DOCUMENT REVISIONS
Table of Contents
1. 2. 3. Purpose .......................................................................................................... 3 Abbreviations ................................................................................................. 4 UNITS ............................................................................................................. 4
RESPONSIBILITIES ........................................................................................... 4 Scope ............................................................................................................. 5 Codes and Standards...................................................................................... 6 Shipyards Scope of work for Base Case and Option A ................................... 6
Base case ....................................................................................................................................... 7 Option A....................................................................................................................................... 10
8. 9.
9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9
Vendor technical and commercial deliverables. ........................................... 17 Appendix A................................................................................................... 21 Appendix B ................................................................................................... 24
Page 2 of 25
1. Purpose
This document is intended to allow Dalian Deepwater Developer Ltd. (DDD Ltd.) to consult with shipyards regarding proposed upgrades as detailed below and hence is supported by outline drawing including provisional weight calculations, PFDs of system and layout drawings. The drawings (PFD and SLD) and design descriptions are issued separately. Refer Appendix B for list. This document also outlines the philosophy, scope and deliverables of the engineering work to upgrade the Dalian Developer to allow for the loading/offloading and storage of 320,000 bbl of crude oil (with a provision of expansion to 1,000,000 bbl in future) within the current designated void spaces using hydraulic submersible pumps and also modifications to allow UBD to use the cargo and slops tanks for storage. At present 2 options exist: Base Case Option A for storage of only 320,000 bbls of crude oil with minimum pumping rate 4250 m3/hr for storage of 1,000,000 bbls of crude oil pumping rate 6600 m3/hr
This design is based upon hydraulically driven deep well pumps of the Framo type being installed and no pump room or tank suction piping will be required. Detailed design will be carried out by TMH in Kuala Lumpur at Phase 2 with design engineers on site as required. Crude oil will be taken from the Underbalanced drilling (UBD) unit to the port slops tank for holding and return to unit for further separation or direct to a cargo tank. Crude oil within tanks will be heated to maintain a temperature in the range 35-55C as determined by PETROBRAS. Subject to parcel size crude will be offloaded using the in-tank submersible pumps via a hose (reel mounted ) aft to Petrobras supplied Aframax tanker in tandem configuration with DP assist . Maximum offloading rate of 6600m3/hr to discharge 10000000 bbls in 24 hrs at maximum 125 mlc to be achieved by 6 main cargo tank pumps operating together for option A . All deck piping to be designed for this flow rate. With this planned significant conversion to carry crude oil, TMH will address Class notation of vessel to ensure compliance at all levels. DNV rules are to be applied and class notation shall be changed to allow for the new design change for the loading, storage, carriage and discharge of crude oil. Brazilian regulation requirement shall be part of the design and complied with. However the PETROBRAS Technical Specifications for the Unit forms the governing design requirements. The associated drawings are still subject to HAZOP and safety review at P&ID level.
Page 3 of 25
2. Abbreviations
ACH COW DNV DP DDD FAT IACS ICS IG MDO SOLAS TMH OCIMF PFDs SLD SP Air-changes per hour Crude Oil Washing Det Norske Veritas Dynamically Positioned Dalian Deepwater Developer Ltd Factory Acceptance Test International Association of Classification Societies Integrated Control System Inert gas Marine Diesel Oil Safety of Life at Sea Technip MHB Hull Engineering Oil Companies International Marine Forum Process Flow Diagrams Single line diagram Hydraulic Submersible Pumps
3. UNITS
SI units will used throughout unless otherwise specified kV kilovolt MW Megawatt Cu.m Cubic meter
4. RESPONSIBILITIES
This section defines the following responsibilities of TMH and shipyard:1/ 2/ 3/ 4/ 5/ 6/ TMH shall interface with vendors to provide detailed design to P&ID and structural design level with Class approval. All detailed pipe, cable, cable tray and instrument tube routing shall be designed by shipyard. Ship yard shall control all site survey work by Class. Shipyard and their vendors shall cover under procurement, responsibility for Class attendance at FATs. Shipyard shall be responsible for advising TMH and owner of FATs at least 2 weeks prior to activity taking place. Shipyard to provide final document packages of As-builts, for conversion/upgrade scope of work as outlined in this document. Shipyard shall on completion of work, provide 3 full sets of As-built drawings and vendor documentation complying with Brazilian requirements in Page 4 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 addition to class and flag state requirements and regulations for all work carried out for the cargo handling system upgrade. Red line mark ups from commissioning to be included in completed drawings. Shipyard is responsible for all stability and hull structural calculations( including SF/BM etc). Shipyard to provide DNV approved full stability booklet for intact and damage case. Shipyard to develop loading plans for inclusion within the stability books Shipyard to supply DNV approved stability computer suitable for interfacing to the tank sounding system for on line and offline stability calculations. Shipyard to integrate computer into the cargo system.
