You are on page 1of 114

FIXED OFFSHORE PRODUCTION FACILITIES ENGINEERING AND CONSTRUCTION

PROJECT REFERENCES

FIXED OFFSHORE PRODUCTION FACILITIES

INDEX

SAIPEM TODAY SAIPEMENGINEERING & CONSTRUCTION

4 6

FIXED OFFSHORE PRODUCTION FACILITIES 8 SAIPEM ASSETS: PROJECT MANAGEMENT AND ENGINEERING SAIPEM ASSETS: FABRICATION YARDS WORLDWIDE SAIPEM ASSETS: OFFSHORE CONSTRUCTION FLEET FLOAT-OVER METHOD FOR HEAVY WEIGHT DECK INSTALLATION FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES FIXED OFFSHORE PRODUCTION FACILITIES MAJOR ENGINEERING REFERENCES MAJOR ENGINEERING & PROJECT REFERENCES (BY COUNTRY)

16

20

24 28

32

88

96
3

Saipem today
Saipem today is a world leader in the global supply of engineering, procurement, project management, construction and drilling services with distinctive capabilities in the design and execution of large-scale offshore and onshore projects.
Saipem has a strong bias towards oil and gas frontiers, namely activities in harsh and remote areas, in deep waters as well as in extremely cold and hot environments, applying significant technological competences in many diverse fields such as gas monetization and heavy oil exploitation. Saipem is organized in two Business Units: Engineering & Construction and Drilling.

SAIPEM ENGINEERING & CONSTRUCTION


FOLLOWING AN AGGRESSIVE GROWTH STRATEGY, WHICH INCLUDED IN THE LAST DECADE THE ACQUISITION OF MANY CONSTRUCTION, TECHNOLOGY AND ENGINEERING COMPANIES, MOST PROMINENTLY OF SNAMPROGETTI, BOUYGUES OFFSHORE, SOFRESID AND MOSS MARITIME, SAIPEM HAS BECOME ONE OF THE WORLD LARGEST AND MOST COMPLETE ENGINEERING AND CONSTRUCTION COMPANIES IN THE GLOBAL OIL AND GAS MARKETS, ONSHORE AND OFFSHORE.

Ever since its initial steps in the fifties as the construction division of Snam, the pipeline company of the Eni Group in Italy, Saipem has pursued a systematic growth strategy, based on the development of internal assets, expertise and skilled resources, as well as on the acquisition of other players with their own asset bases, such as Micoperi in late eighties, and many others. In the last decade, Saipem has continued its growth by acquiring Bouygues Offshore and Sofresid in France, Moss Maritime in Norway, IDPE in India and Snamprogetti in Italy, and by carrying out a multibillion investment program into the expansion of its offshore construction and drilling fleets. Since the year 2000, Saipems market capitalization has grown more than sixfold and its revenues tenfold.(*) The organizational integration of this considerable asset base, namely the network of engineering centres, fabrication and support yards in several continents as well as the offshore construction fleet, has been completed gradually over the years - most recently with the creation of a unified Business Unit Engineering & Construction, an entity with over 30,000 employees (excluding corporate and BU Drilling staff) from over 100 nationalities, with over 60 permanent establishments

and numerous project execution centres around the globe, and with yearly revenues exceeding 10 billion /y; all held together by outstanding project management skills. Through the involvement of our global EP(I)C hubs in Milan, Rome and Fano (Italy), P aris (France) and Chennai (India), which operate in connection with a growing number of medium size and smaller regional engineering and project execution centres employing altogether over 7,000 engineers, Saipem balances high project execution quality with a competitive cost and - most importantly - with a major emphasis on local know-how and content. This well-integrated multicenter approach provides a consistent design and robust execution philosophy on all our projects worldwide. Top priority is provided throughout to all HSEQ aspects. Saipem therefore offers a complete range of project definition and execution services, offshore and onshore, particularly for the complex mega-projects required by the market today: from feasibility and conceptual studies to complex integrated solutions combining design, engineering, procurement, field construction, fabrication and offshore

installation; also revamps, upgradings, maintenance, decommissionings, reclamations and decontaminations. Saipem today operates in virtually every world market, often in remote locations with harsh environmental conditions and challenging logistics, leveraging on its proven experience across the most significant product lines in the oil and gas production onshore, offshore, in deepwater; gas and oil transportation via offshore and onshore pipeline systems; midstream, refining, chemicals, power generation from fossil as well as from renewable sources; environmental industries, maritime works and infrastructure. This new series, therefore, outlines Saipems integrated references in engineering and construction markets offshore and onshore, according to individual business and technology lines.

(*) Until Dec. 31, 2010


7

FIXED OFFSHORE PRODUCTION FACILITIES


SINCE ITS EARLY STEPS IN OFFSHORE MARKETS IN THE FIFTIES, SAIPEM HAS BECOME A LEADER IN DESIGNING AND INSTALLING THE HEAVIEST AND MOST MODERN OFFSHORE FACILITIES, WITH A TRACK RECORD TO DATE OF MORE THAN 90 MAJOR EPIC PROJECTS AND OVER 2.5 MILLION TONNES OF INSTALLED STRUCTURES.

Saipems consolidated experience in designing and installing offshore oil and gas production facilities dates back to the Companys earliest steps: in 1961 Saipem fabricated and installed Europes first offshore production platform off the shores of Sicily, followed by other such installations in the sixties and in the seventies in the Adriatic Sea for Agip, the initial lead customer.

In the following decade the market for fixed offshore oil and gas facilities grew substantially. To match those growing needs, Saipem effectively developed its skills and the required vessels and tools, to rapidly become a recognized international contractor, for both International and National Oil Companies.

Float out of the first European offshore platform, Licata, Italy, 1960
8

Indeed, since those early steps in the domestic and Mediterranean markets, Saipem has become a global market leader, having designed, built and installed hundreds of platforms, while excelling at both the heavy lift and the float-over techniques. Over its sixty years life, Saipem has thus evolved to become a complete offshore services provider, with distinctive capabilities in the design and execution of even the largest projects. This consolidated industrial model has led Saipem to successfully complete more than 60 EPIC platform projects over the last two decades, including drilling and production platforms with modular or integrated decks, wellhead and accommodation platforms, often as part of larger integrated offshore systems.

Following the above mentioned initial steps in the sixties and seventies, the main stepping stones during Saipems expansion in expertise and proprietary assets were: The South Bassain BPB Complex project in India (1986 - 1991), the Zuluf project (1981 - 1984) and the Safaniya GOSP 4 project (1990 - 1995) in Saudi Arabia, in partnership with Snamprogetti, along with Agips complex Bouri field development, offshore Libya, completed in 1988, confirmed the trend of Saipems involvement in supplying the full range of services, from engineering to procurement, construction, offshore installation and commissioning.

With the acquisition of Micoperi in 1990, the state-of-the-art semisubmersible heavy lift vessel Micoperi 7000 (rechristened Saipem 7000) joined Saipems fleet to lead the future world heavy lift market. Still today, Saipem 7000 is one of the world largest and most powerful heavy lift vessels. Indeed, in 1996 Saipem 7000 set the world heavy lift record at that time of lifting 10,400 t in DP mode (Dynamic Positioning), for the installation of the integrated deck of BPs Andrew platform in the North Sea. This project was also significant as it was the first of several projects executed under an alliance scheme with the Client, based on an innovative risk / reward contract mechanism.

10

The same technologies and assets typically used for fixed facilities were also employed in the ExxonMobils DianaHoover field development (1997 2000), a moored spar floating production platform standing in 1,480 m of water in the Gulf of Mexico. The Diana-Hoover project was the first example of supplying a package of integrated marine services on a major deepwater development, and marked the transformation of the Saipem 7000 to include J-lay. The specific challenges of the project included the installation in DP mode of the worlds largest deep draught caisson structure, of numerous topside modules ranging up to 8,790 t in weight, and of multiple flowlines and steel catenary risers, all performed by Saipem 7000.
11

Today, Saipems unique fleet of more than 40 construction vessels, with a balanced mix of high reliability and high technology units, stands out as a key element for the conservation and the strengthening of its leadership in this sector. The development of an in-house know-how to design, manage and optimally operate these assets, from the earliest steps in R&D and new vessels design to the maintenance and continuing upgrading of the ones in operation, has been a key factor of success in ensuring Saipems achievements.

Furthermore, nine fabrication yards, distributed in various locations worldwide, maximize the services provided close to the project sites. They also contribute to Saipems full control of the overall EPIC process, both for onshore and offshore projects, while providing maximum local content. These yards are normally able to support the offshore projects by fabricating specific or all parts of the fixed production systems, with an aggregate in-house fabrication capacity of over 200,000 t per year.

While developing its own fleet and a business model based on the local content maximization, the Company reinforced its engineering and project management capabilities in order to satisfy the market needs increasingly oriented towards large integrated EPIC and EPC projects. In the offshore sector, this was achieved through a number of acquisitions, such as that of Bouygues Offshore in 2002, as well as through a determined investment in training and skills development.

12

13

In most recent years, Saipem has designed and successfully executed several complex integrated projects, which combine the EPIC skills in many related fields. For example, the large-scale integrated projects of Bahr Essalam Full Field Development in Libya and the Kashagan Experimental Program in the Caspian Sea. New records for the offshore industry were established, such as the 12,150 t Sabratha deck combined lift performed by the Saipem 7000 in Libya, and the float-over of the 28,300 t deck of Piltun-Astokhskoye-B platform, Sakhalin II project, in Russia. A recent milestone is the 2011 award by Saudi Aramco of the multi billion Al Wasit project off the Saudi Arabian shores. This complex endeavor includes the design and construction of 12 wellheads, 2 tie-in and 1 injection platforms, a 260 km export trunkline offshore, a 120 km onshore pipeline, many service pipelines and cables, as well as the shore approaches. Today, Saipem has thus strengthened its position as one of the world leaders in this market segment.

14

15

SAIPEMS ASSETS: PROJECT MANAGEMENT AND ENGINEERING


A PILLAR OF THE COMPANYS INDUSTRIAL MODEL, IT ENABLES SAIPEM TO TAKE FULL RESPONSIBILITY FOR THE EFFECTIVE AND RELIABLE EXECUTION OF LARGE AND COMPLEX EPIC PROJECTS.

