FECHA

16-Sep-00

PLATAFORMA ARENQUE-A POZO :ARENQUE 23

CEMENTACION DE T.R. 13 3/8" - 12.41"


VOL. TOTAL POZO Y PRESAS PROF. TOTAL LONG. T.R. 16" D.E. T.R. 16" D.I. T.R. 16" CAP. INT. T.R. 16" (Lts/Mto) VOL. TOTAL EN T.R. 16" D.E. T.R. 13 3/8" D.I. T.R. 13 3/8" CAP. INT. T.R. 13 3/8" (Lts/Mto) VOL. TOTAL EN T.R. 13 3/8' PESO T.R. 13 3/8" DIAM. POZO CAP. INT. 14 3/4" VOL. TOTAL AGUJERO DESC. LONG. COPLE DE DESPLAZAMTO. VOL. TOTAL EN T.R. 13 3/8' HASTA EL COPLE VOL. DEL COPLE AL FONDO ALTURA CMTO. EN ESP. AN. ENTRE 16" Y 13 3/8" VOL. DE ACERO T.R. 13 3/8" CAP. AN. 16" Y 13 3/8"(Lt/Mto) VOL. AN. ENTRE 16" Y 13 3/8" VOL. AN. ENTRE 16" Y 13 3/8" A LA ALTURA CMTO. VOL. AN. ENTRE 16" Y 13 3/8" EN TRASLAPE CMTO. CAP. AN. 14 3/4" Y 13 3/8" (Lt/Mto) VOL. AN. TOTAL ENTRE 14 3/4' Y 13 3/8" FACTOR FACTOR VOLUMENES:
COPLE DESPL. (+/-) 720 Mts.
3 2.575 M

T.R. 30" 180 Mts. ALTURA DEL CMTO. 0 Mts.

3 0.00 M

T.R. 16" 405 Mts.

3 9.52 M

3 56.19 M

T.R. 13 3/8" 68.0 # / Ft D.I. 12.41" CAP. INT. 74.04 Lt/Mto.

3 6.82 M

119.00 753 405 16 15.01 114.16 46.23 13 3/8 12.41 78.04 58.76 68 14 3/4 110.24 38.36 720 56.19 2.575 0 9.72 23.52 9.52 0.00 9.52 19.60 6.82 0.5067 0.1898

M3 Mts. Mts. Pulg. Pulg. Lts/Mto. M3 Pulg. Pulg. Lts/Mto. M3 Lbs/Pie Pulg. Lts/Mto. M3 Mts. M3 M3 Mts. M3 Lts/Mto. M3 M3 M3 Lts/Mto. M3 S/D S/D

VOL. FINAL DEL POZO SIN T.R./ T.P. VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. / T.P. VOL. DEL ACERO DESPLAZADO POR LA T.R.
FONDO PERFORADO 753 Mts.

84.59 M 34.41 M 119.00 M 9.72 M 75.10 M 44.13 M 18.92 M 0.00 M 28.64 M 56.19 M 63.05 M 119.23 M

3 3 3 3 3 3 3 3 3 3 3 3

VOL. FINAL DE LODO EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS C/T.R. EN EL FONDO. VOL. DESPLAZADO POR EL CEMENTO. VOL. DESCARTADO EN T.R'S. 16" Y 13 3/8" INCREMENTO DE VOL. POR T.R. Y CEMENTO VOL. FINAL LODO EN POZO CON T.R. CEMENTADA. VOL. FINAL EN PRESAS C/T.R. CEMENTADA. VOL. FINAL POZO Y PRESAS C/T.R. CEMENTADA

PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS P/CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR. 6.- BOMBEAR BACHE LAVADOR. 7.- MEZCLAR Y BOMBEAR LECHADAS DE CEMENTO (VOL = 20.13 M3) DENS. DE 1.89 / 1.90 Gr/cc. 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CMTO. 56.20 M3) 10.- ALCANZAR PRESION FINAL, SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO. NOTA : LA CEMENTACION DE LA T.R DE 13 3/8" SERA HASTA LA SUPERFICIE POR LO CONSIGUIENTE NO QUEDARA NADA DE LODO ENTRAMPADO .

NOTA:

SE REQUIERE EL APOYO DEL BARCO LODERO PARA PODER RECIBIR LOS VOLUMENES DESPLAZADOS

ELABORO: LUCIANO ALVARADO

Y NICOLAS INFANTE P.

