You are on page 1of 1

Name Ben Hunt Risk Assessment No.

1 2 3 4 5 Hazard Weather Wires Terrain Theft Loss of equipment Existing Control Measure Dress appropriately (coats, boots), keep protective covering for the equipment (water tight bags) Keep the wires covered and cleared away safely for cast and crew Keep dangerous or risky areas tapped off Keep equipment locked away or supervised at all times Keep a list of all equipment and make sure it is secured away correctly. Risk Rating Low Low Low Low Low

Risk rating: High: Current controls totally inadequate with serious consequences, death(s), serious injury, long term illness, health. Or there is a very high probability of the hazard occurring. Medium: Current controls still poor but consequences less serious: Minor injury, short term ill health with no lasting effects. Low: Current controls are adequate to minimise the risk so far as reasonably practicable.

You might also like