DINAS PETERNAKAN
Jalan Bhayangkara No. 54 Telp. (0541) 743721
SAMARINDA
SATKER
DINAS PETERNAKAN PROVINSI KALIMANTAN TIMUR (06)
PROGRAM
PENCAPAIAN SWASEMBADA DAGING SAPI DAN PENINGKATAN PENYEDIAAN
PANGAN HEWANI YANG AMAN, SEHAT, UTUH DAN HALAL
KEGIATAN
PENGEMBANGAN BUDIDAYA UNGGAS LOKAL
PEKERJAAN
PENATAAN KANDANG DI PEMUKIMAN
LOKASI
KELURAHAN LEMPAKE DAN KELURAHAN BAYUR KOTA SAMARINDA
TAHUN
2012
KONSULTAN PERENCANA :
REKAPITULASI BIAYA
1.
PROGRAM
2.
KEGIATAN
3.
PEKERJAAN
4.
LOKASI
5.
PAGU DANA
Rp. 100.000.000,-
6.
SUMBER DANA
NO
URAIAN PEKERJAAN
JUMLAH
HARGA (Rp)
4 UNIT KANDANG
PEKERJAAN PENDAHULUAN
2,279,012.14
1,536,789.98
25,000.00
250,000.00
JUMLAH
4,090,802.12
81,816,042.44
PPN 10%
8,181,604.24
TOTAL
89,997,646.69
PEMBULATAN
89,997,000.00
Terbilang :
Delapan Puluh Sembilan Juta Sembilan Ratus Sembilan Puluh Tujuh Ribu Rupiah
Samarinda,
Juni 2012
Menyetujui,
PEJABAT PEMBUAT KOMITMEN
Konsultan Perencana
CV. BUMI BONEO AGUNG KONSULTAN
JONI SETIAWAN, ST
Direktur
PROGRAM
2.
KEGIATAN
3.
PEKERJAAN
4.
LOKASI
5.
PAGU DANA
: Rp. 100.000.000,-
6.
SUMBER DANA
NO
URAIAN PEKERJAAN
SAT.
VOLUME
PEKERJAAN PENDAHULUAN
1 Penentuan Lokasi, Dokumentasi & administrasi proyek
Ls
1.00
25,000.00
SUB TOTAL
0.11
5,713,500.00
599,917.50
M3
0.04
5,713,500.00
239,967.00
M3
0.06
2,617,875.00
164,926.13
M3
0.12
2,700,000.00
336,960.00
M3
0.07
2,617,875.00
183,251.25
M3
0.14
2,910,000.00
404,308.13
M2
12.00
29,140.18
349,682.14
2,279,012.14
M3
0.07
2,617,875.00
178,669.97
M3
0.13
2,617,875.00
352,758.66
M2
20.09
50,047.86
1,005,361.35
M1
5.50
22,620.00
SUB TOTAL
25,000.00
25,000.00
SUB TOTAL
D
124,410.00
1,536,789.98
Bh
1.00
105,000.00
105,000.00
Bh
1.00
145,000.00
145,000.00
SUB TOTAL
RAB unggas
250,000.00
PROGRAM
2.
KEGIATAN
3.
PEKERJAAN
4.
LOKASI
5.
PAGU DANA
6.
SUMBER DANA
NO
KODE
:
:
:
:
:
URAIAN PEKERJAAN
HARGA
SATUAN
(Rp)
BIAYA
UPAH
(Rp)
BIAYA
BAHAN
(Rp)
JUMLAH
HARGA
(Rp)
PEKERJAAN KAYU
1
M
Kg
OH
OH
OH
OH
Balok Ulin
Paku Ulin
Mandor
Kepala Tukang
Tukang kayu
Pekerja
4,800,000.00
22,500.00
110,000.00
95,000.00
80,000.00
60,000.00
Total
606,000.00
M
Kg
OH
OH
OH
OH
Kayu Meranti
Paku Biasa
Tukang
Kepala Tukang
Pekerja
Mandor
2,200,000.00
15,000.00
80,000.00
95,000.00
60,000.00
110,000.00
Total
5,107,500.00
5,713,500.00
2,310,000.00
45,000.00
180,000.00
21,375.00
45,000.00
16,500.00
262,875.00
2,355,000.00
2,617,875.00
M
Kg
OH
OH
OH
OH
Kayu Meranti
Paku Biasa
Tukang
Kepala Tukang
Pekerja
Mandor
2,200,000.00
15,000.00
80,000.00
95,000.00
60,000.00
110,000.00
Total
44,000.00
152,000.00
320,000.00
90,000.00
5,040,000.00
67,500.00
2,310,000.00
45,000.00
240,000.00
28,500.00
60,000.00
16,500.00
345,000.00
2,355,000.00
2,700,000.00
M
Kg
OH
OH
OH
OH
2,400,000.00
15,000.00
80,000.00
95,000.00
60,000.00
110,000.00
Total
ANA LISA
2,520,000.00
45,000.00
240,000.00
28,500.00
60,000.00
16,500.00
345,000.00
2,565,000.00
2,910,000.00
NO
KODE
URAIAN PEKERJAAN
HARGA
SATUAN
(Rp)
BIAYA
UPAH
(Rp)
BIAYA
BAHAN
(Rp)
JUMLAH
HARGA
(Rp)
1
5
M1
Kg
OH
OH
OH
OH
Kawat Harmonika
Paku Biasa
Tukang
Kepala Tukang
Pekerja
Mandor
17,500.00
15,000.00
80,000.00
95,000.00
60,000.00
110,000.00
Total
18,375.00
750.00
571.43
5,343.75
3,000.00
1,100.00
10,015.18
19,125.00
29,140.18
PEKERJAAN ATAP
1
Lbr
Kg
OH
OH
OH
OH
65,000.00
17,500.00
60,000.00
80,000.00
95,000.00
110,000.00
37,142.86
875.00
6,000.00
4,800.00
570.00
660.00
12,030.00
38,017.86
50,047.86
Lbr
Buah
HO
HO
HO
HO
17,500.00
15,000.00
80,000.00
95,000.00
60,000.00
110,000.00
Total
ANA LISA
7,000.00
900.00
8,000.00
5,700.00
360.00
660.00
14,720.00
7,900.00
22,620.00
PROGRAM
2.
KEGIATAN
3.
PEKERJAAN
4.
LOKASI
5.
PAGU DANA
6.
SUMBER DANA
NO.
1
I.
:
:
:
:
:
HARGA SATUAN
( Rp)
4
SATUAN
3
UPAH KERJA
Pekerja
OH
Rp.
60,000.00
Tukang Kayu
OH
Rp.
80,000.00
OH
Rp.
95,000.00
Mandor
OH
Rp.
110,000.00
II.
BAHAN
Balok Ulin
Rp.
4,800,000.00
Paku Ulin/Beton
Kg
Rp.
22,500.00
Kayu Meranti
Rp.
2,200,000.00
Paku Biasa
Kg
Rp.
15,000.00
Rp.
2,400,000.00
Kawat harmonika
M1
Rp.
17,500.00
Lbr
Rp.
65,000.00
Paku Seng
Kg
Rp.
17,500.00
Seng Plat
M1
Rp.
17,500.00
UPAH BAHAN