Hamilton County Public Works - Exhibit 33 Project Name: Project Address: Date: Designer:

Exhibit 33 PRE Q1 to POST Q10 Stage One Volume and Q1 Release EDIT GRAY CELLS - GREEN CELLS EQUAL RESULTS Data Required: a1 On-site pre-development drainage area (acres) section ST 711(d) (1) a2 Off-site drainage area (acres) section ST 711 (d) (1) a3 Total pre-development drainage area (acres) a4 On-site post development drainage area to release structure a5 Total post- development drainage area (acres) a2+a4 c1 On-site pre-development run-off coefficient, Section ST 711 (f) c2 Off-site pre-development run-off coefficent, Section ST 711 (f) c3 Adjusted pre-development run-off coefficent c4 On-site post -development run-off coefficent, Section ST 711 (g) c5 Off-site post-development run-off coefficent, Section ST 711 (g) c6 Adjusted post-development runoff coefficent tc1 Pre-development time of concentration. Exhibit No. 5 tc10 Post- development time of concentration, Exhibit No. 5 Pre-Development 1 Year Storm I1 = 3.33 in/hr Pre Q1 = 1.09 cfs

0.82 0.04 0.86 0.67 0.71 0.38 0.38 0.38 0.76 0.38 0.90 10.0 6.0

Maximum Release Rate

Storm Duration Producing Stage One Detention Storage Tc = 36.07 minutes Rainfall Intensity I10 = 2.88 in/hr Post Q10 Volume Volume = = = 1.84 2182 0.05 cfs cu.ft. acre ft. Peak Rate of Flow Post-Development Q10 Stage One Detention Storage Volume

You might also like