BIDANG BANGUNAN

ANALISA BIAYA KONSTRUKSI


REHABILITASI RUANG KELAS SD ..
Tahun 2012
1

1 m2 Membersihkan Lapangan dan Perataan


0.100 Org Pekerja
0.100 Org Mandor

1.2.2
Tenaga
0.100 Org Pekerja
0.100 Org Tukang kayu
0.010 Org Kepala tukang
0.010 Org Mandor

3,000.00
3,000.00

Rp
Rp
Rp

2,740,000.00
9,000.00
3,500,000.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

32,880.00
180.00
24,500.00
57,560.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

3,000.00
4,500.00
500.00
5,000.00

Jumlah (1) + (2)

Rp

62,560.00

30,000.00
-

=
=

Rp
Rp

18,750.00
-

Jumlah

Rp

18,750.00

@
@
@

@
@
@
@

@
@

Rp
Rp

Rp
Rp

30,000.00
Jumlah

=
=
=

Rp
Rp
Rp

5,760.00
5,760.00

Rp

75,000.00
Jumlah (1)

=
=

Rp
Rp

90,000.00
90,000.00

Rp
Rp

30,000.00
Jumlah (2)

=
=
=

Rp
Rp
Rp

9,000.00
9,000.00

Jumlah (1) + (2)

Rp

99,000.00

Rp
Rp

125,000.00
75,000.00
Jumlah (1)

=
=

Rp
Rp
Rp

150,000.00
22,500.00
172,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

23,400.00
17,550.00
1,950.00
42,900.00

Jumlah (1) + (2)

Rp

215,400.00

1 m Urugan pasir
2.6.1
Bahan
1.200
M
Pasir urug

2.6.2
Tenaga
0.300 Org Pekerja
0.010 Org Mandor

Rp
Rp
Rp

1 m Urugan kembali
2.4.1
Tenaga
0.192 Org Pekerja
0.019 Org Mandor

=
=
=

1 m Galian tanah keras sedalam 1 meter


2.1.1
Tenaga
0.625 Org Pekerja
0.062 Org Mandor

30,000.00
Jumlah

1 m' Pengukuran dan pemasangan bouwplank


1.2.1
Bahan
0.012
M
Kayu 5/7
0.020
Kg
Paku biasa 2" - 5"
0.007
M
Kayu papan 3/20

@ Rp
Rp

1 m Pasang pondasi batu kosong


4.2.1
Bahan
1.200
M
Batu belah 15/20 cm
0.300
M
Pasir urug
4.2.2
Tenaga
0.780 Org Pekerja
0.390 Org Tukang batu
0.039 Org Kepala tukang
0.039 Org Mandor

@
@

@
@
@
@

BIDANG BANGUNAN

1 m Pasang pondasi batu kali, 1 Pc :4 Ps


4.1.1
Bahan
1.100
M
Batu belah 15/20 cm
163.000
Kg
Semen portland
0.520
M
Pasir pasang

4.1.2
Tenaga
1.500 Org Pekerja
0.600 Org Tukang batu
0.060 Org Kepala tukang batu
0.075 Org Mandor

3.3.2
Tenaga
0.320 Org Pekerja
0.100 Org Tukang batu
0.010 Org Kepala tukang
0.015 Org Mandor

@
@
@
@

Rp
Rp
Rp

125,000.00
1,160.00
85,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

137,500.00
189,080.00
44,200.00
370,780.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

45,000.00
27,000.00
3,000.00
75,000.00

Jumlah (1) + (2)

Rp

445,780.00

@
@

Rp
Rp
Rp

350.00
1,160.00
85,000.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

24,500.00
16,669.20
3,400.00
44,569.20

@
@

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

9,600.00
4,500.00
500.00
14,600.00

@
@

Jumlah (1) + (2)

Rp

59,169.20

Rp
Rp
Rp

350.00
1,160.00
85,000.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

24,500.00
13,340.00
3,655.00
41,495.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

9,600.00
4,500.00
500.00
14,600.00

Jumlah (1) + (2)

Rp

56,095.00

Rp
Rp

1,160.00
85,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp

7,516.80
1,615.00
9,131.80

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

6,000.00
6,750.00
750.00
13,500.00

Jumlah (1) + (2)