Vo. Bo. FCO. RIOS HDZ


SUPTTE. EN TURNO

I.T.F QUIMICO CIA. M-I DRILLING FLUIDS

POZO: ARENQUE -31 PLATAFORMA : ARENQUE A

2712,0919 Mts. Zpto T.R. 9 5/8" 3248 Mts.

M3

3370.969 Mts.

COLLAR DE DOBLE ETAPA 3398 Mts.

T.R. 7 " 26 # / Ft D.I. 6.276" (0-4644) Mts. COLLAR DIFERENCIAL 4,624 Mts.

PROFUNDIDAD TOTAL VOLUMEN FINAL POZO Y PRESAS DIAMETRO DEL POZO CAPACIDAD INTERIOR AGUJERO DE 8.5" VOLUMEN TOTAL AGUJERO DESCUBIERTO LONGITUD DE LA T.R. 9 5/8 " DIAMETRO EXTERIOR T.R. 9 5/8" DIAMETRO INTERIOR T.R. 9 5/8" CAPACIDAD INTERIOR T.R. 9 5/8" VOLUMEN TOTAL EN T.R. 9 5/8" LONGITUD DEL COPLE DE DESPLAZAMIENTO DIAMETRO EXTERIOR T.R. 7 " DIAMETRO INTERIOR T.R. 7 " CAPACIDAD INTERIOR T.R. 7 " VOLUMEN TOTAL EN T.R. 7 " VOLUMEN TOTAL EN T.R. 7" HASTA EL COPLE VOLUMEN DEL COPLE AL FONDO CAPACIDAD ANULAR EN 9 5/8" Y 7 " VOLUMEN ANULAR EN 9 5/8" Y 7 " CAP. ANULAR EN AGUJ. 8.5" Y T.R 7" VOLUMEN ANULAR EN 9 1/2" Y 7 5/8" PESO T.R. 7 " VOLUMEN DE ACERO T.R. 7 5/8" FACTOR FACTOR VOLUMENES: VOL. FINAL DEL POZO SIN T.R. Y T.P. VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. VOL. DEL ACERO DESPLAZADO POR LA T.R.

3880 180 8 1/2 36.61 46.35 2614 9 5/8 8.681 38.18 99.82 3850 7 6.094 18.82 73.01 72.45 0.565 13.36 34.91 11.78 14.91 32 23.57 0.5067 0.1898

Mts. M3 Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. 3 M 3 M 3 M Lts/Mto. 3 M Lts/Mto. 3 M Lbs/Ft. 3 M S/D S/D

146.16 M 33.84 23.57 0.00 23.57 57.40 0.00 57.40 0.00 57.40 M M M M M M M M M 180.00 M

3 3 3 3 3 3 3 3 3 3 3

20 Mts.

VOL. DESPLAZADO POR EL CEMENTO. INCREMENTO DE VOLUMEN POR T.R. Y CEMENTO VOL. EN PRESAS CON T.R. ADENTRO.

8 1/2"
FONDO PERFORADO 4644 Mts.

VOL. EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS CON T.R. CEMENTADA. VOL. FINAL EN POZO CON T.R. CEMENTADA. VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA

PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR (3 M3). 6.- BOMBEAR BACHE LAVADOR. (5 M3). 7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO (LECHADA xx + xx DE BACHES = xx M3) DENS. DE 1.89 Gr/cc. 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = xx M3 / xx Bls) 10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO.

ELABORO:
NICOLAS INFANTE PEREZ / JUAN SAN ROMAN QUIMICOS CIA. M-I DRILLING FLUIDS

Vo. Bo.
ROYER QUINTANILLA MTZ ING. DE PROYECTO PEMEX.

DRILLING FLUIDS DE MXICO

POZO : ARENQUE 23 PLATAFORMA : ARENQUE FECHA : 12- OCT- 00

CEMENTACION DE T.R. 9 5/8"

T.R. 13 3/8" 745 Mts.

