You are on page 1of 5

DISEO DE MURO DE CONTENCION EN VOLADIZO

t1 = 0.20
S. ARENOSO DENSO

FSD =
FSV =

1.5
1.75
g1 =
f =

PESO ESPECIFICO DEL TERRENO (t/m3)


ANGULO DE FRICCION INTERNA (Grados)
PESO ESPECIF, CONCRETO (kg/m3)
PESO ESPECIF, ACERO (kg/m3)
TIPO DE TERRENO
(Kg/cm2)

f'c =
fy =
d =

Coeficiente de friccion para Deslizamiento "f"


f =

0.6
= TAN(f) = 0.625 0.6

f
TAN(f) =

0.625

Usar f = 0.6, para el calculo de la estabilidad contra deslizamiento


= 2 (45 /2 )
ka =

0.307

ka . =

0.584

DIMENCIONAMIENTO DE LA PANTALLA
t1

0.2 m

Mu =
Mu =

(1.7)*ka*Ys*(hp^3)/6
20.67 ton-m

ademas:
Mu =.b.d^2.fc.w.(1-0,59.w)
=
b =

despejando de I y II

0.9
100 cm

0.004

w =

0.096

. II

1.9
32
175
4200
3

d =

38.07

cm

t2 = d + r + acero/2
t2 =
usar: t2 =

42.87

cm

45

cm

d =

VERIFICACION POR CORTE


Vdu = 1.7Vd = 1.7(1/2)Ys.ka(hp - d)^2
Vdu

10.49 ton

Vdu

12.34 ton

Vc =

26.19 ton

Si As se traslapa en la base:

Vce = 2/3 Vc =

17.46 ton

DIMENCIONAMIENTO DE LA ZAPATA
hz =

t2 + 5 cm =

h = hp + hz =

B1
h

5.50

50 cm
m

0.365

B1

2.01 m

B1 =

2.23 m

usar : B1 =
B2
h

B2

2.15

0.0379

0.21

40.21

cm

Usar: B2 (min) = hz =

0.50

VERIFICACION DE ESTABILIDAD
t1 =

0.20

g2 = 2.40

h = 5.00
P2
A

0.3

P3
0.45

t1 =

P4

P1

hz = 0.50

B = 2.65
Pi

Pesos (ton)

P1
P2
P3
P4

0.50*2.65*2.40 =
0.20*5.00*2.40 =
0.45*5.00*0.5*2.40 =
1.70*5.00*1.90 =
N =

FSD =

Hr =
Ha

FSV =

Mr =
Ma

Brazo de Giro (X) m

Mi (ton-m)

1.325
0.850
0.600
1.800

4.2135
2.04
1.62
29.07
36.9435

3.18
2.40
2.70
16.15
24.43

fN =
Ha

2.28

M =

1.66

1.50

1.75

Conforme

Conforme

PRESIONES SOBRE EL TERRENO


Xo =

Mr - Ma =
N

Xo =

0.850

B
6

0.442

20.7566
24.43
m

<

e =0.455

Cae fuera del tercio central

Aumentar B:
Usar:

B =
Pi

2.7

m
Pesos (ton)

Brazo de Giro (X) m

Mi (ton-m)

Pi

Pesos (ton)

P1
P2
P3
P4

0.50*2.70*2.40 =
0.20*5.00*2.40 =
0.45*5.00*0.5*2.40 =
1.75*5.00*1.90 =
N =

FSD =

Hr =
Ha

FSV =

Xo =

e =

Brazo de Giro (X) m

Mi (ton-m)

1.350
0.850
0.600
1.825

4.374
2.04
1.62
30.340625
38.37

3.24
2.40
2.70
16.625
24.97

M =

fN =
Ha

2.37

1.697

1.75

Mr - Ma =
N

0.889

0.461

B =
6

1.50

Conforme

Conforme

0.45

Luego:
q1 =

18.72

ton-m

q2 =

-0.23

ton-m

<

Conforme

h = 5.00 m

You might also like