16

In the offshore markets Saipems role has evolved from a T&I operator in the early days to the present profile also as a fully integrated EPIC general contractor. This growth in the breadth of services provided to every client was achieved

initially through numerous acquisitions carried out in the last decade, most notably Bouygues Offshore, Sofresid, Moss Maritime, Snamprogetti, Idpe. Subsequently, this original infusion of powerful project management and

engineering capabilities was followed by a determined effort to upgrade the quality and the number of specialized personnel via training and hiring.

HIGH-TECH FLEET, UNIQUE IN GLOBAL MARKETS

STATE-OF-THE-ART KNOW-HOW AND TOP QUALITY ENGINEERING

STRONG PROJECT MANAGEMENT


BROAD, WELL-ROOTED, SUSTAINABLE PRESENCE IN STRATEGIC MARKETS WORLDWIDE LOCAL CONTENT MAXIMIZATION MAJOR EMPHASIS ON HSEQ CULTURE

17

Today, a worldwide network of more than 7,000 project management and engineering personnel is distributed over five main project hubs in Milan, Rome, Fano, Paris, and Chennai, and a number of specialized engineering centres close to the markets, such as Sharjah (UAE), and Jakarta (Indonesia).

More regional engineering centres are continuing to be established to support offshore projects in developing countries by involving and growing to the maximum extent local resources and expertise.

Saipem (Milan - Italy)

Saipem (Paris - France)

Saipem (Rome - Italy)

Saipem (London, Aberdeen - UK)

Snamprogetti Canada (Calgary - Canada)

Offshore Design Engineering (London - UK)

Saimexicana (Mexico City - Mexico)

Saipem (Basingstoke - UK)

Sofresid (Regional Offices - France)

Saipem Contracting Algrie (Algiers - Algeria)

Saipem (Vibo - Italy)

Saipem Brazil (Rio de Janeiro - Brazil)

18

EP(I)C HUBS ENGINEERING CENTRES

Saipem (Fano -Italy)

Saipem India Projects (Chennai - India)

Moss Maritime (Oslo - Norway)

Sairus (Moscow - Russia)

Snamprogetti Romania (Bucharest - Romania)

Saipem India Projects (New Delhi - India)

Saipem Mediterranean Services (Rijeka - Croatia)

Saipem Indonesia (Jakarta - Indonesia)

Saipem (Sharjah - UAE)

Saipem Contracting (Lagos States - Nigeria)

Deepwater Engineering and Technology (Luanda - Angola)

SA.LI.CO. (Tripoli - Libya)

19

SAIPEMS ASSETS: FABRICATION YARDS WORLDWIDE


CONTRIBUTE TO SAIPEMS FULL CONTROL OF THE OVERALL EPIC PROCESS AND PROVIDE MAXIMUM LOCAL CONTENT.

Saipem utilizes a large in-house fabrication capacity over 200,000 t per year distributed in various locations worldwide in order to maximize the services provided close to the project sites, while ensuring top competitiveness, as well as to reinforce the full in-house control of the EPIC chain, for both onshore and offshore projects, in order to minimize project risk. The yards in West Africa, Central Asia, Middle East, Canada and Brazil are witnesses to Saipems commitment to a permanent presence and significant local growth in countries deemed to be leading players in the future oil & gas markets. These yards are normally able to provide support to the offshore projects by fabricating specific or all parts of the fixed production systems. Dedicated improvement programs and investments continuously extend the range of services that these yards can provide.

Edmonton Yard Alberta, Canada

Under Construction Yard Brazil

FABRICATION YARDS (*) (*) Construction support facilities worldwide not included

20

Arbatax Yard Italy

Dammam Yard Saudi Arabia Kurik Yard Kazakhstan

Baku Yard Azerbaijan

Soyo Yard Angola Ambriz Yard Angola

Karimun Yard Indonesia

Pointe-Noire Yard Republic of Congo Rumuolumeni Yard Nigeria

21

The newest yard on Karimun Island, in Indonesia has been developed to guarantee the availability of a most competitive fabrication facility to fulfill any Saipem project need worldwide. The yard is capable of providing the full fabrication capacity needed for the largest and most complex offshore facilities. The fabrication facilities of Kurik in Kazakhstan and Baku in Azerbaijan contribute to Saipems leading role in the execution of complex projects in the north Caspian Sea, an area almost fully isolated and requiring original technical solutions. Four fabrication yards, established in Angola, Republic of the Congo, and Nigeria, witness Saipems historic and deeply rooted presence in West Africa. The Rumuolumeni Yard at Port Harcourt stands out as the largest fabrication facility in the region.

Saipems fabrication assets also include the Arbatax Yard and the Dammam Yard, conveniently located in the heart of the Mediterranean Sea and in Saudi Arabia, respectively. In Brazil, Saipem has acquired a site - strategically overlooking the most important Santos and Campos offshore basins - to develop a new yard for the fabrication of subsea and floating structures, which is complementary to the services provided by the highly specialized ultra-deep water fleet recently built by the company.

22

Karimun PT Saipem Indonesia, Karimun Island Yard, Indonesia. A top class yard for large offshore projects worldwide, with 30,000 t fabrication and 4,100,000 manhours capacities per year.

Rumuolumeni Saipem Contracting Nigeria, Rumuolumeni Yard, Nigeria. The largest yard in West Africa: - Over 1,000 employees (90% Nigerian) - 26,000 t fabrication capacity per year

Kurik Ersai, Kurik Yard, Kazakhstan. The Fabrication powerhouse for Saipems activities in the north Caspian Sea.

23

SAIPEM ASSETS: OFFSHORE CONSTRUCTION FLEET


SAIPEMS UNIQUE CONSTRUCTION FLEET COMBINED WITH ITS EXTENSIVE T&I ENGINEERING EXPERTISE PLACE THE COMPANY IN THE LEADING POSITION AS THE TOP OFFSHORE INSTALLATION GENERAL CONTRACTOR.

24

Out of a wholly owned fleet for offshore construction of over 40 units, Saipem owns and operates nine major lift vessels with lifting capacity performance ranging from around 1,000 t to 14,000 t in both the moored and dynamic positioning modes. Saipems flagship the Saipem 7000 is the most powerful vessel in the market with her industry benchmark lifting capacity of 14,000 t. Indeed, the world lifting record is held by the Saipem 7000 with the 12,100 t lift of the Sabratha platform integrated deck in the Mediterranean Sea. Her combined lifting / pipelaying capabilities provide the needed versatility to carry out large, complex and integrated projects.

25

26

Saipems fleet for heavy lift includes Castoro Otto and Saipem 3000 vessels, with over 2,000 t lifting capacity each. Thanks to the involvement in the Kashagan project in the north Caspian Sea, Saipem has also developed proprietary expertise, execution technologies and a dedicated fleet to carry out construction work in ultra shallow waters and in arctic like environments.

27

FLOAT-OVER METHOD FOR HEAVY WEIGHT DECK INSTALLATION


Used when a heavy integrated deck is transported to the offshore site by cargo bargeS and directly laid onto the pre-installed sub-structure legs by a suitable lowering system.

28

The float-over method allows for the installation in a single stage of massive platform decks fully pre-assembled at a yard when its weight exceeds the lifting capacity of the existing heavy lift fleet. Since its first application in the early nineties, Saipem has successfully completed 16 float-over installations, including groundbreaking achievements, such as:

The world record for heaviest weight deck mating in open sea (2002) The heaviest float-over in the Caspian (2005) The heaviesttopsideever installedby the float-over method (PA-B Platform, 28,300t) for Sakhalin II Phase II topsides project in the Russian Far East (2007) for Sakhalin Energy Investment Company Ltd. This achievement included the heaviest load-out support frame everbuilt, the greatestload-out operation and the biggest barge ever built for topside offshore transportation.

29

Float-over operations are either passive or active: the first ones are realized through fast ballasting with a lowering speed of 4m / hour; the second ones are applied where swell seas are present, through jacking systems with a lowering speed of 4m / min. Based on its extensive experience, Saipem has developed the Anteo System, an innovative proprietary active solution that ensures an improved and faster deck lowering operation - a key success factor in case of adverse environmental conditions - by a giant, fully recoverable, hydraulic jacking system.

30

31

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES


COUNTRY
Angola

CLIENT
Cabinda Gulf Oil Company

PROJECT
Farm Project - flare and relief modifications and hook-up on Takula and Malongo Areas platforms West Chirag Platform Anguille Field Redevelopment Project - AGM-N wellhead platform WHP and PQP Platforms for Ruby Field Gajah Baru Project Iraq Crude Oil Export Expansion Project - Phase 2 - CMMP Platform

Azerbaijan Gabon Indonesia Indonesia Iraq

AIOC Total Pearl Oil Premier Oil South Oil Company

GAJAH BARU PROJECT INDONESIA


The Gajah Baru field development included a Central Processing Platform, weighing a total of 12,900 t and installed by float over method, a Wellhead Platform, a connecting bridge and a 16 gas export pipeline 3 km long. The integrated EPIC contract was executed by Saipem as the leader in a consortium with PT SMOE Indonesia.

32

TOTAL WEIGHT[t]
1,500 41,600 1,200 8,800 17,000 12,600

SCOPE OF WORK MAIN VESSELS EMPLOYED


EPIC Fabrication and T&I EPIC T&I EPIC EPIC Saipem 3000 Castoro Otto Castoro Otto Castoro Otto Saipem 3000 - SB 230

ON STREAM
Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution

33

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Kazakhstan

CLIENT
Agip KCO

PROJECT
Kashagan Field Development Project - Experimental Programme hook-up and commissioning of facilities Kashagan Field Development Project - Experimental Programme - piles and flares Suriya-B Wellhead Platform and Pipeline Project

Kazakhstan Malaysia-Thailand JDA

Agip KCO Carigali Hess

KASHAGAN FIELD DEVELOPMENT PROJECT EXPERIMENTAL PROGRAMME - KAZAKHSTAN


Offshore and onshore integrated mega-project for the production of crude oil and associated gas, including: Offshore artificial islands for drilling, process and utility facilities An oil and gas export system to shore A new onshore processing facility. Saipem has been assigned several interconnected contracts for: The mobilization, installation and operation of Drilling facilities for multiple wells from the artificial islands The Engineering, Procurement, Construction and Installation of: The offshore and onshore sections of the oil and gas trunklines transport system from the artificial islands to the onshore processing facilities The fuel gas transportation from shore to the offshore islands and associated fibre optic cables, power cables and control umbilicals The production flowlines and associated fibre optic cables, power cables and control umbilicals interconnecting the artificial islands

34

TOTAL WEIGHT[t]
N.A. 65,800 2,700

SCOPE OF WORK
EPIC Fabrication and T&I T&I

MAIN VESSELS EMPLOYED


N.A. Caspian Fleet Castoro Otto

ON STREAM
Under Execution Under Execution Under Execution

The in-shore hook-up of the modular units part of the offshore facilities system - and their transportation and installation at site The fabrication, transportation & installation of additional components for the offshore facilities system, including structural piles, flares, pipe racks and other elements The hook-up and commissioning of the offshore facilities system.

