing of aluminum door & windows in control room building under progress. Renovation of bath rooms under progress.

S. Name of the Scheme No.

Scheme Targets No. MVA

Scheme cost

Revised

Cumm. Expdtt. 03/2011


267.642

Outlay 2011-12

Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012


9.868 0.00 9.868

iii

Modernization of 220/132/33 KV G/S Udhampur.

355.08

355.08

10.00

Cumu. Exptd. ending 02/2012 since 277.510

Physical Status as on ending 02/2012

2 No. SF-6 breaker foundation laid. Improvement of 33 KV, 132 KV and 220 KV yards including individual pipe earthing of equipments completed. Laying of gravel in 33 KV, 132 KV yard completed and laying of Gravel in 220/132KV transformer yard completed. 2 no. SF-6 breakers erected. Replacement of ACSR panther conductor by Zebra in 132KV and 33KV yard under progress. Replacement of worn-out 33 KV isolators 6 no. completed. Replacement of old worn out 33 KV MOCBs 6 Nos. by 33 KV VCBs completed including testing and commissioning. Procurement of 220 KV &132 KV SF-6 Ckt. Breakers 3 Nos. each.

Physical progress during the month under report

iv

2x20 MVA, 132/33 KV Grid Station Reasi.

50

891.79

1776.84

491.070

10.00

9.808

0.00

9.808

500.878
Land acquisition 53 Kanal, preliminary works including land development, leveling & security fencing completed. Laying of foundation for gantry & equipment structures 132 KV site 7 No. bays, 33 KV site 9 No. bays completed. Laying of earth mat completed. Construction of JEs/SBAs quarters, Chowkidar quarter & control room building under progress. Procurement of tar steel of various sizes & cement.

Construction of control room building under progress.

Civil works other than Grid/R/Stn. Construction of approach road for Grid Station Chandak

20.00

20.00

20.00

0.00

0.00

0.00

0.00

20.00

Construction of Fair Weather road under progress by PWD Authorities.

S. Name of the Scheme No.

Scheme Targets No. MVA

Scheme cost

Revised

Cumm. Expdtt. 03/2011


877.654

Outlay 2011-12

Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012


169.710 0.000 169.710

vi

Acquisition of land under State Plan for PMRP Projects (S&O Jammu).

550.00

1100.00

170.00

Cumu. Exptd. ending 02/2012 since 1047.364

Physical Status as on ending 02/2012

Forest compensation paid: 132 KV D/C Ramban-KhellaniKishtwar Tr. Line. 132 KV S/C Thatri to Bhalessa Tr. Line. Part payment of 132 KV D/C Hiranahar-Battal Manwal Tr. Line.

Physical progress during the month under Landreport


compensation paid under the scheme 132 KV D/C HiranagrBattal Manwal Tr. Line to forest authorities.

vii Improvement of 131.5 MVA, 132/33 KV G/S Miran Sahib by way of replacement of breakers.

136.784

136.784

49.98

Original= 25.00 Revised= 15.00

24.93

0.00

24.93

74.91

Replacement of 33 KV breakers with Erection, new 33 KV vacuum ckt. Breakers-60 testing %. commissioning of Replacement 33 KV CTs with new 33 2 No. SF-6 KV CTs-90 % Replacement of old 33 KV isolators breaker with new 33 KV isolators-10 %. Providing & fixing of new cable duct covers & re-furnishing of damaged & other items 65 %. Payment made to the firm on a/c of 132 KV SF6 breaker 2 Nos. Laying of 132 KV SF-6 breaker foundation 04 Nos. Erection testing commissioning of 2 No. SF-6 breaker u/p.

viii Replacement of conductor of 132 KV Hiranagar - Gladni line from tower location No. 47-52 & tower location No. 99-100 (Stabilization of existing Tr. Lines & Grid Stations) ix Aug. of 2x20 MVA, 132/33 KV to 70 MVA Grid Station Akhnoor

41.50

41.50

19.998

15.00

14.988

0.000

14.988

34.986

Work completed.

279.00

279.00

0.00

200.00

199.81

0.15

199.96

199.96

Commissioning of 50 MVA, 132/33 KV Power Transformer stands completed on 15.06.2011.

S. Name of the Scheme No.

Scheme Targets No. MVA

Scheme cost

Revised

Cumm. Expdtt. 03/2011


0.00

Outlay 2011-12

Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012


199.688 0.000 199.688

Aug. of Grid Station Barn from 2x20 MVA, 132/33 KV to 2x50 MVA. Shifting of 132 KV D/C Canal- Miran Sahib transmission line for acquisation of land for 27 towers (13.5 Kanal) in coneection with Extn. Of Jammu Airport.

873.17

873.17

200.00

Cumu. Exptd. ending 02/2012 since 199.688

Physical Status as on ending 02/2012

1x50 MVA, 132/33 KV Power Transformer installed in place of 20 MVA, 132/33 KV Power Transformer. Testing & Commissioning completed.

Physical progress during the month under report

xi

0.00

100.00

0.00

0.00

0.00

0.00

xii Const. of Additional Stroe shed at Division Store at 220/132 KV Grid Stn. Udhm. xiii Strenthing of 220 KV bus bar ACSR Zebra to twin mouse at 710 MVA , 220/132 / 33 KV Grid Stn . Gladni.
18.25 18.25

0.00

12.70

0.00

0.00

0.00

0.00

0.00

11.35

0.00

9.049

9.049

9.049

Strenthing of 220 KV bus bar ACSR Zebra to twin mouse at 710 MVA , 220/132 / 33 KV Grid Stn . Gladni.

Strenthing of 220 KV bus bar ACSR Zebra to twin mouse at 710 MVA , 220/132 / 33 KV Grid Stn . Gladni.

xiv Replacement of old Battery Bank at Grid Stn. Miran Sahib xv Replacement of old Battery Bank at Grid Stn.Bari-Brahamana

9.60

9.60

0.00

9.60

0.00

8.861

8.861

8.861

Replacement of old Battery Bank at Grid Stn. Miran Sahib Replacement of old Battery Bank at Grid Stn.BariBrahamana

Replacement of old Battery Bank at Grid Stn. Miran Sahib Replacement of old Battery Bank at Grid Stn.Bari-Brahamana

15.24

15.24

0.00

15.24

0.00

9.027

9.027

9.027

8302.53 Total: -

13748.27

7481.37

Original= 1093.89 Revised= 1053.89

906.994

42.443

949.437

8430.80

Chief Engineer, S&O wing, PDD, Jammu

S. Name of the Scheme No.

Scheme Targets No. MVA

Scheme cost

Revised

Cumm. Expdtt. 03/2011

Outlay 2011-12

Exptd. Exptd. Expdtt. ending during ending 01/2012 02/2012 02/2012

Cumu. Exptd. ending 02/2012 since

Physical Status as on ending 02/2012

Physical progress during the month under report

Bottlenecks in execution of works

Bottlenecks in execution of works

Bottlenecks in execution of works

Commissioning of line is pending due to court case.

ROW problem in location No. 38-42 (Forest / Wild Life land).

Bottlenecks in execution of works

Bottlenecks in execution of works

Bottlenecks in execution of works

Bottlenecks in execution of works

Bottlenecks in execution of works