3 23.21 M

3 100.02 M

3 63.82 M

PROFUNDIDAD TOTAL VOLUMEN FINAL POZO Y PRESAS DIAMETRO DEL POZO CAPACIDAD INTERIOR AGUJERO DE 12 1/4" VOLUMEN TOTAL AGUJERO DESCUBIERTO LONGITUD DE LA T.R. 13 3/8" DIAMETRO EXTERIOR T.R. 13 3/8" DIAMETRO INTERIOR T.R. 13 3/8" CAPACIDAD INTERIOR T.R. 13 3/8" VOLUMEN TOTAL EN T.R. 13 3/8" LONGITUD DEL COPLE DE DESPLAZAMIENTO DIAMETRO EXTERIOR T.R. 9 5/8" DIAMETRO INTERIOR T.R. 9 5/8" CAPACIDAD INTERIOR T.R. 9 5/8" VOLUMEN TOTAL EN T.R. 9 5/8" VOLUMEN TOTAL EN T.R. 9 5/8" HASTA EL COPLE VOLUMEN DEL COPLE AL FONDO CAPACIDAD ANULAR EN 13 3/8" Y 9 5/8" VOLUMEN ANULAR EN 13 3/8" Y 9 5/8" CAPACIDAD ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" VOLUMEN ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" PESO T.R. 9 5/8" VOLUMEN DE ACERO T.R. 9 5/8" FACTOR FACTOR BACHE LIMPIADOR. BACHE ESPACIADOR VOLUMENES:

2650 225 12 3/5 80.44 153.25 745 13 3/8 12.415 78.10 58.18 2620 9 5/8 8.68 38.18 101.17 100.02 1.145 31.16 23.21 33.50 63.82 47 23.64 0.5067 0.1898 5 5

Mts. 3 M Pulg. Lts/Mto. 3 M Mts. Pulg. Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. M3 M3 M3 Lts/Mto. M3 Lts/Mto. M3 Lbs/Ft. M3 S/D S/D M3 M3

COPLE DESPLAZAMIENTO (+/-) 2645 Mts.

VOL. FINAL DEL POZO SIN T.R. Y T.P. VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. VOL. DEL ACERO DESPLAZADO POR LA T.R. VOL. DESPLAZADO POR EL CEMENTO.
INCREMENTO DE VOLUMEN POR.CEMENTO Y BACHES.

211.43 M 13.57 M 225.00 M 23.64 M 88.18 M 98.18 M 37.21 M 188.20 M 125.39 M 100.02 M 225.41 M

3 3 3 3 3 3 3 3 3 3 3

30 Mts. 1.145 M
3

FONDO PERFORADO 2650 Mts.

VOL. EN PRESAS CON T.R. ADENTRO. VOL. EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS CON T.R. CEMENTADA. VOL. FINAL EN POZO CON T.R. CEMENTADA. VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA

PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR ( +- 5 M3). 6.- BOMBEAR BACHE LAVADOR. (+- 5 M3). 7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO = VOL. DE LECHADA 501.8 BL / 79.79 M3 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = 100.02 M3 / 629.05 Bls) 10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO.

ELABORO:

ING. NICOLAS INFANTE P. / CECILIO CERON C.


CIA. M-I DRILLING FLUIDS

Vo. Bo.

ING. FCO. RIOS HERNANDEZ . ING. PROYECTO. PEMEX. POZO ARENQUE -23.

POZO: ARENQUE -23 VOLUMEN DE LECHADA


PROFUNDIDAD TOTAL CAP. INT. DE TR DE 9 5/8" CIMA TEORICA EN TR DE 9 5/8" LONG. DEL CMTO. EN INT. DE TR DE 9 5/8" VOL. REQUERIDO PARA DESPLAZAR LECHADA VOL. CMTO. DENTRO DE LA TR DE 9 5/8" VOLUMEN ANULAR EN 13 3/8" Y 9 5/8" VOLUMEN ANULAR EN AGUJERO DE 12 1/4" Y 9 5/8" SUMA DE VOLUMENES DENSIDAD DE LA LECHADA EXCESO 2645 38.18 2620 25.00 100.02 1.15 23.21 63.8 88,175 1.89 0.20 Mts. Lts/Mto. Mts. Mts. M3 M3 M3 M3 Lts. Gr/cc. %

CANTIDAD DE SACOS CMTO. SACOS SACOS CANT. DE CMTO.

88,175.00 38.03 2319 2782 139,114

Lts. Lts/Sco Sacos Sacos Ms el 0.20 % de exceso Kgs. 73,605 5,000 5,000 83,605 23,640.00 107,245 Lts. Lts. Lts. Lts. Lts. Lts. 139,100 73597.9 5000 3000 81597.9 23,640.00 105,237.88