Rp

22,631.80

1 m Pasangan bata merah tebal bata, 1 Pc : 6Ps


3.4.1
Bahan
70.000
Bh
Bata merah 5 x 11 x 22 cm
11.500
Kg
Semen portland
0.043
M
Pasir pasang

3.4.2
Tenaga
0.320 Org Pekerja
0.100 Org Tukang batu
0.010 Org Kepala tukang
0.015 Org Mandor

10

1 m Pasangan bata merah tebal bata, 1 Pc : 3 Ps


3.3.1
Bahan
70.000
Bh
Bata merah 5 x 11 x 22 cm
14.370
Kg
Semen portland
0.040
M
Pasir pasang

1 m Plesteran 1 Pc : 3 Ps, tebal 15 mm


7.1.1
Bahan
6.480
Kg
Semen portland
0.019
M
Pasir pasang

7.1.2
Tenaga
0.200 Org Pekerja
0.150 Org Tukang batu
0.015 Org Kepala tukang
0.010 Org Mandor

@
@
@

@
@
@
@

@
@

@
@
@
@

BIDANG BANGUNAN

11

1 m Plesteran 1 Pc : 6 Ps, tebal 15 mm


7.2.1
Bahan
0.520
Kg
Semen portland
0.020
M
Pasir pasang

7.2.2
Tenaga
0.200 Org Pekerja
0.150 Org Tukang batu
0.015 Org Kepala tukang
0.010 Org Mandor

12

5.2.2
Tenaga
6.000 Org Pekerja
18.000 Org Tukang kayu
2.000 Org Kepala tukang
0.300 Org Mandor

@
@
@
@

Rp
Rp

1,160.00
85,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp

603.20
1,700.00
2,303.20

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

6,000.00
6,750.00
750.00
13,500.00

Jumlah (1) + (2)

Rp

15,803.20

Rp

5,000,000.00
Jumlah (1)

=
=

Rp
Rp

5,500,000.00
5,500,000.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

180,000.00
810,000.00
100,000.00
1,090,000.00
6,590,000.00

Rp

5,500,000.00
Jumlah (1)

=
=

Rp
Rp

220,000.00
220,000.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

30,000.00
112,500.00
12,500.00
155,000.00
375,000.00

Rp

5,500,000.00
Jumlah (1)

=
=

Rp
Rp

192,500.00
192,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

24,000.00
90,000.00
10,000.00
124,000.00
316,500.00

@
@

1 m Pasang pintu panel kayu Kelas II


5.8.1
Bahan
0.040
M
Kayu kelas II, papan

5.8.2
Tenaga
1.000 Org Pekerja
2.500 Org Tukang kayu
0.250 Org Kepala tukang
0.050 Org Mandor

14

1 m Pasang kusen pintu dan jendela kayu kelas II


5.2.1
Bahan
1.100
M
Kayu Kelas II, balok

13

@
@

1 m Pasang jendela kaca kayu kelas II


5.10.1 Bahan
0.035
M
Kayu kelas II, papan

5.10.2 Tenaga
0.800 Org Pekerja
2.000 Org Tukang kayu
0.200 Org Kepala tukang
0.040 Org Mandor

@
@
@

BIDANG BANGUNAN

15

1 m Pasang konstruksi kuda-kuda kayu kelas II


5.30.1 Bahan
1.100
M
Kayu kelas II, balok
15.000
Kg
Besi strip & baut
0.800
Kg
Paku biasa 2" - 5"

5.30.2 Tenaga
4.000 Org Pekerja
12.000 Org Tukang kayu
1.200 Org Kepala tukang
0.200 Org Mandor

16

5.31.2 Tenaga
0.100 Org Pekerja
0.100 Org Tukang kayu
0.010 Org Kepala tukang
0.050 Org Mandor

@
@
@
@

Rp
Rp
Rp

5,000,000.00
13,300.00
9,000.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

5,500,000.00
199,500.00
7,200.00
5,706,700.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

120,000.00
540,000.00
60,000.00
720,000.00
6,426,700.00

@
@

Rp
Rp
Rp

5,000,000.00
5,000,000.00
9,000.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

40,000.00
35,000.00
1,350.00
76,350.00

@
@

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,000.00
4,500.00
500.00
8,000.00
84,350.00

@
@

1 m Pasang rangka langit-langit (1.00 x 1.00) m, kayu kelas III


5.40.1 Bahan
0.012
M
Kayu Kelas III
0.100
Kg
Paku biasa 2" - 5"

5.40.2 Tenaga
0.150 Org Pekerja
0.250 Org Tukang kayu
0.025 Org Kepala tukang
0.075 Org Mandor

18

1 m Pasang usuk kayu kelas II+reng kayu kelas II


5.31.1 Bahan
0.008
M
Kayu kelas II Usuk
0.007
M
Kayu kelas II Reng
0.150
Kg
Paku biasa 2" - 5"

17

@
@

@
@
@
@

Rp
Rp

4,250,000.00
9,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp

51,000.00
900.00
51,900.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
11,250.00
1,250.00
17,000.00
68,900.00