7/ 8/ 9/
Structural detail for hull practice, detail of hull outfitting practice, piping practice (hull and machinery), steel outfitting practice and practice for electric installation shall be in accordance with the existing shipyard contract agreed specifications and shall be approved by Class (DNV). All designs produced by TMH will be approved by class (DNV) but shall be subject to Owner approval, Owner HAZOP and safety /operability studies. Adequate mechanical handling facilities are to be provided by shipyard where applicable. Any item identified by shipyard which is not called for in this document but required by the Rules and/or Regulations shall be immediately advised to TMH for review. Shipyard to procure and install according to the Shipbuilding practice for this Class of Vessel subject to owner approval. All Vendor approval by owner. The Shipyard may make minor changes and improvements to the requirements outlined, if found necessary for introduction of improved production methods or otherwise, provided that the Shipyard shall first obtain the Owner's written approval. Vendor spare parts shall be supplied by the Shipyard according to the existing contract which meets the requirements of the Classification Society, the Regulatory bodies or the normal standards of the Shipyard and the manufacturers, whichever is greater, prior to completion of delivery of the Vessel. Any additional spares required by the Owner not described in the Specifications shall be supplied by the Shipyard on the Owners account or by mutual agreement.
5. Scope
The scope includes all hull modifications required for the upgrade, including steel work, piping, electrical and safety systems to support loading of crude oil from UBD or process and export of the crude, with offloading reel stored hose and hawser system to DP shuttle tanker. A flare system with capacity for UBD but with the capability to be increased without physical change of length to allow for process flaring is also included in this scope. Additionally provision for future use of Dalian Developer during the oil spill control mode i.e. having provision of chemicals storage (circa 1600 m3) in hull tanks and Methanol (circa 200 m3) in deck tanks to be taken into account and provisionally designed to be included(Hold).
Page 5 of 25
DYNPOS-AUTRO,
E0,
HELDK
SH,
CRANE,
F-AMC,
ICS
This notation will be amended subject to class approval to comply with DNV rules enabling the vessel to operate as an FPSO including the loading, storage, carriage and discharge of crude oil in compliance with current regulations DNV Rules and Standards
The list of Class rules, given below, RPs etc. is not exhaustive but covers main subjects for the conversion phase. All design will be in compliance with current DNV rules and IACS interpretations of:o o o o o o o DNV SHIP CONSTRUCTION RULES DNV-OSS-102 Rules for Classification of Floating Production, Storage and Loading Units DNV-OSS-101 Rules for Classification of Offshore Drilling and Support Units DNV-OS-D101 Marine and Machinery Systems and Equipment DNV-OS-D201 Electrical Installations DNV-OS-D202 Automation, Safety, and Telecommunication Systems DNV-OS-C102 Structural Design of Offshore Ships
In addition to and including above standards, the Engineering would also be in compliance with the requirements of the EPC contract with COSCO see Appendix B.
Page 6 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 systems as necessary and integration of remote control and monitoring into the ICS. This shall permit operation of the mentioned equipment without restriction at full designed capability.
