16-Sep-00
3 0.00 M
3 9.52 M
3 56.19 M
3 6.82 M
119.00 753 405 16 15.01 114.16 46.23 13 3/8 12.41 78.04 58.76 68 14 3/4 110.24 38.36 720 56.19 2.575 0 9.72 23.52 9.52 0.00 9.52 19.60 6.82 0.5067 0.1898
M3 Mts. Mts. Pulg. Pulg. Lts/Mto. M3 Pulg. Pulg. Lts/Mto. M3 Lbs/Pie Pulg. Lts/Mto. M3 Mts. M3 M3 Mts. M3 Lts/Mto. M3 M3 M3 Lts/Mto. M3 S/D S/D
VOL. FINAL DEL POZO SIN T.R./ T.P. VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. / T.P. VOL. DEL ACERO DESPLAZADO POR LA T.R.
FONDO PERFORADO 753 Mts.
84.59 M 34.41 M 119.00 M 9.72 M 75.10 M 44.13 M 18.92 M 0.00 M 28.64 M 56.19 M 63.05 M 119.23 M
3 3 3 3 3 3 3 3 3 3 3 3
VOL. FINAL DE LODO EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS C/T.R. EN EL FONDO. VOL. DESPLAZADO POR EL CEMENTO. VOL. DESCARTADO EN T.R'S. 16" Y 13 3/8" INCREMENTO DE VOL. POR T.R. Y CEMENTO VOL. FINAL LODO EN POZO CON T.R. CEMENTADA. VOL. FINAL EN PRESAS C/T.R. CEMENTADA. VOL. FINAL POZO Y PRESAS C/T.R. CEMENTADA
PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS P/CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR. 6.- BOMBEAR BACHE LAVADOR. 7.- MEZCLAR Y BOMBEAR LECHADAS DE CEMENTO (VOL = 20.13 M3) DENS. DE 1.89 / 1.90 Gr/cc. 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CMTO. 56.20 M3) 10.- ALCANZAR PRESION FINAL, SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO. NOTA : LA CEMENTACION DE LA T.R DE 13 3/8" SERA HASTA LA SUPERFICIE POR LO CONSIGUIENTE NO QUEDARA NADA DE LODO ENTRAMPADO .
NOTA:
SE REQUIERE EL APOYO DEL BARCO LODERO PARA PODER RECIBIR LOS VOLUMENES DESPLAZADOS
Y NICOLAS INFANTE P.
M3
3370.969 Mts.
T.R. 7 " 26 # / Ft D.I. 6.276" (0-4644) Mts. COLLAR DIFERENCIAL 4,624 Mts.
PROFUNDIDAD TOTAL VOLUMEN FINAL POZO Y PRESAS DIAMETRO DEL POZO CAPACIDAD INTERIOR AGUJERO DE 8.5" VOLUMEN TOTAL AGUJERO DESCUBIERTO LONGITUD DE LA T.R. 9 5/8 " DIAMETRO EXTERIOR T.R. 9 5/8" DIAMETRO INTERIOR T.R. 9 5/8" CAPACIDAD INTERIOR T.R. 9 5/8" VOLUMEN TOTAL EN T.R. 9 5/8" LONGITUD DEL COPLE DE DESPLAZAMIENTO DIAMETRO EXTERIOR T.R. 7 " DIAMETRO INTERIOR T.R. 7 " CAPACIDAD INTERIOR T.R. 7 " VOLUMEN TOTAL EN T.R. 7 " VOLUMEN TOTAL EN T.R. 7" HASTA EL COPLE VOLUMEN DEL COPLE AL FONDO CAPACIDAD ANULAR EN 9 5/8" Y 7 " VOLUMEN ANULAR EN 9 5/8" Y 7 " CAP. ANULAR EN AGUJ. 8.5" Y T.R 7" VOLUMEN ANULAR EN 9 1/2" Y 7 5/8" PESO T.R. 7 " VOLUMEN DE ACERO T.R. 7 5/8" FACTOR FACTOR VOLUMENES: VOL. FINAL DEL POZO SIN T.R. Y T.P. VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. VOL. DEL ACERO DESPLAZADO POR LA T.R.
