You are on page 1of 2

TENDER SCHEDULE Name of the work : Proposed construction of a Retaining wall for storm water drain infront of KMT

Hospital in Kayalpatnam Municipality Estimate Amount : 2,40,000/Sl. No Qty. Contract Value : 230631/Description of work Earth work excavation for foundation in all solis and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers not more than 15cm thick well rammed. Consolidated and depositing the surplus earth in all places shown by the Departmental Officers with the initial leads and lifts etc., including leveling the site complete complying with the standard specifications and as directed. Cement concrete 1:4:8 (One Cement four sand and eight hard broken stone) Using 40 mm gauge stone hand broken granite stone jelly for foundation including watering necessary and laid in layers not more than 15 cm thick, compacting etc., complete complying with standard specification and as directed. Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29 m height for plane surface in all floors with all cross bracings wing mild steel sheets of size 90 cm x 80 cm and gauge stiffened welded with mild steel angles of size 25mmx 25mm x 3mm for boarding laid over silver oak (Country wood) joist of size 10cm x 6.5cm dia spaced at about 90 cm center to center and supported by casuarinas props of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with standard specifications and as directed. SSRB MDSS No Unit Figures Words EMD Rs. 2400/Rates in

23.00m3

1 m3 (One cubic metre)

10.00 m3

1 m3 (One cubic metre)

197.00 m2

1 m2 (One square metre)

No. of over writings No. of Corrections

Signature of the Contractor

60.00m3

Plain cement concrete of mix 1:2:4 mix using 20mm B.S.S HBG metal including cost and conveyance of all materials and labour charges including curing etc., complete as per standard specification.

1 m3 (One cubic metre)

27.00 m2

Plastering with Cement Mortar 1:5, 12mm thick in all floors including curing etc., complete complying with standard specification.

1 m2 (One square metre)

No. of over writings No. of Corrections Signature of the Contractor

You might also like