TABLE 1 - List of Activities for Base Case (320,000 BBL of Crude Oil storage and Discharge)
ACTIVITY
1A 1B 2
Install within No 5 wings and No 6 across Framo SD 300 pumps with 8 meter stack (one per tank) complete with SUS sumps add cargo load lines from deck etc. Provision to be made for pump and stack extraction through process deck or similar obstruction. Install in cargo tank bulkhead at low level cross over /balance valves (4 off) Install anodes in No 5 & 6 cargo tanks Install Framo HPU powered at 11 kV with a power rating of 3.8 MW (5 pumps). Install hydraulic flow and return control lines etc to installed pumps on deck. Construct 2 new switch rooms in aft structure at main deck level aft of the windlasses with mezzanine decks, install 2 new 11 kV switchboards, associated transformers and LV switch gear for cargo and UBD equipment. Power to be supplied on existing 11kV feeders from LER A and D Install passive fire protection. Design and install HVAC for switch board rooms Install full piping system with dedicated Framo SD200 pumps within the slops tanks
Detailed Procurement Design Construction engineering Structural Installation design Commissioning DNV approval Site approval DNV Shipyard TMH Vendor
Shipyard
3A 4
Shipyard Shipyard
Page 7 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 ( one per tank) plus a skimming pump and integrate this with the new cargo piping system. Design and install piping system to be able to take Crude oil from the UBD plant after the 2nd stage of separation for storage in one slop tank and to transfer the oil later to the 3rd stage of separation after which the oil will run down into the main storage tanks. Install anodes in slops tanks Install Radar and manual ullaging systems within no 6 tanks across, no 5 wing tanks and slops Install within No 4, 3 wings and no 1 and 2 across deck penetrations (Items 1, and 5 )with blanks to allow for option A (Refer Section 7.2) with minimum hot work. Install SUS 316 sumps, guides and pump supports for future installation of SD300 pumps in these tanks. Install brackets for future anodes Install within the No 6 across heating coils with heat equivalent output of 3 MW. Coil materials to be defined but to have life expectancy > 20 years e.g. Cuni or AlBr. Install deck piping and tank manifolds flow to and return to fired heaters note 1 Install on deck in Zone 2 or safe area , Crude oil and MDO fired heater(s) of approx 3 MW to support heating coil system with liquid heating medium inc. pumps, header tanks and treatment systems. Install on deck skid mounted IG generator incl. scrubber unit and fans in Zone 2 or safe area. Install deck piping with P/V breakers, deck seal and associated pressure relief system terminated with HV and flame screen vents elevated in the flare tower at circa 25 meters. Deck piping to be installed to slops, No 6 and No 5 tanks with facility to extend to all cargo tanks. Manually operated deck valves Install provision for flexible hose connections to adjacent ballast tanks Install on deck - loading, transfer and COW
4A 1. 5
Shipyard Shipyard
Shipyard
2. 7
TMH Vendor
Shipyard
TMH/ Vendor
Shipyard
3. 9
TMH/ Vendor
Shipyard
10
TMH
Shipyard Page 8 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 lines with auxiliary equipment e.g COW guns etc to support crude loading and discharge from the No 6 and 5 with facility to extend to all cargo tanks. Lines sizes to be compatible with full capacity system. Design and install supports to extend this system in the future taking into account self draining lines and maximum elevations etc. Install on the poop deck port aft a 50 meter 11 high flare tower extending out board to port. Install on deck knock out drums and piping etc required for the operation of the flare from UBD and also install tie ins for future increase in flaring capacity. Install with tie into existing fire main for deluge and cooling water system for water spray system for cooling. Connect to existing flare supplies. Install a deck deluge system using monitors 12 and under platform foam deluges to create foam blanketing system for the cargo tank and slop deck spaces with contingency to be extended for option A to all tanks. This system to be tied into existing vessel fire main with addition of bulk storage foam tank and pumps with liquid foam distribution piping. Construct on aft deck platform and install 13 hose reel with capacity for 250 meters of 16 inch ID hose. 690 V HPU unit located in a safe area under deck aft .see note 2 Install CCTV as extension to existing system 14 Construct on aft deck platform (integrated with item 13) and install hawser reel with capacity for 100 meters of 16 grommet hawser with chain etc to meet OCIMF. 