South Capitol Street Corridor Project

Joint Bicycle and Pedestrian Advisory Council Meeting February 05, 2013

Agenda
State of the Existing Bridge Project Goals and Commitments Cost and Phasing Design Elements Challenges Delivery

February 05, 2013

Frederick Douglass Memorial Bridge


63-years-old, End of Useful Life Replacement Due to: o Age and Condition, o Functional Limitations, and o Importance to the Districts Transportation Network and Plans Deterioration Requires Repairs with Increasing Frequency, Cost and Traffic Impacts
December 12, 2012 3

Deterioration and Repairs


Trucks Restricted from Right Lanes Inspections every 6 months. Recent Inspection Identified $800,000 in Needed Repairs in 2013 $110 120 million in Major Repairs in 5 to 10 Years, Replacing the Swing Span Requires o Closing Bridge for More Than a Year o Re-routing More Than 70,000 Vehicles, Bicyclists and Pedestrians Daily
December 12, 2012 4

Environmental Impact Statement (EIS) Project Goals


Safety Multi-modal mobility Accessibility Economic development Creating Grand Urban Boulevard

February 05, 2013

Major Environmental Commitments


Consult with Section 106 Signatory Agencies and other Key Stakeholders Avoid, Minimize and/or Mitigate Adverse Effects on Plan of the City of Washington Design to Visually Maintain Historic LEnfant Plan Minimize Effects on Suitland Parkway Account for U.S. Department of Interior Standards for Historic Properties Salvage and Re-use Original Historic Materials Make a Good-faith Effort in Any Design Modifications to Avoid Historic Properties
February 05, 2013 6

Project Cost, Segments and Phasing


$906 Million Project Five segments to be delivered in two phases: o Phase 1: Segments 1 & 2 o Phase 2: Segments 3, 4 & 5

February 05, 2013

Phase 1 Design-Build Components


Segment 1 Build New Frederick Douglass Memorial Bridge, Traffic Oval and Circle Segment 2 Reconstruct Interstate 295 and Suitland Parkway Interchange

February 05, 2013

Key Stakeholders
Local Communities, Residents and Businesses Bicyclists / Pedestrians Motorists Federal Highway Administration U.S. Coast Guard U.S. Navy Army Corps of Engineers National Capital Planning Commission Commission on Fine Arts
February 05, 2013 9

Advisory Council on Historic Preservation National Park Service Washington Metropolitan Area Transit Authority DC Water U.S. Environmental Protection Agency District Department of the Environment State Historic Preservation Office

Project Progress Since FEIS


Final EIS Signed Record of Decision Early Land Acquisition Begun
o Phase I and II Site Assessments

March 2011 Pending January 2012 February 2012

Preliminary Engineering Begun


o o o o o
Preparing Preliminary Design Plans Geotechnical Investigations Survey (Topographic, Control, Utility) Type, Size and Location Studies for bridges Draft Financial Plan

February 05, 2013

10

Key Elements of Design


South Capitol Street Reconstructed as Grand

Boulevard New 6-lane Frederick Douglass Memorial Bridge New Traffic Oval West of the Anacostia River New Traffic Oval East of the Anacostia River Bicycle and Pedestrian Improvements Suitland Parkway/I-295 Interchange Rebuilt Howard Road and Firth Sterling Avenue Improvements

February 05, 2013

11

FEIS Bridge Alignment

February 05, 2013

12

Technical Design Challenges


Geotechnical/Foundation Conditions Bascule Span Design Environmental Remediation Maintenance of Traffic During Construction Constructability Utilities Permitting Coordination with Other Projects (DC Water and WMATA)

February 05, 2013

13

New Parallel Bridge Alignment

February 05, 2013

14

Anacostia River Navigation Study


Stakeholder coordination Minimum navigation clearance o Coast Guard o Moveable bridge o Navy o Fixed bridge o NU Star fuel pier o Adjacent marinas FHWA mandated cost benefit analysis for fixed v. moveable U.S. Coast Guard Permit

January 30, 2013

15

New Frederick Douglass Memorial Bridge

February 05, 2013

16

West Traffic Oval

February 05, 2013

17

East Traffic Circle and I-295/Suitland Parkway Interchange

February 05, 2013

18

Anacostia Waterfront Transportation Design Guidelines

February 05, 2013

19

Suitland Parkway/MLK, Jr. Avenue Interchange

Segment 3

February 05, 2013

20

Project Delivery Segments 1 and 2



Issue design-build RFQ Complete Preliminary Engineering Issue Draft Design-Build RFP Issue Final Design-Build RFP Select Design-Build Contractor Issue Notice to Proceed Project Completion 1st Quarter 2013 2nd Quarter 2013 3rd Quarter 2013 4th Quarter 2013 2nd Quarter 2014 4th Quarter 2014 Mid 2018

February 05, 2013

21

Questions

February 05, 2013

22

More Information
Internet: owww.anacostiawaterfront.org/SouthCapitolStreet Corridor Email: oDdot.awi@dc.gov Phone: o202-741-8528

February 05, 2013

23