3880 180 8 1/2 36.61 46.35 2614 9 5/8 8.681 38.18 99.82 3850 7 6.094 18.82 73.01 72.45 0.565 13.36 34.91 11.78 14.91 32 23.57 0.5067 0.1898
Mts. M3 Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. 3 M 3 M 3 M Lts/Mto. 3 M Lts/Mto. 3 M Lbs/Ft. 3 M S/D S/D
146.16 M 33.84 23.57 0.00 23.57 57.40 0.00 57.40 0.00 57.40 M M M M M M M M M 180.00 M
3 3 3 3 3 3 3 3 3 3 3
20 Mts.
VOL. DESPLAZADO POR EL CEMENTO. INCREMENTO DE VOLUMEN POR T.R. Y CEMENTO VOL. EN PRESAS CON T.R. ADENTRO.
8 1/2"
FONDO PERFORADO 4644 Mts.
VOL. EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS CON T.R. CEMENTADA. VOL. FINAL EN POZO CON T.R. CEMENTADA. VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA
PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR (3 M3). 6.- BOMBEAR BACHE LAVADOR. (5 M3). 7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO (LECHADA xx + xx DE BACHES = xx M3) DENS. DE 1.89 Gr/cc. 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = xx M3 / xx Bls) 10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO.
ELABORO:
NICOLAS INFANTE PEREZ / JUAN SAN ROMAN QUIMICOS CIA. M-I DRILLING FLUIDS
Vo. Bo.
ROYER QUINTANILLA MTZ ING. DE PROYECTO PEMEX.
3 23.21 M
3 100.02 M
3 63.82 M
PROFUNDIDAD TOTAL VOLUMEN FINAL POZO Y PRESAS DIAMETRO DEL POZO CAPACIDAD INTERIOR AGUJERO DE 12 1/4" VOLUMEN TOTAL AGUJERO DESCUBIERTO LONGITUD DE LA T.R. 13 3/8" DIAMETRO EXTERIOR T.R. 13 3/8" DIAMETRO INTERIOR T.R. 13 3/8" CAPACIDAD INTERIOR T.R. 13 3/8" VOLUMEN TOTAL EN T.R. 13 3/8" LONGITUD DEL COPLE DE DESPLAZAMIENTO DIAMETRO EXTERIOR T.R. 9 5/8" DIAMETRO INTERIOR T.R. 9 5/8" CAPACIDAD INTERIOR T.R. 9 5/8" VOLUMEN TOTAL EN T.R. 9 5/8" VOLUMEN TOTAL EN T.R. 9 5/8" HASTA EL COPLE VOLUMEN DEL COPLE AL FONDO CAPACIDAD ANULAR EN 13 3/8" Y 9 5/8" VOLUMEN ANULAR EN 13 3/8" Y 9 5/8" CAPACIDAD ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" VOLUMEN ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" PESO T.R. 9 5/8" VOLUMEN DE ACERO T.R. 9 5/8" FACTOR FACTOR BACHE LIMPIADOR. BACHE ESPACIADOR VOLUMENES:
2650 225 12 3/5 80.44 153.25 745 13 3/8 12.415 78.10 58.18 2620 9 5/8 8.68 38.18 101.17 100.02 1.145 31.16 23.21 33.50 63.82 47 23.64 0.5067 0.1898 5 5
Mts. 3 M Pulg. Lts/Mto. 3 M Mts. Pulg. Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. M3 M3 M3 Lts/Mto. M3 Lts/Mto. M3 Lbs/Ft. M3 S/D S/D M3 M3
VOL. FINAL DEL POZO SIN T.R. Y T.P. VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. VOL. DEL ACERO DESPLAZADO POR LA T.R. VOL. DESPLAZADO POR EL CEMENTO.
INCREMENTO DE VOLUMEN POR.CEMENTO Y BACHES.
211.43 M 13.57 M 225.00 M 23.64 M 88.18 M 98.18 M 37.21 M 188.20 M 125.39 M 100.02 M 225.41 M
3 3 3 3 3 3 3 3 3 3 3
30 Mts. 1.145 M
3
VOL. EN PRESAS CON T.R. ADENTRO. VOL. EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS CON T.R. CEMENTADA. VOL. FINAL EN POZO CON T.R. CEMENTADA. VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA
PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR ( +- 5 M3). 6.- BOMBEAR BACHE LAVADOR. (+- 5 M3). 7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO = VOL. DE LECHADA 501.8 BL / 79.79 M3 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = 100.02 M3 / 629.05 Bls) 10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO.
ELABORO:
Vo. Bo.
ING. FCO. RIOS HERNANDEZ . ING. PROYECTO. PEMEX. POZO ARENQUE -23.