690 V HPU unit located in a safe area under deck aft . note 2 Install metering skid at main deck to match 15 PETROBRAS requirements (Fiscal or Ultrasonic to be defined). Install shuttle tanker DP navigation package 16 as separate item to DD DP system. Install deck strong points as short pedestals 17 or doubler plates to take future expansion equipment on after deck space. Install new instrument cable loops and 18
TMH
Shipyard
TMH
Shipyard
TMH/ Vendor
Shipyard
TMH/ Vendor
Shipyard
TMH/ Vendor
Shipyard
Shipyard Shipyard
TMH /Vendor
Shipyard Page 9 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 interface to control systems. Install control equipment and HMIs in designated area Integration of all new vendor equipment TMH/ Vendor Shipyard 19 within ICS. Expand PAGA, Fire and gas systems for new TMH/ Vendor Shipyard 20 equipment subject to survey. Extend ESD system and align with cargo and offloading requirements The above option is to be built considering the potential for expansion, to minimize requirements for hot work and tank entries for all future equipment installation. Note 1 Shipyard to provide costs on material options to meet specifications Note2 Integration to existing mooring equipment HPU to be investigated with vendor
7.2 Option A
To create a fully operational storage capacity of 1,000,000 bbls which requires no further work in compliance with PETROBRAS standards allowing for a 24 hour discharge of 1,000,000 bbls of crude. TABLE 2 - List of Activities for Option-A (expansion to 1,000,000 BBL of Crude Oil storage and
ACTIVITY
1A
1B 2
Install within all cargo tanks Framo SD 300 pumps (one per tank) complete with SUS sumps add cargo load lines from deck etc Install in all cargo tank bulkheads at low level cross over /balance valves (15) est 250 mm hydraulically operated Install anodes in all cargo tanks inc brackets Install Framo HPU powered at 11 kV with a power rating of 3.8 MW (5 pumps) within safe area aft. Install hydraulic flow and return control lines etc to installed pumps on deck. Install power supplies and local control Construct 2 new switch rooms in aft structure at main deck level aft of the windlasses, install 2 new 11 kV switchboards, associated transformers and LV switch gear for cargo and UBD equipment. Power to be supplied on existing
Detailed Design Structural design DNV approval TMH Vendor TMH Vendor TMH Vendor TMH Vendor
Shipyard
Shipyard Shipyard
TMH/ Vendor
Shipyard
Page 10 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 11kV feeders from LER A and D Install passive fire protection. 3A 4 Design and install HVAC for switch board rooms Install full piping system with dedicated Framo SD200 pumps within the slops tanks ( one per tank) plus a skimming pump and mate this with the new cargo piping system. Design and install piping system to be able to take Crude oil from the UBD plant after the 2nd stage of separation for storage in one slop tank and to transfer the oil later to the 3rd stage of separation after which the oil will run down into the main storage tanks. Install hydraulically operated valves. Install anodes in slops tanks Install Radar and manual ullaging systems including pressure/temperature monitoring within all tanks. Install within the No 6 across heating coils with heat equivalent output of 3 MW. Coil materials to be defined but to have life expectancy > 20 years e.g. Cuni or AlBr. Install deck piping and tank manifolds flow to and return to fired heaters Install in addition SUS deck heaters of equivalent value 3 x 1MW .note1 Install on deck in Zone 2 or safe area , Crude oil and MDO fired heater(s) of approx 3 MW to support heating coil system with liquid heating medium inc. pumps, header tanks and treatment systems. Install on deck skid mounted IG generator incl. scrubber unit and fans in Zone 2 or safe area. Install deck piping with P/V breakers, deck seal and associated pressure relief system terminated with HV and flame screen vents elevated in the flare tower at circa 25 meters. Deck piping to be installed to all cargo tanks comprising clean header, dirty header and purge header. Manually operated deck valves Install provision for flexible hose connections to all adjacent ballast tanks Shipyard Shipyard Shipyard
