ANALISA HARGA SATUAN

PEKERJAAN

1 M' TRANSPORT TIANG KE TITIK PANCANG


HARGA

URAIAN

NO.

1
2
3

SATUAN

Pekerja
Mandor
Alat bantu

Hari
Hari
Ls

KUANTITAS

SATUAN
(Rp.)

1.2500
0.3000
1.0000

JUMLAH
(Rp.)

50,000.00
90,000.00
2,500.00

JUMLAH

PEKERJAAN

62,500.00
27,000.00
2,500.00

92,000.00

1 M' PEMANCANGAN TIANG PANCANG


HARGA

URAIAN

NO.

1
2
3
4
5
6
7
8
9
10

SATUAN

Pekerja pancang
Operator
Pembantu operator
Juru ukur
Pelumas
Grease
Solar
Pile diesel hammer
Ponton pancang dan crane
Theodolit

Hari
Hari
Hari
Hari
Liter
Kg
Liter
Jam
Jam
Jam

Untuk 1 Hari Pemancangan Tiang Tegak


Untuk 1 Hari Pemancangan Tiang Miring

PEKERJAAN

KUANTITAS

13.0000
2.0000
4.0000
1.0000
8.0000
4.0000
300.0000
1.0000
1.0000
1.0000

SATUAN
(Rp.)

JUMLAH
(Rp.)

50,000.00
90,000.00
70,000.00
90,000.00
22,500.00
27,500.00
5,000.00
3,000,000.00
5,000,000.00
150,000.00

JUMLAH
35.0000 M'
30.0000 M'

650,000.00
180,000.00
280,000.00
90,000.00
180,000.00
110,000.00
1,500,000.00
3,000,000.00
5,000,000.00
150,000.00

11,140,000.00
318,285.71
371,333.33

1 BUAH SAMBUNGAN TIANG


HARGA

URAIAN

NO.

1
2
3
4
5
6
7
8
9

Pekerja
Mandor
Tukang
Kepala tukang
Besi plat
Kawat las
Ponton kerja
Mesin las
Alat bantu

SATUAN

Hari
Hari
Hari
Hari
Kg
Kg
Jam
Jam
Ls

KUANTITAS

1.0000
0.1000
1.5000
0.1500
10.0000
3.0000
0.2500
1.0000
1.0000

SATUAN
(Rp.)
50,000.00
90,000.00
80,000.00
90,000.00
32,500.00
27,500.00
200,000.00
100,000.00
2,500.00

JUMLAH
(Rp.)
50,000.00
9,000.00
120,000.00
13,500.00
325,000.00
82,500.00
50,000.00
100,000.00
2,500.00

JUMLAH

PEKERJAAN

752,500.00

1 BUAH PEMBUATAN SEPATU TIANG


HARGA

URAIAN

NO.

1
2
3
4
5

SATUAN

Pekerja
Tukang
Besi plat
Kawat las
Mesin las

Hari
Hari
Kg
Kg
Jam

KUANTITAS

SATUAN
(Rp.)

1.3500
1.0000
40.0000
7.0000
1.0000

JUMLAH
(Rp.)

50,000.00
80,000.00
32,500.00
27,500.00
100,000.00

JUMLAH

PEKERJAAN

67,500.00
80,000.00
1,300,000.00
192,500.00
100,000.00

1,740,000.00

1 M2 PENGECATAN TIANG PANCANG


HARGA

URAIAN

NO.

1
2
3
4
5
6
7

SATUAN

Pekerja
Mandor
Tukang
Kepala tukang
Cat primer marine paint
Minyak cat
Alat bantu

Hari
Hari
Hari
Hari
Kg
Liter
Ls

KUANTITAS

SATUAN
(Rp.)

0.2000
0.0100
0.3000
0.0300
0.4000
0.2680
1.0000

JUMLAH
(Rp.)

50,000.00
90,000.00
80,000.00
90,000.00
100,000.00
35,000.00
2,500.00

JUMLAH

PEKERJAAN

10,000.00
900.00
24,000.00
2,700.00
40,000.00
9,380.00
2,500.00

89,480.00

1 M3 BETON BERTULANG K - 300

HARGA
URAIAN

NO.

1
2
3
4
5

Pekerja
Tukang bongkar / rawat
Mandor
Tukang
Kepala tukang

SATUAN

Hari
Hari
Hari
Hari
Hari

KUANTITAS

6.2500
4.0000
0.3152
1.2500
0.1250

SATUAN
(Rp.)
50,000.00
45,000.00
90,000.00
80,000.00
90,000.00

JUMLAH
(Rp.)
312,500.00
180,000.00
28,368.00
100,000.00
11,250.00

6
7
8
9
10
11

Semen @ 50 kg
Batu pecah 1/2
Batu pecah 2/3
Pasir beton
Concrete mixer
Concrete vibrator

Zak
M3
M3
M3
Jam
Jam

8.5000
0.5100
0.3800
0.4800
0.5000
0.4000

60,000.00
500,000.00
450,000.00
250,000.00
50,000.00
35,000.00

JUMLAH

PEKERJAAN

510,000.00
255,000.00
171,000.00
120,000.00
25,000.00
14,000.00

1,727,118.00

100 KG PEMBESIAN
HARGA

URAIAN

NO.

1
2
3
4
5
6

SATUAN

Pekerja
Mandor
Tukang
Besi beton
Kawat beton
Pemotong besi

Hari
Hari
Hari
Kg
Kg
Ls

KUANTITAS

6.2500
0.6300
3.1300
110.0000
2.0000
1.0000

SATUAN
(Rp.)

JUMLAH
(Rp.)

50,000.00
90,000.00
80,000.00
17,500.00
20,000.00
20,000.00

JUMLAH

2,604,600.00
26,046.00

Untuk Biaya Per 1 Kg

PEKERJAAN

312,500.00
56,700.00
250,400.00
1,925,000.00
40,000.00
20,000.00

1 M2 CETAKAN BETON

HARGA
URAIAN

NO.

1
2
3
4
5
6
7
8

SATUAN

Pekerja
Mandor
Tukang
Kepala tukang
Multipleks 9 mm
Kayu kls. III
Paku
Alat bantu

Hari
Hari
Hari
Hari
Lembar
M3
Kg
Ls

KUANTITAS

0.2000
0.0100
0.5000
0.0500
0.3500
0.0350
0.2500
1.0000

SATUAN
(Rp.)

JUMLAH
(Rp.)

50,000.00
90,000.00
80,000.00
90,000.00
125,000.00
3,500,000.00
17,500.00
2,500.00

JUMLAH

PEKERJAAN

10,000.00
900.00
40,000.00
4,500.00
43,750.00
122,500.00
4,375.00
2,500.00

228,525.00

1 M3 BETON BERTULANG ISI TIANG PANCANG K - 300


HARGA

URAIAN

NO.

1
2

SATUAN

Beton K-300
Pembesian

M3
Kg

KUANTITAS

1.0000
260.0000

SATUAN
(Rp.)

JUMLAH
(Rp.)

1,727,118.00
26,046.00

JUMLAH

PEKERJAAN

1,727,118.00
6,771,960.00

8,499,078.00

1 M3 LANTAI DAN SELIMUT TIANG BETON BERTULANG


K - 300
HARGA

URAIAN

NO.

1
2
3

Beton K-300
Pembesian
Bekesting

SATUAN

M3
Kg
M3

KUANTITAS

1.0000
206.0000
5.4000

SATUAN
(Rp.)
1,727,118.00
26,046.00
228,525.00

JUMLAH

JUMLAH
(Rp.)
1,727,118.00
5,365,476.00
1,234,035.00

8,326,629.00