Lts. Lts/Sco Sacos Sacos Ms el 0.20 % de exceso Kgs. 73,605 5,000 5,000 83,605 23,640.00 107,245 Lts. Lts. Lts. Lts. Lts. Lts. 139,100 73597.9 5000 3000 81597.9 23,640.00 105,237.88
VOLUMEN DE LECHADA BACHE LIMPIADOR BACHE ESPACIADOR SUMA VOL. DEL ACERO T.R. 9 5/8"
VOL. TOTAL POR DESPLAZAR
VOL. REQUERIDO DE LODO SIN PESO PARA AJUSTAR DENS. A 1.18 Gr/cc. PARA PROXIMA ETAPA
Volumen Pozo Con T.R. Cementada Volumen Necesario en Presas Para Iniciar a Perforar Volumen Total Para Iniciar a Perforar Densidad Inicial Volumen de Lodo Sin Peso Por Agregar Densidad del Lodo Sin Peso Densidad del Lodo Por Retirar Volumen de Lodo (1.24 gr/cc) Por Retirar Volumen Total Requerido de 1.18 Gr/cc Densidad Requerida Para Iniciar a perforar 54 70 124 1.24 ??? 0.90 1.24 ??? 124 1.18 M3 M3 M3 Gr/cc M3 Gr/cc Gr/cc M3 M3 Gr/cc
V1 D1 V2 D2 D3 V3 Vf Df
X X
V2 = V3 = 22 22
M3 DE LODO SIN PESO POR AGREGAR. M3 DE LODO DE 1.24 Gr/cc POR RETIRAR.
Vol. Y Dens. Resultante Vol. Lodo Inicial 139 Lodo Por Agregar 22 Resultante 161 Dens. 1.24 0.90 1.19376
Lts. Lts/Sco Sacos Sacos Ms el 0.11 % de exceso Kgs. 20,140 2,000 2,000 24,140 9,615 33,755 Lts. Lts. Lts. Lts. Lts. Lts.
VOLUMEN DE LECHADA BACHE LIMPIADOR BACHE ESPACIADOR SUMA VOL. DEL ACERO T.R. 7 5/8"
VOL. TOTAL POR DESPLAZAR
FECHA
16-Sep-00
CAPACIDAD TP 3 1/2" M
2670 160 8 1/2 36.61 -10.80 2965 9 5/8 8.535 36.91 109.44 1966 3663.7 7 6.189 19.41 893.38 38.15 -19.285 ###### 150 20.71 11.78 12.25 29 4.92 9.25 0.56 27.43 0.5067 0.1898 5 3 13.68
Mts. 3 M Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. 3 M Mts. Pulg. Pulg. Lts/Mto. Mts. 3 M 3 M Mts. Mts. M3 Lts/Mto. M3 Lbs/Ft. 3 M Lts/Mto. M3 3 M S/D S/D M3 3 M M3
(2636-2639) m
(2641-2645) m
(2647-2648) m
M M M M M M M
3 3 3 3 3 3 3 3 3 3 3
VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. 1.90 27.12 49.79 13.68 274.7 13.7 7.45 g / cc.
LTS/SCS LTS/SCS M3 SCS. TON. M3
160.00 M
DENSIDAD DE LA LECHADA RENDIMIENTO DE AGUA RENDIMIENTO DE CEMENTO VOL.DE LECHADA CANTIDAD DE SCS. CTO. TON. CEMENTO VOL. DE AGUA RENDIMIENTO DE PRODUCTOS.
VOL. DEL ACERO DESPLAZADO POR LA TR.Y TP VOL. DESPLAZADO POR EL CEMENTO Y BACHES VOL. EN PRESAS CON T.R. ADENTRO. VOL. EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS CON T.R. CEMENTADA. VOL. FINAL EN POZO CON T.R. CEMENTADA. VOL. PARA DESPLAZAR EL CEMENTO VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA
128.31 M 147.59 M
0.00 M 3 236.10 M
PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR (3 M3). 6.- BOMBEAR BACHE LAVADOR. (5 M3). 7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO (LECHADA 11 + 8 DE BACHES = 19 M3) DENS. DE 1.90 Gr/cc. 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = + - 18.66 M3 / 117 Bls) 10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO + - 24 HRS.
ELABORO:
CESAR MARIN ORTEGA. QUIMICOS CIA. M-I DRILLING FLUIDS
Vo. Bo.
COORDINADOR / I.T.P. (PEMEX)