TMH Vendor
4A 4. 5
Shipyard Shipyard
Shipyard
5. 7
TMH/ Vendor
Shipyard
TMH Vendor
Shipyard
Page 11 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 6. 9 Install on deck - loading, transfer and COW lines with auxiliary equipment e.g COW guns (34-40) etc to support crude loading and discharge in all cargo tanks. Design and install all supports taking into account self draining lines and maximum elevations etc. Install on the poop deck port aft a 50 high meter flare tower extending out board to port. Install on deck knock out drums and piping etc required for the operation of the flare from UBD and also install tie ins for future increase in flaring capacity. Install and tie into existing fire main deluge and water spray system for cooling. Install a deck deluge system using monitors and under platform foam deluges to create foam blanketing system for the cargo tank and slop deck spaces for all tanks. This system to be connected into existing vessel fire main for 5 new fire zones. Install deck bunding for fire zones on main deck. Addition of one bulk storage foam tank and two foam pumps with liquid foam distribution piping in SUS. Construct on aft deck platform and install hose reel with capacity for 250 meters of 16 inch ID hose. Install 690 V HPU unit located in a safe area under deck aft .see note 2 Install CCTV as extension to existing system Construct on aft deck platform (integrated with item 12) and install hawser reel with capacity for 100 meters of 16 grommet hawser with chain etc to meet OCIMF. 690 V HPU unit located in a safe area under deck aft . see note 2 Install metering skid at main deck to match PETROBRAS requirements (Fiscal or non fiscal Ultrasonic to be defined). Install shuttle tanker DP navigation package as separate item to DD DP system. Install deck strong points as short pedestals or doubler plates to take future expansion equipment on after deck space. Number to be confirmed Install new instrument cable loops and interface to control systems. Install control equipment and HMIs in designated area
TMH Vendor
Shipyard
10
TMH
Shipyard
11
TMH
Shipyard
12
TMH Vendor
Shipyard
13
TMH Vendor
Shipyard
14
TMH Vendor
Shipyard
15 16
Shipyard Shipyard
17
Vendor
Shipyard
Page 12 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 Pilothouse integration of all new vendor equipment within ICS. Expand PAGA, Fire and gas systems for new equipment subject to survey. Extend ESD system and align with cargo and offloading requirements
18
TMH/Vendor
Shipyard
Note 1 Shipyard to provide costs on material options to meet specifications Note2 Integration to existing mooring equipment HPU to be investigated with vendor Note 3 following options shall be quoted: Option Modify the port ballast tank Frames 14-22 by addition of internal bulkhead with cross over valves installed to main tank. To provide future contingency for carriage of oil dispersant. Option Make provision on deck above No 5 Center tank for location of a methanol fixed tank complete with AR-AFFF foam deluge
8. Hardware
The Hardware, i.e. Equipments and fittings which is envisaged to be installed for the upgrade (Base Case and Option-A) is detailed in Table 3 and 4 respectively. All piping quantities given are estimates of major lengths and exclude bends, manual valve, spades etc this will be provided in detailed design.
Note: All piping shall be of carbon steel unless otherwise stated. Reference N110-COS-L-SA-000-1011 Instrument tubing and hydraulics piping in SUS 316 L > 2.5% Mo(Vendor supply) All valves min contact with crude oil to have seals suitable for 60C. All remote operated valves to have overcam locking device in open and closed position In general all hydraulically operated valves shall have a local manual isolating valve fitted nearby. IG system valves to be interlocked
TABLE 3 - List of Activities for Base Case (320,000 bbls of Crude Oil storage and Discharge with expansion to 1,000,000 BBL)
LOCATION
Nos 5 Ws and 6 across (5 Tanks) Nos 6 across
EQUIPMENT
Bulkhead valves (4) 5 units Tank radar system for ullaging, temperature and pressure 5 sets MMC Manual manifolds
PIPING
Load lines 5x 25 m x 300 mm Material(hold) heating coils 65 mm x
CONTROL
