Main Characteristics
Developed in 2004 as Nauticus Construction, focused on shipbuilders. Renamed in 2011 to Nauticus Project, reflecting broad coverage to shipowners, designers, etc. Fully Internet based (software, database and document files stored in DNV/Norway servers). No need for IT homologation, no deployement. Special version for shipyards (software and database in DNV/Norway, document files stored in the shipyard server). No need for renaming document files, renumbering of documents, etc. Indepency from shipbuilder, classification society, shipdesigner, etc. Can be fully downloaded for read-only at end of project. The stroke of genius behind NP is not just its simplicity and flexibility but also its shift of focus towards deliverables. The project breakdown structure atomizes the project into manageable deliverables. A project based on such tangible deliverables is far easier to manage than one based on activities alone. It allows one to be precise about what has to be delivered and helps track progress in a concrete way.
Det Norske Veritas Ltda. Todos os direitos reservados. Slide 2
Finance
Charterers
Classification
Newbuilding Dept.
Owners
Vendors
Charterers Requirements
Describe how you will:
Standardise construction survey procedures Support information pooling and analysis Improve process efficiency Simplify the plan, review and approval process Handle Non-conformities Control Change Orders Track vendors Ensure requirements compliance
Shipbuilding is a Process !
Slide 5
Standards Rules
Check status
Inspectio n result
Yes
Application form from QC Dept. NDT reports Survey status of subassembly Tech, doc. Measurement reports Inspection plan Technical Documentation Manufacturers manuals Contract specification Previous surveys comments
Folder (Any number of sub-levels) Item (Blocks, Tanks, Zones, Components, document etc.) Activities Comments/Observations Attachments
Not started In Progress Accepted Not Accepted
Block
Fabrication
File attachments
File attachments
Activity statistics
Coment list
Attached documents
11
Standards Rules
Check status
Inspectio n result
Yes
Application form from QC Dept. NDT reports Survey status of subassembly Tech, doc. Measurement reports Inspection plan Technical Documentation Manufacturers manuals Contract specification Previous surveys comments
END
13
Weekly Statistics
14
Progress Chart
15
Activity Overview
16
Prequalificatio n
Vendor
Define and track process; store results for future projects Make available approval comments in the building phase to assure vessel is built to correct design
Design Approval
Building
Important Hull, Paint and Outfitting - comments can be made available to the guarantee and operational phase to facilitate experience feeback.
Delivery
Operation
17
18
19
20
21
22
23
24
25
26
27