Rp
Rp

5,500,000.00
9,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp

39,600.00
450.00
40,050.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

3,000.00
9,000.00
1,000.00
13,000.00
53,050.00

1 m' Pasang lisplang ukuran (2 x 20) cm, kayu kelas II


5.48.1 Bahan
0.0072
M
Kayu kelas II, papan
0.050
Kg
Paku biasa 2" - 5"

5.48.2 Tenaga
0.100 Org Pekerja
0.200 Org Tukang kayu
0.020 Org Kepala tukang
0.050 Org Mandor

@
@

@
@
@
@

BIDANG BANGUNAN

19

1 m' Pasang list plafon - kayu polos


5.60.1 Bahan
1.050
M'
Kayu polos 1/5

5.60.2 Tenaga
0.021 Org Pekerja
0.021 Org Tukang kayu
0.002 Org Kepala tukang
0.001 Org Mandor

20

1 m Pasang atap lokal


6.2.1
Bahan
25.000
Bh
Genteng

6.2.2
Tenaga
0.150 Org Pekerja
0.075 Org Tukang kayu
0.008 Org Kepala tukang
0.008 Org Mandor

21

1 m' Pasang genteng bubungan


6.4.1
Bahan
3.500
Bh
Genteng bubung
8.000
Kg
Semen portland
0.032
M
Pasir pasang

6.4.2
Tenaga
0.400 Org Pekerja
0.200 Org Tukang kayu
0.020 Org Kepala tukang
0.020 Org Mandor

22

Rp

9,900.00
Jumlah (1)

=
=

Rp
Rp

10,395.00
10,395.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

630.00
945.00
100.00
1,675.00
12,070.00

Rp

3,000.00

Rp

75,000.00

Jumlah (1)

Rp

75,000.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
3,375.00
400.00
8,275.00
83,275.00

Rp
Rp
Rp

3,500.00
1,160.00
85,000.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp

12,250.00
9,280.00
2,720.00
24,250.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

12,000.00
9,000.00
1,000.00
22,000.00
46,250.00

7,000.00
9,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp

7,700.00
90.00
7,790.00

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,700.00
4,050.00
450.00
7,200.00
14,990.00

@
@

@
@
@
@

@
@
@

@
@
@
@

1 m Langit - langit eternit (1,00 x 1,00) m, tebal 3,5 mm


8.4.1
Bahan
1.100
Lbr Eternit tebal 3,5 mm
@ Rp
0.010
Kg
Paku
@ Rp

8.4.2
Tenaga
0.090 Org Pekerja
0.090 Org Tukang kayu
0.009 Org Kepala tukang
0.040 Org Mandor

@
@
@
@

Rp
Rp
Rp
Rp

BIDANG BANGUNAN

23

1 m' Pasang talang datar, seng bjls 28


11.10.1 Bahan
0.500
0.015
0.0096

m1
Kg
M

Seng plat 3"X6" bjls 28


Paku biasa " - 1"
Kayu Kelas II, papan

11.10.2 Tenaga
0.150 Org Pekerja
0.400 Org Tukang kayu
0.040 Org Kepala tukang
0.075 Org Mandor

24

1 bh Pasang kunci tanam


11.1.1 Bahan
1.000
Bh
Kunci tanam
12.1.2 Tenaga
0.060 Org Pekerja
0.500 Org Tukang kayu
0.060 Org Kepala tukang
0.030 Org Mandor

25

1 bh Pasang engsel pintu


11.4.1 Bahan
1.000
Bh
Engsel pintu
11.4.2 Tenaga
0.015 Org Pekerja
0.150 Org Tukang kayu
0.015 Org Kepala tukang
0.008 Org Mandor

26

1 bh Pasang engsel jendela


11.5.1 Bahan
1.000
Bh
Engsel jendela
11.5.2 Tenaga
0.010 Org Pekerja
0.100 Org Tukang kayu
0.010 Org Kepala tukang
0.005 Org Mandor

@
@
@

@
@
@
@

Rp
Rp
Rp

22,500.00
9,000.00
5,000,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

11,250.00
135.00
48,000.00
59,385.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
-