35

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Mexico Myanmar Nigeria Norway Norway

CLIENT
Pemex SMOE Total Nigeria ConocoPhillips Skandinavia ConocoPhillips Skandinavia

PROJECT
KUIL-A, TSIMIN-A, TSIMIN-B and MALOOB-D Platforms Zawtika Platform Ofon Phase II - EPCI 8 Project Eldfisk II - wellhead, process and accommodation platform The Greater Ekofisk Area Development living quarters, bridge support and wellhead platforms Ekofisk 2/4-S Jacket and Tripod Removal Gudrun Sigrun Development Project - Gudrun platform Gullfaks A - drilling facilities change-out Valemon Topsides and Flare

Norway Norway Norway Norway

Statoil Statoil Statoil Statoil

36

TOTAL WEIGHT[t]
12,300 29,000 7,500 19,000 37,200 11,300 18,700 2,000 9,400

SCOPE OF WORK
T&I T&I EPIC T&I T&I T&I T&I T&I T&I

MAIN VESSELS EMPLOYED


Saipem 7000 Saipem 3000 Saipem 3000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000

ON STREAM
Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution

37

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Saudi Arabia

CLIENT
Saudi Aramco

PROJECT
Al Wasit Gas Program - Arabiyah and Hasbah Offshore Platforms, Pipelines and Cables

AL WASIT GAS PROGRAM - ARABIYAH AND HASBAH OFFSHORE PLATFORMS, PIPELINES AND CABLES - SAUDI ARABIA
ArabiyahandHasbah parts of Al Wasit Gas Program - areoffshorefieldslocatedinthe Arabian Gulf, approximately 150 kilometers northeast of Jubail industrial city in Saudi Arabia. Saipem is executing the engineering, procurement, fabrication and installation of the production and export facilities, comprising: 12 wellhead platforms 2 tie-in platforms 1 injection platform 36 inches 260 km export trunkline Approximately 200 km of mono-ethylene glycol (MEG) pipelines 200 km of subsea electric and control cables 40 km of offshore flowlines. The scope of work also includes the shore approaches and about 120 km of onshore pipelines. The larger structures will be fabricated in Saipems newbuilt Karimun yard in Indonesia, whereas other fabrication activities will be carried out in Star Fabricators Dammam Yard, Saudi Arabia, which is owned by Saipem together with Saudi partners.

38

TOTAL WEIGHT[t]
30,900

SCOPE OF WORK
EPIC

MAIN VESSELS EMPLOYED


Castoro II - Castoro Otto

ON STREAM
Under Execution

HASBAH FIELD

ARABIYAH FIELD

ABU ALI KHURSANIYAH WASIT PLANT

39

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Saudi Arabia

CLIENT
Saudi Aramco

PROJECT
Maintain Potential Facilities Long Term Agreement - Arabiyah, Hasbah, Abu Safa and Zuluf Fields - 5 plaform jackets

MAINTAIN POTENTIAL FACILITIES LONG TERM AGREEMENT SAUDI ARABIA


Within the context of the Maintain Potential Facilities Programme, aimed at maintaining the Countrys oil production capacity, Saipem was awarded a long term agreement for the construction, transport and installation of offshore facilities in the Kingdom. This contract is being executed by a consortium led by Saipem together with Saudi Arabian partners. A minimum guaranteed workload during the first four years of the agreement consists of 16 platforms and 80 km of sealines.

40

TOTAL WEIGHT[t]
7,000

SCOPE OF WORK
Fabrication and T&I

MAIN VESSELS EMPLOYED


Castoro II

ON STREAM
Under Execution

41

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
U.S.A. U.S.A. United Kingdom United Kingdom United Kingdom United Kingdom United Kingdom United Kingdom Vietnam Mexico Mexico Saudi Arabia

CLIENT
BP Exploration & Production Williams Field Services - Gulf Coast Company ConocoPhillips Elf Exploration UK Nexen Petroleum UK Talisman ConocoPhillips Elf Exploration UK PTSC Dragados Offshore de Mexico / Dragados Offshore Dragados Offshore de Mexico / Dragados Offshore Saudi Aramco

PROJECT
Mad Dog Drilling Rig Replacement Project Gulstar FPS - platform topsides Britannia Mono Column and Compression Module Elgin B Wellhead Platform Jacket Golden Eagle PUQ and Wellhead Platform Auk Development - Block 30/16 UK North Sea Jasmine Development Project - wellhead, accomodation and process platforms West Franklin Wellhead Platform Jacket Bien Dong 1 Development Project PG-ZAAP-C Project - power generation platform HA-LT-01 Project - living quarter platform Maintain Potential Facilities Long Term Agreement - Hasbah, Arabiyah and Karan Fields - 11 platform jackets Maintain Potential Facilities Long Term Agreement - Safaniya and Berri Fields platform jackets and mezzanine decks

Saudi Arabia

Saudi Aramco

42

TOTAL WEIGHT[t]
6,100 6,500

SCOPE OF WORK
T&I T&I T&I

MAIN VESSELS EMPLOYED


Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Castoro Otto Saipem 7000 Saipem 7000 Castoro II

ON STREAM
Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution 2011 2011 2011

5,400 30,500 6,000 30,400 5,400 42,500 9,700 7,600 13,400

EPIC T&I T&I T&I EPIC T&I T&I T&I Fabrication and T&I

2,700

Fabrication and T&I

Castoro II

2011

43

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Vietnam

CLIENT
PTSC

PROJECT
Block 12W - Chim Sao Development Project wellhead platform and sealines Single Central Platform and injection facilities in Block 2 PMXL-1 Mexilhao Gas Platform Libondo - wellhead platform and sealines Olowi Development Project Sabratha Platform Production Enhancement Project Phase 1 Valhall Re-development Project - production platform

Angola Brazil Congo Gabon Libya Norway

Total Exploration & Production Angola Companhia Mexilhao do Brasil Total Exploration & Production Congo C.N.R. International (Gabon) Mellitah Oil & Gas BP Norge

OLOWI DEVELOPMENT PROJECT GABON


In the frame of the development of the Olowi field, located 18 km off the coast of Gabon, 400 km south of Libreville, the project included the fixed portion of the Production Facilities and the installation of interconnecting subsea pipeline, riser and umbilical systems between the wellhead towers and the FPSO

44

TOTAL WEIGHT[t]
7,500 1,400 28,900 3,300 4,400

SCOPE OF WORK
T&I EPIC T&I EPIC EPIC EPIC

MAIN VESSELS EMPLOYED


Castoro Otto Crawler - Saipem 3000 - SB 230 Saipem 7000 Saipem 3000 - S 355 Saipem 3000 - Castoro II - S 355

ON STREAM
2011 2010 2010 2010 2010 2010

33,400

T&I

Saipem 7000

2010

45

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Saudi Arabia

CLIENT
Saudi Aramco

PROJECT
Maintain Potential Facilities Long Term Agreement - Zuluf Field platforms, jackets and flowlines and Safaniya Field trunkline Castor Underground Gas Storage Development Project - wellhead platform Baraka Field - platform and sealines Maamoura Platform and Sealines Buzzard Enhancement Project - production platform Topaz Development Project - wellhead platform and pipelines Black Tip Development Project

Spain Tunisia Tunisia United Kingdom Vietnam Australia

UTE ACS - Cobra Castoro Eni Tunisia Eni Tunisia Nexen Petroleum UK Petronas Carigali Eni Australia

Black Tip Development Project AUSTRALIA


Engineering,procurement,fabrication,installationandpre-commissioningof a Wellhead Platform, a 18 108 km long export pipeline and a condensate pipeline system for the development of theBlackTipproject.

46

TOTAL WEIGHT[t]
8,700 3,600 2,200 1,500 13,500 3,700 1,750

SCOPE OF WORK
Fabrication and T&I T&I T&I EPIC T&I T&I EPIC

MAIN VESSELS EMPLOYED


Castoro II Saipem 7000 Crawler Crawler Saipem 7000 Castoro Otto Castoro Otto

ON STREAM
2010 2010 2010 2010 2010 2010 2009

47

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Croatia

CLIENT
INAgip

PROJECT
INAgip Frame Agreement Campaign 2008 and 2009 Annamaria A platform topside and sealines North Belut Development Project - process platform topsides Eni E&P Frame Agreement 2004 / 2008 Adriatic Campaign Year 2008 Annamaria B platform jacket Eni E&P Frame Agreement 2009 - Annamaria B platform topsides and sealines Pearl Development Project - platform and sealines Coogee Resources Montara Project - wellhead platform and sealines Azeri, Chirag, Gunashli (ACG) Full Field Project Phase III Azeri, Chirag, Gunashli (ACG) Full Field Project Phase II

Indonesia Italy

ConocoPhillips Indonesia Eni E&P

Italy Vietnam Australia Azerbaijan Azerbaijan

Eni E&P PTSC Coogee Resources (Ashmore Cartier) AIOC AIOC

AZERI, CHIRAG AND GUNASHLI (ACG) FULL FIELD PROJECT - AZERBAIJAN


The ACG Full Field Project included the development of the Azeri, Chirag and Gunashli fields, located 120 km southeast of Baku, in water depths ranging from 100 m to 400 m. This massive development, executed in three overlapping phases, included the execution of six large platforms for drilling, production, utilities and accommodation. Saipem was a leading actor across all three phases, with a continuing commitment from 2001 to 2008, performing: The transportation of the six integrated platform decks and their installation at the site by float-over method The fabrication, transportation and installation of the six jackets, ranging in weight from 13,300 to nearly 16,700 t The fabrication, transportation and installation of other structures, such as drilling templates and platform linking bridges. Saipem achieved the heaviest float-over deck installation (15,850 t) and the heaviest jacket launch and installation (16,670 t) to date in the Caspian region. The fabrication activities were carried out in-house at the BOS Shelfs Baku Yard, and marked the heaviest roll-up operation in the Caspian to date. Saipems scope also included the refurbishment, upgrading and structural reinforcement of the construction barges provided by the Client.
48

TOTAL WEIGHT[t]
3,300 14,000 1,200 2,000 1,200 2,700 75,100 78,700

SCOPE OF WORK
T&I T&I T&I T&I T&I T&I Fabrication and T&I Fabrication and T&I

MAIN VESSELS EMPLOYED


S 355

ON STREAM
2009 2009

S 355 Crawler Castoro Otto Castoro Otto

2009 2009 2009 2008 2008 2008

49

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Congo Croatia Malaysia-Thailand JDA Congo Denmark Indonesia

CLIENT
Eni Congo INAgip Kencana HL Eni Congo Maersk Olie Og Gas BP Berau

PROJECT
Awa Paloukou - wellhead platform and sealines INAgip Frame Agreement Adriatic Campaign 2008 - Ana, Vesna, Irina platform topsides Bumi, Bulan and Suriya Wellhead Platforms and Interfield Lines Ikalou - platforms and sealines Halfdam Northeast Phase 3 Development - platforms Tangguh GPF Platforms and Onshore Site Facilities Project

TANGGUH GPF PLATFORMS AND ONSHORE SITE FACILITIES - INDONESIA


The first major EPIC award in the region, this project covered engineering, procurement, fabrication and installation of two platforms and two pipelines, part of the Tangguh Liquefied Natural Gas (LNG) project in the remote Berau Bay area, island of Papua, about 3,000 km east of Jakarta. The two 20 km pipelines connect the platforms to the LNG shore facilities.