VOLUMEN DE LECHADA BACHE LIMPIADOR BACHE ESPACIADOR SUMA VOL. DEL ACERO T.R. 9 5/8"
VOL. TOTAL POR DESPLAZAR

Atte: NICOLAS INFANTE P / CECILIO CERON C. Qumicos en Turno. 12-Oct-00

VOL. REQUERIDO DE LODO SIN PESO PARA AJUSTAR DENS. A 1.18 Gr/cc. PARA PROXIMA ETAPA
Volumen Pozo Con T.R. Cementada Volumen Necesario en Presas Para Iniciar a Perforar Volumen Total Para Iniciar a Perforar Densidad Inicial Volumen de Lodo Sin Peso Por Agregar Densidad del Lodo Sin Peso Densidad del Lodo Por Retirar Volumen de Lodo (1.24 gr/cc) Por Retirar Volumen Total Requerido de 1.18 Gr/cc Densidad Requerida Para Iniciar a perforar 54 70 124 1.24 ??? 0.90 1.24 ??? 124 1.18 M3 M3 M3 Gr/cc M3 Gr/cc Gr/cc M3 M3 Gr/cc

V1 D1 V2 D2 D3 V3 Vf Df

124 1.24 X 0.90 1.24 X 124 1.18

(V1 * D1) + (V2 * D2) - (V3 * D3) = (Vf * Df)


124 1.24 153.8 153.8 X X 0.34 0.90 0.90 X X X 146.3 153.8 0.34 21.9 146.3 1.24 1.24 124 146.3 1.18

X X
V2 = V3 = 22 22

M3 DE LODO SIN PESO POR AGREGAR. M3 DE LODO DE 1.24 Gr/cc POR RETIRAR.
Vol. Y Dens. Resultante Vol. Lodo Inicial 139 Lodo Por Agregar 22 Resultante 161 Dens. 1.24 0.90 1.19376

172.36 19.6941176 192.054118

ATENTAMENTE: QUIMICOS EN TURNO

ARENQUE 23 VOLUMEN DE LECHADA


PROFUNDIDAD TOTAL CAP. INT. DE TR DE 13 3/8" CIMA TEORICA EN TR DE 13 3/8" LONG. DEL CMTO. EN INT. DE TR DE 13 3/8" VOL. REQUERIDO PARA DESPLAZAR LECHADA VOL. CMTO. DENTRO DE LA TR DE 13 3/8" VOL. ANULAR EN TR DE 16" Y TR DE 13 3/8" VOL. ANULAR EN AGUJ. DE 14 3/4" Y TR DE 13 3/8" SUMA DE VOLUMENES DENSIDAD DE LA LECHADA EXCESO 745 78.04 720 25.00 56.19 1.95 9.52 6.7 18,137.16 1.89 0.11 Mts. Lts/Mto. Mts. Mts. M3 M3 M3 M3 Lts. Gr/cc. %

CANTIDAD DE SACOS CMTO. SACOS SACOS CANT. DE CMTO.

20,140.00 38.3 526 584 29,185

Lts. Lts/Sco Sacos Sacos Ms el 0.11 % de exceso Kgs. 20,140 2,000 2,000 24,140 9,615 33,755 Lts. Lts. Lts. Lts. Lts. Lts.

VOLUMEN DE LECHADA BACHE LIMPIADOR BACHE ESPACIADOR SUMA VOL. DEL ACERO T.R. 7 5/8"
VOL. TOTAL POR DESPLAZAR

Atte: LUCIANO ALVARADO NICOLAS INFANTE Qumicos en Turno.

FECHA
16-Sep-00

POZO: lomitas No. 269 EQUIPO No. 325 FECHA: 25-sept-05

CEMENTACION DE T.R.LINER 7"


PROFUNDIDAD TOTAL VOLUMEN FINAL POZO Y PRESAS DIAMETRO DEL POZO CAPACIDAD INTERIOR AGUJERO DE 8.5 VOLUMEN TOTAL AGUJERO DESCUBIERTO LONGITUD DE LA T.R.9 5/8 DIAMETRO EXTERIOR T.R.9 5/8 DIAMETRO INTERIOR T.R. 95/8 7 5/8" CAPACIDAD INTERIOR T.R. 95/8 7 5/8" VOLUMEN TOTAL EN T.R. 95/8 7 5/8" LONGITUD DE BL 7" AL COPLE LONGITUD DEL COPLE DE DESPLAZAMIENTO DIAMETRO EXTERIOR TR 7" DIAMETRO INTERIOR TR 7" CAPACIDAD INT. TR 7" LONGITUD TR L. 7" VOL.TOTAL L. 7" HASTA EL COPLE VOLUMEN TOTAL DEL COPLE AL FONDO LONGITUD DE TRASLAPE LONGITUD DE TR 7 5/8" 9 5/8 AA LA BL BL. VOL.ANULAR TR 8.5"-TR 7" CAPACIDAD ANULAR AG.8.5"-TR 7" VOL.ANULAR AGUJERO 8.5" Y LIN.7" PESO T.R.7" VOLUMEN DE ACERO LINER 7" CAPACIDAD INT.TP 5" VOL.DESP.POR EL ACERO TP 5" 19.5 Lb/Ft. VOL.INT. TP 5" FACTOR FACTOR VOL.BACHE LAVADOR (2560-2561) m VOL.BACHE ESPACIADOR VOL.DE LECHADA
(2626-2627) m