=
=
=
=

Rp
Rp
Rp
Rp

4,500.00
18,000.00
2,000.00
-

Jumlah (2)
Jumlah (1) + (2)

=
=

Rp
Rp

24,500.00
83,885.00

Rp

150,000.00
Jumlah (1)

=
=

Rp
Rp

150,000.00
150,000.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,800.00
22,500.00
3,000.00
27,300.00
177,300.00

Rp

12,500.00
Jumlah (1)

=
=

Rp
Rp

12,500.00
12,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

450.00
6,750.00
750.00
7,950.00
20,450.00

Rp

7,500.00
Jumlah (1)

=
=

Rp
Rp

7,500.00
7,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

300.00
4,500.00
500.00
5,300.00
12,800.00

@
@
@

@
@
@

@
@
@

BIDANG BANGUNAN

27

1 bh Pasang kait angin


11.8.1 Bahan
1.000
Bh
Hak angin
11.8.2 Tenaga
0.015 Org Pekerja
0.150 Org Tukang kayu
0.015 Org Kepala tukang
0.007 Org Mandor

28

1 bh Pasang grendel pintu


11.10.1 Bahan
1.000
Bh
grendel
11.10.2 Tenaga
0.020 Org Pekerja
0.100 Org Tukang kayu
0.020 Org Kepala tukang
0.001 Org Mandor

29

1 bh Pasang grendel jendela


11.10.1 Bahan
1.000
Bh
grendel jendela
11.10.2 Tenaga
0.020 Org Pekerja
0.100 Org Tukang kayu
0.020 Org Kepala tukang
0.001 Org Mandor

30

1 m Pasang kaca, tebal 5 mm


11.15.1 Bahan
1.100
M
Kaca
11.15.2 Tenaga
0.015 Org Pekerja
0.150 Org Tukang kayu
0.015 Org Kepala tukang
0.008 Org Mandor

31

1 m Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr


12.2.1 Bahan
232.000
Kg
Semen portland
0.520
M
Pasir beton
0.780
M
Koral beton/split
12.2.2 Tenaga
1.650 Org Pekerja
0.250 Org Tukang batu
0.025 Org Kepala tukang
0.080 Org Mandor

Rp

8,500.00
Jumlah (1)

=
=

Rp
Rp

8,500.00
8,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

450.00
6,750.00
750.00
7,950.00
16,450.00

Rp

12,500.00
Jumlah (1)

=
=

Rp
Rp

12,500.00
12,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

600.00
4,500.00
1,000.00
6,100.00
18,600.00

Rp

12,500.00
Jumlah (1)

=
=

Rp
Rp

12,500.00
12,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

600.00
4,500.00
1,000.00
6,100.00
18,600.00

Rp

95,000.00
Jumlah (1)

=
=

Rp
Rp

104,500.00
104,500.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

450.00
6,750.00
750.00
7,950.00
112,450.00

Rp
Rp
Rp

1,160.00
110,000.00
150,000.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

269,120.00
57,200.00
117,000.00
443,320.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
11,250.00
1,250.00
62,000.00
505,320.00

@
@
@
@

@
@
@

@
@
@

@
@
@

@
@
@

@
@
@
@

BIDANG BANGUNAN

32.0 1 Kg Pembesian dengan besi polos


12.4.1 Bahan
1.050
Kg
Besi beton (polos)
0.015
Kg
Kawat beton
12.4.2 Tenaga
0.007 Org Pekerja
0.007 Org Tukang besi
0.0007 Org Kepala tukang
0.0004 Org Mandor

33

1 m Pasang bekisting untuk sloof


12.6.1 Bahan
0.045
M
Kayu kelas III
0.300
Kg
Paku biasa 2" - 5"
0.100
Lt
Minyak bekisting
12.6.2 Tenaga
0.300 Org Pekerja
0.260 Org Tukang kayu
0.026 Org Kepala tukang
0.015 Org Mandor

34

1 m Pasang bekisting untuk kolom


12.7.1 Bahan
0.040
M
Kayu kelas III
0.400
Kg
Paku biasa 2" - 5"
0.200
Lt
Minyak bekisting
0.015
M
Balok kayu kelas III, begesting
0.028
M
Kaso 5/7x400 m
12.7.2 Tenaga
0.300 Org Pekerja
0.330 Org Tukang kayu
0.033 Org Kepala tukang
0.015 Org Mandor