50

TOTAL WEIGHT[t]
4,700 800 7,400 4,400 10,600 7,600

SCOPE OF WORK
EPIC T&I T&I EPIC T&I EPIC

MAIN VESSELS EMPLOYED


Castoro II - Saipem 3000 S 355 Castoro 10 - Castoro Otto Castoro II - Saipem 3000 Saipem 7000 Castoro Otto

ON STREAM
2008 2008 2008 2007 2007 2007

51

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Mexico

CLIENT
Pemex

PROJECT
KU-MALOOB-ZAAP Field Development - production platforms topsides and living quarter platforms Amenan Field Development - facilities extension

Nigeria

Elf Petroleum Nigeria

AMENAM FIELD DEVELOPMENT - NIGERIA


The EPIC project, executed in two subsequent phases, consists of the Amenam field facilities, 60 km offshore Bonny, and includes a production platform, a gas compression and injection platform, both installed by float-over method, two tripod platforms and several connecting bridges.

52

TOTAL WEIGHT[t]
38,700 14,700

SCOPE OF WORK
T&I EPIC

MAIN VESSELS EMPLOYED


Saipem 7000 Saipem 3000 - SB 230

ON STREAM
2007 2007

53

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Russia

CLIENT
Samsung Heavy Industries

PROJECT
Sakhalin II Phase 2 Development Project

SAKHALIN II PHASE 2 DEVELOPMENT PROJECT RUSSIA


The offshore portion of the Sakhalin II project in the Russian Far East - one of the biggest integrated oil and gas projects in the world - included the development of the Lunskoye and Piltun-Astokhskoye fields by fixed facilities, their connection via sealines to the Sakhalin Island shores, and an export oil terminal at Aniva Bay, in the southern part of the Island. Saipems involvement included: The engineering, procurement, construction and installation of oil and gas pipelines and subsea power and communication cables The transportation and installation of the huge LUN-A and PA-B platform topsides, securing to Saipem, in close sequence, the worlds records for the heaviest deck installation by float-over method. The 28,300 t PA-B integrated deck, installed in 2007, is still today the heaviest float-over operation ever undertaken worldwide. In parallel, Saipem successfully completed the major twin onshore pipeline system linking the offshore fields landfalls in the Northeast of the Island with the LNG Plant in the South. More recently, as part of the Sakhalin 3 project, Saipem has been awarded a contract for the subsea development of Kirinskoye Gas Condensate Field, off the east coast of Sakhalin Island, the first subsea development of this type in Russia.

54

TOTAL WEIGHT[t]
60,000

SCOPE OF WORK
EPIC

MAIN VESSELS EMPLOYED


Castoro Otto

ON STREAM
2007

55

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Canada Egypt Ivory Coast

CLIENT
ExxonMobil Canada Properties Petrobel CNR International (Cte dIvoire)

PROJECT
Sable Offshore Energy Project - Tier II Compression Platform Temsah NW2 Platform West Espoir Development - wellhead platform and sealines

SABLE OFFSHORE ENERGY PROJECT CANADA


The Sable Offshore Energy Project - the largest construction project ever undertaken in Nova Scotia - is located offshore Sable Island, approximately 250 km from Nova Scotia, and is divided into two tiers of offshore development. The first tier was completed in 1999 and involved the development of the Thebaud, North Triumph, and Venture fields. The second tier, including the development of Alma and South Venture fields, was completed in 2004. Saipems continued commitment across all phases, with a total of over 40,000 t of installed structures, consisted in the EPIC of Thebaud, North Triumph and Venture platforms (Tier I), along with a new compression platform (Tier II).

56

TOTAL WEIGHT[t]
12,800 5,300 3,000

SCOPE OF WORK
EPIC T&I EPIC

MAIN VESSELS EMPLOYED


Saipem 7000 Saipem 3000 Saipem 3000 - S 355

ON STREAM
2006 2006 2006

57

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Libya Nigeria

CLIENT
Agip Gas Mobil Producing Nigeria

PROJECT
Western Libya Gas Project - Sabratha Platform East Area Project EPC2A

WESTERN LIBYA GAS PROJECT SABRATHA PLATFORM - LIBYA


One of the largest Mediterranean offshore platforms ever built: 12,500 t integrated deck (establishment of a new world record for offshore lifting: 12,100 t) 23,000 t jacket, ranked among the world biggest offshore substructures ever constructed and installed. The contract for project management, engineering, procurement, fabrication, transportation & installation, hook-up & commissioning, start-up and six months of operational assistance, was awarded to a consortium of Saipem as the leader and Hyundai Heavy Industries. In parallel to the design and installation of the Sabratha Platform, the Western Libya Gas Project had also seen Saipems involvement in the design (Snamprogetti, now Saipem) and construction or laying of the GreenStream gas pipeline between Libya and Sicily, successfully completed in 2004, as well as for the completion of three additional EP(I)C projects: The offshore gatheringpipelines and theexporttrunklinesfrom the Sabratha Platform totheonshoreplant at Mellitah The SubseaProductionSystem,in JV with others The 6.66 mmscfd gas treatment and the 2 x 23,000 bopd oil production plant at Mellitah, completed in 2007.

58

TOTAL WEIGHT[t]
47,400 4,000

SCOPE OF WORK
EPIC EPIC

MAIN VESSELS EMPLOYED


Saipem 7000 - Crawler Saipem 3000 - S 355 - SB 230

ON STREAM
2006 2006

59

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Nigeria Thailand United Kingdom Azerbaijan China Croatia Denmark Qatar

CLIENT
Mobil Producing Nigeria PTT Exploration and Prodution Public Co. EniCanada UK AIOC Offshore Oil Engineering Co. INAgip Maersk SMOE

PROJECT
Yoho Development Projects EPC2 Third Transmission Pipeline Project - offshore platform system Buzzard Platforms Azeri, Chirag, Gunashli (ACG) Full Field Project Phase I Dong Fang and Lu Feng Fields - wellhead platform jackets and sealines Ika, Ida and Ivana gas Fields - unmanned gas platforms and sealines DAN FG Platform and Bridge PS-1K Platform

YOHO DEVELOPMENT PROJECTS EPC2 NIGERIA


Production facilities to develop the Yoho field, located in block OML 104, in water depths ranging from 65 to 90 m. The contractual scope of work included project management, engineering, procurement, construction, transportation and installation, hook-up and commissioning of one production platform, two wellhead platforms, one living platform, along with 20 km of subsea pipelines.

60

TOTAL WEIGHT[t]
22,700 13,600 49,100 66,300 1,300 8,600 11,400 13,500

SCOPE OF WORK
EPIC EPIC T&I Fabrication and T&I T&I T&I T&I T&I

MAIN VESSELS EMPLOYED


Castoro Otto - Saipem 7000 Castoro Otto Saipem 7000

ON STREAM
2006 2006 2006 2005

Castoro Otto Crawler Saipem 7000 Saipem 3000

2005 2005 2005 2005

61

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Thailand Indonesia U.S.A. U.S.A. United Kingdom Angola Denmark Malaysia Mexico Nigeria Nigeria Norway Norway Norway Libya

CLIENT
PTT Exploration and Prodution Public Co. TotalFinaElf ConocoPhillips ConocoPhillips BP Cabinda Gulf Oil Company Dong A/S Nippon Oil Dragados Offshore de Mexico/Dragados Offshore Agip Energy & Natural Resources Elf Petroleum Nigeria BP Statoil TotalFinaElf Compagnies des Petroles Total Libye

PROJECT
Bongkot Field Development Project Phase III C - package 2 - platforms and sealines Peciko Field Development Phase IV (PCK 4 EPSC2) - platforms and sealines Magnolia Tendons and Integrated Platform Magnolia TLP Piles Clair Phase I Development Project Kuito Developemnt Project Phase 2 A - installation of FPSO modules Nini and Cecilie Wellhead Platforms Helang Project - processing platform Cantarell EPC - 78B (AKAL-L) - production platform, flare and bridge structures Okpoho and Okono Fields Development - wellhead platform and sealines Amenam Field Development Valhall Jacket Repair and Topside Installation Kvitebjorn PDQ Platform K5PK Compression Platform BD-1 Platform

62

TOTAL WEIGHT[t]
8,400 10,900

SCOPE OF WORK
EPIC EPIC T&I

MAIN VESSELS EMPLOYED


Castoro 10 - Castoro II - Castoro Otto Castoro 10 - Castoro II - Saipem 3000 Saipem 3000 Saipem 7000 Saipem 7000 Castoro Otto - SB 230 Saipem 7000 Pearl Marine Saipem 7000 Castoro Otto Castoro Otto Saipem 7000 Saipem 7000

ON STREAM
2005 2004 2004 2004 2004 2003 2003 2003 2003 2003 2003 2003 2003 2003 2002

4,400 27,400 3,600 6,400 14,500 14,700 3,000 17,700 11,100 16,200 3,700 9,300

T&I T&I T&I T&I T&I T&I EPIC EPIC T&I

T&I EPIC

Saipem 7000

63

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Malaysia Norway Congo Ivory Coast Norway Norway Norway Norway Croatia Italy Norway Norway

CLIENT
Carigali-Triton Operating Company Aker Stord Agip Recherches Congo Ranger Oil Cote d'Ivoire Hyundai Heavy Industries Phillips Petroleum Co. Statoil Statoil INAgip Agip Norsk Hydro Produksjon Statoil

PROJECT
Cakerawala Project Valhall Water Injection Platform Foukanda and Mwafi Field Development - platforms and sealines Espoir Field Development - wellhead platform and sealines Hanze Integrated Production Deck Jade Platform Huldra Phase 1 - platform jacket Huldra Phase 2 - platform topsides Ivana E, B, and D Platforms and Sealines Frame Agreement 1999 / 2003 - Year 2000 - platforms Oseberg Sor Platform Asgard B - semisubmersible platform topsides

64

TOTAL WEIGHT[t]
52,400 6,800 5,800 2,300 7,100 6,300 8,100 4,300 1,000 12,800 25,100

SCOPE OF WORK
T&I T&I EPIC EPIC T&I T&I T&I T&I T&I T&I T&I EPC

MAIN VESSELS EMPLOYED


Castoro II - Pearl Marine Saipem 7000 Castoro Otto Castoro Otto Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Castoro II - Crawler Crawler - Pearl Marine Saipem 7000 N. A.