CAPACIDAD TP 3 1/2" M

2670 160 8 1/2 36.61 -10.80 2965 9 5/8 8.535 36.91 109.44 1966 3663.7 7 6.189 19.41 893.38 38.15 -19.285 ###### 150 20.71 11.78 12.25 29 4.92 9.25 0.56 27.43 0.5067 0.1898 5 3 13.68

Mts. 3 M Pulg. Lts/Mto. M3 Mts. Pulg. Pulg. Lts/Mto. 3 M Mts. Pulg. Pulg. Lts/Mto. Mts. 3 M 3 M Mts. Mts. M3 Lts/Mto. M3 Lbs/Ft. 3 M Lts/Mto. M3 3 M S/D S/D M3 3 M M3

(2636-2639) m

(2641-2645) m

(2647-2648) m

VOLUMENES: VOL. FINAL DEL POZO SIN T.R. Y T.P.


FONDO PERFORADO 2906 Mts.

98.64 61.36 5.47 21.68 66.83 88.51

M M M M M M M

3 3 3 3 3 3 3 3 3 3 3

VOL. EN PRESAS ANTES DE METER LA T.R. SUMA VOLS. POZO Y PRESAS SIN T.R. 1.90 27.12 49.79 13.68 274.7 13.7 7.45 g / cc.
LTS/SCS LTS/SCS M3 SCS. TON. M3

160.00 M

DENSIDAD DE LA LECHADA RENDIMIENTO DE AGUA RENDIMIENTO DE CEMENTO VOL.DE LECHADA CANTIDAD DE SCS. CTO. TON. CEMENTO VOL. DE AGUA RENDIMIENTO DE PRODUCTOS.

VOL. DEL ACERO DESPLAZADO POR LA TR.Y TP VOL. DESPLAZADO POR EL CEMENTO Y BACHES VOL. EN PRESAS CON T.R. ADENTRO. VOL. EN POZO CON T.R. ADENTRO VOL. FINAL EN PRESAS CON T.R. CEMENTADA. VOL. FINAL EN POZO CON T.R. CEMENTADA. VOL. PARA DESPLAZAR EL CEMENTO VOL. TOTAL POZO Y PRESAS CON T.R. CEMENTADA

INCREMENTO DE VOL. POR T.R, CEMENTO Y BACHES 27.15

128.31 M 147.59 M

0.00 M 3 236.10 M

PROGRAMA OPERATIVO:
1.- UNA VEZ INTRODUCIDA LA T.R. AL FONDO, SENTAR T.R. DEJANDO +/- 50 % DE SU PESO EN BLOCK. 2.- LEVANTAR +/- 2 Mts. ARRIBA DEL FONDO (POR LA ELONGACION DE LA MISMA). 3.- CIRCULAR UN CICLO MIENTRAS SE REALIZAN PREPARATIVOS PARA CEMENTAR. 4.- EFECTUAR JUNTA DE SEGURIDAD CON PERSONAL INVOLUCRADO EN OPERACION. 5.- BOMBEAR BACHE ESPACIADOR (3 M3). 6.- BOMBEAR BACHE LAVADOR. (5 M3). 7.- MEZCLAR Y BOMBEAR LECHADA DE CEMENTO (LECHADA 11 + 8 DE BACHES = 19 M3) DENS. DE 1.90 Gr/cc. 8.- SOLTAR TAPON DE DESPLAZAMIENTO. 9.- INICIAR DESPLAZAMIENTO, (VOL. DE LODO REQUERIDO PARA DESPLAZAR CEMENTO = + - 18.66 M3 / 117 Bls) 10.- ALCANZAR PRESION FINAL. SI SE ALCANZA PRESION FINAL, DESCARGAR MISMA A CERO, VERIFICAR EQ. DE FLOTACION. 11.- ESPERAR TIEMPO DE FRAGUADO + - 24 HRS.

ELABORO:
CESAR MARIN ORTEGA. QUIMICOS CIA. M-I DRILLING FLUIDS

Vo. Bo.
COORDINADOR / I.T.P. (PEMEX)