35

1 m Pasang bekisting untuk balok


12.8.1 Bahan
0.040
M
Kayu Kelas III
0.400
Kg
Paku biasa 2" - 5"
0.200
Lt
Minyak bekisting
0.018
M
Balok kayu borneo
0.028
M
Kaso 5/7x400 m
12.38.2 Tenaga
0.320 Org Pekerja
0.330 Org Tukang kayu
0.033 Org Kepala tukang
0.016 Org Mandor

@
@

@
@
@
@

@
@
@

@
@
@
@

@
@
@
@
@

@
@
@
@

@
@
@
@
@

@
@
@
@

Rp
Rp

10,500.00
12,500.00
Jumlah (1)

=
=

Rp
Rp
Rp

11,025.00
187.50
11,212.50

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

210.00
315.00
35.00
560.00
11,772.50

Rp
Rp
Rp

2,740,000.00
9,000.00
9,750.00
Jumlah (1)

=
=
=

Rp
Rp
Rp
Rp

123,300.00
2,700.00
975.00
126,975.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)
Untuk 2xpakai

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,000.00
11,700.00
1,300.00
22,000.00
148,975.00
74,487.50

Rp
Rp
Rp
Rp
Rp

2,740,000.00
9,000.00
9,750.00
3,500,000.00
4,250,000.00
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

109,600.00
3,600.00
1,950.00
52,500.00
119,000.00
286,650.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)
Untuk2xpakai

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,000.00
14,850.00
1,650.00
25,500.00
312,150.00
156,075.00

Rp
Rp
Rp
Rp
Rp

2,740,000.00
9,000.00
9,750.00
3,500,000.00
4,250,000.00
Jumlah (1)

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

109,600.00
3,600.00
1,950.00
63,000.00
119,000.00
297,150.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)
Untuk 2xpakai

=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,600.00
14,850.00
1,650.00
26,100.00
323,250.00
161,625.00

BIDANG BANGUNAN

36

1 m Pasang lantai keramik 30 x 30 cm


13.17.1 Bahan
1.000
m2 Ubin keramik 30 x 30 cm
11.380
Kg
Semen portland
0.042
M
Pasir pasang
1.500
Kg
Semen putih
13.17.1 Tenaga
0.150 Org Pekerja
0.160 Org Tukang batu
0.035 Org Kepala tukang
0.008 Org Mandor

37

38

39

@
@
@
@

@
@
@
@

Rp
Rp
Rp
Rp

45,000.00
1,200.00
85,000.00
2,500.00
Jumlah (1)

=
=
=
=

Rp
Rp
Rp
Rp
Rp

45,000.00
13,656.00
3,570.00
3,750.00
65,976.00

Rp
Rp
Rp
Rp

30,000.00
45,000.00
50,000.00
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
7,200.00
1,750.00
13,450.00
79,426.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp

4,500.00
3,120.00
550.00
11,700.00
19,870.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,100.00
4,050.00
300.00
6,450.00
26,320.00

=
=
=
=

Rp
Rp
Rp
Rp
Rp

4,500.00
3,120.00
550.00
15,750.00
23,920.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

2,100.00
4,725.00
200.00
7,025.00
30,945.00

=
=

Rp
Rp
Rp
Rp
Rp

480.00
1,540.00
550.00
4,004.00
6,574.00

Rp
Rp
Rp
Rp
Rp
Rp

600.00
2,835.00
315.00
3,750.00
10,324.00

1 m Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar,


2 lapis cat penutup.
14.6.1 Bahan
0.200
Kg
Cat meni
@ Rp
22,500.00
0.150
Kg
Plamir
@ Rp
20,800.00
0.200
lbr
Kertas gosok
@ Rp
2,750.00
0.260
Kg
Cat penutup 2 kali
@ Rp
45,000.00
Jumlah (1)
14.6.2 Tenaga
0.070 Org Pekerja
@ Rp
30,000.00
0.090 Org Tukang cat
@ Rp
45,000.00
0.006 Org Kepala tukang
@ Rp
50,000.00
0.004 Org Mandor
@ Rp
Jumlah (2)
Jumlah (1) + (2)
1 m Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar,
3 lapis cat penutup.
14.7.1 Bahan
0.200
Kg
Cat meni
@ Rp
22,500.00
0.150
Kg
Plamir
@ Rp
20,800.00
0.200
lbr
Ketas gosok
@ Rp
2,750.00
0.350
Kg
Cat penutup 3 kali
@ Rp
45,000.00
Jumlah (1)
14.7.2 Tenaga
0.070 Org Pekerja
@ Rp
30,000.00
0.105 Org Tukang cat
@ Rp
45,000.00
0.004 Org Kepala tukang
@ Rp
50,000.00
0.003 Org Mandor
@ Rp
Jumlah (2)
Jumlah (1) + (2)
1 m Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis
cat penutup )
14.11.1 Bahan
0.100
Kg
Plamir
@ Rp
4,800.00
0.100
Kg
Cat dasar
@ Rp
15,400.00
0.200
lbr
Kertas gosok
@ Rp
2,750.00
0.260
Kg
Cat penutup 2x
@ Rp
15,400.00
Jumlah (1)
14.11.1 Tenaga
0.020 Org Pekerja
@ Rp
30,000.00
0.063 Org Tukang cat
@ Rp
45,000.00
0.0063 Org Kepala tukang
@ Rp
50,000.00
0.003 Org Mandor
@ Rp
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=
=

