Professional Documents
Culture Documents
Is there any way by which we can lock two specific wbs elements say overheads and other expenses, so that the user cannot release PR? The easiest way would be to define the project release process in the bottom-up fashion. That means, you will only release the activities/WBS elements that you need from time to time during the course of the project. That way, charges won't be accrued on a WBS element until it's released (so, don't release it until it's ready for collecting costs). Is there any way by which we can stop the network from attaching further materials after it is released? This is controlled through the change profile, which is assigned to the network profile. In the change profile, under the Component tab, you can define the release status of the activity at which you can create/change/delete material components. *-- Murali Lanka How can we set the options for capacity reports CM01 ? This will possible depend on your config, but the options I use are: Settings>General> Tick, Cumulation of reqmts, Dyn. capacity cumul. and then select the hierarchy you have set up. I then select the financial year (as we are budget driven) using Entry type A and the start/finish of the financial year. I select period Month. Then click tick. I then select the work centre I require. or arm of the hierarchy. You can then select standard overview and also select graphs or if you need a detailed list press that button. *-- Jim Carter
http://www.sap-img.com/project/sap-ps-interview-questions.htm[09-08-2011 12:21:40]
PS Questions Short Questions Answers on SAP PS SAP PS Frequently Asked Questions Get help for your SAP PS problems SAP PS Forum - Do you have a SAP PS Question? SAP Project System Books SAP PS Books - Certification, Interview Questions and Configuration SAP Project System Tips SAP PS Tips and Project System Discussion Forum Best regards, SAP Basis, ABAP Programming and Other IMG Stuff http://www.sap-img.com
All the site contents are Copyright www.sap-img.com and the content authors. All rights reserved. All product names are trademarks of their respective companies. The site www.sap-img.com is in no way affiliated with SAP AG. Every effort is made to ensure the content integrity. Information used on this site is at your own risk. The content on this site may not be reproduced or redistributed without the express written permission of www.sap-img.com or the content authors.
http://www.sap-img.com/project/sap-ps-interview-questions.htm[09-08-2011 12:21:40]