ON STREAM
2002 2002 2001 2001 2001 2001 2001 2001 2000 2000 2000 2000

65

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
U.S.A. Canada Canada Canada

CLIENT
Exxon Company Usa Mobil Oil Canada Properties Mobil Oil Canada Properties Mobil Oil Canada Properties

PROJECT
Diana Hoover Project - spar and flowlines Sable Offshore Energy Project Phase 3 Sable Offshore Energy Project Phase 2 Sable Offshore Energy Project Phase 1

DIANA HOOVER PROJECT GULF OF MEXICO


The major facility for the Diana Hoover deepwater field development included a moored production system in the form of a Deep Draft Caisson Vessel (DDCV), supporting about 22,000 t of drilling and production topsides. Saipem installed the massive DDCV, its mooring system, the topside modules, the flowlines, and the Steel Catenary Risers (SCR). The heavy lift and laying activities were both performed by Saipem 7000, converted in 1999 to a combination derrick and pipelaying vessel by the addition of the worlds largest J-lay tower for deepwater operations.

66

TOTAL WEIGHT[t]
64,600 14,600 8,000 5,600

SCOPE OF WORK
T&I EPIC EPIC EPIC

MAIN VESSELS EMPLOYED


Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000

ON STREAM
2000 1999 1999 1999

67

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Congo Croatia Ivory Coast Mexico Myanmar Nigeria Nigeria Norway Norway United Kingdom Australia Brunei Congo Congo Italy

CLIENT
Elf Congo INAgip Apache L.D.C. Pemex Texaco Myanmar Mobil Producing Nigeria Mobil Producing Nigeria Norsk Hydro Produksjon Phillips Petroleum Co. Norway Bluewater Engineering Apache Energy Elf Brunei Agip Recherches Congo Agip Recherches Congo Agip

PROJECT
Kombi Likala Project - production platforms and sealines Ivana A - platform and sealines Foxtrot Development - gas production platform and sealines Cantarell EPC-1 Phase 1 - platform jackets Yetagun Project - Andaman Sea Iodho Q and E Revamping Project - platform topsides Oso 2y-2 Development Project Oseberg Gass (D) Platform Eldfisk - 2/7E platform Bleo Holm Project - FPSO topsides Stag - CPF Platform Mahraja Lela / Jamalulalam Platforms Kitina EPC Project - platform and sealines Zatchi Zaf-4 Field Development Project - production platform and sealines Campagna Mare 1998 Adriatic Sea - platforms and sealines

68

TOTAL WEIGHT[t]
5,000 1,100 3,800

SCOPE OF WORK
EPIC T&I T&I T&I

MAIN VESSELS EMPLOYED


Castoro Otto Crawler Castoro Otto Pearl Marine Pearl Marine Castoro Otto Castoro Otto - SB 230 Saipem 7000 Saipem 7000

ON STREAM
1999 1999 1999 1999 1999 1999 1999 1999 1999 1999 1998

18,000 900 6,600 9,800 8,100

T&I EPIC EPIC T&I EPIC EPIC

7,800

EPIC T&I Pearl Marine Castoro Otto - Saipem 7000 Castoro Otto Crawler

1998 1998 1998 1998

12,000 2,100 3,300

EPIC EPIC T&I

69

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Norway U.S.A. Congo Italy Italy Nigeria Nigeria Nigeria Nigeria Norway Norway Norway Thailand United Kingdom Vietnam

CLIENT
Norsk Hydro Produksjon Transco Agip Recherches Congo Agip TMF Chevron Nigeria Mobil Producing Nigeria Mobil Producing Nigeria Mobil Producing Nigeria Phillips Petroleum Company Norway Phillips Petroleum Company Norway Saga Petroleum Total Elf Exploration UK Petechim

PROJECT
Oseberg OST Platform Mobile Bay Expansion and Extension Project Kitina Platform Topsides Campagna Mare 1997 Adriatic Sea - platform and sealines Bonaccia Gas Field Development Project - production platform and sealines Escravos Gas Project Phase 1 Development Oso NGL Topsides Installation Usari Development Project - production, wellhead and riser platforms; sealines Usari Topsides Ekofisk 2/4J platform jacket Phase 1 Ekofisk 2/4J Topsides Phase 2 Varg Field Development - wellhead platform Bongkot Phase B 3 - wellhead platforms and sealines Elgin and Franklin Wellhead Jacket Installation White Tiger Central Compression Platform

70

TOTAL WEIGHT[t]
20,600 800 4,900 5,200 2,600

SCOPE OF WORK
T&I T&I T&I T&I EPIC T&I

MAIN VESSELS EMPLOYED


Saipem 7000 Castoro Otto Saipem 7000 Crawler - Pearl Marine Crawler - Pearl Marine Castoro II Saipem 7000 Castoro Otto - S 355 - Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000

ON STREAM
1998 1998 1997 1997 1997 1997 1997 1997 1997 1997 1997 1997 1997

9,700 11,600 3,100 17,800 25,600 5,000

EPIC EPIC T&I T&I T&I T&I T&I

9,100 11,200

EPIC EPIC

Saipem 7000

1997 1997

71

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Angola Angola

CLIENT
Cabinda Gulf Oil Company Texaco Panama

PROJECT
Cabinda Phase 2 (S. Sanha and North N'Dola) - production platforms and sealines Bagre Central Field Area Development - well protector and production platforms, tripod platform jackets, sealines Chuchupa B - production platform and sealines Transportation and Installation of Platforms MNLG-DUA Platforms Project Ngo Field Development - platform and sealines Unam C and D, Edop E and Asasa A and B Wellhead Platforms and Sealines Andrew Project

Colombia Malaysia Malaysia Nigeria Nigeria Norway

Guajira Gas Services Sarawak Shell Berhard Shell Sarawak Liberty Technical Services Mobil Producing Nigeria BP Exploration

ANDREW PROJECT - NORWAY


The Andrew development consisted of a piled steel jacket supporting an integrated deck with production, drilling and accommodation facilities. The operator BP chose an alliance-based contract structure under which the primary contractors, including Saipem, committed themselves to completing the project within a preset costs and time frame, sharing risks and rewards associated with the overall performance. Saipem was involved in the transportation, installation and commissioning of the platform components. The installation of the 10,400 t integrated deck by Saipem 7000 set the world heavy lift record in Dynamic Positioning at that time. The project was completed below target cost and six months ahead of target date.

72

TOTAL WEIGHT[t]
11,500 4,800 2,400 53,000 49,900 500 3,900 17,400

SCOPE OF WORK
T&I T&I T&I T&I T&I EPIC T&I T&I

MAIN VESSELS EMPLOYED


Castoro Otto Castoro Otto - SB 230 Castoro II Pearl Marine Pearl Marine Castoro Otto - SB 230

ON STREAM
1996 1996 1996 1996 1996 1996 1996

Saipem 7000

1996

73

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Norway United Kingdom United Kingdom United Kingdom Congo Italy Nigeria Norway Norway Norway Norway Norway Tunisia United Kingdom United Kingdom

CLIENT
Statoil Texaco North Sea UK Texaco North Sea UK Texaco North Sea UK Elf Congo Agip Mobil Producing Nigeria Elf Norge Elf Norge Elf Norge Phillips Petroleum Company Norway Statoil SEREPT Brown & Root Highland Fabricators Elf Enterprise Caledonia

PROJECT
Sleipner Vest SLT Gas Treatment Platform Captain Field WPP Platform Erskine Field Development - platform jacket Captain Field Development Project - wellhead protection platform and sealines N'Knossa (NKF2) Jacket Daria B - drilling and production platform Ubit Expansion Project - production and compression platforms Froy Wellhead Platform Phase 2 Froy Wellhead Platform Phase 3 Froy Wellhead Platform Template Phase 1 "J" Block Judy Wellhead Platform Sleipner Vest SLB Wellhead Platform Ashtart Field - ASPF3 Platform Amoco Davy Bessemer Monotower Platforms Claymore Accommodation Platform Project (CAP)

74

TOTAL WEIGHT[t]
25,600 13,700 2,700 16,000 7,400 2,100

SCOPE OF WORK
T&I T&I EPIC EPIC EPC EPC EPIC

MAIN VESSELS EMPLOYED


Saipem 7000 Saipem 7000 Saipem 7000 Maxita - Saipem 7000

ON STREAM
1996 1996 1996 1996 1995 1995 1995

12,300 3,200

T&I T&I T&I

Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Saipem 7000 Castoro Otto Saipem 7000 Saipem 7000

1995 1995 1995 1995 1995 1995 1995 1995

30,900 7,500 3,700 2,600 10,500

T&I T&I Fabrication and T&I T&I T&I

75

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Angola Congo Nigeria Norway United Kingdom Angola Congo Congo Italy Nigeria Saudi Arabia Trinidad United Kingdom United Kingdom United Kingdom

CLIENT
Chevron Lummus Overseas Mobil Producing Nigeria Statoil Total Oil Marine Elf Aquitaine Angola Agip Recherches Congo Agip Recherches Congo Agip Elf Petroleum Nigeria Saudi Aramco Amoco / Brown & Root BP Exploration Chevron UK Hyde Project Alliance

PROJECT
Cabinda Area B,C Phase 1 Project West Kokongo Field Platforms Ubit Expansion Project - platforms and sealines Europipe 16/11E Riser Platform Dunbar Integrated Deck Cob-F1 and Pac-F4 Platform Jackets Zatchi - Zap Production Deck ZAP Project - production platform and sealines Campagna Mare 1993 Adriatic Sea - platforms and sealines Platform and Sealine for IME Edikan Safaniya GOSP-4 Project - accomodation, tie-in, bridge and production platforms Galeota Point - platform and sealines installation Hyde Alliance Project - production platform Alba Field Development - Alba Northern Platform Hyde Platform

76

TOTAL WEIGHT[t]

SCOPE OF WORK
T&I T&I EPIC

MAIN VESSELS EMPLOYED


Castoro Otto Castoro Otto Castoro Otto Saipem 7000 N. A.