DAFTAR HARGA BAHAN BANGUNAN & UPAH KERJA


#REF!
TAHUN 2012
No.
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
28
25
27
26
29
26
28
27
30
27
29
28
31
28
30
29
32
29
31
30
33
30
32
31
34
31
33

JENIS BAHAN
BAHAN BANGUNAN
Pasir Urug
Pasir Pasang
Pasir Cor
Batu Belah
Kerikil 2/3 pecah mesin
Bata Merah
Portland Cement (PC) 40 Kg
Portland Cement (PC) Putih
Semen Warna
Besi Beton Polos
Kawat Beton (bendrat)
Besi Beugel/dook, angker
Besi Strip
Minyak Cat
Cat Meni Kayu
Cat Dinding
Cat Kayu
Plamur Dinding
Plamur Kayu
Kertas Gosok
Kuas 4"
Teer/Residu
Kaca Bening 5 mm
Kaca Rayband 5 mm
Kayu balok/papan begesting
Kayu Papan mutu C
Kayu papan mutu A
Kayu Papan sgl ukuran kelas II
Kayu Balok sgl ukuran kelas II
Kayu Balok sgl ukuran kelas II
List gypsum 8 cm
Asbes Datar 1x1
Keramik (30x30) kw 1
Seng Plat 3"X6" BJLS 28
Paku
Engsel Pintu ukuran 12 Cm
Engsel Jendela ukuran 6 Cm
Grendel tanam pintu
Grendel Jendela
Hak Angin Sikutan
Hak Angin Kait
Pasang instalasi
Pasang Stop kontak
Saklar Tunggal
Saklar Ganda
Lampu TL 20 w lengkap
Lampu SL 18 w
Kunci Tanam2 x putar
Fitting Lampu pijar
Genteng Lokal Kodok
Genteng bubungan lokal

Sat.

Jumlah Harga (Rp)

m3
m3
m3
m3
m3
bj
kg
kg
kg
kg
kg
kg
kg
ltr
kg
kg
kg
kg
kg
lbr
bh
ltr
m2
m2
m3
m3
m3
m3
m3
m3
m'
lbr
m2
m'
kg
bj
bj
bj
bj
bj
bj
ttk
ttk
bj
bj
bj
bj
bh
bj
bj
bj

75,000.00
85,000.00
110,000.00
125,000.00
150,000.00
350.00
1,160.00
2,500.00
7,500.00
10,500.00
12,500.00
10,500.00
13,300.00
4,300.00
22,500.00
15,400.00
45,000.00
4,800.00
20,800.00
2,750.00
15,000.00
32,500.00
95,000.00
189,500.00
2,740,000.00
3,500,000.00
4,250,000.00
5,500,000.00
5,000,000.00
5,000,000.00
15,000.00
7,000.00
45,000.00
22,500.00
9,000.00
12,500.00
7,500.00
8.000,00
12,500.00
5,500.00
8,500.00
110,000.00
25,000.00
25,000.00
35,000.00
125,000.00
36,000.00
150,000.00
17,500.00
3,000.00
3,500.00

No.

DAFTAR KEAHLIAN

Sat.

Upah Harian (Rp)

B.

UPAH TENAGA KERJA

Mandor

Org/Hr

0.00

Kepala Tukang Kayu

Org/Hr

50,000.00

Kepala Tukang batu

Org/Hr

50,000.00

Tukang Kayu

Org/Hr

45,000.00

Tukang Batu

Org/Hr

45,000.00

Tukang Cat
Pekerja

Org/Hr

45,000.00

Org/Hr

30,000.00

6
7