You are on page 1of 2

GENERAL MARITIME MANAGEMENT

BUNKERING PLAN M/T


HFO TANKS CAPACITY 95% ROB IN MT/LT BEFORE BUNKERING

PORT:
ROB IN MT/ML AFTER BUNKERING IN M/T, L/T RECEIVED

DATE:
REMARKS & SPECIAL INSTRUCTIONS Maximum accepted bunkering rate HFO: MT / bbls DO: MT / bbls 1.Follow the Bunkering Procedures as posted for safety and operational purpose. 2.Bunkering system valves to be opened before bunkering commenced:

TOTALS
D.O. TANKS

3.Bunkering system valves to be closed after bunkering completed:

Form: OP144

Rev. 01-09/04

Issued/Approved by: DPA/MD

Page 1 of 2

GMS - M7

GENERAL MARITIME MANAGEMENT

TOTALS PERSONNEL ON DUTY ENGINE


1) OILERS(s) 2) 4TH ENGINEER 3) 4) 3RD ENGINEER 2ND ENGINEER CAPTAIN 1) 2) 3) 4) CIIEF ENGINEER

DECK

Form: OP144

Rev. 01-09/04

Issued/Approved by: DPA/MD

Page 2 of 2

GMS - M7

You might also like