Remote operated valves Piping on deck Page 13 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 Heating In voids Deck penetrations for SPs , internal supports and pump sumps 2 submersible pumps and skimming unit 2 units Tank radar system for ullaging, temperature and pressure 2 sets MMC Manual manifolds Load line Transfer line IG Line 1800 m Blinds fitted at bulkhead penetrations with spools for valves
Load lines
Slops tanks
Slops tank separation piping 500 mm x 40 m Piping from UBD 250 mm X 120 m Drains 4 x 25 x350mm Cunifer(hold) heating coils 65 mm x 400 m 400 mm X 100 m 400 mm X 100 m 500 mm X 200 m 300 mm X 100 m 100 mm X 50 m Vendor supply Framo 650 mm x 200 m 100mm x100m flow and return
Slops heating
on deck Remote operated valves Remote operated valves Remote and manual operated valves Remote and manual operated valves
On deck
COW line Hydraulic lines Discharge main 2x Deck heaters completed with day tank, expansion tank and heating medium circulating pumps 1 x 8250m3/hr IG generator with MDO day tank including deck seal/deck scrubber/ PV breakers UBD Liquids Interface Water Deluge UBD Gas Interface IG vents Foam deck deluge Hose Reel
LCP Interface
LCP interface Further details required 100mm x 30m Further details required 500mm x 75 m HV vents and purging flame vents with flame screen
Flare
Monitors/Deluge Fabricate deck extension as foundation and install on upper poop level hose reel for 250 meters 16 inch hose
150 mm X 350 m HPU and hydraulic piping to vendor specification Local Interface ESDV with cargo system Page 14 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 Fabricate deck extension as foundation and install on upper poop level a hawser reel for 200T SWL 2x11kV switchboards, 1 x 11kV/690V transformer, 2 x 690 V switchboards 2 x HVAC systems 1 main cargo pump HPU 1 main cargo pump auxiliary unit 1 hydraulic valve HPU I hawser/hose reel HPU(hold)
Hawser reel
local
Cable to be determined
ICS/PMS interface
Internal Poop
TABLE 4 - List of Activities for Option-A (1,000,000 BBL of Crude Oil storage and Discharge)
LOCATION
In all tanks (15 Tanks)
EQUIPMENT
Bulkhead valves(15) 15 units Tank radar system for ullaging, pressure and temperature 15 sets MMC Manual manifolds 2 submersible pumps and 1 skimming unit 2 units Tank radar system for ullaging, pressure and temperature 2 sets MMC Manual manifolds Load line Transfer line
PIPING
Load lines 15 x 25m x300 mm
CONTROL
Remote operated valves Standalone HMI interface Piping on deck
Material(hold) heating coils 65 mm x 1800 m Slops tank separation piping 500 mm x 40 m Piping from UBD 250 mm X 120 m Drains 4 x 25 x350mm Cunifer(hold) heating coils 65 mm x 400 m 400 mm X 200 m 400 mm X 200 m 500 mm X 600 m 300 mm X 250 m 100 mm X 150 m Vendor package(FRAMO) installation
Slops tanks
Slops heating
Piping on deck Remote operated valves Remote operated valves Manual operated valves Manual operated valves
On Deck
Page 15 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 by shipyard Discharge main Flare UBD Liquids Interface Water Deluge UBD Gas Interface IG vents Internal Poop 2x11kV switchboards, 1 x 11kV/690V transformer, 2 x 690 V switchboards 2 xHVAC systems 1 main cargo pump HPU 1 main cargo pump auxiliary unit 1 hydraulic valve HPU I hawser/hose reel HPU(hold) 450 -750 mm x 400 m Further details required 100mm x 30m Further details required 500mm x 75 m Cable to be determined HV vents and purging flame vents with flame screen Remote operated valves
9. Structural
The structural work envisaged for the upgrade is as mentioned below. This to be in compliance with DnV Class rules.
10.
The following major item equipment list has been generated from anticipated requirements based on the submerged pump solution confirmed April 2012 and is still subject to detailed engineering. The vendors nominated below have in general been contacted by TMH for budgetary quotations are generally valid in Q2 2012 but now may be subject to re-quote with detailed design information. All prices were quoted to TMH without any frame arrangements, nominated shipyard may be able to improve on quotations from some vendors. Shipyard to quote on their workscope based upon design descriptions with MTOs, vendor documentation SL. No. 1 MARINE EQUIPMENT PACKAGE LIST Cargo Pumps Base case PROPOSED VENDOR Framo Pumps PROPOSED MACHINERY Vendor budgetary proposal
1A
Framo Pumps
5x SD 300 plus 2 xSD200 plus 1x SD150 plus 1x TD 150 including fitting for all tanks and HPU 3.8 MW (for 6 SD300 pumps) 7x SD 300 plus 8 x SD300(L) plus 2 xSD200 plus 1x SD150 plus 1x TD 150 including fitting for all tanks and HPU 3.8 MW (for 6 SD300 pumps)
