300 200 100

R1001

BENDING SCHEDULE
550 3650

10 16

288 72

250 150 300 3350

150

R1601

EXISTING BARS 12 - 1001 LINKS @ 200 C/C

350

NEW BARS

EXISTING FOOTING

1
CHISEL 75 x 500mm

500

75

300

5mm black polythene damp - proof membrane spread over hard core filling

DETAIL OF COLUMN (24 No)


5mm black polythene damp - proof membrane on the peripherial of the rendered walls

150

300

1400

SECTION 1 - 1

6 - R16mm EXISTING BARS

3 - R1601 NEW BARS

900

900

REV.

DATE

REVISION

EAGLE POINT CONSULT P. O. BOX K 474 ACCRA - NEWTOWN


PROPOSED CHURCH FOR PRESBYTERIAN CHURCH OF GH. AT T. D.C / T.P.D / T / C3 / 93 PROJECT COLUMN FOOTING REINF. DETAILS DWG MAR. 2012 DATE R. MENSAH DRAWN GUSTAV CHECKED 1 :25 SCALE DANIEL REVIEW JOB No.

1100

ES 2A
DWG No.

225

DETAIL OF DAMP - PROOFING

PC / EPC / 10 / 29