Professional Documents
Culture Documents
(Value Engineering)
.
.
.
80-90%
1. (Planning)
.
2. (Concept Design) 1
(Main Function)
.
3. (Basic Design) (Drawing)
.
4. (Detail Design)
.
5. (Manufacturing Preparation)
.
.
(Design to Cost)
.
(Cost Drivers)
(Functional Analysis)
.
(Design for Assembly)
.
DFMA
(Virtual
Prototype) (Disassembly)
50% 32%
.
()
=
(1)
1)
2)
3)
4)
(2)
1)
2)
3)
4) ( )
5)
6)
7)
8)
9)
2 (1)
(2)
(1)
(2)
4
1 :
2 :
3 :
4 :
= () ( )
(1) (2)
(3)
(1)
(2)
3 Mu Muri Mura
Muda
3 Mu
= ( ) /
( )
QC Story
(3)
(Zero Waste or Reject)
6
(1) (Corrective
Materials)
(2) (Repair)
(3)
(Reprocess)
(4) (Requality or Blending)
(5) (Adjust Mixing Ratio)
(6) (As Raw
Material)
2%
(1)
/ = () x ( /)
/ = (/) x (/)
/. = (/.) x (/)
/ = (/) x (/)
(2)
1)
( /)
2)
2.1)
2.2)
2.3)
2.4) ( )
2.5)
2.6)
2.7)
2.8)
2.9)
Fuel Max
2.10)
-
-
3)
3.1)
3.2)
3.3)
3.4)
4)
4.1)
4.2)
5)
5.1)
5.2)
5.3)
5.4)
(3)
1)
()() () .
2)
20 : 1
3)
(Tejohn)
10 - 20 % 10 15 %
7-15%
(Performance Index)
%(%Over Time)
1)
2) (Break Down)
3) ( Multi-skill)
4)
5)
6)
7) ( )
3
8)
9)
10)
11)
12)
13)
2 (1)
(2)
(Redesign)
(1)
1)
2) (% )
3)
4)
(Preventive Maintenance)
5)
6)
7)
(2)
1)
2)
1 1
3 2 7 6
3) 35 / 90 /
90 / 120 /
4)
% 7-12 %
%
(Break Down)
(1) (Specification)
(2) (Safety)
(3) (Environment)
(4) (Redesign)
?
?
(5) (Work Reduction)
(6) (Work Cutting) 100
80
(7) (Innovative)
180
1)
2)
3)
4)
5) ( Key Performance Index (KPI) )
20% 80%
7-15%
(Specification)
Just in Time
Petroleum Coke
Fuel Max
Separator 110 KWH/t 101 KWH/t Demand Charge
Energy Charge Peak
20%
(% Utility)
50 % Utility
Pressure Loss
-
-
-
-
- 1
2 3
3
- (Condition Base) (Time Base)
-
-
-
- (Cluster)
- (Standby)
-
- (Failure Analysis)
- (Service Contract)
-
-
1)
2)
3)