USD 4 million
Page 17 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 2 COW guns Base case DASIC/Polar marine 15-18 fixed tank top machines with 3 meter internal penetration all SUS 316 or better 36-40 fixed tank top machines with 3 meter internal penetration all SUS 316 or better 1 off ODME packages with auto valves USD 54,000
DASIC/Polar marine
USD 120,000
Slop tank discharge oily water package / monitor Offloading hose reel and Hawser
Jowa
Pusnes/Trelle borg
Hawser
Pusnes
Offloading hose
Trelleborg
Emmerson
Thermal boiler (for tank heating coil duty plus deck heaters ) Thermal fluid pumps and expansion drum
10
Hose reel with spooling gear and HPU for 250 meter 16inch hose(QC/DC option) PB compliant Hawser 100 meter hawser with OCIMF 76 mm chains etc inc spare. 150 m 16 inch double carcass OCIMF compliant hose including jewellery and tanker end hose Non fiscal ultrasonic meter for flows up to 8000 m3/hr Full ultrasonic fiscal skid for max 8000m3/hr liquids MDO fire unit for 8,250 m3/hr IG at <2% O2 supply to include deck seal and vacuum breakers MDO/Crude oil fire boiler for liquid heating medium system. Minimum 2 x3 MW proposed maximum 2 x 6MW units 3 x 90 m3/hr pumps Heating medium equipment to circulate system. I MW each 20-25m3/hr HM Single 6000 litre Foam tank 1% AFFF with 2 pumps and eductor for 20 minute supply . Deluge release cabinets, monitors
Inclusive bid including 150 m hose with spare section but excluding hawser USD 3.7 million USD 250,000
See 4
12
Deck Heaters Foam packages Chubb/SEMCO (including pumps Maritime and tanks)
USD 90,000 Subject to survey 8/5/2012 No quote requested to date Est USD 120,000
Page 18 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 15 Control packages associated with cargo system, offloading system, IG system Transformers, batteries, UPSs and electrical switchgear associated with pumps / packages HVAC equipment associated with instrument / switchgear rooms Fire protection packages associated with machinery spaces and other internal spaces Heating coils in cargo tanks . Macgregor Supply of complete valve system including valves , actuators, multi-core tubing, HPU's, solenoid boxes and HMI for all remote control valves associated with cargo upgrade including IG USD 650,000 based on 60 remote valves 300-600 mm
16
17
Shipyard
Shipyard
18
19
Shipyard
20
Shipyard
21
Deck piping/valves pipe rack Power cable and cable trays etc Flare tower
Shipyard
Upgrade of fire and gas detection system to cover process deck and cargo areas. Installation of Gaseous extinguishant in machinery space. Supply of deck piping , intank coils with tank manifolds with installation . Insulation of exposed piping . Subject to materials used for tank coils Supply of deck piping , intank coils with tank manifolds with installation . Insulation of exposed piping Subject to survey 8/5/2012
22
Shipyard
23
Shipyard
Page 19 of 25
Basis of Conversion (Submersible Pump Solution) TM3002-100-RT-70-00-0002-02 24 Hawser and hose Shipyard reel support Misc structural supports Shipyard See design documents and MTO See design documents and MTO
25
Page 20 of 25
11.
Appendix A
Extract from COSCO EPC Contract
The following DNV guidelines, offshore standards and recommended practices shall be applied to the design and construction of the Unit:
DNV-OS-C101 Design of Offshore Steel Structures DNV-OS-A101 Safety Principles and Arrangements DNV-OS-C101 Design of Offshore Steel Structures DNV-OS-C102 Structural Design of Offshore Ship] DNV-RP-C102 Stability and Watertight Integrity DNV-OS-C401 Fabrication and Testing of Offshore Structures DNV-OS-C301 Stability and Watertight Integrity DNV-OS-D101 Marine and Machinery Systems and Equipment DNV-OS-D201 Electrical Installations DNV-OS-D202 Instrumentation and Telecommunication Systems DNV-OS-D301 Fire protection DNV-OS-E101 Drilling plant DNV-OS-E201 Oil and Gas Processing Systems DNV-RP-C204 Design against Accidental Loads DNV Rules for Marine Operations where applicable
Other Rules and Regulations The Vessel shall comply with the latest published editions of the following Rules and Regulations: a) Maritime Regulations of the Registered Country / Flag state. k) IMO: International Convention for the Safety of Life at Sea, 1974 (SOLAS), consolidated edition 2004 and latest amendments, as defined by MODU code.
