PERENCANAAN JEMBATAN

BAB I
KEDALAMAN PENGGERUSAN
Data Sungai :

+ 10.4
A

B =

25
m
MAB : + 7.38

+ 10.4
B

+ 3.32
C
b =
-

20

Lebar rata-rata dasar Sungai (b)


Lebar rata-rata muka air banjir (B)
Kemiringan rata-rata talud Sungai (m)
Kemiringan muka air aliran (i)

m
=
=
=
=

20
m
25
m
0.6158
0.0057

Menentukan debit banjir (Q) :


Q=A.V

Dimana : Q = Debit banjir (m3/dt)


A = Luas penampang basah (m2)
V = Kecepatan aliran (m/dt)

Rumus manning untuk kecepatan aliran :


1
0.5
V=
. R 0.67 i.
n
Dimana : n = Koefisien kekasaran Manning diambil
R = Jari - jari hidrolis (m)
i. = Kemiringan muka air aliran
R =

A
K

A = b + m . h .
=
20 + 0.62 .
=
91.35 m2
K = b +
2 h
=
20 +
2 .
= 29.536 m

Andi Burhanuddin/D11198107

0.025

(tanah)

h
, h = tinggi muka air banjir
4.06 .
4.06

1 + m2
4.06
1 +

0.62

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Jadi

Andi Burhanuddin/D11198107

R =

A
=
K

91.35
29.536

3.0928 m

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
1
n

V=

0.67

0.5

i.

1
0.025

=
=

3.0928

0.67

0.0057

0.5

6.4348 m/dt

Sehingga debit banjir (Q) :


Q=A.V

=
=

91.35 .
6.4348
587.82 m3/dt

Menentukan kedalaman penggerusan (d) :


d

0.473

Q
f

0.333

0.473

588
1.25

0.333

3.6707 m

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

IV -

Perencanaan Bangunan Atas

4. 1. Perhitungan Pipa Sandaran


Pipa sandaran direncanakan :
- Pipa bulat f (D)= 76.2 mm Diameter lubang (d) =
- Tebal pipa (t) =
2.3 mm
- Jarak antar tiang
= 2 m
Sifat-sifat penampang pipa :
(A) = LD - Ld = 1/4 . p . D2 - 1/4 . p . d2 = 1/4 . p

76.2 -

7.62

2 .

7.16

2.3 =

7.16 cm

5.3419 cm2

p
64

D4

d4

p
64

7.62

7.16

36.502

cm4

p
32

D3

d3

p
32

7.62

7.16

7.4043

cm4

Untuk 1 meter panjang pipa :


Berat isi baja tuang = 7.85 t/m3 =
Berat pipa sandaran =
A
x
= 0.0005342 .
Perhitungan pembebanan :
- Berat sendiri
- Beban luar (beban orang)

- Beban horisontal

=
=
qv =
qh =

qtot

4.1934 kg/m
100
kg/m
104.19 kg/m
100

=
=

7850 kg/m3
1 x Berat isi baja tuang
1 .
7850
= 4.1934 kg/m

qv

kg/m
2

qh

104.19

144.42 kg/m

Momen maksimum terjadi dimana tiang sandaran menjadi perletakan :


1
1
2
. qtot .
=
. 144.42 .
2
= 72.208
Mmax =
L2
8
8
= 708148.68 Nmm
Kontrol lendutan :
M
708148.68
=
=
fytd =
W
7404.2799
fizin

250
gm

250
1.15

95.64

100

kgm

N/mm2

217.39

N/mm2

fytd

<

fizin

Aman !!!

4.2 Perhitungan Tiang Sandaran


H =

100 kg/m

H =
45

cm

100 kg/m
Pot. I - I

65

cm

h =

16

cm

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas

65
b= 10 cm

16 cm

100 cm

Direncanakan :
- Ukuran tiang sandaran
- Jarak antar tiang
- gbeton

=
=
=

cm2

10
.
16
2 m
2.5 t/m3

Beban-beban yang bekerja pada tiang sandaran :


a. Beban vertikal
- Berat sendiri pipa sandaran
- Berat sendiri tiang sandaran

=
=

2 .
0.1

4.1934 .
. 0.16 .

2.00
=
1 . 2500 =
N =

16.774 kg
40
kg
56.774 kg

a. Beban horisontal
Tiang-tiang sandaran pada tepi jembatan harus diperhitungkan untuk dapat menahan
beban sebesar 100 kg/m yang bekerja pada setinggi 90 cm diatas lantai kendaraan.
(PPPJJR, SKBI - 1.3.28 - 1987)
P = 100 . 2 = 200 kg
M = 200 .
1.1 . =
220 kgm =
2157540 Nmm
-

Mutu baja (fy)


Mutu beton (f'c)

fy2
1,7 . fc' .b
2400
1.7 250

AS2

Mu
f

= 0

2400

160

- 384000 AS.

fy . d.

AS2

100

135.52941 AS2

240 N/mm2
25 N/mm2

=
=

Dengan rumus ABC diperoleh :

AS.

AS.
2 f

AS.

2696925

= 7.041
19 =

cm2

5.7

2157540
0.8

+
=

= 0

cm2

Kontrol
rmin

1.4
fy

rada

As.
b. d

rmaks =
=

1.4
240

0.75 . b 1 .
0.0403

10

0.0058

5.67
.
16

0.85 .
fy

0.0354

f'c
600

600
+ fy

Ok !!!

0.75

0.85

0.85 . f'c25
240

600

600
+ 240

Ok !!!

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


4
1. Lantai trotoar
P=

100

kg/m'

10
16

90

2
500 kg/m

qLL =
I

20
20

I
75

25
56
16

20

45

1.75 m

50

Ditinjau jalur selebar 1 m :


MI-I = Momen pada irisan pertama
= P
+
=
DI-I

1.1

0.10

110

+ 0.20

+ 2500 .

0.16

1.10

0.56
2

. 2500 .

+ 78.4 + 75.2 +

= 0.20 . 2500 .
0.10 . 0.16 .
= 700 kg

21.1

0.20

. 2200 +

500

0.40
2

0.48

284.72 kgm

0.56 + 0.20 . 2200 +


1.10 . 2500

500

0.40 +

Penulangan : Akibat momen pada pembebanan tetap.

sb =

Cara Elastis : Beton K-325

sa = 1740

Baja U-30
h

fo

Ca

Ca
d

=
=

9.6413
0.2

0.0115
19

Amin

0.25% b. h

Amin

> Aperlu

20

sa

n . sb

17

19

1740
.
110

0.8325

cm

17
19
. 284.72
1740 . 1.0
)
)

kg/cm2

3 =

110 kg/cm2
19

nw
f
100

=
=
.

9.6413

0.0115
z =
6.143 (OK)
17

0.25% .

1.03
100 .

0.95

cm2
17 =

4.25 cm2

= 4.25 cm2

dipilih tulangan :

12

20

5.65

cm2

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


A'

= A =

0.2 .

dipilih tulangan :

5.65 =
8

1.13 cm2
30 =

cm2

1.68

Kontrol tebal plat dan tegangan-tegangan yang terjadi


Mu

284.72 kgm

zb

1
1

Kb

sa
+
n . sb

0.5457

= 1/2 . zb (1 - 1/3 . zb) . sb


= 1/2 .
0.5457 (
= 24.554

h'

1740
19 .
110

1 -

28472
100 24.554

1/3 .

0.5457 ) .

3.4053

Tebal plat yang diperoleh = h' + a =

110

cm

3.4053 +

3 =

6.41 cm <

20

cm

Ok !!!

Tegangan yang terjadi :


sb

ytd

Mu
A.h.f.n.z

sa ytd = n . f . sbytd

=
=

5.65 .

19

17

28472
6.14 .

6.14 .

2.6739

19
=

0.95

312.09 kg/cm2

2.6739
<

1740

kg/cm2

Akibat gaya lintang :


8
D
.
7
b . h

tb

t'b

= 0.47 kg/cm2

=
<

8
.
7

700
= 0.47
100 . 17

t'b

6.5

kg/cm2

kg/cm2

Praktis tidak perlu tulangan geser

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


4.4. Perhitungan Lantai Kendaraan
Pembebanan pada lantai :
* Beban merata :
- Akibat berat sendiri =
- Akibat berat aspal
=
- Akibat berat air hujan
Jarak gelagar = 1.75 m
1
Mxm =
. 0.65 . 1.75
10
Mxm =

1
.
3

0.199

* Beban hidup- T :
- Beban roda
- Bidang kontak

0.2
0.05
0.05

1.0
1.0
1.0

0.199

0.066

2.50
2.00
1.00
qDL

=
=
=
=

0.5
0.1
0.05
0.65

t/m1
t/m1
t/m1
t/m1

tm

tm

:
:

T = 10 ton (Kelas I = 100 % .


40 .
70 cm2
10
- Muatan T disebarkan : T =
= 35.714
0.4 .
0.7
50
20

10 =

10 ton

t/m2

450
b = 0.7
a = 20
b = 50
WL

+2
+2

10

10

0.5
0.5

T
a

5
10

10

=
=
=

20
20

a = 0.4

tg 45
tg 45

0
0

=
=

40
70

cm
cm

=
=

0.4
0.7

m
m

10
0.4

0.7

35.714
35.714

t / m2 x pias 1 meter
t / m'

Dipakai tabel Bittner (dari Dr. Ing Ernst Bittner)


dengan : Ix =
1.75 m
Iy = ~ (lantai tidak mampu menumpu pada diafragma)
* Dicari momen pada saat 1 (satu) roda pada tengah-tengah pelat :
X
tx = 70
tx
70
=
=
0.45
y( )
70
lx = 175
Ix
175
40
ty = 40
ty
40
=
= 0.22857
lx = 175
Ix
175

fxm

0.1499

fym

0.1274

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


Dari tabel bittner (Mxm) :
0.5 0.45
0.1407 +
0.5 0.4
0.5 0.45
0.1546 +
0.5 0.4
0.5 0.45
0.1426 +
0.5 0.4

0.1444

0.1407

0.1426

0.1597

0.1546

0.1572

0.1572

0.1426

= 0.1499

0.1280

0.1053

0.1372

0.1111

= 0.12974

0.12974

0.1215

= 0.1274

.
.

0.40
0.40

.
.

0.70
0.70

1.4985
1.274

=
=

Dari tabel bittner (Mym) :


0.3 - 0.2286
0.1053 +
0.3 0.2
0.3 - 0.2286
0.1111 +
0.3 0.2
0.3 - 0.2286
0.122
+
0.3 0.2
Mxm
Mym

=
=

0.1499
0.1274

Momen total :
Arah - x :
Mxm
Arah - y :
Mym

=
=

.
.

35.714
35.714

0.199
0.066

+
+

=
=

0.122

1.4985 tm/m
1.2739 tm/m

1.6976 tm/m'
1.3403 tm/m'

* Dicari momen pada saat 2 (dua) roda berdekatan dengan jarak antara as ke as
minimum = 1,00 m
50

50
100

0.4

10

70

30

10

70

72.5

72.5

10

175

Luas bidang kontak diatas dapat dihitung atas 2 keadaan (I & II) sebagai berikut :
(I)

(II)

=
Keadaan - I :

tx
Ix
ty
Ix

=
=
=
=

175
175
40
175

tx
=
Ix
ty
=
Ix

175
175
40
175

= 0.22857

fxm

0.2714

fym

0.2129

Dari tabel bittner (Mxm) :


=

0.2714

Dari tabel bittner (Mym) :


0.3 - 0.2286
0.1887 +
0.3 0.2
0.2160

0.3
0.3

0.2286
0.2

0.1926

0.1887

0.1915

0.2237

0.2160

0.2215

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


0.1915

0.3
0.3

0.2286
0.2

0.2215

0.1915

0.2129

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


Mxm
Mym

=
=

0.2714
0.2129

tx
Ix
ty
Ix

=
=
=
=

30
175
40
175

Bagian - II :

.
.

35.714
35.714
tx
=
Ix
ty
=
Ix

.
.

30
175
40
175

0.400
0.400
=

.
.

1.75
1.75

=
=

6.7850 tm/m
5.3231 tm/m

0.17143

fxm

= 0.22971

= 0.22857

fym

= 0.12445

Dari tabel bittner (Mxm) :


0.2 - 0.1714
0.2160 +
0.2 0.1
0.2 - 0.1714
0.2533 +
0.2 0.1
0.2 - 0.1714
0.21820 +
0.2 0.1
Dari tabel bittner (Mym) :
0.3 - 0.2286
0.1053 +
0.3 0.2
0.3 - 0.2286
0.1111 +
0.3 0.2
0.3 - 0.2286
0.12151 +
0.3 0.1

0.2237

0.2160

0.2182

0.2714

0.2533

0.2585

0.2585

- 0.21820 = 0.22971

0.1280

0.1053

0.1372

0.1111

= 0.12974

0.12974

0.1215

= 0.12445

Mxm
Mym

= 0.2297
= 0.12445

.
.

35.714
35.714

.
.

0.400
0.400

.
.

0.30
0.30

Mxm
Mym

= (I) - (II) =
= (I) - (II) =

6.7850
5.3231

0.9845
0.5334

=
=

0.199
0.066

5.8005
4.7897

=
=

5.9996 tm/m
4.8561 tm/m

=
=

0.12151

0.9845 tm/m
0.5334 tm/m

Jadi :

Momen total :
Mxm
Mym

=
=

+
+

5.8005 tm/m
4.7897 tm/m

Dengan membandingkan momen Mxm dan Mym untuk beban 1 (satu) roda terhadap beban
2 (dua) roda diperoleh momen yang menentukan adalah sebagai berikut :
arah - x : Mxm = 5.9996 tm/m
arah - y : Mym =
4.8561 tm/m

Penulangan :
arah - x : Mxm =

0.1053

0.1111

0.12151

6000

0.3
0.3
0.3
0.3
0.3
0.3

0.2286
0.2
0.2286
0.2
0.2286
0.2

0.128

0.1053

0.122

0.1372

0.1111

0.1297

0.1297

0.12151

= 0.12738

kgm

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


h =

20

16
19
.
1740 .

4 =

Ca

Ca
d

=
=

1.9768
0.2

0.0682
19

Mmin

0.25% b. h

Mmin

A =

Mperlu >

6000
1.0
)
)

nw
f

=
=

100

16

cm

1.9768

0.0682
2.333 >
16

cm2

= 5.74

0.25% .

16

(OK)

fo

100

cm2

5.74 cm2
dipilih tulangan :

12

15

7.54

cm2

dipilih tulangan :

30

1.68

cm2

A' = 0,2 A = 1.15 cm2


arah - y : Mym =
h =
Ca

Ca
d

=
=

4856
20 -

kgm
3 =

17
19
.
4856
1740 . 1.0
2.3345
) nw
0.2
) f
0.0434
19

A' = 0,2 A = 0.78 cm2

100

=
=
=
.

17

cm

2.3345
0.0434
3
>

17

= 3.88

fo

(OK)

cm2

dipilih tulangan :

12

15

7.54

cm2

dipilih tulangan :

30

1.68

cm2

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


Akibat beban sementara :
Disini beban sementara adalah beban angin yang bekerja pada kendaraan.
2 .

Gaya pada roda =


2
ket : -

1.75
Sehingga beban roda : T =

10

5 .

1 .
1.75

150

= 857.14
=
0.857 Ton
tinggi kendaraan (2m)
Lebar kendaraan (5 m)

0.857 =
10.9 ton
10.9
Muatan T disebarkan : WL =
= 38.776 ton / m2
0.40 .
0.70
= 38.776 ton/m2

x pias 1 meter

Ditinjau akibat beban 1 (satu) roda (yang menentukan) pada tengah-tengah pelat :
0.40
.
0.70
= 1.6269 tm/m
Mxm = 0.1499 . 38.776 .
0.40
.
0.70
= 1.3831 tm/m
Mym = 0.1274 . 38.776 .
Momen total :
Mxm
Mym

=
=

0.199
0.066

+
+

1.6269
1.3831

=
=

1.8260 tm/m
1.4495 tm/m

Penulangan plat lantai kendaraan


-

Tebal plat (h) = 20 cm =


200 mm
Penutup beton (p) = 40 mm
Diameter tulangan utama yang diperkirakan
Arah x
= 12 mm
Arah y
= 12 mm
Tinggi efektif (d) dalam arah y dan x
dx = h - p - 0.5 x
= 200 - 40 - 0.5 12
= 154 mm
Tulanganlapangan arah x :
Mu

mu
=
b d2

=
=
=
=

1.2
MD +
1.2 0.199 +
3.160 tm
31.605 KNm

31.605
2
1.0 0.154

1.6
1.6

ML
1.8260

1332.638

7) hal 75

KN/m

Dari tabel untuk f'c = 25 M dan fy = 240 Mpa


mu
=
b d2
mu
=
b d2

1300

0.0071

1400

0.0076

8) hal 46

Dengan cara interpolasi diperoleh harga untuk :


mu
=
b d2
=

1332.638

0.0071

1332.64 100

1300

0.0076

0.0071

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


0.00726

=
min

0.0025

max =
>
As

(tabel 7)

0.0404 ( tabel 8)

*.) hal 52

sehinga:

min

= b d
= 0.00726 x
1000
=
1118.5
mm2

Digunakan tulangan
-

*.)hal 51

12 -

154

100 =

1131

mm2 >

1118.5

mm2

Tulanganlapangan arah y :
Mu

mu
=
b d2

1.2
MD +
1.2 0.066 +
2.399 tm
23.988 KNm

=
=
=
=

23.988
2
1.0 0.154

1.6
1.6

ML
1.4495

1011.456

7) hal 75

KN/m

Dari tabel untuk f'c = 25 M dan fy = 240 Mpa


mu
=
b d2
mu
=
b d2

1000

0.0054

1100

0.0059

8) hal 46

Dengan cara interpolasi diperoleh harga untuk :


mu
=
b d2
=
=
min

max =
>
As

min

1011.456

0.0054

1011.46

100

0.0059

0.0054

0.00546

0.0025

(tabel 7)

*.)hal 51

0.0404 ( tabel 8)

*.) hal 52

sehinga:

= b d
= 0.00546 x
1000
= 840.42
mm2

Digunakan tulangan

12 -

154

125 =

4.5 Perhitungan Balok Diagfragma


-

1000

Ditaksir ukuran balok diafragma


Bentang balok diafragma
L =

905

30 x
1.75 m

mm2 >

840.42

mm2

50

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


Beban-beban yang bekerja :
-

Beban akibat berat sendiri balok diafragma :


Wd =
=

0.3 x 0.5 x
375
Kg/m'

2500

Momen yang terjadi :


M tumpuan =

1 12 .

WD .

1 12 .

375 .

96
1

24

WD .

24

375 .

47.9

0.957

KNm

L2
1.75 2

kgm

0.479

KNm

Tulangan lapangan
-

Tinggi balok (h)


= 500 mm
Selimut beton (p) = 40
mm
Diameter tulangan utama (D)
Diameter tulangan sengkang (S)

Tinggi efektif (d)

= h
=

500

=
MD =

0.479

Mu =

1.2

As

444

MD

16
8

- S 40

mm
mm
0.5 D

0.5

16

mm

1.2

0.574

9.709

0.479
KNm
KN/m

0.0058

min

0.0058 x

772.56 mm2

Digunakan tulangan

=
=

KNm

mu
0.574
=
2
b d2
0.30 0.444
Diambil =
min =

1.75 2

kgm

M lapangan =

Perhitungan tulangan

L2

300

4 16 =

444

804 mm2 >

772.56

Tulangan tumpuan
MD =

0.957

Mu =

1.2

KNm
MD

1.2

0.957

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


=
mu
1.148
=
2
b d2
0.30 0.444
Diambil

As

=
=

1.148
19.419

min

0.0058

min

0.0058 x

300

= 772.56 mm2
Digunakan tulangan
4 16 =

Kontrol lebar balok

KNm
KN/m

444

804 mm2 >

772.56

Lebar minimum yang dibutuhkan :


4 x 16

(diameter tulangan utama)

64 mm

2 x

(diameter tulangan sengkang)

16 mm
75 mm

3 x

25

(jarak minimum antar tulangan) =

2 x

40

(selimut beton)

=
=

80 mm
235 mm

mm memadai, cukup disusun 1 baris

30
Tulangan Lapangan

50

30

50

Jadi lebar balok

total

30
Tulangan Tumpuan

Gambar 4.6. Penulangan balok diafragma

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas

=
=
=
=

0
0
####
0.2
0.0711
0

0
.
.

0
1.0
) nw
) f

####

=
=

100

0.0711
2.279 >
0

= ###

dipilih tulangan :

(OK)

fo
cm2
f

15

7.54

30

1.68

#
### cm2

dipilih tulangan :

cm2

8
1449
h =
=
=
=
=

tm/m

### -

cm2

3 = ### cm

#REF!
= #REF!
0
.
1449
0
. 1.0
#REF!
) nw
= 0.0393
0.2
) f
=
3.167 > fo
(OK)
0.0393
cm2
. 100 .
0
= ###
0
dipilih tulangan :
f #
### cm2

dipilih tulangan :

Ca

25

15

7.54

30

1.68

cm2

cm2

45

Ca
d Pembebanan :
- Akibat berat sendiri balok =
=

0.25 . 0.45 . 2500


281.25 kg/m'

Balok melintang merupakan balok dalam beberapa tumpuan


1
1
. 281.25 . 1.75
Diambil Mtumpuan =
ql2 =
A' = 0,2 A =
10
10

arah - y : M
Mym
= = 86.133 kgm

Ca

Ca
d

Ca

19
1740
12

40
.
.

b .h
s*au

h=

86.13
1.0
=

45
=

12
#

5 =

40

86.133

kgm

cm

41.245

25

40

4.32

cm2

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


4

A
4.32 cm2

12

4.52

cm2

A' = 0,2 A =
*

H1

H2
Jadi A = Amin =

Berat sendiri

16 15

100 cm

Berat lapisan aspal

4.3 Perhitungan
Gambar Penampang
Lantai Lantai
Trotoar
Trotoar

Beban
W1 hidup
=
0.2 x

1.15 x

2500 x

1.00 =

575

Kg

Gaya
W2
horisontal
=
0.2
pada
x tiang
1.00sandaran
x 2200 x

1.00 =

440

kg

20

45

45

Berat pipa dan tiang sandaran

Jurusan Teknik Sipil - UKIP

IV -

20

20

Perencanaan Bangunan Atas


W3 = 0.05 x 1.00 x
Gaya horisontal pada kerb:
W4

16.8

MD W5

500 x

2000 x

40

1.00

1.00 =

56.8

kg

500

kg

100

kg

Beban-beban yang bekerja pada lantai trotoar per meter:


H1
= 100 x 1.00
= 100
kg
-

H2

500 x

1.00

500

1.00
2

+ W3

1.00
2

1.6

ML

kg

ML
= W1

1.15
2

+ W2

+ W4

0.16
2

1.00

+ H1 1.10

- Mu
+ H2 0.20
=
-

871.94 Kgm

= W5

1.00
2

250

Kgm

1.2

MD +

Momen yang
= terjadi
1.2
871.94
pada potongan
+
1.6
I - I 250
=

1446.3

Kgm

14174.02

Nm

14.174

KNm

200 mm
40 mm
= 12 mm

l
=

115
=

13

8.85 cm <

h =

cm (ok)

13

d = h -

200 -

154

0.5
40

0.5

12

mm

Direncanakan
Mu tebal14.174
plat h =
KN/m2
= 597.656
2 =
2
Tebal penutup
b . D2
d
beton
1.0 0.15
perkiraan diameter tulangan utama :

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


Kontrol hmin
=
25 Mpa ; fy =
Perhitungan tulangan :
Mu
= 500
Tinggi befektif
. D2
d2 :
Mu
=
b . D2
d2

0.0026

max =

0.0026

0.0032

KN/m2
597.656 100

Dari tabel 5.1.c


= 0.0032
f'c
min = 0.0025

>

*.) hal 46

600

Mu
= 597.656
b . D2
d2
=

240 Mpa

500

0.0026

(tabel 7)

0.0404 ( tabel 8)
*.)hal 51

min

sehinga:
*.) hal 52

As = b d
Dengan cara interpolasi
= 0.0032maka
x diperoleh
1000 xharga
154 untuk :
= 490.63
mm2
Digunakan tulangan

12 -

225 =

mm2

>

490.63

mm2

0.25 b h
As =
Beban-beban yang100
bekerja pada lantai kendaraan :
a.

0.25

1000

200

4.3 Perhitungan Lantai Trotoar

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


100

kg

45

45

H1 =

500 kg

20

20

H2 =

16 15

100

Gambar 4.5. Penampang Lantai Trotoar


Beban-beban yang bekerja pada lantai trotoar per meter panjang jembatan:
-

Berat sendiri lantai trotoar ( W1 )


W1

575

kg

0.2 x

1.0

2200

1.0

440

kg

0.05 x

1.0

2000

1.0

100

kg

500 x

1.0

500

kg

4.193

56.387

1.0

0.1

0.16

1.2

2500

kg

Gaya horizontal pada tiang sandaran (H1)


H1

1.0

Berat pipa dan tiang sandaran (W5)


W5

2500

Beban hidup (W4)


W4

1.15 x

Berat lapisan aspal ( W3 )


W3

0.2 x

Berat beton pengisi ( W2 )


W2

100 x

1.0

100

kg

500

Kg

Gaya horizontal pada kerb (H2)


H2

500 x

1.0

Momen yang terjadi pada potongan I - I


MD

= W1

1.15
2

+ W2

1.15
2

+ W3

1.00
2

+ W5

0.16
2

1.15

+ H1 1.2

+ H2 0.2

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas

+ H2 0.2

.
922.98

kgm

W4

1.0
2

Mu =

1.2

MD +

1.2

922.98 +

ML

1507.58

1.0
2

500

1.6

250

kgm

ML
1.6

kgm

250

15.076

20

KNm

Penulangan lantai trotoar


-

Direncanakan tebal plat


L
13

Kontrol hmin

115
13

Penutup beton (p) =

Rencana diameter tulangan utama


d = h -

p -

200 -

154

40

mm

cm =
=

200
8.846

mm
<

20

cm

`
D = 12

mm

0.5 D
40

0.5 12

mm

mu
=
b d2

15.076
2
1.0 0.154

635.679

KN/m

Dari tabel untuk f'c = 25 M dan fy = 240 Mpa


mu
=
600
= 0.0032
b d2
mu
=
700
= 0.0037
b d2

8) hal 46

Dengan cara interpolasi diperoleh harga untuk :


mu
=
b d2
=
=
min

max =
>
As

min

635.679

0.0032

KN/m
635.68

100

600

0.0037

0.0032

0.00338

0.0025

(tabel 7)

*.)hal 51

0.0404 ( tabel 8)

*.) hal 52

sehinga:

= b d
= 0.00338 x

1000

154

Jurusan Teknik Sipil - UKIP

IV -

Perencanaan Bangunan Atas


=

520.27

Digunakan tulangan

mm2
12 -

200 =

565

mm2 >

520.27

mm2

565

mm2 >

500

mm2

Luas tulangan pembagi


As

0.25 x b x h
100
0.25 x 1000 x
=
100
=
500
mm2
=

Digunakan tulangan

12 -

200

200 =

Jurusan Teknik Sipil - UKIP

PERHITUNGAN BALOK INDUK BENTANG L1 (POST-TENTIONING)


Beban - beban yang bekerja :
* Pembebanan :
* Akibat beban mati
- Akibat pelat
= 0.20 . 2500 . 1.75 = 875 kg/m'
- Akibat pavement = 0.10 . 2000 . 1.75 = 350 kg/m'
- Akibat air
= 0.05 . 1000 . 1.75 = 87.5 kg/m'
qDL = 1312.5 kg/m'
= 1.3125 t/m'
* Akibat beban hidup
- Beban terbagi rata
1.1
q =
. L 60
1.1
60

Untuk L > 30 (PPPJJR 1987)

30

25

q'

= Untuk satu gelagar

30

= -0.0917

-0.0917 . 1.75
= -0.0583
2.75

- Beban garis P =

= 25 m

t/m

t/m

12 t
20
= 1.27
50 + 25.0

- Koefisien kejut = 1 +

P ' = Untuk satu gelagar


P'

12

. 2.00
. 1.2667 = 11.055
2.75

- Beban hidup trotoar


Untuk sebuah gelagar q =
=

1440
432

. 0.5 .
kg/m

t/m

60%

Langkah 1
Rencana penampang balok adalah sbb :
50
20

II

15

II
15

15
20
15
55

135

III

25
25

25

IV

Potongan A - A

IV
V

20
70

JURUSAN TEK. SIPIL UKI

50
20

BAGIAN
I
II
III
IV
V
TOTAL

LUAS (cm2)
1000
225
1900
625
1400
5150

Yi
125
110
67.5
28.333
10

MOMEN STATIS
125000
24750
128250
17708.33333
14000
309708.3333

Yt =

135 -

Yb =

135 -

Ai (cm2)
1000
225
1900
625
1400
5150

BAGIAN
I
II
III
IV
V
TOTAL

60.138 =

(Y - yi) (cm)
64.862
44.862
7.362
23.471
50.138

II

15

74.862

II
15

15
20
60

135

III

25
60.138

Statis momen
309708.3333
Yb =
=
= 60.138
Luas
5150

cm

IV

25

70

Ai.(Y - yi)2 (cm4)


4207138.658
452844.0622
102991.0401
344301.1977
3519282.148

Ix
Yt

10385480.72
= 138727.4848 cm3
74.862

Zb =

Ix
Yb

10385480.72
= 172695.4684 cm3
60.138

IV

20

74.862 cm

Zt =

25

Io (cm4)
33333.333
1406.25
1666666.667
10850.694
46666.667

mm

Ix (cm4)
4240471.992
454250.3122
1769657.707
355151.8921
3565948.814
10385480.717

Untuk balok pratekan, digunakan mutu beton K-325


fc'
fc

=
=

0,33 f'ck
0,5

0,48 f'ck

tb
=
0,43 f'ck0,5
Ec pratekan = 6400

0.33 x

325

0.48 x

325

= 0.43 x
325 0.5

0.5

107.3

kg/cm2

8.6533

kg/cm2

325 0.5
=
7.7519 kg/cm2
Ec lantai = 6400 325 0.5

= 115.37764 kg/cm2
= 115 kg/cm2
Balok dan lantai dianggap bekerja sama sehingga terbentuk konstruksi komposit antara balok pratekan
dan lantai beton beton bertulang
f 'c =
25 MPa
2
t = 20 cm
Bm
Ec = 115 kg/cm

Balok pracetak
prategang

1.75 m

f 'c
Ec

1.75 m

=
=

25 MPa
115.38 kg/cm2

1.75 m

1.75 m

Sistem struktur komposit

JURUSAN TEK. SIPIL UKI

Lebar efektif lantai beton (Bm) diberikan sbb :


1
Bm <
L
= 1.75
m
2
Bm <
L/3 = 0.5833 m
3
Bm <
16 t = 3.2
m
4
Bm <
4 h = 5.4
m
5
Bm <
8 bo = 5.6
m

( paling memenuhi)

Dengan mengambil lebar manfaat lantai = 0,8 x


beton pratekan dan lantai adalah sama.

3.2 = 2.56 m, maka dapat dianggap bahwa kekakuan

Tabel 1
Balok pratekan sendiri
A

5150

cm2

I balok =

10385481 cm2

Yt

74.862

cm

Zt

= 138727.48 cm3

Yb
Wb

=
=

60.138
1236

cm
kg/m'

Zb

= 172695.47 cm3

Tabel 2
A

Penampang

Y
2

Lantai
Balok

(Cm )
2560
5150

Jumlah

7710

Yct
b

Yc

(Cm )
256000
46344264.09

(Cm4 )
170666.667
10385480.7

104.86246 514141.6667

46600264.09

10556147.38

= 155.000 -

66.685

514142 /
=

7710

( Io + AY2 ) - Ac ( Yct )2

=
=

(
(

Zct

Zcb

66.685

Cm

88.315 Cm

Io

(Cm )
25600
488541.6667

(Cm)
10
94.862

= S AY / S A

I composit

A.Y2

A.Y

10556147 + 46600264.09 ) - [
57156411.48 - 34285558.16 )

7710

66.685 ) 2 ]

22870853.32 cm4
I Composit
Yct
I Composit
Ycb

=
=

22870853.32
66.685
22870853.32
88.315

342968.2722

Cm3

258969.1893

Cm3

JURUSAN TEK. SIPIL UKI

Langkah 2
Perhitungan tegangan
Balok pratekan memikul beban
- Beban mati (DL)
Balok pratekan
Lantai kendaraan
Lapisan Aspal
Berat air hujan

=
=
=
=

1236
875
350
87.5

Kg/m'
Kg/m'
Kg/m'
Kg/m'

- Beban hidup (LL)


q

-0.0917 . 1.75
= -0.0583
2.75

- Beban hidup trotoar


Untuk sebuah gelagar q =
=

1440
432

t/m

. 0.5 .
kg/m

60%

- Beban titik
P'

12

. 2.00
. 1.2667 = 11.055
2.75

t/m

- Beban melintang (balok diagfragma)


= 281.3 kg/m'

(ditinjau 1 arah saja = 1/2 P )


Beban hidup
= 0.5 x 400 x 5
=
1000 Kg/m'
Beban akibat berat sendiri balok, plat lantai atap dipikul oleh balok pratekan
* Momen akibat balok pratekan (MG)
MG = 1/8
1236 x 25
MG
9656250
=
f Gt =
Zt
138727.48
MG
9656250
=
f Gb =
Zb
172695.47

96562.5

Kg.m

69.60589 Kg/cm2

= -55.914901 Kg/cm2

* Momen akibat lantai kendaraan (Mss)


Mss = 1/8
875 x 25
Mss
6835937.5
=
fSt =
Zt
138727.48
Mss
6835937.5
b
=
fS =
Zb
172695.47

68359.375 Kg.m

= 49.276014 Kg/cm2
= -39.583769 Kg/cm2

* Momen akibat balok diagfragma (Mdd)


Mdd = 1/8
281.25 x 25
Mdd
2197265.6
t
=
fd =
Zt
138727.48
Mdd
2197265.6
b
=
fd =
Zb
172695.47

21972.656 Kg.m

= 15.838719 Kg/cm2
= -12.723354 Kg/cm2

JURUSAN TEK. SIPIL UKI

Langkah 3
Menentukan tegangan akibat beban luar
Beban akibat beban aspal, air hujan & beban hidup dipikul oleh penampang komposit
(balok + lantai)
* Momen akibat beban luar (air hujan dan aspal) (Mws)
Mws = 1/8
437.5 x 25 2
Mws
3417968.8
=
fwsts =
342968.27
Zct
Mws
3417968.8
=
fwsb =
b
258969.19
Zc
t
Y
c
t
x
fwst =
fwsts
Ytc
66.685 20
=
x 9.9658
66.685

34179.688 Kg.m

= 9.9658453 Kg/cm2
= -13.198361 Kg/cm2

= 6.9769155 Kg/cm2

* Momen akibat beban hidup (MLS)


MLs = 1/8 -58.333 x 25
MLs
-455729.2
=
fLsts =
t
342968.27
Zc
MLs
-455729.2
b
=
fLs =
258969.19
Zcb
fLst

Ytc

- t
x
Ytc
66.685 20
=
66.685
=

= -4557.2917 Kg.m
= -1.3287794 Kg/cm2
= 1.7597814 Kg/cm2

fwsts
x

-1.3288

= -0.9302554 Kg/cm2

* Momen akibat beban titik (Mps)


Mps = 1/4
11055 x 25
Mps
3454545.5
=
fpsts =
342968.27
Zct
Mps
3454545.5
=
fpsb =
b
258969.19
Zc
t
Yc - t
x
fpst =
fpsts
Ytc
66.685 20
=
x 10.072
66.685

34545.455 Kg.m

= 10.072493 Kg/cm2
=

-13.3396

Kg/cm2

= 7.0515776 Kg/cm2

* Momen akibat beban hidup trotoar (MT)


ML

= 1/8

432

25

33750

Kg.m

JURUSAN TEK. SIPIL UKI

fTs

fTb

fTt

MT
Zct
MT
Zcb

3375000
342968.27
3375000
=
258969.19

= 9.8405604 Kg/cm2

Ytc

- t
x
Yc
66.685 20
=
66.685
t

= -13.032438 Kg/cm2

fLts
x

= 6.8892057 Kg/cm2

9.8406

Tabel 3
Hasil-hasil yang diperoleh dari langkah 2 & 3
ft

Momen (kg.cm)
MG
Mss
Mdd
Mws
ML
MPS
ML

9656250
6835937.5
2197265.625
3417968.75
-455729.1667
3454545.455
3375000

=
=
=
=
=
=
=

Total

fb

(kg/cm2 )
69.60588967
49.27601413
15.83871883
6.976915521
-0.930255403
7.051577578
6.889205726
154.708066

f ts

(kg/cm2 )
(Cm3 )
-55.91490089
-39.58376883
-12.72335427
-13.19836062 9.965845319
1.759781416 -1.328779376
-13.33960022 10.07249281
-13.03243837 9.840560407
-146.0326418

Tegangan-tegangan yang diizinkan bekerja pada kawat pratekan


f 'c (tekan)

= 0.33

fck

f c (tarik)

= 0.48

fck

= 0.33 x

325

= 0.48 x

325

=
1

107.25

Kg/cm2

8.6533231 Kg/cm2

fc sisa

= f total - fc (tarik)

= 146.03264 - 8.6533231
= 137.37932 Kg/cm2
fc sisa inilah yang harus ditahan oleh kawat pratekan
Check apakah dibutuhkan "deflected-tendons" ditinjau untuk tegangan tekan pada serat bawah
137.37932 Kg/cm2

>

>

137.37932 Kg/cm

fc'
107.3 Kg/cm2

Ok

f ts
f

ytc

ybc
-

bo

fb

Gambar tegangan penampang komposite

JURUSAN TEK. SIPIL UKI

Langkah 4
Perencanaan kawat pratekan
Tinggi balok pratekan
=
135
cm
Taksir letak titik berat kawat pratekan = 15% x tinggi balok dari dasar
= 15% x
135 ~
20
cm
e = 60.138 20
= 40.138 cm
F
A
F
137.37932 =
5150
fc sisa

+
+

= 322038.54

F.e
Zb
F . 40.1
172695.4684
Kg

74.86 cm
135

CGC

60.14 cm

cm

CGS

20
Digunakan kawat pratekan tipe 270K f 1/2" dengan final force =
322038.54
Jumlah kawat yang diperlukan
=
= 0.39
824497.5
1 buah kawat
Digunakan sebanyak

e =
cm

17615 lbs

40.138 cm

= 824498 kg

JURUSAN TEK. SIPIL UKI

JURUSAN TEK. SIPIL UKI

JURUSAN TEK. SIPIL UKI

JURUSAN TEK. SIPIL UKI

Tabel 8

Jarak dari
tumpuan
(X)

Precast-Section

Composite-Section

MG

fGt

fGb

MS

fst

fsb

Mws

fwst

fwsb

ML

0m

5.625 m

4224609.4 m 30.5 m -24.463 2990722.7 m 21.6 m -17.318 1495361.3 m 4.36 m -5.7743 1476562.5 m

11.25 m

7242187.5 m 52.2 m -41.936 5126953.1 m

15 m
22.5 m

-29.688 2563476.6 m 7.47 m -9.8988

2531250 m

8583333.3 m 61.9 m -49.702 6076388.9 m 43.8 m -35.186 3038194.4 m 8.86 m -11.732

3000000 m

9656250

69.606 -55.915

6835937.5

37 m

49.276 -39.584

Catatan : Momen dalam ( Kg.Cm ) dan tegangan dalam ( Kg/cm2 )

3417968.75

9.9658 -13.198

3375000

Composite-Section
ML

fLt

fLb

ftG+S+WS+L

fbG+S+WS+L

1476562.5 m 4.31 m -5.7017 60.676135 -53.25664


2531250 m

7.38 m -9.7743 104.01623

-91.2971

3000000 m

8.75 m -11.584 123.2785

-108.204

3375000

9.8406 -13.032 138.68831 -121.7295

PERENCANAAN JEMBATAN

f = 5.2

2,5 m

2,5 m

2,5 m

2,5 m

2,5 m

2,5 m

2,5 m

2,5 m

L =
Data - data jembatan
~ Panjang jembatan
~ Jarak antar portal
~ Tabel panjang tiap portal
Diperoleh dengan rumus :
4 . f . x . (L - x)
y =
L2

Portal
1
2
3
4

xn

yn

40

2,5 m

2,5 m

2,5 m

2,5 m

2,5 m

2,5 m

2,5 m

Dimana : f = Tinggi portal di tengah bentang =

5.2 m

x = Jarak total portal selain yang ditinjau (m)


L = Panjang total jembatan (m)
d = Jarak antar portal =
2.5 m

Portal

37.5 1.22
35 2.28
32.5 3.17
30
3.9

2,5 m

5
6
7
8

xn

yn

27.5 4.47
25 4.88
22.5 5.12
20
5.2

Portal

xn

yn

Portal

xn

yn

9
10
11
12

17.5
15
12.5
10

5.12
4.88
4.47
3.9

13
14
15
16

10
7.5
5
2.5

3.9
3.17
2.28
1.22

Perencanaan konstruksi balok pelengkung


Dimensi balok

20

20

cm

~ Menentukan momen maximum


Kedua ujung struktur dianggap jepit sempurna, sehingga untuk menyelesaikannya
digunakan metode Slope Deflection
Beban-beban yang bekerja pada struktur :
- Beban hidup (pekerja & peralatannya) P =
100 kg
Pu =
- Beban balok (beban merata) q =
0.2 x 0.2 x 2400 =
qu =
115 kg/m
Pu =

160 kg
qu =

160 kg
96 kg/m

115 kg/m

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
A

2.5 m

Menentukan momen primer


1
. q . L
MFAB = (-)
12
= (-)

1
.
12

115

-110 kgm

MFAB =

110 kgm

+ (-)

2.5

PL
8
+ (-)

160 .

2.5
8

Persamaan Slope Deflection :


MAB =
=
MBA=
=

MFAB
-110
MFBA
110

2 EI
L

+
+

0.8
2 EI
L

0.8

EI = konstan

2 qA + qB
2 qA + qB =

-110 +

1.6 qA +

0.8 qB

110 +

0.8 qA +

1.6 qB

qA + 2qB
qA + 2qB =

Karena kedua ujungnya jepit, maka putaran sudut (q) =0


Pu = 160 kg
qu =
115 kg/m
S MB = 0
MBA
VA .
2.5 - Pu .
1.25 - Q .
1.25 - MAB + MBA = 0
C
VB
VA .
2.5 - 200 360 = 0
2.5 m
560
VA =
= 224 m
MAB
2.5
VA
S MA = 0
SV=0
VA + VB = Pu + Qu
VB = VA =
224 m
448 = 448
Ok
Gaya dalam
Bentang AC ( 0 < x <

1.25 )

Mx = VA.x - MAB - 1/2 qx2


Untuk x =0

MA = -110 kgm

Andi Burhanuddin/D11198107

224 x -

110 -

Untuk x =

57.6 x2

1.25

MC =

80

kgm

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Untuk mendesain tulangan digunakan momen maksimum =

Andi Burhanuddin/D11198107

110 kg.m

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
-

Mutu baja (fy)

300 N/mm2

Mutu beton (f'c)

22.4 N/mm2

fy2
1,7 . fc' .b
3000
1.7 224

AS2
2

200

118.43664 AS2

Mu
f

= 0

3000

160

- 480000 AS.

fy . d.

AS2

Dengan rumus ABC diperoleh :

AS.

AS.
2

Tulangan tekan AS' = 0,25 . AS

15

10

1100000
0.8

+
=

= 0

cm

3.53

cm2

1.57

cm2

0.72 cm2

=
2

1375000
2.867

AS.

Kontrol
rmin

1.4
fy

rada

As.
b. d

rmaks =

0.75

. b1 .

1.4
300

0.0047

3.53
20
.
16
0.85 .
fy

0.0269

f'c

0.011

Ok !!!

600
600 + fy

0.75

0.85

0.85 . f'c22.4
300

600
600 + 300

Ok !!!

Perencanaan konstruksi kolom


Dalam hal ini diambil contoh kolom yang paling tinggi yang mewakili semua kolom
Pu =

448 kg
Mu =
20

210 kgm
x

20

cm
Lu =

Andi Burhanuddin/D11198107

5.2 m

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Penulangan Kolom

~ Mengecek pengaruh kelangsingan kolom


Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :
k . Lu
< 22
r
dimana :
k = faktor tekuk = 1
lu = panjang kolom =

SK. SNI T - 15 - 1991 - 03. 33 11 4)

5.2
I
A
0.3 .

r = radius girasi

atau r = 0,3 . h. =

1 /

=
20

12 .
20
6

20
.

20

20

5.7735

Jadi :
k . Lu
=
r

1 .

5.2
0.06

86.667

>

22

Berarti faktor kelangsingan tak dapat diabaikan

~ Faktor pembesar momen ( d )


d

=
1

Dimana :

Cm
Pu
f . Pc
Cm = 1

(konservatif)

Pu =
Pc =
EI =
Ec =

> 1

0.448

ton

p . EI
(k . Lu)2
Ec . Ig
2,5 . (1 + bd)
4700 . fc'

4700

22.4 =

22219.620 Mpa

Ig = 1/12 . b. h3 =
1
Ig =
. 0.2 . 0.2 3 = 0.0001333 m4
12
1,2 . qdl
1.2 .
96
Bd =
=
1,2 . qdl + 1,6 . qll
1.2 .
96
+
1.6
diperoleh :
2221962.0 .
0.0001333
EI =
= 83.53605661
2.5 . (
1 +
0.4186 )
Pc =

p2

Andi Burhanuddin/D11198107

83.536057

2221962.0

100

t/m2

0.4186

30.46

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Pc =

1 .

5.2

Mu =

0.21

30.46

1
0.448
0.65 .
30.46

d =
1

1.023

> 1

Ok !!!

tm

Mc = d . Mu
=
1.0232 .

0.21

0.2149 tm

Hitung :
Pn perlu =

Pu
=
f

Mn perlu =

Mc
f

0.448
0.65

0.6892

0.2149
0.65

ton

0.3306

tm

Eksentrisitas :
e =

Mn perlu
=
Pn perlu

0.330556619
0.689230769

emin = 15 + 0,03 . h.
Syarat :

emin < e

15

0.4796

0.03 .

200

479.6

= 21

Ok !!!

Hitung nilai r
~ Sumbu vertikal
Pu
f . Ag . 0,85 . fc'

~ Sumbu horizontal
Pu
f . Ag . 0,85 . Fc'

0.65 .

e
=
h

4480
200 .

200 .

0.0091

479.6
200

0.0085

0.85 .

22.4

0.0091

0.0218

Dari diagram interaksi kolom, diperoleh :


b = 0.85
r =
0.01
Maka, r = b . r =

0.85

0.01

Hitung luas tulangan :


Ast = r . Ag
= 0.0085 .
=

340

200

200.0

mm

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
As = As' = 1/2 . Ast

Digunakan Tulangan :

2 f

Andi Burhanuddin/D11198107

0.5 .
12

340 =

170

mm2

= 226.286 mm2

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Perencanaan Balok Memanjang untuk bentang L =

40

Balok memanjang tengah direncanakan sebagai balok - T.


* Pembebanan :
* Akibat beban mati
- Akibat pelat
= 0.20 . 2500 . 1.75 = 875 kg/m'
- Akibat balok
= 0.20 . 0.75 . 2500 = 375 kg/m'
- Akibat pavement = 0.10 . 2000 . 1.75 = 350 kg/m'
- Akibat air
= 0.05 . 1000 . 1.75 = 87.5 kg/m'
qDL
= 1688 kg/m'
= 1.69 t/m'
* Diafragma
= 0.25 . 0.45 . 2500 . 1.75
* Akibat beban portal (pelengkung)
= 0.45 t

0.20 =

0.4359 t

* Akibat beban hidup


Koefisien kejut =

Beban garis : P =

12

Beban merata : P =

2.2

Md

1.22

= 9.33

ton

1.22

ton

1.71

0.8839 t
c

1m

1.75
2.75
1.75
2.75

1.22

0.8839 t
3.3986 a

RA

20
=
+ 40.0

50

DA

1m

3.3986

73.822

770.2

tm

Dd

73.822

3.3986

Mc

73.822

3 -

203.08 tm

Andi Burhanuddin/D11198107

20

1m

20

17 m

7.07 =

73.822 t

0.8839

30

1.7679

20

0.8839

3.5

0.5

0.5

3.3986

20

4.0821 t
.

3.3986

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Dc

73.822

3.3986

Mb

73.822

2 -

139.08 tm

Db

73.822

3.3986

0.8839

66.141 t

Ma

73.822

0.8839

0.5

3.3986

71.239 tm

Da

73.822

3.3986

0.8839

0.8839

1.7679
2

= =

61.859 t

0.5

69.54

3.3986

bk
bm

b0 + I0/5

20

bm

b0 + I0/10 + bk/2

bm

bm

Sehingga, bm =

b0
1000
5
20 +

bm
1000 +
10

220 cm
175
2

bm

208 cm

175 cm
175 cm

bm
=
b0

175
20

= 8.75

t
h

20
90

= 0.22

<

balok T sempit

Penulangan :
Md =

77020 kgm

h =

95

- 5 =

Ca

Ca

90

cm

90
=
19
. 77020
1740 . 1.7500
4.1054
)
nw
=
0.2
) f
=

Andi Burhanuddin/D11198107

4.1054

0.0773
2.175 >

fo

(OK)

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN

0.0773
19
15

175
22

Mc =

8
D
.
=
7
bh

64.1

cm2

2
57.02 cm

3 f 1"
8
.
7

4082.125
20
.
90

= 2.59 < tb =

6.5

kg/cm2

20308 kbm

Taksir x =
h =
95

0.34
l = 0.93
- 5 = 90 cm
=

Ca

7.5993

0.2

0.1091
19

tc

b = l

90
19
. 20308
1740 .
1.581

Ca

175

8
D
.
=
7
bh

. bm =

1.581

7.5993

dari tabel diperoleh x


=
0.358
nw
=
0.1091
f
=
1.789 > fo
(OK)

A' = 0,2 A = 18.1 cm2

Mb =

90

A' = 0,2 A = 12.8 cm2


td

90

= 90.4

cm2

(OK)

12

f 1"

3 f 1"
8
.
7

61858.51389
20
.
90

= 39.3

<t=

5.5

kg/cm2

139079 kgm

Taksir x =
h =
95

0.28
l = 0.97
- 5 = 90 cm

b = l

90
19
. 139079
1740 .
1.649

Ca

Ca

2.9656

0.2

0.0589

Andi Burhanuddin/D11198107

. bm =

1.649

2.9656

dari tabel diperoleh x


=
0.283
nw
= 0.0589
f
=
2.532 > fo
(OK)
175

90

= 48.8

cm2

(OK)

f 1"
Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
A

19

175

A' = 0,2 A = 9.77 cm2


tb
Ma =

8
D
.
=
7
bh

90

= 48.8

cm2

f 1"

2 f 1"
8
.
7

66141.0625
20
.
90

42

<t=

5.5

kg/cm2

71239 kgm

Taksir x =
h =
95

0.22
l = 0.99
- 5 = 90 cm
90
19
. 71239
1740 .
1.683

Ca

Ca

4.1862

0.2

0.0309
19

tsisa

8
D
.
=
7
bh

= 44.2 -

175

1.683

4.1862

90

= 25.6

cm2

(OK)

f 1"

2 f 1"
8
.
7

5.5 =

69539.67361
20
.
90

As . sa
b .d

= 44.2

>t=

5.5

kg/cm2

38.7 kg/cm2

Pakai tulangan beugel f 3/8" - 20


tyang terjadi

. bm =

dari tabel diperoleh x


=
0.217
nw
= 0.0309
f
=
3.615 > fo
(OK)

A' = 0,2 A = 5.12 cm2


ta

b = l

1.43 cm2

As =

1.43 .
20 .

1400
20

5.01

kg/cm2

>

tsisa

(OK)

E. Balok Memanjang tepi :


Agar lebih ekonomis, balok memanjang tepi harus dihitung tersendiri dengan memperhitungkan
beban-beban jalur sebesar setengah beban jalur BM-tengah serta beban tambahan yaitu
beban trotoir.
Selanjutnya perhitungan BM-tepi dapat diselesaikan analog dengan cara perhitungan untuk
BM-tengah.

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN

Perencanaan Tiang Pancang


Data - data perencanaan
~ Abutment I
Elevasi Sondir
= +
87.5
Elevasi Kaki poer
= +
80.5
Elevasi tanah keras
= +
87.5
Direncanakan panjang tiang pancang
Data sondir :

qc =
STf =

150 kg/cm
825 kg/cm

~ Abutment II
Elevasi Sondir
= +
85.2
Elevasi Kaki poer
= +
78.2
Elevasi tanah keras
= +
85.2
Direncanakan panjang tiang pancang
Data sondir :

qc =
STf =

m
m
=

20
20

=
-

67.5 m
7 =
13

15

15
15

=
-

70.2 m
7 =
8

10

m
m
=

150 kg/cm2
800 kg/cm

~ Abutment I
Q =

qc . A
3

A = 1/4 p d2

STf . K
5

= 1/4 . 3,14 .
=

Q =
=

150 .

1256
3

825 .

( p . 40)
5

40

1256 cm2
=

83524 kg

83.524 ton

~ Abutment II
Q =

qc . A
3

A = 1/4 p d2

STf . K
5

= 1/4 . 3,14 .
=

Q =
=

150 .

1256
3

800 .

( p . 40)
5

1256 cm
=

40

82896 kg

82.896 ton

Jumlah tiang pancang


n =

V
=
Q

Andi Burhanuddin/D11198107

793.85
82.896

= 9.58

11 buah

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN

0.50
1.25
1.25
0.50
1.00

1.50

Syarat

1.50

1.50

< 2,5 D
S 3,0 D

1.50

1.50

1.50

1.00

(min 0,60 m dan maks 2,00 m)

Sn = 150 cm

dan

Sm

= 125 cm

Menentukan Beban Akibat Momen Yang Dipikul Tiang Tengah

P1
P2

P0
P3

X3

X4

P4
P5

X2
X1

Andi Burhanuddin/D11198107

X5

P6
X6

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN

M = 2 P1.X1 + P2.X2 + 2 P3.X3 + 3 P0. 0 + 2 P4.X4 + P5.X5 + 2 P6.X6


Analogi :
P2 : P1 = X1 : X2

P4 = P1. (X4/X1)

P2 = P1. (X2/X1)

P5 = P1. (X5/X1)

P3 = P1. (X3/X1)

P6 = P1. (X6/X1)

M = 2 P1.X1 + P1.(X22/X1) + 2 P1.(X32/X1) + 0 + 2 P1.(X42/X1) + P1.(X52/X1)


+ 2 P1.(X62/X1)

M = (P1/X1) (2X12 + X22 + 2X32 + 2 X42 + X52 + 2 X62)


P1 =

M. X1
2

(2X1 + X2 + 2X3 + 2 X42 + X52 + 2 X62)

DIMANA :
M =
521.78769
X1 =
X2 =
X3 =
PM =

4.5 m
3.0 m
1.5 m

( 2.

PM =

4.5 ^2

V
n

PMAKS =

793.8549
11

PMAKS =

81.844

289.58496
X4 =
X5 =
X6 =

3.0 ^2

1044.91229
108.00

PMAKS =

Andi Burhanuddin/D11198107

232.20273

1.5 m
3.0 m
4.5 m
232.20273 x 4.50
+ 2. 1.5 ^2 + 2. 1.5 ^2

3.0 ^2

+ 2. 4.5 ^2)

9.675 Ton

+ PM

+ 9.675

<

QTanah

82.896

Oke .!

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN
Effisiensi Kelompok Tiang Pancang

1. Metode Feld
Effisiensi Tiang

A =

Effisiensi Tiang

B =

Effisiensi Tiang

C =

Effisiensi Tiang

D =

11
4

11
7

11
4
11
4
11

11
7
11
7
11

=
=

4 Buah Tiang

A = 4 x

Eff

A = 4

4 Buah Tiang

B = 4 x

Eff

B = 4

2 Buah Tiang

C = 2 x

Eff

C = 2

1 Buah Tiang

D =

Eff

D =

1 x

8
11
7
11
7
11
7
11

=
=
=
=

Total Eff.
Effisiensi Satu Tiang =

7.3636
11

32
11
28
11
14
11
7
11
81
11

= 7.3636

= 0.6694

2. Metode Converse Labone Formulae


SFf . N

Dimana :

q
90

q =
m =
n =

SFf . N

=
=

Andi Burhanuddin/D11198107

(n - 1) m + (m - 1) n
m .n
40
125

Arc Tan
3
7
17.7
90

7 -

1 3 +
3 .

17.745

3 7

1 7

0.6996

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN

Karena tiang juga mengandalkan friction, maka :


150 .

Q =

1256
3

0.6996

0.6996

825 .

( p . 40)
5

77298 kg

800 .

( p . 40)
5

76858 kg

77.298 ton
150 .

Q =

1256
3

76.858 ton

Q >

Q (

81.844 ton )

Tidak Oke Cess!

Kontrol dengan cara perpindahan :


1. Menentukan konstanta pegas
~ Konstanta pegas arah axial
Ap . Ep
Kv = a .
l
dimana :
a

0.041

l
- 0.27 =
D

2.2925

Ap

1256 cm2

Ep
l

=
=

6400 .
fck = 156767 kg/cm2
25 m =
2500 cm

Kv

2.2925

1256 .
156767
= 180557
2500

kg/cm

~ Konstanta pegas arah ortogonal


=

4EI b3 =

29358.02518 kg/cm

K2=K3 =
K4 =

2EI b2 =
2EI b =

2039996.384 kg/rad
283505802.8 kgcm/rad

K1

156767 kg/cm
p
=
.
D4 = 125664
cm4
64
4
k.D
=
= 0.007195607 cm-1
4EI

I
b

ko . y-1/2

ko

= 0,2 . Eo . D-3/4 =

Eo

28

N =

5.2812204 kg/cm2
5.2812

420 kg/cm2

Untuk kemiringan tiang pancang dianggap qi = 0, hal ini adalah kondisi kritis pada
stabilitas abutment.
1. Menentukan koefisien matriks perpindahan

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN
Axx = S (K1 cos2qi + Kv sin qi) = n . K1 =
322938.28
Axy = Ayx = S (Kv . K1) sin qi . cos qi =
0
Axa = Aax = S (Kv - K1) xi sin qi . cos qi - K2 cos qi = -n . K2 =
Ayy = S (K1 cos2qi + Kv sin qi) = n . Kv =
2

-22439960

1986123.8

Aya = Aay = S (Kv cos qi + K1 sin qi) xi +K2 sin qi) = 0


Aaa = S (Kv cos2qi + K1 sin2 qi) xi2 +(K2 + K3) xi . sin qi K4)
= SKv . x2 + SK4 =

3123032609

Formula Matriks perpindahan tiang pancang


Axx
Ayx
Aaa

Axy
Ayy
Aay

Axa
Aya
Aaa

322938.28
0
0
1986123.8
-22439960
0
dx
dy
a

=
=
=

dx
dy
d

Ho
Vo
Mo

-22439960.2
0
3123032609

dx
dy
a

135078
= 793855
518442

0.8583974 cm
0.3997006 cm
0.0063339 rad

dxi' = dx cos qi - (dy + axi) sin qi = dx cos qi = dxi


dx1 = dx =
0.858397419 cm
dx2 = dx =
0.858397419 cm
dx = dx =
0.858397419 cm
dyi' = dx cos qi - (dy + axi) cos qi = (dy + axi)
dy1 =
0.864731278 cm
dy2 =
0.399700608 cm
dy3 =
0.345633618 cm
Pni = Kv . dyi
PN1 = 180556.71 .
PN2= 180556.71 .
PN3 = 180556.71 .

Andi Burhanuddin/D11198107

0.864731278 = kg
0.399700608 = kg
0.345633618 = kg

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN
PHi = K1 dx - K2 a
PH1 = 12279.805 kg
PH2= 12279.805 kg
PH3 = 12279.805 kg
Mti = -K3 dxi + K4 a
Mt1 = 44557.953 kg m
Mt2= 44557.953 kg m
Mt3 = 44557.953 kg m
Kontrol !!!
SHi = n . PHi = 159637.47
SVi = 5 . PN1 + 3 PN2 + 5 PN3 =
Mti = S (Mti + Vi . Xi)
= n . Mti + 5 V1 . 125 + 5 V3 (-125)
=

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN
Penulangan Tiang Pancang
Penulangan tiang pancang dihitung berdasarkan kebutuhan pada waktu pengangkatan
a.

diangkat

L - 2a

M1

M3

M2
M1 = 1/2 . g . a2

g = Berat tiang pancang (kg/m) =

302 kg/m

M2 = 1/8 . g . (L - 2a)2 - 1/2 g . a2


M1 = M2

1/2 .g. a2 = 1/8 . g . (L - 2a)2 - 1/2 g . a2


4a2 + 4a L - L2 =0
4a2 + 4a

15

L =

15

15

4 a2 +
60 a - 225 =
0
Dengan rumus ABC diperoleh :
a1 =
3.1066
a2 = -18.107
(tidak memenuhi)
M1 = M2 =1/2 g. a2 =

Andi Burhanuddin/D11198107

1/2 .

302 .

3.11

1455.3 kgm

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN
b.

diangkat

Dari penurunan rumus diperoleh


persamaan :
2 a2 - 4 a L + L2
2a2 - 4a

L-a

15

=
-

15

2 a2 +
30 a - 225 =
0
Dengan rumus ABC diperoleh :
a1 =
5.4904
a2 =
(tidak memenuhi)
-20.49

M1 = M2 =1/2 g. a2 =

1/2 .

302 .

Jadi keadaan yang paling menentukan adalah keadaan b. (Mmaks =


Penulangan diambil =
12 f
19

Andi Burhanuddin/D11198107

5.49

4545.7 kgm

4545.7 kgm)

Arif Hasan Akuba/D1198060

PERENCANAAN JEMBATAN

BAB III
PERHITUNGAN KONSTRUKSI BANGUNAN BAWAH
III. 1. PERHITUNGAN ABUTMENT
0.3

II

0.7

III

0.7

IV

V
4.1

Pa1

Pp1

VI

0.2

Menentukan lokasi titik berat abutment

Arif

Pp2

VIII

0.4

Data - data tanah :


Dari grafik sondir, diperoleh :
- Kedalaman tanah keras
=
20
- g tanah
=
1.7
- j =
29 0
- Nilai konus C
Ka = tan2 (45 - f/2) =
0.35
2
Kp = tan (45 + f/2) =
2.88
3
- g beton
= 2400 kg/m

VII

Pp3
2

PERENCANAAN JEMBATAN

Bagian

Luas (F)
m2

I
II
III
IV
V
VI
VII
VIII

0.3
1.12
0.105
0.105
5
0.2
0.2
2
9.03

F.X

F.Y

1.85
2.5
1.8
3.1
2.5
1.333333
3.666667
2.5

6.6
5.75
5.166667
5.166667
2.65
0.466667
0.466667
0.2

0.555
2.8
0.189
0.3255
12.5
0.266666667
0.733333333
5
22.3695

1.98
6.44
0.5425
0.5425
13.25
0.093333
0.093333
0.4
23.34167

22.3695
9.03

X =

S F.X
=
SF

Y =

23.34167
S F.Y
=
= 2.585 m
9.03
SF

= 2.477 m

~ Perhitungan berat sendiri abutment (B)


B = Luas total x berat beton
=
9.03
. 2400
= 21672 kg/m
~ Perhitungan tekanan tanah aktif (Pa)
Pa = 1/2 . gt . h2 . Ka

1/2 .

1700 .

7.1

0.35 =

14867.32 kg/m

~ Perhitungan berat tanah pengisi (G)


G1
G2
G3
G4

=
=
=
=

2.4
0.7
4.1
0.2

.
.
.
.

2
0.3
2
2

.
.
.
.

1700
0.5
1700
0.5

1700

1700

=
=
=
=
=

8160
178.5
13940
340
22618.5

kgm
kgm
kgm
kgm
kgm

~ Perhitungan tekanan tanah pasif


Pp3 = 1/2 . gt . h2 . Kp

1/2 .

1700 .

~ Beban - beban yang bekerja pada abutment


Beban mati
* Berat aspal
=
770
* Berat lantai kendaraan
=
3024

Arif

0.4

kg/m
kg/m

2.88 =

391.9602 kg/m

PERENCANAAN JEMBATAN

*
*
*
*

Berat gelagar induk


Berat trotoar
Berat pipa sandaran
Berat beton pengisi
q

Beban balok diafrgma


Tiang sandaran

=
=
=
=
=

7837.872
993.6
96.48
552
13273.952

=
=
P =

kg/m
kg/m
kg/m
kg/m
kg/m

5376
855.36
6231.36

kg
kg
kg

Beban hidup
20

Koefisien kejut (K) =

1 +

Beban terpusat (P) =

12
2.75

5.5

1
.
2

1.5

. 1.222 = 33333.33

kg

Beban jalur (q) =

2.2
2.75

5.5

1
.
2

1.5

kg

* Beban hidup trotoar


Reaksi total
* Beban mati
Beban terpusat
Beban merata
Beban hidup trotoar

50

40.0

= 1.222

1.5

7500

1000 kg/m

= 1/2 .
=
= 1/2 .
= 1/2 .

13273.952

40.0 + 1/2 .

7500
1000

40.0

6231.36 =
=
=
=
S Rtot =

268594.7
33333.33
3750
20000
325678.1

~ Gaya akibat rem dan traksi (HR)


Diambil 5 % dari muatan D dengan titik tangkap 1,2 m diatas jembatan
HR =

5% ( n . Pb + n . 50% Pb + n . L . P' + n . L . 50% . P')

Dimana :

HR

Arif

n
L
Pb
p'

= jumlah jalur =
= bentang jembatan
= Berat kendaraan
=
2.2 ton

2 . 12 +
2.
+ 2 . 40.0 .
ton
=
15000 kg

50%
2.2

5% (

15

=
=

40.0 m
12 ton

. 12 + 2
. 50% )

40.0

2.2

PERENCANAAN JEMBATAN

~ Gaya akibat gempa bumi


K = E . (SB + R) =
=

0.14 . (
48629.01 kg

21672

~ Momen pada tengah alas abutment


Mo = 325678.1

~ Gaya normal
N = SG + SB + R
= 22618.5 +
= 369968.6 kg

21672

325678.0533

~ Letak titik tangkap gaya normal (N) terhadap titik A


~ Momen guling ditinjau terhadap titik A
~ Momen tahanan (MT)
MT = N . X

916501.8

~ Gaya geser (SH)


SH = Pa + HR + K - Pp
~ Gaya tahanan (Nf)
Nf = N . Tan j
~ Kontrol kestabilan
- Stabilitas terhadap guling
Syarat : MT
>
2
MG

Arif

916502

325678.1 )

PERENCANAAN JEMBATAN

Stabilitas terhadap gaya vertikal, titik tangkap harus berada didaerah pusat.

Stabilitas terhadap gaya geser

Penulangan Abutment
0.3

II

II

Pa

Pp
2

III

Potongan I - I
Pa = 1/2 . gt . h2 . Ka
M = Pa'
=

Mu =
fy2

Arif

AS2

1/2 .

IV

1.7

0.35 =

kg.cm

fy . d.

AS.

Mu

= 0

0.294928 kg/m

PERENCANAAN JEMBATAN
AS2

1,7 . fc' .b

fy . d.

= 0

0
1.7

#DIV/0!

AS2

AS2

AS.

Dengan rumus ABC diperoleh :

AS.

16

20

AS.

10.05

+
=

AS.

0
0.8

= 0

cm2

#DIV/0!

cm2

Kontrol

rmin

1.4
fy

0
0

rada

As.
b. d

10.05
0
.
0

rmaks

0.75

. b1 .

#DIV/0!

#DIV/0!

0.85 . f'c
fy

#DIV/0!

#DIV/0!

600
600

fy

0.75

0.85

0.85 .

#DIV/0!

Potongan III - III = Potongan IV - IV


Untuk mendesain tulangan pada pot. Tersebut didasarkan pada momen guling, tahanan
dan gaya vertikal
N.E
N
st
=
+
W
F
Dimana :

F = Luas abutment
W = 1/6 . b2 . h

Sehingga :
st

st max =
st min =

#DIV/0! +
0

Berat beban bagian


- Kiri :
Berat tanah

Arif

#DIV/0! =
0

#DIV/0!
0

#DIV/0!

#DIV/0!

f'c 0
0

600
600

PERENCANAAN JEMBATAN

Berat plat

Arif

PERENCANAAN JEMBATAN

Pp3

Arif

PERENCANAAN JEMBATAN

Arif

PERENCANAAN JEMBATAN

kg
kg
kg
kg
kg

Arif

PERENCANAAN JEMBATAN

Arif

PERENCANAAN JEMBATAN

Arif

PERENCANAAN JEMBATAN

600
+

Arif

PERHITUNGAN ABUTMENT
III. 1. PERHITUNGAN ABUTMENT
I. Analisa Pembebanan
1. Elemen bangunan atas/Beban mati super struktur (DL)
~ Berat gelagar induk
= 5 . ( 0.515 .
~ Berat trotoar
= 2 . ( 0.2 .
~ Berat lantai kendaraan
= 0.2 .
7.
~ Berat lapisan aspal
= 0.05 .
7.
~ Berat air hujan
= 0.05 .
7.

Jadi PND =

267.24375

2. Beban hidup (LL)


~ Beban garis P =
5.5

45
1.
45
45
45

2500 )
45 .
2400 )
.
2400
.
2200
.
1000
Total
Untuk satu abutment

=
=
=
=
=
=
=

ton

12 ton/jalur
m
100%P
50%P

7.0
P =

12
2.75

= 4.364

t/m

~ Beban jalur
q =

2.2

1.1
60

.(

30

2.2

1.1
60

.(

45

30

1.925 t/m2

PNH = (q . 5,5) . 100% + (q . 1,5) . 50% . 0,5 . L + (P . 5,5) . 100% + (P . 1,5) . 50%
= 297.9759 ton

Untuk satu abutment =

148.9879 ton

289687.5
43200
151200
34650
15750
534487.5
267243.75

kg
kg
kg
kg
kg
kg
kg

3. Perhitungan Berat Konstruksi


a. Abutmen
0.2

0.2

1.6

0.65

0.9

0.4

0.4

II
III
IV
0.7

m
7

VI
3.85 m

VII

VIII
IX

1.45

0.6

0.13
0.36
0.8
0.14
0.14
2.73
0.2175
0.2175
1.75

3.432
9.504
21.12
3.696
3.696
72.072
5.742
5.742
46.2
171.204

Jarak ya
(m)

Mx

Mx
G

309.6126
= 1.808443 m
171.204

Yca

My
G

444.6464
= 2.597173 m
171.204
2.7

0.9

22.9086
56.0736
110.88
18.172
18.172
199.9998
3.4452
3.4452
11.55
444.6464

Torsi M = G . Xo =
=

b. Sayap

0.5

My

2.45
6.675
8.4084
2.55
5.9
24.2352
1.75
5.25
36.96
2.283333 4.916667 8.4392
1.216667 4.916667 4.4968
1.75
2.775
126.126
2.533333
0.6
14.5464
0.966667
0.6
5.5506
1.75
0.25
80.85
309.6126

Xca

0.65

1.45

Menentukan lokasi titik berat abutment


Luas (F)
Jarak xa
Bagian
Berat (t)
2
(m)
m
I
II
III
IV
V
VI
VII
VIII
IX

0.3

0.2

0.6

171.204 . 0.058443
10.0056 tm

0.9

0.4

0.4

II
III

IV

1.05 m

VI
VII

2.80

0.3

0.5

VIII

1.75

1.45

Bagian
I
II
III
IV
V
VI
VII
VIII

Torsi

Luas (F)
2

m
1.755
3.25
1
0.14
3.36
2.45
4.06
0.2175

Mx =
y =

Berat (t)

Jarak Xo Jarak Yo
(m)
(m)

0.6

Mx

2.5272
2.15
6.675
5.43348
4.68
2.25
5.7
10.53
1.44
2.25
4.85
3.24
0.2016 0.766667 4.783333 0.15456
4.8384
3.5
4.125
16.9344
3.528 2.333333 2.666667 8.232
5.8464
1.025
2.2
5.99256
0.3132 1.266667
0.7
0.39672
23.3748
50.91372

50.91372 tm
93.9411
23.3748

= 4.019 m

1.45

My
16.86906
26.676
6.984
0.96432
19.9584
9.408
12.86208
0.21924
93.9411

c. Berat tanah
0.2

1.3

II

0.4

III

0.5

IV
0.7

3.85 m

0.6

0.65

0.3

0.2

VI

1.45

0.6

Menentukan lokasi titik berat abutment


Luas (F)
Jarak Xo Jarak Yo
Bagian
Berat (t)
2
(m)
(m)
m
I
II
III
IV
V
VI

Torsi

0.6175
0.975
0.3
0.14
5.5825
0.2175

Mx =
y =

1.45

Mx

My

11.5596
1.275
6.675 14.73849 77.16033
18.252
1.375
5.7
25.0965 104.0364
5.616
1.375
4.85
7.722
27.2376
2.6208 0.766667 4.783333 2.00928 12.53616
104.5044 1.025
2.725
107.117 284.7745
4.0716 1.266667
0.7
5.15736 2.85012
146.6244
161.8406 508.5951

161.8406 tm
508.5951
= 3.469 m
146.6244

4. Tekanan Tanah Normal


- Berat jenis tanah

1.8

- Sudut geser dalam tanah


- Koefisien tekanan tanah

ton/m3
=

Ka = tan2 (45 - f/2) =

29

0.35

Kp = tan (45 + f/2) =


2.88
Beban merata dibelakang abutment diperhitungkan senilai dengan muatan tanah setinggi
60 cm (PPPJJR, hal 13)
1.08 tm/m2

q = gt . h = 1,8 . 0,6 =
Diagram tekanan tanah

1.08 tm/m2

3.8

1.7

Pa1

Pa2

~ Tekanan tanah aktif


Pa1 = q . H . Ka . L
= 1.08 .
7
= 28.85 ton

0.35 .

11

Pa2 = 1/2 gt . H2 . Ka . L
= 1/2 .
1.8
= 168.3 ton
Pa total =

0.35 .

197.2 ton

SMPa = Pa1 (1/2 H) + Pa2 (1/3 H)


= 28.85 .
3.5 + 168.3 .
= 493.7 tm

2.333

11

~ Tekanan tanah Pasif


Pp = 1/2 gt . H2 . Kp . L
= 1/2 .
1.8
= 82.46 ton
SMPp = Pp (1/3) H

1.70

46.73

2.88 .

11

~ Tekanan tanah pada saat gempa bumi


Koef. Tekanan tanah
Data tanah :

29

fo =

Arc tan

fo =

5.7106

Eh
L - Ev

Dimana Eh = 0,1, Ev = 0

Aktif
KEA =
2

cos fo
=

cos2 (f - fo)
sin f . sin (f - fo)
1 +
cos fo

=
2

0.843678152
0.191682
0.990099 . 1 +
0.995037

0.843678152
0.191682
0.990099 . 1 0.995037

0.843678152
0.990099 . 2.070449

= 0.411561
-

Pasif
KEP=
cos2 fo
=

cos2 (f - fo)
sin f . sin (f - fo)
cos fo

=
2

0.843678152
0.990099 . 0.314827

= 2.706612
Koef. Tekanan tanah akibat gempa
- Aktif
PEA1 = q . H . KEA . L
= 1.08 .
PEA2 = 1/2 gt . H . KEA . L
PEA tot =

233.8734 t

1/2 .

1.8

0.412 .
7

11 =
2

34.23 t

0.412

. 11 =

199.6 t

SMPEA

= PEA1 (1/2 H) + PEA2 (1/3 H)


= 34.23 .
3.5 + 199.6 .
= 585.6 tm

2.333

Pasif
PEp = 1/2 gt . H2 . KEp . L
= 1/2 .
1.8
= 77.44 ton

SMPa = Pp (1/3) H

1.70

43.88 tm

2.71 .

11

5. Beban Angin
1. Beban angin tegak lurus
(50% . (30% + 50%) . (L - 5) - H . 150 + 100% . L . 2 . 150)
Ar =
2
Dimana : L =
45 m
H = 3.55 m
Ar = -7008.25 t
2. Beban angin arah memanjang
Al = 2 ( 6 + 2 . 0,5) . 150
=
2.1 ton
Menurut ketentuan gaya angin yang dipilih adalah arah memanjang Al = 2,1 t setinggi
H = 5,5 m
MAl = 2,1 . 5,5 =
11.55 tm
6. Gaya Gesek Tumpuan (Gg) bekerja pada ketinggian H =
Gg = 0,15 . Beban mati
= 0.15 .
267.24375

= 40.08656 t

MGg =

= 218.4718 tm

40.08656 .

5.45

5.45 m

7. Gaya gempa horisontal eqivalent akibat gempa (Gh)


Koef. Gempa horisontal (Kh)
Kh = Kr . f . p . b
Tg

Dimana :

Tg

0,3 Mp + Ma
3 EI . g

= 2p

= 2p
=

Mp =
Ma =

171.204
267.2438

E =

6400

= 1/12 .

g
h

=
=

0.367315

9.8
7

h3

sb
3.5

=
11

6400
3

225 =

960000 t/m2

388.2083 m4

m/det2
m

0.3
. 171.204 + 267.2438
. 960000 . 388.2083 .
9.8
Zone IV diperoleh

Kr =

7
0.05

Beban mati struktur yang ditinjau


1. Beban mati diatas struktur (M =
267.2438 tm)
Gh1 =
0.1 . 267.2438 = 26.72438 t
MGh1 = 26.72438 .
7 = 187.0706 t
2. Akibat beban mati abutment (M =
Hg1 = 2.597173 m
Gh2 =
0.1 .
171.204 =
MGh2 = 17.1204 . 2.597 =

171.204 tm)
17.1204 t
44.46464 t

3. Akibat beban mati sayap (M =


23.3748 tm)
Hg3 = 4.018905 m
Gh3 =
0.1 .
23.3748 = 2.33748 t
MGh3 = 2.33748 . 4.019 = 9.39411 t
Sehingga

SGh =
SMGh =

46.18226
240.9294

8. Beban rem (Rm) bekerja setinggi H =

5.35 +

1.2

6.55 m

Rm = 5% dari beban mati total


=
5% . 148.9879
= 7.449396 t
MRm =
=

7.449396 .
6.55
48.79355 tm

9. Beban merata permukaan


Q = 1,08 . 27,5 = 29,7 tm
M = 29,7 . 2,25 = 66,825 tm

Plat injak (5,6/2 . 2,4) = 6,72 t

Rekapitulasi Gaya pada Abutment


No.

Gaya pada abutment

Simbol

Vertikal
V (ton)

Horisontal
H (ton)

Mx

My

I.
a. Beban mati
b. Beban hidup
c. Gaya rem
d. Gaya gesek
e. Beban angin
f. Beban gempa
g. Beban merata
h. Plat injak
II.

III.

267.2438
148.9879
Rm
Gg
A
Gh
q

Bangunan bawah
a. Berat abutment
b. Berat sayap
c. Berat tanah
Tekanan tanah
a. Keadaan normal
1. Aktif
2. Pasif
b. Keadaan gempa
1. Aktif
2. Pasif

T
Ta
Taa
Tap
Tg
Tga
Tgp

-7.44939631
-40.0865625
-2.1
-46.182255

-48.7935458
-218.471766
-11.55
-240.929375

29.7
6.72

66.825

171.204
23.3748
146.6244

10.0056
50.91372
161.84064

-114.712842
-197.171463
82.45862057
-156.434528
-233.873392
77.43886488

Mmv = 289.585 t
Mv = 644.867
KOMBINASI PEMBEBANAN
1. KOMBINASI I
Muatan
V (ton)
H (ton)
MV ton.m MH (ton.m)
M
644.86695
289.58496
H
148.9879261
Ta
-114.712842
-447.003616
Tu
100% 793.8548761 -114.712842 289.58496 -447.003616
100% 793.8548761 -114.712842 289.58496 -447.003616
2. KOMBINASI II
Muatan
V (ton)
M
644.86695
Ta
Gg
A
125%
644.86695
100%
515.89356

H (ton)
-114.712842
-40.0865625
-2.1
-156.899405
-125.519524

3. KOMBINASI III
Muatan
V (ton)
H (ton)
M
793.8548761 -114.712842
Rm
-7.44939631
Gg
-40.0865625

MV ton.m
289.58496

289.58496
231.667968

MV ton.m
289.58496

MH (ton.m)
-447.003616
-218.471766
-11.55
-677.025382
-541.620305

MH (ton.m)
-447.003616
-48.7935458
-218.471766

-447.003616
-493.730168
46.72655166
-541.752162
-585.634186
43.88202343

A
140%
100%

-2.1
793.8548761 -164.348801
567.0391972 -117.392001

4. KOMBINASI IV
Muatan
V (ton)
M
644.86695
Gh
Tag
150%
644.86695
100%
429.9113

H (ton)
-46.182255
-156.434528
-202.616783
-135.077855

289.58496
206.8464

MV ton.m
289.58496

289.58496

Dari tabel diatas diperoleh kombinasi maksimum


Vertikal
= 793.8549 t
Horisontal
= 135.0779 t
Mv
= 289.585 tm
Mh
= 521.7877 tm

-11.55
-725.818927
-518.442091

MH (ton.m)
-240.929375
-541.752162
-782.681537
-521.787692

II. Penulangan Abutment


0.2

0.65

1.3

0.4

0.2

0.6

3.85 m

I
0.3

0.5

III

II

VI

1.45

0.6

III

1.45

II

I. Potongan I - I
q

1.08 tm/m2

I
II
III
IV

6.20 m
Pa1
VI
Pa2

Diketahui :
Ls = 11 m
Pa2 = 1/2 gt . H2 . Ka . L

Pa1 = q . H . Ka . L
= 1.08 .
6.20 .
= 25.56 ton
Pa total =

0.35 .

11

= 1/2 .
1.8
=
132 ton

157.6 t

Lengan tekanan tanah (y) dan momen (M)


y1 =
3.1 m
M1 = Pa1 . Y1 = 25.56 .
y2 = 2.067 m
M2 = Pa2 . Y2 = 132 .
SM = M1 + M2
y=

SM
SP

352.1148
= 2.234
157.5998

3.1 =
2.067 =

352.1148 tm
m

79.22583 tm
272.889 tm

6.20

0.35 .

11

Tabel perhitungan gaya geser dan momen


Jarak
Jarak
Beban
x (m)
y (m)
Bangunan atas
a. Beban mati
0
0
b. Beban hidup
0
0
c. Gaya rem
Rm
5.55
d. Gaya gesek
Gg
5.55
e. Beban angin
A
5.55
f. Beban gempa
Gh
5.55
g. Beban merata
q
1.35
h. Plat injak
1
-

V
(ton)

H
(ton)

Mx = H . y.
tm

My = V . x.
tm

7.449396
40.08656
2.1
46.18226

0
0
41.3441495
222.4804219
11.655
256.3115153

0
0
40.095
6.72

8.4084
24.2352
36.96
8.4392
4.4968
126.126

79.226
272.889
883.906

255.481

267.2438
148.9879

29.7
6.72

Bangunan bawah
a. Berat abutment
I
II
III
IV
V
VI

2.45
5.875
2.55
5.1
1.75
4.45
2.283333 4.116667
1.216667 4.116667
1.75
2.125

3.432
9.504
21.12
3.696
3.696
72.072

b. Tekanan tanah
Pa1
Pa2

3.1
2.066667

25.55672
132.043
566.1717 253.418

Dari perhitungan diatas diperoleh :


Gaya geser
= 566.1717 ton
Momen
= 628.425 ton m
Normal
= 253.418 ton
-

Mutu baja (fy)

300 N/mm2

Mutu beton (f'c)

22.35 N/mm2

fy2
1,7 . fc' .b

AS2

2
3000
1.7 223.5 1000

23.68732728 AS2

Mu
f

= 0

3000

960

2880000 AS.

fy . d.

AS2

AS.

AS.

7855316066

6284252852
0.8

= 0

Dengan rumus ABC diperoleh :

AS.

Dipilih tulangan=
Tulangan tekan AS' = 0,25 . AS

2791.64 mm2 /meter


25

10

4908.7

mm2

20

565.5

mm2

697.9 cm

Dipilih tulangan=

12

Kontrol
rmin

1.4
fy

1.4
300

rada

As.
b. d

4908.74
1000 . 960

rmaks

0.75

. b1 .

= 0.026913

= 0.004667

0.85 . f'c
fy
Ok !!!

= 0.005113

600

600
+ fy

Ok !!!

0.75

0.85

0.85 . f'c22.35
300

600

600
+ 300

II. Potongan II - II

II

1.7
0.3

II

0.5

Pp

2
1.45

0.6

1.45

II
Tabel perhitungan gaya geser dan momen
Beban
Berat G (ton)
Jarak x (m)
Berat tanah
I
25.839
1.025
II
4.3065
1.2667
Berat abutment
1
5.742
0.7833
2
19.14
1.025
Pp
82.45862057
-

Jarak y (m)

Mx = G . y.

My = G . x.

46.727
46.727

26.485
5.455

0.56667

4.498
19.619
56.056

Dari perhitungan diatas diperoleh :


Momen
=
9.330 ton m
fy2
1,7 . fc' .b

AS2

2
3000
1.7 223.5 1000

23.68732728 AS2

Mu
f

= 0

3000

500

1500000 AS.

fy . d.

AS2

Dengan rumus ABC diperoleh :

AS.

AS.

Dipilih tulangan=
Tulangan tekan AS' = 0,25 . AS

Dipilih tulangan=

=
f

AS.

116621541.8

mm2 /meter

77.84
25

93297233.44
0.8

20

2454.4

mm2

20

565.5

mm2

19.46 cm
f

12

= 0

Kontrol
rmin

1.4
fy

1.4
300

rada

As.
b. d

2454.37
1000 . 500

rmaks

0.75

. b1 .

= 0.026913

= 0.004667

0.85 . f'c
fy

= 0.004909

600

600
+ fy

2.7

Ok !!!

0.75

0.85

0.85 . f'c22.35
300

600

Ok !!!

III. Potongan III - III

0.65

0.9

0.4

0.4

0.2

0.6

I
II
III

IV

1.05 m

VI
VII

2.80

0.3

0.5

1.75

VIII

IX
X
1.45

0.6

1.45

600
+ 300

Tabel perhitungan gaya geser dan momen


Beban
Berat G (ton)
Jarak x (m)
Beban merata
Berat sayap
I
2.5272
2.1500
II
4.68
2.2500
III
1.44
2.2500
IV
0.2016
0.7667
V
4.8384
3.5000
VI
3.528
2.3333
VII
5.8464
1.0250
VIII
0.3132
1.2667
Berat Tanah
I
34.749
2.1500
II
64.35
2.2500
III
19.8
2.2500
IV
2.772
0.7667
V
66.528
3.5000
VI
48.51
2.3333
VII
80.388
1.0250
VIII
4.3065
1.2667
Berat Abutment
IX
5.742
0.7833
X
19.14
1.0250
Pa1
28.85436045
Pa2
168.3171026
-

Jarak y (m)

Mx = G . y.

My = G . x.

5.433
10.530
3.240
0.155
16.934
8.232
5.993
0.397
74.710
144.788
44.550
2.125
232.848
113.190
82.398
5.455
4.498
19.619

3.5000
2.3333

100.990
392.740
493.730

775.094

Dari perhitungan diatas diperoleh :


Momen
= 281.364 ton m
fy2
1,7 . fc' .b

AS2

2
3000
1.7 223.5 1000

23.68732728 AS2

Mu
f

= 0

3000

500

1500000 AS.

fy . d.

AS2

Dengan rumus ABC diperoleh :

AS.

AS.

Dipilih tulangan=
Tulangan tekan AS' = 0,25 . AS

Dipilih tulangan=

=
f

AS.

3517045029

2813636023
0.8

2438.61 mm2 /meter


25

12.5

3927.0

mm2

20

1005.3

mm2

609.7 cm
f

16

= 0

Kontrol
rmin

1.4
fy

1.4
300

rada

As.
b. d

3926.99
1000 . 500

rmaks

0.75

. b1 .

= 0.026913

= 0.004667

0.85 . f'c
fy
Ok !!!

= 0.007854

600

600
+ fy

Ok !!!

0.75

0.85

0.85 . f'c22.35
300

600

600
+ 300

Perencanaan Bangunan Atas

IV -1

BAB IV
PERENCANAAN BANGUNAN ATAS
(SUPER STRUKTUR)

45

10

100

45

100
2%

2%

20
20
Blk. Girder

175

175

175

175

700
Gambar 4.1. Penampang melintang superstruktur
Data-data perencanaan :
Lokasi jembatan

: Ruas Makassar - Bone Kabupaten Maros

Panjang bentang

Kelas muatan

: Kelas I

Lebar trotoar

24 m

2x

Lebar lantai kendaraan :

1.0 m

7.0 m

Beban muatan sesuai Peraturan Muatan untuk Jembatan Jalan Raya No. SK 131. 28-1987
(khusus untuk lantai kendaraan menggunakan tabel Bitner)
Rencana penggunaan bahan :
-

Tian sandaran
: Mutu beton (f'c) = 24 Mpa, fy = 240 Mpa
Lantai kendaraab dan lantai trotoar : Mutu beton (f'c) = 25 Mpa, fy = 240 Mpa
Balok diafragma
: Mutu beton (f'c) = 25 Mpa, fy = 240 Mpa
Gelagar utama
: Balok beton prategang type "I" dengan sistem
Post-Tensioning dan mutu beton (f'c) = 50 Mpa
serta tendon VSL.

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV -2

Rencana denah jembatan :


- Jarak antar gelagar

1.75 m

- Jarak antar balok diafragma

5.0 m

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 3

4.6. Perhitungan Gelagar Utama


Dimensi gelagar utama
Ditaksir tinggi balok prategang (h)

1
L
17

1
25

1.471 -

L =

25

Penampang yang ditinjau :


penampangh :
AASTHO I - Beams Type III (panjang bentang maximum = 25 m)
Catatan : Type ini dimodifikasi
B1
D2

I
II

II

D4

B4
D1

B3

III

B6
IV

D5

IV

D6

B2
Gambar 4.6 Dimensi Balok Prategang ( type III)
Dimensi (mm)
D1

D2

D4

D5

D6

B1

B2

B3

B4

B6

1150

150

150

200

200

500

600

200

150

200

Luas penampang

417500

mm2

4175

cm2

##

Beban-beban yang bekerja pada gelagar utama :


a. Akibat beban mati yang dipikul oleh balok beton prategang
-

Berat plat lantai (gp)

0.20 x

1.75 x

Berat balok prategang (gG)

0.4175 x

Berat balok diafragma (gd)

0.3

2500 =

2500
0.5

875

kg/m'

1043.75 kg/m'

2500 =

375

kg/m'

b. Akibat beban hidup dan beban mati tambahan yang dipikul oleh balok komposit
-

Berat lapisan aspal (gas)

0.05 x

1.75 x

2200 =

192.5

kg/m'

Berat air hujan (gw)

0.05 x

1.75 x

1000 =

87.5

kg/m'

Beban hidup trotoar diperhitungkan pengaruhnya terhadap balok gelagar utama sebesar
60 % dari beban hidup yang bekerja pada trotoar

=
=

0.6
300

500 x

1.00

kg/m'

Beban hidup/lalulintas terdiri dari

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 4

1 Muatan garis

p = 12 Ton

Muatan garis =

12 ton yang bekerja

100 % (kelas I)

12

12

ton

1.0

Beban garis yang dipikul oleh satu gelagar :

p' =

p
2.75

a s

Dimana :
a = faktor distribusi sesuai PPPJJR SKBI 1.3 28 1987

p' =

1.0 bila kekuatan gelagar melintang tidak diperhitungkan


= jarak gelagar
12
2.75

1.0

7.636

1.75

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 5

2 Muatan terbagi rata (g)


Untuk bentang L < 30 m maka :
q =

2.2

1) hal 7

t/m

Untuk jembatan kelas I bekerja


2.2

100 % =

100 % beban terbagi rata (g) yaitu :

2.2

t/m

beban merata yang dipikul oleh satu gelagar :

q' =

q
2.75

a s

2.2
2.75

1.0

1.4

1.8

t/m'

Koefisien kejut (K)


K

1 +

20

50

+ L

1 +

20

50

1.267

25

Momen-momen yang terjadi akibat beba yang bekerja :


-

Yang dipikul oleh balok prategang :


1

Momen akibat berat sendiri balok prategang


MG

1
8

WG

L2

1
8

1044

25

=
2

81542.9688

kgm

Momen akibat berat plat lantai

Mp

1
8

qp

L2

1
8

875

25

68359.375

kgm

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 6

Momen akibat berat balok diagfragma


d

5.0

5.0

5.0

5.0

5.0

RA

RB
5 d

RA

RB =
2

375
2

=
Md

937.5

= (RA )
=

937.5

9375

kg

10.0 -

10.0 -

10.0 -

10.0 -

kgm

Yang dipikul oleh balok komposit


1

Momen akibat berat berat lapisan aspal


Mas

L2 =

1
192.5
8

25

= 15039.06 kgm

1
8

qw

L2 =

1
87.5
8

25

= 6835.938 kgm

Momen akibat beban hidup trotoar

Mtr

qas

Momen akibat berat berat air hujan

Mw

1
8

1
8

qtr

L2 =

1
8

300

25

23437.5

Momen akibat beban hidup lalu lintas


ML1

1
p' L K =
4

1
4

7.636

25

1.27

60.455

=
ML2

1
q' L2
8

1
8

1.4

25

=
MD

ML

kgm

= MG

+ Mp

81542.9688 +

204589.844

= ML1

Md

68359

+ Mas
+

+ Mw

9375

tm

60454.545 kgm

109.4

109375

tm

kgm

+ Mtr
15039

6836

23438

kgm

+ ML2

60454.545 +

169829.545

109375
kgm

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 7

MT

= MD
=

+ ML

204589.844

169829.545

374419.389

kgm

37441938.9

kgcm

Hitung luas penampang beton dengan rumus :

Ac

F
0.5 fc

MT
0.65 h

37441938.9
0.65 x
115

Ac

500895.504

*5) hal 167

kg

500895.504
0.5 x
225
4452.404

cm2

< A taksiran

4175

cm2

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 8

15

I
II

62.146 cm

15

50

II

15
115

20

20

IV

52.854 cm

III

IV

20

20

60

TAHAP I
a

Perhitungan sifat-sifat penampang prategang


-

Perhitungan letak garis netral penampang prategang.


Luas penampang
Penampang (A)
cm 2
A1 =

50

A2 =

2( 1/2

15

A3 =

80

20

A4 =

2( 1/2

20

A5 =

60

A =

Yt

15
x

20

259458.33
4175

Statis Momen
(S=A.Y)
cm 3

750

7.5

5625

15)=

225

20

4500

1600

55

88000

20)=

400

88.333

35333.333

1200

105

4175

S
=
A

Jarak terhadap serat


Atas (y)
cm

126000
s

62.146

259458.33

cm

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 9

Yb

Yt

= h -

115

52.854

62.146
cm

Perhitungan momen inersia penampang prategang.


I1

= 1/12

I2

2 1/36

I3

= 1/12

I4

I5

50

15
15

= 1/12

15

20

2 1/36

80
20

60

20

20
3

54.64571 2

750

42.14571 2

225

1600

400

7.146

26.18762 2

1200

42.854

I
-

2253677.600

cm4

802129.8384

cm4

935031.175

cm4

557522.241

cm4

2243788.351

cm4

6792149.206

cm4

Perhitungan modulus penampang prategang.


Zt

I
=
Yt

6792149.206
62.146

109293.938

cm3

Zb

I
=
Yb

6792149.206
52.854

128507.053

cm3

Perhitungan letak titik gali (kern) penampang prategang.


i2

I
=
A

6792149.206
4175

1626.862

cm2

kt

i2
=
Yb

1626.862
52.854

30.780

cm

kb

i2
=
Yt

1626.862
62.146

26.178

cm

Hasil perhitungan sifat-sifat penampang balok prategang


A

4175

cm2

6792149.206

cm4

Yt

62.146

cm

Zt

109293.938

cm3

Yb

52.854

cm

Zb

128507.053

cm3

115

cm

Kt

30.780

cm

cm

Kb

26.178

cm

1626.862

Perhitungan sifat-sifat penampang komposit


-

Lebar efektif plat lantai.


Untuk gelagar dalam dengan plat dikedua sisi gelagar :
be < L/4

25

be < l

Be<bw +

12 t

Diambil be yang terkecil


-

20

6.25 m

12

20

260 cm

2.6

Akibat perbedaan mutu beton antara plat lantai dan balok prategang maka perlu

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 10

disamakan kekuatan plat lantai dan balok prategang dengan mengalikan lebar efektif
(be) dengan modulus elastis beton (n).

E plat
E balok

4700
4700

f'c
f'c

4700
4700

25
50

*3) hal.9

0.707

Dengan demikian kekuatan plat dan balok dianggap sama untuk semua lebar plat dan
ditulis :
Le

= n be

Jadi lebar efektif :


=

0.707

Le

141.4

1.414

m =

141.4

cm

cm
20

Le

Yct
Garis netral komposit

Ycb

Gambar 4.8 Penampang komposit

Perhitungan letak garis netral penampang komposit


Luas penampang
Acomp (cm 2 )

No

Plat lantai
A1
=
=

Jarak ke serat atas


Y (cm)
Y1

141.4

20

= 1/2 t
=
10

Balok Prategang
A2
=
4175

Acomp =

28284.2712

2828.427
Y2

t
= Y + t
= 62.146

Yct

Statis momen
Sc = Acomp . Y (cm 3 )

Sc
Acomp

82.146

7003.427

Sc

371242.605
7003.427

342958.333
+ 20

53.009

371242.605

cm

Ycb = h + t - Yct

115 +

81.991

20

53.009

cm

Perhitungan momen inersia penampang komposit

I comp = I prategang + I plat

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 11

= Ib + (Ab . Y2) + (Ip + (Ap . Y2)


2

6792149.206

10336577.914

15662738.306

cm4

29.137

+ 1/12

141.4

20

+ 2828.427 43.00871

5326160.392

Perhitungan Modulus penampang komposit


Zct

I comp
Yct

15662738.306
53.009

295474.832

cm3

Zcb

I comp
Ycb

15662738.306
81.991

191029.284

cm3

Perhitungan letak titik gali (kern)


i2

4175

I comp
A comp

kct

kcb

i2
Ycb
i2
Yct

15662738.306
7003.427

2236.439
81.991

cm2

2236.439

= 27.27654

2236.439

= 42.19003

53.009

Hasil perhitungan sifat-sifat penampang komposit :


A comp

7003.427

cm2

I comp

15662738.306

cm4

Yct

53.009

cm

Zct

295474.832

cm3

Ycb

81.991

cm

Zcb

191029.284

cm3

kct

27.277

cm

kcb

42.190

cm

TAHAP II
Perhitngan tegangan-tegangan yang diakibatkan oleh beban mati yang harus dipikul oleh
balok prategang.
Tegangan-tegangan yang terjadi :
1. Akibat berat lantai kendaraan

Mp

6835937.5 kgcm

fpt =

Mp
Zt

6835937.5
109293.938

62.546

kg/cm2

fpb =

Mp
Zb

6835937.5
128507.053

53.195

kg/cm2

2. Akibat berat sendiri balok prategang

MG

8154296.88 kgcm

fGt =

MG
Zt

8154296.875
109293.938

74.609

kg/cm2

fGb =

MG
Zb

8154296.875
128507.053

63.454

kg/cm2

3. Akibat berat balok diagfragma

Md

937500

kgcm

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 12

fdt =

Md
Zt

937500
109293.938

8.578

kg/cm2

fdb =

Md
Zb

937500
128507.053

7.295

kg/cm2

Tabel perhitungan momen dan tegangan.

No

Momen (kg cm)

f t (kg/cm2)

f b (kg/cm2)

Mp

6835937.5

62.546

53.195

MG

8154296.875

74.609

63.454

Md

937500

8.578

7.295

Mt 1

15927734.38

145.733

123.944

TAHAP III

Perhitungan tegangan - tegangan akibat beban mati dan beban hidup yang dipikul oleh
penampang komposit.
Tegangan-tegangan yang terjadi :
1. Akibat lapisan aspal

fas

ts

fas t

fas b

M as
Zct

ts

fw t

fw b

Mw
Zct

fas

ts

1503906.25

kg cm

5.090

53.009 53.009

20

Mw

fw

ts

3.169

kg/cm2

1.441

kg/cm2

kg/cm2

2.314

295474.832
t

5.090

683593.75 kg cm

683593.75

kg/cm2

kg/cm2

7.873

191029.284

Yct Yct
Mw
Zcb

1503906.25

295474.832

2. Akibat air hujan

fw

1503906.25

Yct Yct
M as
Zcb

Mas

683593.75
191029.284

53.009 53.009

3.578

20

2.314

kg/cm2

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 13

3. Akibat beban hidup terotoar

ftr

ts

ftr t

ftr b

Mtr
Zct

Mtr

2343750

ts

fL t

fL b

2343750

Yct Yct
Mw
Zcb

ftr

ts

53.009 53.009

2343750

20

Mw
Zct

16982954.545

16982954.545

Mw
Zcb

fL

ts

53.009 53.009

16982954.55

kg/cm2

4.939

kg cm

kg/cm2

57.477

295474.832

Yct Yct

7.932

kg/cm2

12.269

191029.284
ML

kg cm

kg/cm2

7.932

295474.832

4. Akibat beban hidup/lalu lintas

fL

20

57.477

35.791

kg/cm2

kg/cm2

88.902

191029.284

Tabel perhitungan momen dan tegangan

No

Momen (kg cm)

f t (kg/cm2)

f b (kg/cm2)

f ts (kg/cm2)

Mas

1503906.25

3.169

7.873

5.090

Mw

683593.75

1.441

3.578

2.314

Mtr

2343750

4.939

12.269

7.932

ML

16982954.545

35.791

88.902

57.477

Mt 2

21514204.55

45.340

112.623

72.812

Momen total adalah :


M =

Mt1

+ Mt2

=
=

15927734.38

37441938.920

21514204.545
kg cm

Tegangan total adalah :


ft =

f1t

+ f2t

145.733

45.340

191.073

kg/cm2 (tekan)

fb =

f1b

+ f2b

123.944

112.623

236.567

kg/cm2 (tarik)

f ts =

72.812

kg/cm2 (tekan)

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 14

TAHAP IV
Perencanaan tendon prategang dan besarnya gaya prategang.
Dalam perencanaan tegangan tarik pada serat bawah beton prategang difungsikan, sehingga
yang ditahan oleh post-tensioning adalah :
f b post

b
= f total

236.567

201.217

fts
-

35.35
kg/cm2

Perkiraan letak kawat prategang diambil 15 % dari tinggi (h) balok dari bagian dasar
x = 15 % . H

= Y

0.15 .

115

17.25

52.854 -

35.604

cm
17.25
cm

Besarnya gaya prategang (F)


f bpost

201.217

F
A

Fe
Zb

F
4175

35.604
128507.053

389516.0973

kg

Dari tabel VSL digunakan tendon VSL unit type 19 dengan nomor starnds 14
(untaian 14 kawat) yang mempunyai kapasitas
=

196802.1

1930 KN atau

1930 x

101.97

kg pada beban putus 75 %

Jumlah tendon yang dibutuhkan (n) adalah :

F untuk 2 tendon

389516.0973
196802.10
=

2 x

2.0

196802.10 =

tendon

393604.20

> F =

389516.0973

kg

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 15

TAHAP V
Menentukan letak tendon dalam balok prategang kontrol harga e dan x
f b post

201.217

F
A

F. e
Zb

393604.20
4175

34.91

Yb

cm
e

X diambil
e

2X

52.85
=

X =

52.85

17.94

18

18

1 .
25
2

393604.20 x e
128507.053

10

cm
cm

34.91

1 .

12.5

34.91

cm

15

cm

115 cm

b
t
Y = 52.85cm Y = 62.146 cm

50 cm

34.91

cm

15
x =

17.94 cm

20
60 cm

Ganbar 4.9 Letak posisi tendon ditengah bentang


Tegangan yang terjadi akibat gaya prategang.
f Ft

F
A

F. e
Zt

393604
4175

393604
.
34.915
109293.938

-31.463

kg/cm2

(tarik)

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

f Fb

IV - 16

F
A

F. e
Zb

393604
4175

393604
.
34.915
128507.053

201.217

kg/cm2

(tekan)

Pada daerah tumpuan tendon direncanakan diletakkan pada daerah dimana terletak
titik berat balok prategang sehingga e pada c.g.s =0, karena jumlah tendon yang digunakan
ada dua buah maka tendon diletakkan masing-masing dibawah dan diatas titik berat penampang
balok prategang dimana jarak antara tendon adalah 32,5 cm diukur dari as ke as dari tendon.

Yt

32.5
Yb

Gambar 4.10 Letak tendon pada daerah tumpuan


TAHAP VI
Kontrol tegangan-tegangan yang terjadi pada serat atas dan serat bawah
A.

Pada saat pengecoran (dipikul oleh balok prategang)


a.

Pada saat pengecoran (dipikul oleh balok prategang)


ft =

fFt

-31.463 +

114.270

fb =

fFb

201.217 -

77.273

fgt

fpt

74.609 +
kg/cm2
fgb

63.454 kg/cm2

62.546 +

<
fpb

<

fdt

fci

8.578
300

kg/cm2

fdb

53.195 fci

7.295
300

kg/cm2

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 17

114.270

77.273
Gambar 4.11 Tegangan pada tengah bentang
b. Tegangan diperletakan (ujung balok)
Dari brosur VSL diperoleh untuk tipe tendon VSL 19 sc 19 tebal plat angker
= 265 mm, jadi tebal balok diperletakan diperbesar, bw = 265 + 2 . 100 = 465 mm
Diambil tebal badan (bw) = 48 cm

48 cm

15

Gambar 4.12 Dimesi penampang yang diperbesar pada perletakan


50 cm

II

II

1 cm

48 cm

IV

IV
V

III

20

6 cm

60 cm
Gambar 4.12 Dimesi penampang yang diperbesar pada perletakan

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 18

Perhitungan sifat-sifat penampang diperletakan titik berat penampang prategang


Luas penampang
Penampang (A)
cm 2

A1 =

50

15

A2 =

2( 1/2

1.0

A3 =

48

80

A4 =

2( 1/2

A5 =

60

Yb

750

7.5

5625

1)=

1.0

15.333

15.333

3840

55

211200

36

93.0

3348.000

1200

105

=
x

Statis Momen
(S=A.Y)
cm 3

6)=

20

A =

Yt

Jarak terhadap serat


Atas (y)
cm

S
=
A

346188.33
5827
Yt

= h -

59.411

115

55.589

= 1/12

I2

50

2 1/36

I3

= 1/12

I4

I5

346188.33

cm

59.411
cm

15
1.0

48

2 1/36

= 1/12

1.0
80

6
20

51.91107 2

750
3

6
60

1.0

3840

36

44.07774 2
4.411

33.58893 2

1200

45.589

Perhitungan momen inersia penampang prategang.


I1

126000

5827

2035132.271

cm4

3885.750155

cm4

2122717.113

cm4

81303.544

cm4

2534020.112

cm4

6777058.791

cm4

Perhitungan modulus penampang prategang.


Zt

I
=
Yt

6777058.791
59.411

114070.631

cm3

Zb

I
=
Yb

6777058.791
55.589

121913.830

cm3

Perhitungan letak titik gali (kern) penampang prategang.


6777058.791
5827

1163.044

cm2

2
= i =
Yb

1163.044
55.589

20.922

cm

2
= i =
Yt

1163.044
59.411

19.576

cm

i2

kt

kb

I
=
A

Statis momen terhadap garis netral


S

750
36

.
.

51.91107 +

33.58893 +

111831.823

cm

1.0
1200

.
.

44.07774 +

3840

4.411

45.589

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 19

Titik berat penampang komposit


Luas penampang
Acomp (cm2)

No

Plat lantai
A1
=

Y1
141.4

=
2

Jarak ke serat atas


Y (cm)

= 1/2 t
=
10

20

t
= Y + t
= 59.411

Y2

=
Acomp =
Yct

28284.2712

2828.427

Balok Prategang
A2
=
5827

Statis momen
Sc = Acomp . Y (cm3)

462728.333
+ 20

79.411

8655.427

Sc
Acomp

Sc

491012.605
8655.427

56.729

cm

+ 1/12

141.4

491012.605

Ycb = h + t - Yct

115 +

78.271

20

56.729

cm

Perhitungan momen inersia penampang komposit

I comp = I prategang + I plat


= Ib + (Ab . Y2) + (Ip + (Ap . Y2)
2

6777058.791

9774947.707

16045346.271

cm4

22.682

20

+ 2828.427

46.729

6270398.564

Perhitungan letak titik gali (kern) penampang komposit


i2

5827

I comp
A comp

16045346.271
8655.427

cm2

1853.790

kct

i2
Ycb

1853.790
78.271

= 23.68421

kcb

i2
Yct

1853.790
56.729

= 32.67807

Statis momen terhadap titik berat penampang composit.


S comp

2828.427

3840

18.27113 +

308224.507

46.729 +

750
36

.
.

29.22887 +

1.0

56.27113 +

1200

A =

5827

cm2

21.39554 +

68.27113

cm3

Jadi luas penampang balok diperletakan (ujung balok)

Untuk menghindari tegangan yang berlebihan pada bagian akibat gaya prategang maka
tendon dibengkokkan keatas hingga titik berat tendon berimpit dengan titik berat penam-

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 20

pang prategang. Jadi tegangan yang terjadi pada ujung balok (prategang) adalah tegangan merata akibat gaya prategang.

ft

F
A

393604.20
5827

67.548

kg/cm2

<

f ci

300

kg/cm2

fb

F
A

393604.20
5827

67.548

kg/cm2

<

f ci

300

kg/cm2

67.548

67.548
Gambar 4.13 Tegangan pada perletakan
B.
Pada saat beban hidup bekerja (dipikul oleh penampang komposit)

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 21

a.

Ditengah bentang
fcts

= fasts
=

5.090

=
fct

+ fwts
+

2.314

fFt

fpt

-31.463 +
+

4.939

fFb

fdt

+ fgt +

fpb

12.269 -

-19.605

fast

8.578

kg/cm2 <

fcs

fdb

+ fgb +

201.217 -

57.477

62.546 +

159.610

kg/cm2

64.880

fcb

+ fLts

fwt

ftrt

74.609 +

+ fLt

3.169

1.441

35.791

53.195 -

kg/cm2

225
fasb

fwb

7.295

63.454 -

fts

-35.35

ftrb

7.873

+ fLb
-

3.578

88.902
kg/cm2 <

kg/cm2

64.880
159.610

-19.605
Gambar 4. 14 Tegangan pada tengah bentang setelah beban hidup bekerja
b. Pada perletakan
fct

F
A

393604.20
5827

67.548

kg/cm2

<

f cs

225

kg/cm2

fcb

F
A

393604.20
5827

67.548

kg/cm2

<

f cs

225

kg/cm2

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 22

67.548

67.548
Gambar 4.15 Tegangan pada perletakan
TAHAP VII
Perhitungan kehilangan-kehilangan gaya prategang
1. Akibat relaksasi baja
D

fs1

7 % f nominal baja

Dimana :
f nominal =

1930 x

1.0197 .
1417

fs1

13888.645

7%

10
10

2.

-2.

kg/cm2

13888.645

972.2052

kg/cm2

2. Akibat perpendekan elastin beton

D fs2 = n

F
A

Es = Modulus elastis baja VSL =

1.98 .

Ec = Modulus elastis beton =


=

= Gaya prategang

= Luas penampang beton

= Es =
Ec

1.98 . 10
332340.187

4700

f 'c

4700

50

10

kg/cm2

33234.019

Mpa

332340.187

kg/cm2

393604.20

kg

cm2

4175

5.958

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 23

Afs2

F
A

= n

393604.20

5.958

4175
=

kg/cm2

561.68

3. Akibat penyusutan beton


D

fs3

= Cs .

Es

Dimana :
Cs =

200 .

10

Log 10 (28 + 2)

t = umur beton pada saat transfer diambil 28 hari


Es =

1.98 .

fe3

200 .
Log 10

10

10

1.98

(28 + 2)

. 10

kg/cm2

132

4. Akibat rangkak beton (creep)


D

fe4

= n .

f 'c

Dimana :
n

= perbandingan modulus elastis baja dan beton =

= Koofisien rangkak =

1.5
500 kg/cm2

f 'c = tegangan isin beton =


D

fe4

5.96 .

1.5

4470

kg/cm2

5.96

500

5. Akibat gesekan dan woobble effect dari tendon


D

fe4

= f pj

f ps

e-

Dimana :
f ps

= f pj .
e

2.7183

= koofisien rangkak =

0.2

= koofisien wobble =

0.0016

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 24

52.85

34.91
17.94
1/2 L = 13 M
Gambar 4.16 Lengkungan tendon dari ujung jacking
4 . fx

Y =

dy

(L-x)

L2

4fx2
L2

8fx

L2

Untuk :

4fx
L

4f

dx

x =

1/2 . L (ditengah bentang)

x =

0 (ujung bentang)

dy
dx

= 0

dy
dx

4f
L

0.0016

13

Jadi sudut kemiringan pada perletakan adalah


4f
L

a =

4 .

(a + kx)
f ps

(radian)

0.3491
25

= 0.055864

x 0.055864 +

= f pj .

f pj

0.2
e-

0.85

= 0.031173

0.0312

fpu
As

Dari tabel brosur VSL diperoleh untuk VSL unit type 19 dengan nomor strands 14
As =

14.17

cm2

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 25

fpu = Kekuatan baja pada beban (100%)


=
f pj

f ps

2500

e-

15291.90

2.7183

0.0312

15291.90

14822.56

kg/cm2

254925 kg
kg/cm2

0.0312

= f pj

10 2 =

1.0197 x

254925
14.17

0.85

= f pj .

fe4

f ps

15291.90

469.34 kg/cm2

14822.56

6. Akibat slip penjangkaran


D

fe4

Da . Es
l

Dimana :
Da = besarnya slip penjangkaran =
Es =
l

0.6

1980000

= panjang lengkungan tendon


l

L +

8 . f2
3
L

dimana :

20

35

69.104

= Panjang bentang
= Tinggi maximum lengkung

36.604

L
f

Gambar 4.17 Letak tendon pada tumpuan dan lapangan

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

IV - 26

f1 =

36.604 -

20

16.60

f2 =

69.104 -

35

34.10

Diambil f = f2 =

34.10 cm

0.34 m

Panjang lengkung tendon ( l )

fs4

25

8
3

0.6

0.341
25

25.0124 m =

2501.24 cm

x
1980000
2501.24

474.9643 kg/cm2

Total kehilangan gaya prategang


fs1 +

fs total =

fs2 +

972.2052 +

7080.19 kg/cm2

fs3 +

561.68 +

fs4 +
132 +

fs5 +

4470.00 +

fs6
469.34 +

474.9643

Persentase kehilangan gaya prategang


fs total

% fs total =

x 100 %

f pj

7080.19
15291.90

x 100 %

46.30 %

Besarnya gaya prategang awal yang harus diberikan


Fo =

100 % + 30.16 % =

130.16 %

512315.23 kg

130.16 %

393604.20

512315.23
2

Untuk 1 buah tendon =

256157.613 kg

Tegangan putus tendon VSL 19 Sc 14 =


Fo untuk 1 tendon =

256157.613 kg <

263082.6
263082.6

kg (aman)

Tegangan-tegangan akibat prategang awal


1. Pada tengah bentang (sebelum komposit)

Jurusan Teknik Sipil - UKIP

Perencanaan Bangunan Atas

fFOt =
=
fFOb=
=

IV - 27

130.16 %

x fFt

130.16 %

130.16 %

x fFb

130.16 %

-31.463

201.217

= -40.9529 kg/cm2

261.904 kg/cm2

2. Pada perletakan (sebelum komposit)


fFOt =
=
fFOb=
=

130.16 %
130.16 %
130.16 %
130.16 %

x fFt
x

67.548 =

87.92092 kg/cm2

x fFb
x

67.548 =

87.92092 kg/cm2

Kontrol tegangan setelah gaya prategang dipindahkan kebeton


1. Pada tengah bentang
f t = fFOt
=

-40.9529 +

f b = fFOb
=

+ f gt
74.609 =

2
33.656 kg/cm

< f ci =

2
300 kg/cm

63.454 =

2
198.450 kg/cm

< f ci =

2
300 kg/cm

+ f gb

261.904 -

2. Pada perletakan
f t = fFOt

2
87.92092 kg/cm

< f ci =

2
300 kg/cm

f b = fFOb

2
87.92092 kg/cm

< f ci =

2
300 kg/cm

Tegangan-tegangan yang terjadi pada tingkat beban kerja setelah komposit


1. Pada tengah bentang
f t = fFOt
=

+ f gt + f pt + f dt + f ast + f wt + f trt + f Lt

-40.9529 +

74.609 +

62.546 +

8.578

3.169

1.441

4.939

7.873

3.578

12.269 +

35.791
=

150.121 kg/cm2

f b = fFOb
=

< f ci =

2
300 kg/cm

+ fgb + fpt + fdt + fast + fwt + ftrt + fLt

261.904 +

63.454 +

53.195 +

7.295

88.902
=

498.471 kg/cm2

< f ci =

2
300 kg/cm

2. Pada perletakan
f t = fFOt

2
87.92092 kg/cm

< f ci =

2
300 kg/cm

f b = fFOb

2
87.92092 kg/cm

< f ci =

2
300 kg/cm

Jurusan Teknik Sipil - UKIP

PERENCANAAN JEMBATAN

III. 2. PERHITUNGAN PIER JEMBATAN


1

0.6

I
II

III

0.5

IV

8.75

0.5

V
22.6 m

19

6.85

6
VI

0.5

VII
VIII

1
1.5

1
1.5

A. BEBAN - BEBAN YANG BEKERJA PADA PIER


I. Berat jembatan
V = 267.24 ton
II. Berat sendiri pier
Bagian

Luas

Berat (ton)

I
II
III
IV
V
VI
VII
VIII

0.6
2
0.125
0.125
20
0.375
0.375
4

1.44
4.8
0.3
0.3
48
0.9
0.9
9.6

27.6

66.24

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
III. Beban akibat aliran air dan benda-benda hanyut
Tekanan air pada pier (P) = K . V2
P =

0.075

Gp = P . F =

6.43

3.106

Dimana : K = Koef. Bentuk = 0,075 (balok persegi)


V=
6.435 m/det

3.106
1 .

t/m2

6.85 )

21.273 ton

Penulangan Pier
1

0.6

I
II

III

0.5

IV

8.75

0.5

V
22.6

19

6.85

6
VI

0.5

VIII

1
1.5

Andi Burhanuddin/D11198107

VII

1
1.5

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Tabel perhitungan gaya geser dan momen
Beban

Jarak

Jarak

Mx = H . y.

My = V . x.

x (m)

y (m)

(ton)

(ton)

tm

tm

0
0
1.35
1

0
0
5.55
5.55
5.55
5.55
-

267.24
148.99
7.4494
40.087
2.1
46.182

0
0
41.3441495
222.4804219
11.655
256.3115153

0
0
40.095
6.72

22.3
21.5
20.833
20.833
11
1.1667
1.1667
0.5

1.44
4.8
0.3
0.3
48
0.9
0.9
9.6

0.72
0
0.2
0.2
0
0.9
0.9
0

21.273

197.483

117.09

729.274

Bangunan atas
a. Beban mati
b. Beban hidup
c. Gaya rem
d. Gaya gesek
e. Beban angin
f. Beban gempa
g. Beban merata
h. Plat injak

Rm
Gg
A
Gh
q

29.7
6.72

Bangunan bawah
a. Berat abutment
I
0.5
II
0
III 0.6667
IV
0.6667
V
0
VI
1
VII
1
VIII
0
b. Tekanan Air
Pa

9.2833
518.89

Andi Burhanuddin/D11198107

49.735

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Penulangan Pier
1

0.6

I
II

0.5

III

IV

8.75

0.5

V
22.6

19

6.85

II

III

II
6

VI

0.5

VII
VIII

1
1.5

1.5

III
I. Potongan I - I
Tabel perhitungan gaya geser dan momen
Beban

Berat G (ton)

Bangunan atas
Vertikal
452.6516761
Horisontal
95.81821381
Berat abutment
I
1.44
II
4.8
III
0.3
IV
0.3
V
48
507.4916761

Andi Burhanuddin/D11198107

Jarak y (m)

Mx = G . y.

0
2.1000

0.000
201.218

1.8000
1
0.333333333
0.333333333
0.25

2.592
4.800
0.100
0.100
12.000
220.8102490

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Dik : K 325

s'b =
n =

sa = 1740

U32

fo

sa
=
n . sb

eo1

M
220810
=
=
N
507492

eo2

eo

1
30

1740
19

e1

= C

110

0.4684
1

lk
100 . ht

= e + 1/2 ht - 0,05 =

= ht - 5 =

Ca
d

=
=

1.193
0.6

ea
h

1.1442
0.95

iA

= w.b.h

A = A' =

371.95
3.97

Andi Burhanuddin/D11198107

= 0.03 m

Dari tabel diperoleh C =


1
100 .

7.58

0.0758 m

0.6942 m

507491.68 .

19
1

0.15 m

ea

0.8325

ht = 7.58

= eo + e1 + e2 =

Ca

= 0.47

0.4684 m

= 0,15 . ht =

N ea =

kg/cm2

0.4351

1
30

. ht =

= eo1 + eo2 =

eo
ht

e2

110 kg/cm2
19

1.1442 m

1.1442 =

95

cm

95
=
. 580690
. 1740.0
)
)
=
=

580690 kgm

nw
f

=
=

1.2

0.7439
z =
0.852 (OK)

0.87

Dari tabel diperoleh i =

0.0392 .

= 93.7

1.193

100 .

3.97

95

cm2 (tulangan simetris)

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Dipilih tulangan=

19

25

cm2

113

II. Potongan II - II
Tabel perhitungan gaya geser dan momen
Beban

Berat G (ton)

Bangunan atas
Vertikal
452.6516761
Horisontal
95.81821381
Berat abutment
I
1.44
II
4.8
III
0.3
IV
0.3
V
45.6
Tekanan air
21.27285637
526.3645325
Dik : K 325

s'b =
n =

fo

sa
=
n . sb

eo1

M
=
N

eo2

1
30

eo

e1

= C

. ht =

5.2934
1

0
21.1000

0.000
2021.764

20.8000
20
19.33333333
19.33333333
9.5

29.952
96.000
5.800
5.800
433.200

8.283333333

176.210
2768.726

1
30

kg/cm2

110

2768726.472
526364.5325

= eo1 + eo2 =

eo
ht

e2

1740
19

Mx = G . y.

110 kg/cm2
19

sa = 1740

U32

Jarak y (m)

5.2601

= 0,15 . ht =

= 0.03 m

ht =

Dari tabel diperoleh C =

7.7

1
100 .

0.077

7.7

0.15 m

= eo + e1 + e2 =

ea

= e + 1/2 ht - 0,05 = 5.9704 m

Andi Burhanuddin/D11198107

5.2934 m

= 5.29

lk
100 . ht

0.8325

5.5204 m

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
N ea =
h

526364.53 .

= ht - 5 =

95

Ca
d

=
=

0.5128
1

ea
h

5.9704
0.95

iA

= w.b.h

19
1

3E+06 kgm

cm

95
. 3E+06
. 1740.0

Ca

A = A' =

5.9704 =

)
)

nw
f

=
=

0.5128

3.511
0.887

= 6.28
=

1755.5
1.47

Dipilih tulangan=

3f

0.89

Dari tabel diperoleh i =

0.1848 .

= 1194

z =
(OK)

100 .

1.47

95

cm2 (tulangan simetris)

25

12

1227

cm2

III. Potongan III - III


Berdasarkan pada momen guling, tahanan, gaya vertikal.
SMx
729.274
x =
=
= 1.4054 m
SVx
518.892
M = V . e + My

518.892 .

wx = 1/6 . b2 . h = 1/6 .

2.5 -

1.41 )

49.735 =

1.25 =

3.3333333 m3

smax =

V
A

M
518.892
=
+
w
5.250

617.69
3.3333

284.14

t/m

smin =

V
A

M
518.892
=
w
5.250

617.69
3.3333

= -86.471

t/m

617.69 tm

Beban - beban yang bekerja pada kaki abutment


q = 158.98 +
20.55 +
32.4
=

211.93 t/m2

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN

211.93

211.93

Menentukan momen maksimum

Mmaks = 1/8 . q . l2
=
N =
119.19
Dik : K 325
s'b =
n =

fo

sa
=
n . sb

eo1

M
=
N

eo2

1
30

1740
19

e1

= C

110

105963
119190
. ht =

= eo1 + eo2 =

eo
ht

e2

0.9224
1

= 0.03 m

Dari tabel diperoleh C =


1
100 .

7.69

0.0769 m

0.15 m

ea

= e + 1/2 ht - 0,05 =

Andi Burhanuddin/D11198107

0.8325

0.889

ht = 7.69

= eo + e1 + e2 =

= ht - 5 =

1
30

= 0.92

lk
100 . ht

119190

kg/cm2

0.9224 m

= 0,15 . ht =

N ea =

110 kg/cm2
19

sa = 1740

U32

eo

105.96 tm

.
95

1.1493 m
1.5993 m

1.5993 =

190616 kgm

cm

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Ca

Ca
d

=
=

2.0823
0.2

ea
h

1.5993
0.95

iA

= w.b.h

19
1

134.25
2

Dipilih tulangan=
A' = d . i . A =

95
. 190616
. 1740.0
)
)
=

nw
f

=
=

1.68

=
=

0.2685
z =
1.062 (OK)

0.85

Dari tabel diperoleh i =

0.0141 .
67.1

2.0823

100 .

95

cm2

25

20

245

cm2

12

20

57

cm2

26.9 cm2

Dipilih tulangan=

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Perencanaan Tiang Pancang
Data - data perencanaan
Elevasi Sondir
= +
71.25
Elevasi Kaki pier
= +
71.25
Elevasi tanah keras
= +
71.25
Direncanakan panjang tiang pancang
Data sondir :

Q =

qc . A
3

95

= 1/4 . 3,14 .

1256

60.25 m
1 =
10

10

A = 1/4 p d2

STf . K

=
-

95 kg/cm
450 kg/cm

=
Q =

11
11

qc =
STf =

m
m
=

450 .

( p . 40)
5

40

1256 cm2
=

51077

kg

51.077 ton

Jumlah tiang pancang


V
518.89
n =
=
Q
51.077

10.2

11 buah

0.50
1.25
1.25
0.50
1.00
Syarat

1.50

1.50

1.50

< 2,5 D
S 3,0 D

1.50

1.50

1.50

1.00

(min 0,60 m dan maks 2,00 m)

Sn = 150 cm

Andi Burhanuddin/D11198107

dan

Sm

= 125 cm

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
Menentukan Beban Akibat Momen Yang Dipikul Tiang Tengah

P1
P2

P0
P3

X3

X4

P4
P5

X2

X5

X1

P6
X6

M = 2 P1.X1 + P2.X2 + 2 P3.X3 + 3 P0. 0 + 2 P4.X4 + P5.X5 + 2 P6.X6


Analogi :
P2 : P1 = X1 : X2

P4 = P1. (X4/X1)

P2 = P1. (X2/X1)

P5 = P1. (X5/X1)

P3 = P1. (X3/X1)

P6 = P1. (X6/X1)

M = 2 P1.X1 + P1.(X22/X1) + 2 P1.(X32/X1) + 0 + 2 P1.(X42/X1) + P1.(X52/X1)


+ 2 P1.(X62/X1)

M = (P1/X1) (2X12 + X22 + 2X32 + 2 X42 + X52 + 2 X62)


P1 =

M. X1
2

(2X1 + X2 + 2X3 + 2 X42 + X52 + 2 X62)

DIMANA :
M =
729.27410

Andi Burhanuddin/D11198107

49.73500

679.53910

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
X1 =
X2 =
X3 =
PM =

4.5 m
3.0 m
1.5 m

( 2.

4.5 ^2

X4 =
X5 =
X6 =

679.53910 x 4.50
+ 2. 1.5 ^2 + 2. 1.5 ^2

3.0 ^2

3057.92596
108.00

PM =

1.5 m
3.0 m
4.5 m

3.0 ^2

+ 2. 4.5 ^2)

28.314 Ton

PMAKS =

V
n

PMAKS =

#REF!
11

+ 28.314

PMAKS =

#REF!

<

+ PM

QTanah

51.077

#REF!

Effisiensi Kelompok Tiang Pancang

C
A

1. Metode Feld
Effisiensi Tiang

A =

Effisiensi Tiang

B =

Effisiensi Tiang

C =

Effisiensi Tiang

D =

3
11
4
11
4
11
4
11

=
=
=
=

8
11
7
11
7
11
7
11

4 Buah Tiang

A = 4 x

Eff

A = 4

4 Buah Tiang

B = 4 x

Eff

B = 4

2 Buah Tiang

C = 2 x

Eff

C = 2

Andi Burhanuddin/D11198107

8
11
7
11
7
11

=
=
=

32
11
28
11
14
11
Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
1 Buah Tiang

D =

1 x

Eff

D =

7
11

Total Eff.
Effisiensi Satu Tiang =

7.3636
11

7
11

81
11

= 7.3636

= 0.6694

2. Metode Converse Labone Formulae


SFf . N

Dimana :

q
90

q =
m =
n =

SFf . N

=
=

40
125

Arc Tan
3
7
17.7
90

(n - 1) m + (m - 1) n
m .n

7 -

17.745

1 3 +
3 .

3 7

1 7

0.6996

Karena tiang juga mengandalkan friction, maka :


95

Q =

1256
3

0.6996

450 .

( p . 40)
5

47681

kg

47.681 ton

Q >

Q (

#REF! ton )

Kontrol dengan cara perpindahan :


1. Menentukan konstanta pegas
~ Konstanta pegas arah axial
Ap . Ep
Kv = a .
l
dimana :
a

Kv

l
D

0.041

0.27 =

2.2925

Ap

1256 cm2

Ep
l

=
=

6400 .
fck = 156767 kg/cm2
25 m =
2500 cm

2.2925

1256 .
156767
2500

= 180557

kg/cm

~ Konstanta pegas arah ortogonal


Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
K1

K2=K3 =
K4 =
E
I
b

4EI b3 =
2

2EI b
2EI b

29358.02518 kg/cm

=
=

2039996.384 kg/rad
283505802.8 kgcm/rad

156767 kg/cm
p
=
.
D4 = 125664
cm4
64
4
k.D
=
= 0.007195607 cm-1
4EI
ko . y-1/2

ko

= 0,2 . Eo . D-3/4 =

Eo

28

5.2812204 kg/cm2
5.2812

420 kg/cm2

N =

Untuk kemiringan tiang pancang dianggap qi = 0, hal ini adalah kondisi kritis pada
stabilitas abutment.
1. Menentukan koefisien matriks perpindahan
Axx = S (K1 cos2qi + Kv sin qi) = n . K1 =
322938.28
Axy = Ayx = S (Kv . K1) sin qi . cos qi =
0
Axa = Aax = S (Kv - K1) xi sin qi . cos qi - K2 cos qi = -n . K2 =
Ayy = S (K1 cos2qi + Kv sin qi) = n . Kv =
2

-22439960

1986123.8

Aya = Aay = S (Kv cos qi + K1 sin qi) xi +K2 sin qi) = 0


Aaa = S (Kv cos2qi + K1 sin2 qi) xi2 +(K2 + K3) xi . sin qi K4)
= SKv . x2 + SK4 =

3123032609

Formula Matriks perpindahan tiang pancang


Axx
Ayx
Aaa

Axy
Ayy
Aay

Axa
Aya
Aaa

322938.28
0
0
1986123.8
-22439960
0
dx
dy
a

=
=
=

dx
dy
d

Ho
Vo
Mo

-22439960.2
0
3123032609

dx
dy
a

117091
= 518892
729.274

0.7241569 cm
0.2612585 cm
0.0052035 rad

dxi' = dx cos qi - (dy + axi) sin qi = dx cos qi = dxi


dx1 = dx =
0.724156928 cm
dx2 = dx =
0.724156928 cm
dx = dx =
0.724156928 cm

Andi Burhanuddin/D11198107

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
dyi' = dx cos qi - (dy + axi) cos qi = (dy + axi)
dy1 =
0.729360455 cm
dy2 =
0.26125848 cm
dy3 =
0.190551604 cm
Pni = Kv . dyi
PN1 = 180556.71 .
PN2= 180556.71 .
PN3 = 180556.71 .

0.729360455 = kg
0.26125848 = kg
0.190551604 = kg

PHi = K1 dx - K2 a
PH1 = 10644.643 kg
PH2= 10644.643 kg
PH3 = 10644.643 kg
Mti = -K3 dxi + K4 a
Mt1 = -2047.648 kg m
Mt2= -2047.648 kg m
Mt3 = -2047.648 kg m
Penulangan Tiang Pancang
Penulangan tiang pancang dihitung berdasarkan kebutuhan pada waktu pengangkatan
a.

diangkat

L - 2a

M1

M3

M2
M1 = 1/2 . g . a2

Andi Burhanuddin/D11198107

g = Berat tiang pancang (kg/m) =

302 kg/m

Arif Hasan Akuba/D11198060

PERENCANAAN JEMBATAN
M2 = 1/8 . g . (L - 2a)2 - 1/2 g . a2
M1 = M2

1/2 .g. a2 = 1/8 . g . (L - 2a)2 - 1/2 g . a2


4a2 + 4a L - L2 =0
4a2 + 4a

10

L =

10

10

4 a2 +
40 a 100 =
0
Dengan rumus ABC diperoleh :
a1 =
2.0711
a2 = -12.071
(tidak memenuhi)
M1 = M2 =1/2 g. a2 =

b.

1/2 .

302 .

2.07

646.81 kgm

diangkat

Dari penurunan rumus diperoleh


persamaan :
2 a2 - 4 a L + L2
2a2 - 4a

L-a

10

=
-

10

2 a2 +
20 a 100 =
0
Dengan rumus ABC diperoleh :
a1 =
3.6603
a2 =
(tidak memenuhi)
-13.66

M1 = M2 =1/2 g. a2 =

1/2 .

302 .

Jadi keadaan yang paling menentukan adalah keadaan b. (Mmaks =


Penulangan diambil =
6 f
19

Andi Burhanuddin/D11198107

3.66

2020.3 kgm

2020.3 kgm)