Project Category:
Project Name:
Contract Value:
Contractor Name:
Architecture Consultant
6) 7) 8) 9) 1 0)
We hereby declare that the information given and the IBS Score submitted herewith is true and complete. The total IBS Score for the proposed building / project is ____________ Date: ______________ Name & Signature of Qualified Person
Project Name : __________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ Type/Block No : ____________________________________ Contract Value:_____________ Total no of Units/blocks:____________
Category of Building Residential (landed) Residential (high rise) Industrial Institutional Commercial Others __________________
For mixed development, please indicate the area of the category: Residential (landed) Residential (high rise) Commercial ________________ m ________________ m ________________ m
2 2
Industrial
________________ m
1.1 FLOOR = PRECAST CONCRETE SLAB a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 0.7 0.6 0.8 1.0 0.8 0.9 0.8 1.0 0.9
ELEMENTS 1.2 FLOOR = IN-SITU CONCRETE ON PERMANENT METAL FORMWORK a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 1.3 FLOOR = IN-SITU CONCRETE WITH REUSABLE SYSTEM FORMWORK a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam
AREA (m ) (a)
IBS FACTOR
COVERAGE %
ELEMENTS 1.4 FLOOR = IN-SITU CONCRETE USING TIMBER FORMWORK a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam
AREA (m ) (a)
IBS FACTOR
COVERAGE %
0.6 0.5 0.4 0.5 0.4 0.3 0.0 0.5 0.6 IBS CONTENT SCORE
ELEMENTS 1.5 FLOOR = STEEL FLOORING SYSTEM a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam
AREA (m ) (a)
IBS FACTOR
COVERAGE %
ELEMENTS
AREA (m ) (a)
IBS FACTOR
COVERAGE %
1.6 FLOOR = TIMBER FRAME FLOORING SYSTEM a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 1.7 NO FLOOR a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 2.0 ROOF SYSTEM a) Prefab timber roof truss b) Prefab metal roof truss c) Precut metal roof truss d) Timber roof truss TOTAL AREA 1.0 1.0 0.5 0.0 100% Sub-total for structural system (maximum 50 points) ( A ) 0.6 0.0 0.7 1.0 0.7 0.8 0.7 1.0 0.8 0.6 0.8 1.0 0.7 0.8 0.9 0.8 1.0 0.9
PART 2: WALL SYSTEMS ELEMENTS a) Precast concrete panel b) Wall cladding c) Prefabricated timber panel d) Full height glass panel e) Dry wall system f) In-situ concrete with reusable system formwork g) In-situ concrete with timber formwork h) Blockwork system i) Pre-assemble brickwall/blockwall j) Common brickwall TOTAL AREA Length (m) IBS FACTOR 1.0 1.0 1.0 1.0 1.0 0.5 0.0 0.5 1.0 0.0 100% Sub-total for wall system (maximum 20 points) ( B ) PART 3: OTHER SIMPLIFIED CONSTRUCTION SOLUTIONS USAGE ELEMENTS 1.0 Utilisation of standardised components based on MS 1064 a) Beams b) Columns c) Walls d) Slabs c) Doors d) Windows 2.0 Repetition of structural layout a) For building of floor more than 2 storeys i) Repetition of floor to floor height ii) Vertical repetition of structural floor layout iii)Horizontal repetition of structural floor layout b) For building 1 or 2 storeys i)Horizontal repetition of structural floor layout Nos 3 6 Nos Nos Nos 1 1 1 2 2 2 Nos Nos m m2 Nos Nos 2 2 2 2 2 2 4 4 4 4 4 4 UNIT
50% X < 75% 75% X 100% COVERAGE
IBS SCORE
Sub-total for other simplified construction solutions (maximum 30 points) ( C ) TOTAL (maximum 100 points) (A + B + C )
SUMMARY SHEET (Multiple Building Project) COVERAGE AREA (%) IBS SCORE OF BUILDING IBS SCORE OF PROJECT
BLOCK NAME
AREA (m )
TOTAL
= ________________