Page 21 of 25
Note: For the purpose as provided in above, the mentioned NMD regulations below shall be used only as reference for the design and construction of the vessel. Builder shall identify and categorize, for Owners review, any deviations should any hull, equipment and systems not comply. b) NMD Regulations concerning stability, watertight subdivision and watertight/weatherproof closing means on Mobile Offshore Units (No. 878 of 1991-12-20) c) NMD regulations concerning ballast systems on Mobile Offshore Units (No 879 of 1991-12-20) d) NMD regulations concerning precautionary measures against fire and explosion on Mobile Offshore Units (No. 227 of 1984-01-31.) e) NMD regulations concerning Risk analysis for Mobile Offshore Units (No. 12391993-12-22) f) NMD regulations concerning evacuation and lifesaving appliances on Mobile Offshore Units (No.702 of 1991-09-09)
Page 22 of 25
Registration The Vessel shall be registered under flag of Marshall Islands or similar. Certification Classification certificates, equipment/component parts certificates and necessary documents as required by authorities are to be supplied at the time of the Vessel completion and delivery, including the following certificates: Builders Certificate Stability declaration (DNV) Classification Certificate for Hull, Equipment and Systems without conditions (DNV) International Load Line Certificate (DNV) Certificate of Tonnage Measurement 1966 (DNV) International Oil Pollution Certificate (I.O.P.P.) (Annex I) (DNV) International sewage Pollution Prevention Certificate (Annex IV) (DNV) International Air pollution Prevention Certificate (Annex VI) (DNV) Suez Canal Special Tonnage Certificate (DNV) MODU Safety Certificate (Inc. GMDSS, COLREG etc. (DNV) Safety Radio Certificate Safety Equipment Certificate Navigation Light Certificate Builder's Certificate for inclining experiment and dead-weight determination (Assembly Yard). Authority Register of Cargo Gear for all cranes and lifting appliances. Certificates for Lifts. Deratting Certificate Lifesaving Equipment Certificate Compass Certificate (LSA Code) Compass Adjustment Certificate Radio License (Buyer's application) Other certificates for component parts of the Vessel required by the rules and regulations of the Classification Society Declaration concerning compliance with ILO Convention no. 92 and or 133, crew accommodation (DNV) Certificate regarding marine vapour control system. US regulation (46CFR Part 39) (DNV) Declaration concerning compliance with USCG Navigation Regulation (Title 33, Part 164) (DNV) Declaration concerning compliance with USCG Pollution and Sanitation regulation /Title 33, Part 155 and /or 159) (DNV) IMO Safety Certificate Where certificates are not obtained from relevant authorities or Class, a statement of compliance is to be released by recognised authorities
Page 23 of 25
Document Title
Basis of Conversion Submersible (update to include comments Design Cargo System
Remark
Type of Document
BOD Design
Cargo Loading
0 1
PFD PFD
4 5 6
PFD
Slop Tanks
PFD
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
IG System inc VOCs COT Protection(anodes paint) Crude Oil Washing Design Cargo Heating Cargo heating Design Fire Fighting F&G Systems Shuttle DP System Preliminary Design of Methanol Tank (Deck tanks) Hose Reel Foundation design Hose Reel Foundation Elevation Hose Reel Foundation Plan Hose Reel Foundation Details Material Take off for Hose Reel Foundation (Steel) Hawser Reel Foundation design
0 0 1 0 0 0 0
0 0 Hawser Foundation Details included Hawser Foundation Details included Hawser Foundation Details included 0 0
Design report Design Report Drawing Drawing Drawing MTO Design Report
Page 24 of 25
22 23 24 25 26 27 28 29 30 31 32 33 34
TM3002-100-RT-10-00-0002 TM3002-100-RT-18-00-0001 TM3002-300-DW-18-100001 TM3002-300-DW-18-100002 TM3002-300-DW-18-100004 TM3002-100-RT-18-00-0001 TM3002-100-RT-70-00-0006 TM3002-100-RT-70-00-0007 TM3002-100-RT-70-00-0008 TM3002-100-RT-70-00-0011
0 0 0
Included in Report
Footing , Chord and foundation details Footing , Chord and foundation details 0 0 0 0 0 Included in Report