11KV FEEDER CABLE TEST REPORT

CUSTOMER

: AHMADIAH CONTRACTING & TRADING CO. (Al-Khiran Pearl City Project) : SUBSTATION NO. : SUBSTATION NO. 40 41

CABLE END 1 CABLE END 2

TEST APPLIED R -YBE Y - RBE B - RYE

VOLTS

DURATION

LEAKAGE CURRENT ( m Amps ) 0.5 0.5 0.5

INSULATION RESISTANCE (2.5kV MEGGER) ( M W )


BEFORE PRESSURE TEST AFTER PRESSURE TEST

21KV DC 21KV DC 21KV DC

15 MINUTES 15 MINUTES 15 MINUTES

INF. INF. INF.

INF. INF. INF.

Remarks :

AL-AHLEIA SWITCHGEAR CO.


(CONTRACTOR)

BURO HAPPOLD
(CONSULTANT)

ACTC
(CUSTOMER)