CALCULATION FOR IBS SCORE


For office use Project Registration No:

Project Category:

Project Name:

Contract Value:

Contractor Name:

Developer / Owner Name:

Architecture Consultant

Civil/Structure Engineer Consultant Name:

List of Submitted Drawings 1) ____________________________________ 2) ____________________________________ 3) ____________________________________ 4) ____________________________________ 5) ____________________________________

6) 7) 8) 9) 1 0)

_______________________________ _______________________________ _______________________________ _______________________________ _______________________________

We hereby declare that the information given and the IBS Score submitted herewith is true and complete. The total IBS Score for the proposed building / project is ____________ Date: ______________ Name & Signature of Qualified Person

Designation: ___________________________ Reg No. (Arch/PE/QS):________________

CALCULATIONS OF OVERALL IBS SCORE


PROJECT DETAILS

Project Name : __________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ Type/Block No : ____________________________________ Contract Value:_____________ Total no of Units/blocks:____________

Category of Building Residential (landed) Residential (high rise) Industrial Institutional Commercial Others __________________

For mixed development, please indicate the area of the category: Residential (landed) Residential (high rise) Commercial ________________ m ________________ m ________________ m
2 2

Industrial

________________ m

Institutional ________________ m Others ________________ m

CALCULATION OF IBS SCORE


PART 1: STRUCTURAL SYSTEMS ELEMENTS 1.0 CONCRETE AREA 2 (m ) IBS FACTOR COVERAGE % IBS CONTENT SCORE

1.1 FLOOR = PRECAST CONCRETE SLAB a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 0.7 0.6 0.8 1.0 0.8 0.9 0.8 1.0 0.9

ELEMENTS 1.2 FLOOR = IN-SITU CONCRETE ON PERMANENT METAL FORMWORK a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 1.3 FLOOR = IN-SITU CONCRETE WITH REUSABLE SYSTEM FORMWORK a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam

AREA (m ) (a)

IBS FACTOR

COVERAGE %

IBS CONTENT SCORE

0.9 0.8 0.7 0.8 0.7 0.6 0.5 0.7 0.9

0.7 0.6 0.5 0.6 0.5 0.5 0.3 0.6 0.7

ELEMENTS 1.4 FLOOR = IN-SITU CONCRETE USING TIMBER FORMWORK a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam

AREA (m ) (a)

IBS FACTOR

COVERAGE %

IBS CONTENT SCORE

0.6 0.5 0.4 0.5 0.4 0.3 0.0 0.5 0.6 IBS CONTENT SCORE

ELEMENTS 1.5 FLOOR = STEEL FLOORING SYSTEM a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam

AREA (m ) (a)

IBS FACTOR

COVERAGE %

1.0 0.9 0.8 0.9 0.8 0.7 0.6 0.8 1.0

ELEMENTS

AREA (m ) (a)

IBS FACTOR

COVERAGE %

IBS CONTENT SCORE

1.6 FLOOR = TIMBER FRAME FLOORING SYSTEM a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 1.7 NO FLOOR a) Precast column and beams b) Precast column and in-situ beams with reusable formwork c) Precast column and in-situ beams with timber formwork d) Precast beams and in-situ columns with reusable formworks e) Precast beams and in-situ column with timber formwork f) In-situ column and beams with reusable system formwork g) In-situ column and beams with timber formwork h) Load bearing blockwork i) Steel column and beam 2.0 ROOF SYSTEM a) Prefab timber roof truss b) Prefab metal roof truss c) Precut metal roof truss d) Timber roof truss TOTAL AREA 1.0 1.0 0.5 0.0 100% Sub-total for structural system (maximum 50 points) ( A ) 0.6 0.0 0.7 1.0 0.7 0.8 0.7 1.0 0.8 0.6 0.8 1.0 0.7 0.8 0.9 0.8 1.0 0.9

PART 2: WALL SYSTEMS ELEMENTS a) Precast concrete panel b) Wall cladding c) Prefabricated timber panel d) Full height glass panel e) Dry wall system f) In-situ concrete with reusable system formwork g) In-situ concrete with timber formwork h) Blockwork system i) Pre-assemble brickwall/blockwall j) Common brickwall TOTAL AREA Length (m) IBS FACTOR 1.0 1.0 1.0 1.0 1.0 0.5 0.0 0.5 1.0 0.0 100% Sub-total for wall system (maximum 20 points) ( B ) PART 3: OTHER SIMPLIFIED CONSTRUCTION SOLUTIONS USAGE ELEMENTS 1.0 Utilisation of standardised components based on MS 1064 a) Beams b) Columns c) Walls d) Slabs c) Doors d) Windows 2.0 Repetition of structural layout a) For building of floor more than 2 storeys i) Repetition of floor to floor height ii) Vertical repetition of structural floor layout iii)Horizontal repetition of structural floor layout b) For building 1 or 2 storeys i)Horizontal repetition of structural floor layout Nos 3 6 Nos Nos Nos 1 1 1 2 2 2 Nos Nos m m2 Nos Nos 2 2 2 2 2 2 4 4 4 4 4 4 UNIT
50% X < 75% 75% X 100% COVERAGE

IBS CONTENT SCORE

% USAGE FOR THIS PROJECT

IBS SCORE

Sub-total for other simplified construction solutions (maximum 30 points) ( C ) TOTAL (maximum 100 points) (A + B + C )

SUMMARY SHEET (Multiple Building Project) COVERAGE AREA (%) IBS SCORE OF BUILDING IBS SCORE OF PROJECT

BLOCK NAME

AREA (m )

TOTAL

TOTAL IBS SCORE FOR THIS PROJECT

= ________________