ON STREAM
1994 1994 1994 1994 1994 1993

11,500

T&I EPC

5,900 3,700 6,500

EPIC EPC T&I T&I N. A. Castoro Otto Castoro II BOS 400 Pearl Marine Castoro Otto

1993 1993 1993 1993 1993 1993 1993

1,600 16,100 600 2,000 15,100 2,300

EPIC EPIC T&I T&I T&I T&I

Saipem 7000 Saipem 7000

1993 1993

77

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Angola Italy Nigeria Nigeria Nigeria Norway Norway Norway Papua New Guinea

CLIENT
Cabinda Gulf Oil Company Agip Elf Petroleum Nigeria Mobil Producing Nigeria Mobil Producing Nigeria Britoil Lasmo-Ultramar Exploration Phillips Petroleum Company Norway Chevron Niugini PTY

PROJECT
Takula O Well Platform Platforms Installation in Adriatic Sea Odudu Odpi Afia Afd1 Drilling and Production Platforms Edop C, D and 12 Wellhead Platforms Oso Field Condensate Development Facilities Bruce Area Development Markham J6A platform Embla Field Development Kutubu Petroleum Platform

78

TOTAL WEIGHT[t]
1,100

SCOPE OF WORK
EPIC T&I

MAIN VESSELS EMPLOYED


Castoro II - Pearl Marine

ON STREAM
1992 1992 1992 1992 1992

5,600 900 5,500 51,400 5,200 8,700 1,800

EPIC EPIC EPIC T&I T&I T&I T&I Saipem 7000 Saipem 7000 Saipem 7000 S 355

1992 1992 1992 1992

79

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
United Kingdom United Kingdom United Kingdom Angola Congo Congo Congo Egypt

CLIENT
Agip UK Amoco Exploration Company Amoco Exploration Company Agip Agip Recherches Congo Agip Recherches Congo Elf Congo Wepco

PROJECT
Tiffany Field Development Central Graben Development Central Graben Development - Lomond Integrated Deck Safueiro Field Development - platform and sealine Zatchi, Zaf-2 and Zaf-3 Platform Decks Loango Field - DP6 Platform Techendo - TCFP Platform Jacket Platform and Sealine Installation

TIFFANY FIELD DEVELOPMENT UNITED KINGDOM


All the components of the fixed Tiffany Platform, part of the overall field development project, were installed by Saipem 7000 in 126 m water depth, under a transportation and installation contract.

80

TOTAL WEIGHT[t]
30,700 30,700 9,800

SCOPE OF WORK
T&I T&I PC EPIC

MAIN VESSELS EMPLOYED


Saipem 7000 Saipem 7000

ON STREAM
1992 1992 1992 1991

2,300 4,800 5,100

EPC T&I EPIC T&I

N. A. Castoro Otto BOS 400 Castoro Otto

1991 1991 1991 1991

81

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
India Indonesia Indonesia Italy Italy Italy Nigeria Norway South Africa Angola Indonesia Italy Norway Norway United Kingdom

CLIENT
ONGC Atlantic Richfield Total Agip Elf Elf Italiana Mobil Producing Nigeria Norsk Hydro Produksjon Mossgas Cabinda Gulf Oil Company Hubay Oil Agip BP Development Statoil Volker Stevin Aerospace

PROJECT
South Bassein BPB Complex Project Phase 2 - gas platforms and gathering sealines FM, FNB and FWB Platforms and Sealines Handfil gaslift compression platform Platforms and Sealines Installation Rospo Mare C - platform and sealine Rospomare RSMC Platform Ubit-I and Ubit-B Drilling Platforms and Sealines Oseberg 2 Topsides FA Platform Numbi-F Well Platform Hudbay Selatan Field - Msn production platform and sealines Luna B and Giovanna Platforms Gyda Platform Veslefrikk Platform British Aerospace Platforms

82

TOTAL WEIGHT[t]
1,100 700

SCOPE OF WORK
EPIC EPIC

MAIN VESSELS EMPLOYED

ON STREAM
1991 1991 1991

T&I 5,000 4,300 1,000 17,300 6,300 1,000 700 T&I EPIC EPIC T&I T&I EPIC EPIC Fabrication and T&I 19,200 14,700 1,800 T&I T&I T&I

Castoro II Castoro II

1991 1991 1991 1991

Saipem 7000 Saipem 7000

1991 1991 1990 1990

Castoro II Saipem 7000 Saipem 7000 Saipem 7000

1990 1990 1989 1989

83

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Brazil Congo Libya Nigeria Italy Egypt Italy Nigeria Congo

CLIENT
Petrobras Agip Recherches Congo Agip Name Agip Energy & Natural Resources Agip Petrobel Agip Agip Energy & Natural Resources Agip Recherches Congo

PROJECT
Polo Nordeste Project - platforms and sealines ZAF 1 Platform and Sealine Bouri Field Development Agbara Production Platform Armida, Pennina and Barbara D Topsides Belayim Oil Production Increase Project - production platforms topsides Nilde Oil Field Development - single point mooring and sealines Agbara Drilling Platform Loango Field - DP5 and DP4 Platforms

BOURI FIELD DEVELOPMENT LIBYA


Two drilling and production platform topsides standing in 160 m water depths, composed by 27 modules ranging in weight from 500 to 1700 t, designed and built in partnership with others. The first large scale integrated EPIC project for fixed production facilities ever undertaken by Saipem.

84

TOTAL WEIGHT[t]
35,400 3,200 26,000 9,000 1,700

SCOPE OF WORK
T&I EPIC EPIC EPIC Fabrication and T&I EPIC EPC

MAIN VESSELS EMPLOYED


Castoro Sei - Pearl Marine - Saipem 7000 Castoro Otto Castoro Otto Castoro Otto Castoro II

ON STREAM
1988 1988 1988 1988 1987 1986

N. A. Castoro Otto Castoro Otto

1986 1986 1985

3,500 6,700

EPIC T&I

85

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR PROJECT REFERENCES

COUNTRY
Egypt Saudi Arabia Egypt Italy Iran Italy Italy Norway Italy Italy Italy Italy Italy Italy Egypt Italy

CLIENT
Petrobel Saudi Aramco Petrobel Agip SIRIP Agip Agip Phillips Petroleum Company Norway Agip Agip Agip Elf Italiana Agip Agip COPE Agip

PROJECT
Hook-up of PP2 and PP3 Process Platforms Zuluf Field Project - compression platform Drilling and Production Platforms and Sealines in the Gulf of Suez Platforms and Sealines - Risers instalaltion Revamping of a Fixed Production Platform Platforms Installation - Adriatic Sea Revamping of Drilling Platforms Ekofisk Field - drilling and production platform Drilling and Production Platforms - Adriatic Sea Platforms Installation - Adriatic Sea Drilling and Production Platforms - Adriatic Sea Drilling and Production Platforms - Adriatic Sea Drilling and Production Platform - offshore Sicily Drilling and Production Platforms - Adriatic Sea Drilling and production platform offshore Sinai peninsula Platform Installation - offshore Sicily

86

TOTAL WEIGHT[t]

SCOPE OF WORK
T&I EPIC

MAIN VESSELS EMPLOYED


Castoro 7 - Castoro V Castoro Otto Castoro II Castoro II

ON STREAM
1985 1984 1983 1978 1971

2,900

EPIC T&I T&I

4,200 1,200 5,500 4,500 2,500 5,000 800 900 1,800 500 1,200

T&I T&I T&I T&I T&I T&I T&I T&I T&I T&I T&I

Castoro II

1971 1971 1971

Castoro II

1970 1969 1968 1968 1967 1967 1962 1961

87

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR ENGINEERING REFERENCES


COUNTRY
Congo Gabon Congo Iraq

CLIENT
Total E&P Eiffel Total E&P Eni E&P

PROJECT
Yanga - YAFP and SEFP Platforms Compressors Anguille Wellhead Platform AGMN Moho Nord - FPU Integration Offshore Sea Water Intake for Zubair Oil Field Development Dissoni Wellhead Platform Integrated Gas Power Generation Project Further Field Development in Block NC-41 Development of a new offshore field connected to an existing onshore LNG plant Flaring Down Project Djeno Export Project Mboundi Water Injection Flaring Down Project - Offshore Ikalou and Ikalou Sud Development Project Alga 1600 Project Zinnia Plant Updating - Baraka Development Awa Paloukou Platform Awa Paloukou Platform

SCOPE OF WORK YEAR


Conceptual Design Detail Engineering Conceptual Design Screening Study Basic Engineering FEED Pre-feasibility Study Screening Study Feasibility Study FEED FEED Feasibility Study Feasibility, FEED and Detail Design Basic Design and FEED Feasibility Study Feasibility Study and FEED Feasibility, FEED and Detail Design 2011 2011 2010 2010 2009 2009 2009 2009 2008 2008 2008 2008 2007 2007 2007 2006 2006

Cameroon Congo Libya Undisclosed

Total E&P Cameroun Eni E&P Eni E&P Confidential

Congo Congo Congo Congo Congo Spain Tunisia Congo Congo

Eni E&P Eni E&P Eni E&P Eni E&P Eni Congo Repsol/Initec Eni E&P Eni Congo Eni Congo

88

COUNTRY
Congo Denmark Italy Italy Kazakhstan Nigeria Nigeria Nigeria Nigeria Egypt Egypt Egypt Kazakhstan Croatia

CLIENT
Eni E&P Maersk Olie & Gas Eni E&P Eni E&P / INAgip Agip KCO Eni E&P Eni E&P Total E&P Total E&P Eni E&P Eni E&P Eni E&P Agip KCO Eni E&P / INAgip

PROJECT
Integrated Gas Power Generation Halfdan Northeast Phase III Development Angela Angelina Phase 2 - Water Injection Plant Annamaria A/B Aktote and Kairan Project - post evaluation phase Okono/Okpoho Gas Export Agbara Gas Export Ofon 2 Epci 5 Living Quarters Ofon 2 Epci 5 Modifications and Tie-in Activities Anshuga Tripode Temsah Concession - Temsah NW2 Platform Early LNG Supply Aktote and Kairan Development Project Katarina Field Development Katarina platform concept definition Ivana Field Development - Ivana-K platform

SCOPE OF WORK
Basic Design Detail Design Conceptual Study Basic Design and Detail Design Feasibility Study Feasibility Study Feasibility Study Basic Engineering Detail Engineering FEED and Detail Design FEED & Detail Design FEED and Detail Design

YEAR
2006 2006 2006 2006 2006 2006 2006 2006 2006 2005 2005 2005

Feasibility and Constructability Study 2005 Basic Engineering Follow-up of EPC Contractor Detail Engineering 2004

Croatia

Eni E&P / INAgip

2004

Libya

Agip Oil Libyan Branch Co.

