225mm THICK SANDSCREED BLOCK (EXT.)WALL 150mm THICK SANDSCREED BLOCK (INT.)WALL 150mm THICK IN SITU CONCRETE FLOOR SLAB FLOOR FINISHWITH SMOOTH FLOATED FINISH PREPARED TO RECEIVE ALUMINIUM FRAMED WINDOW WITH 6MM THICK CLEAR GLASS(SEE WINDOW SCHEDULE) 250MMX250MM REINFORCED CONCRETE COLUMN (SEE STRUCTURE DWGS).
ARCHITECT
PROJECT
Notes
Figured dimension must be taken in preference to scale dimensions. contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawing. All timber to be pressure treated with antfungi and antinfectation on apprived treatment.
JING DESIGN BUILD. 45A CORPORATION DRIVE DOLPHIN ESTATE IKOYI LAGOS. TEL:08023032652
PROPOSED ENTERPRISE BANK HEAD OFFICE AT, 143 AHMADU BELLO WAY, VICTORIA ISLAND, LAGOS.
DRAWING TITLE
drawing nos:
construction column
. . .
225mm THICK SANDSCREED BLOCK (EXT.)WALL 150mm THICK SANDSCREED BLOCK (INT.)WALL 150mm THICK IN SITU CONCRETE FLOOR SLAB FLOOR FINISHWITH SMOOTH FLOATED FINISH PREPARED TO RECEIVE ALUMINIUM FRAMED WINDOW WITH 6MM THICK CLEAR GLASS(SEE WINDOW SCHEDULE) 250MMX250MM REINFORCED CONCRETE COLUMN (SEE STRUCTURE DWGS).
ARCHITECT
PROJECT
Notes
Figured dimension must be taken in preference to scale dimensions. contractors, sub-contractors and suppliers must verify all dimensions on site before commencing any work or making any shop drawing. All timber to be pressure treated with antfungi and antinfectation on apprived treatment.
JING DESIGN BUILD. 45A CORPORATION DRIVE DOLPHIN ESTATE IKOYI LAGOS. TEL:08023032652
PROPOSED ENTERPRISE BANK HEAD OFFICE AT, 143 AHMADU BELLO WAY, VICTORIA ISLAND, LAGOS.
DRAWING TITLE
drawing nos: