You are on page 1of 4

HOME

ABOUT IORI MOCHIZUKI

EVACUATE

FORUM

KAWAII

DAILY NEWS

COLUMN OF THE DAY

BREAKING NEWS

BACKGROUND

EVACUATE

FORUM

KAWAII

The first floor of the steel framing of reactor4 cover was completed
Posted by Mochizuki on January 16th, 2013 4 Comments

FRIEND US

SUBSCRIBE

On 1/14/2013, Tepco completed the steel framing cover of reactor4 for fuel removal.

FOLLOW US

Search

0.00 (0:00 ~ 2:00 1/21/2013 NY time) 0.00 (0:00 ~ 2:00 2013/1/21 NY )

http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130115_01-e.pdf Iori Mochizuki _____ Franais : Le premier tage de linfrastructure dacier devant couvrir le racteur 4 est termin. Le 14 janvier 2013, Tepco a termin le premier tage de la charpente mtallique pour le retrait des combustibles du racteur 4.

Spotlight on the covered truth. Fukushima Diary's genuinely supported by donation like wikipedia. Please consider donating!
1 Bq Fukushima Diary wikipedia 100%

Thank you for your donation


$0.50 USD

Recurring Donations $3.00USD - monthly

http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2013/images/handouts_130115_01-e.pdf

Fukushima Diary now receives cheque and registered mail for cash at the address below.
converted by Web2PDFConvert.com

0.00 (0:00 ~ 2:00 1/21/2013 NY time) 0.00 (0:00 ~ 2:00 2013/1/21 NY )

Spotlight on the covered truth. Fukushima Diary's genuinely supported by donation like wikipedia. Thank you for considering donating!
1 Bq Fukushima Diary wikipedia 100%

PO box 487 ASHMORE CITY QLD Australia 4214 Recipient : C. Meskanen (Please make a cheque payable for this name because Iori doesn't have a bank account yet.) Currency : Any Thank you very much ! Fukushima Diary

PO box 487 ASHMORE CITY QLD Australia 4214 C. Meskanen ( )


Thank you for your donation $0.50 USD

Click for TEPCO live cam


Recurring Donations $3.00USD - monthly

Click here for JNN live cam

flo: on the good side: at least, it's not the first time, he gets such h ufs76: conclusion: my soeks is crap! ufs76: his inspector can

Fukushima Diary now receives cheque and registered mail for cash at the address below. PO box 487 ASHMORE CITY QLD Australia 4214 Recipient : C. Meskanen (Please make a cheque payable for this name because Iori doesn't have a bank account yet.) Currency : Any Thank you very much ! Fukushima Diary PO box 487 ASHMORE CITY QLD Australia 4214
C. Meskanen ( )

ufs76: my soeks cannot detect alpha radiation ufs76: *no higher than 0.12 ufs76: I tested fresh snow this morning > 0.12 microsv/hr

ufs76: this guy is getting high readings in UK http://www.youtube

ufs76: for those who can understand japanese http://www.yout

ufs76: http://north-shore-times.whereilive.com.au/news/story/rot

ufs76: http://news.discovery.com/earth/oceans/fridge-tsunami-d ufs76: treatment of ptsd

ufs76: nhk march to recovery on now http://www3.nhk.or.jp/nhk flo: however... uploader will read it anyway 36 users online

Posted in Daily News, Fukushima Plant situation reactor4, steel frame, tepco

Tags: 311, fuel, fukushima, japan, nuclear, radiation,

CATEGORIES
Background Breaking News Column of the Day

Tepco temporarily stopped updating the plant parameters of reactor2 including the temperature data 2.27 Sv/h from dog paws in Tokyo You can skip to the end and leave a response. Pinging is currently not allowed.

Correspondent

4 Responses to The first floor of the steel framing of reactor4 cover was completed
Jay says: January 16, 2013 at 2:52 pm
The huge size of those beams say they expect furter explosions or/and a major earthquake . But if thats so , shouldnt they expect as well the colapse of the Spent Fuel Pool , the water to drain and a start of Chernobyl-like nuclear fires ? Well see if they will install Water Pipes

Daily News Demonstration Earthquake Food Fukushima Plant situation Global consequences
converted by Web2PDFConvert.com

and Water Nozels on those beams as a preparation . If not , well have something to speculate about Reply

Global consequences Human right Incineration ash

NYCSteve says: January 17, 2013 at 6:30 am


One level in almost 2 years. I hope the next 3 levels are installed faster so TEPCO can finally mitigate the danger here. Reply

Map Media blackout Mutation Nuclear lobbying Plant

Iwanttolive says: January 17, 2013 at 12:59 pm


lol. Joke mitigation at work. In some sense, better than nothing, though if greater urgency were made known, more lives would be safe. In this sense, Japan is like China. Lives are like dimes and nickels. Reply

Publicity Radiation measurement Sanity Scientific report Sea contamination

Jay says: January 19, 2013 at 2:09 pm


The whole proposed new structure seems unstable , ready to topple , the size of those beams hanging over the SFP must put a lot of pull on the rest of the new structure that seats on the ground . Which brings us to how they fastened those huge beams to the existing pavement ? For such size one needs a Foundation of pilons but we didnt see that . Is the new structure mounted on the ground using just bolts ? If thats the case I bet the new stucture will topple on top of the SFP during a M8 because of the bolts being sheared ( the shear/scissor action acts on the weaker , cross section , of the special airplane-grade bolts ) . Iori , you are a civil engineer , what do you think ? Reply

self-defense self-defense Social movement Symptoms Uncategorized Unconfirmed reports Unusual phenomenon USA

RECENT POSTS

Leave a Reply
Name (required) Mail (will not be published) (required) Website

Issued thermometers in reactor2 indicate 208 and 134 Chinese media Military confrontation may happen soon between China and Japan 5 Bq/Kg from Fukushima apple juice and 5.8 Bq/Kg from Miso [Express] Doctors give no advice for health problems in Shirakawa city Fukushima Cesium and Iodine was measured from nearly 10% of breast milk from March to Sept of 2011

RECENT COMMENTS
kintaman on 5 Bq/Kg from Fukushima apple juice and 5.8 Bq/Kg from Miso Submit Comment kintaman on Chinese media Military confrontation may happen soon between China and Japan Joe Chapman on Chinese media Military confrontation may happen soon between China and Japan pat b on Chinese media Military confrontation may happen soon
converted by Web2PDFConvert.com

between China and Japan pat b on Issued thermometers in reactor2 indicate 208 and 134

Copyright 2012 Fukushima Diary - Life in Japan, after 3.11.11

Powered by WordPress | Designed by: penny auctions | Thanks to credit repair, seo services and st louis seo

converted by Web2PDFConvert.com

You might also like