Bouri Field removal of rig A and enhacement of rig B on DP4 platform

Basic and Detail Engineering

2003

89

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR ENGINEERING REFERENCES

COUNTRY
Nigeria Nigeria

CLIENT
EPNL (Total) EPNL (Total)

PROJECT
Oml 100 - Upgrade of Edikan and Odudu Platforms Amenam Amp 2 GAS Production Platform, Bridges and Flare RPP and PF-D New Platforms - upgrading of existing PF-A platform and El Gamil onshore Plant Debottlenecking of Bouri Production Facilities Amenam Living Quarter

SCOPE OF WORK
Basic Engineering Basic Engineering

YEAR
2003 2003

Egypt

I/IEOC

FEED and Detail Design Conceptual Study Detail Engineering and Procurement Services Technical Services Conceptual Study and Basic Design FEED FEED FEED Feasibility Study Feasibility and Conceptual Design, FEED FEED FEED Detail Engineering, Assistance to Procurement

2002 2002 2002 2002 2001 2000 2000 2000 1999 1999 1998 1998 1998

Libya Nigeria

Agip Oil Eiffel for EPNL (Total)

Nigeria Nigeria

EPNL (Total) Agip Energy & Natural Resources I/IEOC Elf Aquitaine Lybie Rasgas Eni E&P Agip

Amenam Amp 1 Platform Okono/Okpoho Fields Temsah Field Elf Libye 137B Field - wellhead platform and flowlines Rasgas Field Development Soroosh Oil Field Development Abo Field Development

Egypt Libya Qatar Iran Nigeria

Congo Gabon Italy

Agip Recherches Congo Agip Agip

Zaf 4 Platform Project Limande Platform Project Bonaccia Gas Field Development - Phase 2

90

COUNTRY
Libya

CLIENT
Elf EP

PROJECT
Impact Study for Connection of 137 B Field to Bouri Field Ofon Project

SCOPE OF WORK
Feasibility Study Detail Engineering, Procurement and Commissioning Services Engineering Services Detail Engineering, FEED, follow up of Procurement activities for EPC Project

YEAR
1998

Nigeria

Elf Nigeria

1998 1998

Nigeria Romania

Shell Petrom R.A.

Obigbo Soku Flowstation Lebada Est Eocene Gas Field Development

1997

Libya

Agip Name OGTT

Western Libya Gas Project Offshore Gas Development NC41 Nkossa Drilling Platforms

Feasibility Study Basic and Detail Engineering, Procurement and Commissioning Services

1996

Congo

Elf Congo

1995

Italy

Agip

Alto Adriatico project - unmanned production platforms: Ada A and Giuditta, Chioggia A, B and C Alto Adriatico Project BEAF 4 slots standard production platforms IME - Edikan Development

Engineering Services

1995

Italy

Agip

Engineering Services Detail Engineering and Procurement Services Engineering Services Engineering Services Detail Engineering and Procurement Services

1995

Nigeria

ETPM/McDermott

1994 1994 1993 1993

Usa Italy Nigeria

Agip Petroleum Company Agip ETPM/McDermott

Grand Isle Offshore Project - production platform Platine Project - S.CO.O.TER.OIL unmanned platform AFIA Odudu Development

91

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR ENGINEERING REFERENCES

COUNTRY
Qatar

CLIENT
Qatar Europe LNG Co.

PROJECT
Qatar Europe LNG Project Project Definition Phase -offshsore portion Barbara F - eight legged jacket - unmanned DP platform Hewett Platform - Block 48/29A Barbara F - eight legged jacket unmanned DP platform (gas) Research project for prestressed concrete platform T-Block Project Phase 1 - drilling/production platform Porto Corsini C Gas Platform height pile jacket unmanned platform Hidra Project Barbara D Drilling and Production Remote Control Gas Platform Pennina 1 - eight pile jacket unmanned drilling/production platform Barbara C - eight pile jacket - unmanned DP platform Agbara DP 1-4 pile jacket drilling and PP-4 pile jacket production platforms Zatchi Oil Field Development - topsides facilities Loango Field Expansion DP6 four pile jacket drilling platform

SCOPE OF WORK
Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Basic Engineering Engineering Services

YEAR
1993 1991 1990 1990 1990 1990 1989 1988 1988

Italy Italy Italy

Agip Agip Agip

Italy United Kingdom Italy

Eni Agip UK Eni

Argentina Italy

Total Agip

Italy

Agip

Engineering Services Engineering Services Engineering Services Basic Engineering Engineering Services

1988 1987 1987 1986 1986

Italy Nigeria

Agip Agip

Congo Congo

Agip Agip Recherches Congo

92

COUNTRY
Italy Italy Italy Tunisia

CLIENT
Agip Agip Agip SEREPT

PROJECT
PCW-C Platform Adriatic Sea Project - PCC Gas Platform Adriatic Sea Project - PCW A Platform Ashtart Oil Field - Gas Lift Project and General Revamping - new platform Ras Budran Offshore Project oil production platform and submarine pipeline Mila Project - production platform Pampo Project - new production platform Saf Project - automation technology development for offhsore unmanned extraction platforms Adriatic Sea Project - Basil gas production platform Gas Injection and LPG Recovery Platforms Sendji (SEFP) Project

SCOPE OF WORK
Engineering Services Engineering Services Engineering Services Engineering Services

YEAR
1986 1986 1986 1986

Egypt

Suez Oil Company

Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Detail Engineering, procurement and commissioning services Detail Engineering, Procurement, construction and Commissioning Services

1985 1985 1983 1983 1983 1982 1982

Italy Brazil Italy

Montedison Petrobras Agip

Italy Angola Congo

Agip Gulf/Sonangol Elf Congo

Congo

Elf Congo

Yanga (YAQ) Project

1982

Italy

Agip

Adriatic Sea Project - Barbara and Barbara B Gas Production and Drilling Platform

Engineering Services

1982

93

FIXED OFFSHORE PRODUCTION FACILITIES MAJOR ENGINEERING REFERENCES

COUNTRY
Italy

CLIENT
Agip

PROJECT
Adriatic Sea Project - Porto Corsini Gas Production and Drilling Platform Adriatic Sea Project - Fulvia Production Platform Adriatic Sea Project - Emma Production Platform Adriatic Sea Project Diana Gas Production and Drilling Platform Adriatic Sea Project - Flavia Production Platform + C105 Adriatic Sea Project - Giulia Production Platform Adriatic Sea Project - Fratello Cluster/Fratello Est 2/ Fratello Nord 1/2 Production Platform Adriatic Sea Project - Ada Gas Production Platform Adriatic Sea Project - Squalo Production Platform Adriatic Sea Project Anemone and Anemone 2 Platforms Adriatic Sea Project - David Gas Production Platform Adriatic Sea Project Antonella Gas Drilling and Production Platform Adriatic Sea Project Angela Drilling and Production Platform

SCOPE OF WORK
Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services

YEAR
1982 1981 1981 1981 1980 1980 1979 1979 1979 1979 1978 1976

Italy Italy Italy

Agip Agip Agip

Italy Italy Italy

Agip Agip Agip

Italy Italy Italy

Agip Agip Agip

Italy Italy

Agip Agip

Italy

Agip

Engineering Services

1975

94

COUNTRY
Italy Italy Italy

CLIENT
Agip Agip Agip

PROJECT
Adriatic Sea Project - Azalea Gas Production Platform Luna Project - Offshore Gas Drilling/Production Platform Adriatic Sea Project Armida Gas Production and Drilling Platform Adriatic Sea Project Cervia Gas Production and Drilling Platform Adriatic Sea Project Amelia Gas Production and Drilling Platform Now Rouz Project - Oil Gathering Platform Adriatic Sea Project Porto Garibaldi Gas Production and Drilling Platform Adriatic Sea Project Agostino Gas Production and Drilling Platform Adriatic Sea Project Porto Corsini Ovest Gas Production and Drilling Platform Adriatic Sea Project Ravenna Gas Production and Drilling Platform Adriatic Sea Project - Cesenatico Gas Production and Drilling Platform

SCOPE OF WORK
Engineering Services Engineering Services Engineering Services

YEAR
1975 1974 1973

Italy

Agip

Engineering Services

1971

Italy

Agip

Engineering Services Engineering Services Engineering Services

1971 1970 1970

Iran Italy

SIRIP Agip

Italy

Agip

Engineering Services

1970

Italy

Agip

Engineering Services

1968

Italy

Agip

Engineering Services

1968

Italy

Agip

Engineering Services

1965

95

MAJOR ENGINEERING & project REFERENCES


(by Country)
CLIENT
Cabinda Gulf Oil Company

PROJECT
Farm Project - flare and relief modifications and hook-up on Takula and Malongo Areas platforms

SCOPE OF WORK ON STREAM


EPIC Under Execution

Total Exploration & Production Angola Cabinda Gulf Oil Company

Single Central Platform and Injection facilities in Block 2 Kuito Developemnt Project Phase 2 A installation of FPSO modules Cabinda Phase 2 (S. Sanha and North N'Dola) production platforms and sealines Bagre Central Field Area Development - well protector and production platforms, tripod platform jackets, sealines Cabinda Area B,C Phase 1 Project Cob-F1 and Pac-F4 Platform Jackets Takula O Well Platform Safueiro Field Development - platform and sealine Numbi-F Well Platform Gas Injection and LPG Recovery Platforms Hidra Project

EPIC

2010

T&I

2003

Cabinda Gulf Oil Company

T&I

1996

ANGOLA

Texaco Panama

T&I T&I EPIC EPIC EPIC EPIC Engineering Services Basic Engineering

1996 1994 1993 1992 1991 1990 1982 1988

Chevron Elf Aquitaine Angola Cabinda Gulf Oil Company Agip Cabinda Gulf Oil Company Gulf/Sonangol

ARGENTINA

Total

Eni Australia

Black Tip Development Project Coogee Resources Montara Project wellhead platform and sealines Stag - CPF Platform West Chirag Platform Azeri, Chirag, Gunashli (ACG) Full Field Project Phase II Azeri, Chirag, Gunashli (ACG) Full Field Project Phase III Azeri, Chirag, Gunashli (ACG) Full Field Project Phase I

EPIC T&I EPIC Fabrication and T&I Fabrication and T&I Fabrication and T&I Fabrication and T&I

2009 2008 1998 Under Execution 2008 2008 2005

AUSTRALIA AZERBAIJAN
96

Coogee Resources (Ashmore Cartier) Apache Energy AIOC AIOC AIOC AIOC

CLIENT
Companhia Mexilhao do Brasil

PROJECT
PMXL-1 Mexilhao Gas Platform Polo Nordeste Project - platforms and sealines Pampo Project - new production platform Mahraja Lela / Jamalulalam Platforms

SCOPE OF WORK ON STREAM


T&I T&I Engineering Services T&I 2010 1988 1983 1998

BRAZIL BRUNEI

Petrobras Petrobras Elf Brunei

CAMEROON

Total E&P Cameroun

Dissoni Wellhead Platform

Basic Engineering

2009

ExxonMobil Canada Properties

Sable Offshore Energy Project - Tier II Compression Platform Sable Offshore Energy Project Phase 1 Sable Offshore Energy Project Phase 2 Sable Offshore Energy Project Phase 3 Dong Fang and Lu Feng Fields wellhead platform jackets and sealines Chuchupa B - production platform and sealines

EPIC EPIC EPIC EPIC

2006 1999 1999 1999

CANADA CHINA

Mobil Oil Canada Properties Mobil Oil Canada Properties Mobil Oil Canada Properties Offshore Oil Engineering Co.

T&I T&I

2005 1996

COLOMBIA

Guajira Gas Services

Total E&P Total Exploration & Production Congo Total E&P Eni E&P

Yanga - YAFP and SEFP Platforms Compressors Libondo - wellhead platform and sealines Moho Nord - FPU Integration Integrated Gas Power Generation Project Awa Paloukou - wellhead platform and sealines Flaring Down Project Djeno Export Project Mboundi Water Injection Flaring Down Project - Offshore Ikalou - platforms and sealines

Conceptual Design EPIC Conceptual Design FEED EPIC Feasibility Study FEED FEED Feasibility Study EPIC

2011 2010 2010 2009 2008 2008 2008 2008 2008 2007

CONGO

Eni Congo Eni E&P Eni E&P Eni E&P Eni E&P Eni Congo

97

MAJOR ENGINEERING & project REFERENCES (by Country)

CLIENT PROJECT
Eni Congo Ikalou and Ikalou Sud Development Project

SCOPE OF WORK ON STREAM


Feasibility, FEED and Detail Design Feasibility Study and FEED Feasibility, FEED and Detail Design Basic Design EPIC EPIC EPIC EPIC FEED T&I EPC Basic and Detail Engineering, Procurement and Commissioning Services T&I EPC T&I EPC T&I EPIC EPIC Basic Engineering Engineering Services T&I 2007 2006 2006 2006 2001 1999 1998 1998 1998 1997 1995

Eni Congo Eni Congo

Awa Paloukou Platform Awa Paloukou Platform

Eni E&P Agip Recherches Congo Elf Congo Agip Recherches Congo Agip Recherches Congo

Integrated Gas Power Generation Foukanda and Mwafi Field Development - platforms and sealines Kombi Likala Project - production platforms and sealines Kitina EPC Project - platform and sealines Zatchi Zaf-4 Field Development Project production platform and sealines Zaf 4 Platform Project Kitina Platform Topsides N'Knossa (NKF2) Jacket Nkossa Drilling Platforms

Agip Recherches Congo Agip Recherches Congo Elf Congo

CONGO (contd)

Elf Congo

1995 1994 1993 1993 1991 1991 1991 1988 1986 1986 1985

Lummus Overseas Agip Recherches Congo Agip Recherches Congo Agip Recherches Congo Agip Recherches Congo Elf Congo Agip Recherches Congo Agip Agip Recherches Congo Agip Recherches Congo Elf Congo

West Kokongo Field Platforms Zatchi - Zap Production Deck ZAP Project - production platform and sealines Zatchi, Zaf-2 and Zaf-3 Platform Decks Loango Field - DP6 Platform Techendo - TCFP Platform Jacket ZAF 1 Platform and Sealine Zatchi Oil Field Development - topsides facilities Loango Field Expansion - DP6 four pile jacket drilling platform Loango Field - DP5 and DP4 Platforms Sendji (SEFP) Project

Detail Engineering, procurement and commissioning services 1982 Detail Engineering, Procurement, Construction and Commissioning Services

Elf Congo

Yanga (YAQ) Project

1982

98

CLIENT
INAgip

PROJECT
INAgip Frame Agreement Campaign 2008 Annamaria A platform topside and sealines INAgip Frame Agreement Adriatic Campaign 2008 Ana, Vesna, Irina platform topsides

SCOPE OF WORK ON STREAM


T&I 2009

INAgip

T&I

2008 2005 2004 2004 2000 1999 2007 2005 2003 2006 2006 2005 2005 2005 2002 2000 1991 1986 1985 1985 1983 1962

CROATIA

INAgip Eni E&P / INAgip Eni E&P / INAgip

Ika, Ida and Ivana gas Fields - unmanned gas platforms and sealines T&I Katarina Field Development - Katarina platform concept definition Ivana Field Development - Ivana-K platform Basic Engineering Follow-up of EPC Contractor Detail Engineering T&I T&I T&I T&I T&I Detail Design T&I FEED and Detail Design FEED & Detail Design FEED and Detail Design FEED and Detail Design FEED T&I EPIC T&I Engineering Services EPIC T&I

INAgip INAgip Maersk Olie Og Gas

Ivana E, B, and D Platforms and Sealines Ivana A - platform and sealines Halfdam Northeast Phase 3 Development - platforms DAN FG Platform and Bridge Nini and Cecilie Wellhead Platforms Halfdan Notheast Phase III Development Temsah NW2 Platform Anshuga Tripode Temsah Concession - Temsah NW2 Platform Early LNG Supply RPP and PF-D New Platforms - upgrading of existing PF A platform and El Gamil onshore Plant Temsah Field Platform and Sealine Installation Belayim Oil Production Increase Project production platforms topsides Hook-up of PP2 and PP3 Process Platforms Ras Budran Offshore Project -oil production platform and submarine pipeline Drilling and Production Platforms and Sealines in the Gulf of Suez Drilling and production platform offshore Sinai peninsula

DENMARK EGYPT

Maersk Dong A/S Maersk Olie & Gas Petrobel Eni E&P Eni E&P Eni E&P I/IEOC

I/IEOC Wepco Petrobel

Petrobel Suez Oil Company

Petrobel COPE

99

MAJOR ENGINEERING & project REFERENCES (by Country)

CLIENT PROJECT
Total Anguille Field Redevelopment Project - AGM-N wellhead platform Anguille Wellhead Platform AGMN Olowi Development Project Limande Platform Project South Bassein BPB Complex Project Phase 2 gas platforms and gathering sealines WHP and PQP Platforms for Ruby Field Gajah Baru Project North Belut Development Project - process platform topsides Tangguh GPF Platforms and Onshore Site Facilities Project Peciko Field Development Phase IV (PCK 4 EPSC2) platforms and sealines FM, FNB and FWB Platforms and Sealines Handfil gaslift compression platform Hudbay Selatan Field - Msn production platform and sealines Soroosh Oil Field Development Revamping of a Fixed Production Platform Now Rouz Project - Oil Gathering Platform Iraq Crude Oil Export Expansion Project - Phase 2 - CMMP Platform Offshore Sea Water Intake for Zubair Oil Field Development Eni E&P Frame Agreement 2004 / 2008 Adriatic Campaign Year 2008 - Annamaria B platform jacket Eni E&P Frame Agreement 2009 Annamaria B platform topsides and sealines Angela Angelina Phase 2 - Water Injection Plant Annamaria A/B Frame Agreement 1999 / 2003 - Year 2000 - platforms Campagna Mare 1998 Adriatic Sea - platforms and sealines Eiffel C.N.R. International (Gabon) Agip ONGC

SCOPE OF WORK ON STREAM


EPIC Detail Engineering EPIC FEED Under Execution 2011 2010 1998

INDIA

GABON

EPIC T&I EPIC T&I EPIC EPIC EPIC

1991 Under Execution Under Execution 2009 2007 2004 1991 1991

Pearl Oil Premier Oil ConocoPhillips Indonesia

INDONESIA

BP Berau TotalFinaElf

Atlantic Richfield Total Hubay Oil Eni E&P

EPIC Feasibility Study T&I Engineering Services EPIC Screening Study

1990 1999 1971 1970 Under Execution 2010

IRAN IRAQ

SIRIP SIRIP South Oil Company Eni E&P Eni E&P

T&I

2009

Eni E&P

T&I Conceptual Study Basic Design and Detail Design T&I T&I

2009 2006 2006 2000 1998

ITALY
100

Eni E&P Eni E&P / INAgip Agip Agip

CLIENT
Agip

PROJECT
Bonaccia Gas Field Development - Phase 2

SCOPE OF WORK ON STREAM


Detail Engineering, Assistance to Procurement T&I EPIC EPC Engineering Services Engineering Services T&I Engineering Services T&I T&I T&I EPIC Engineering Services Fabrication and T&I Engineering Services Engineering Services Engineering Services 1998 1997 1997 1995 1995 1995 1993 1993 1992 1991 1991 1991 1991 1990 1990 1990 1990 1989 1988 1988 1987 1987 1986 1986 1986 1986

Agip TMF

Campagna Mare 1997 Adriatic Sea - platform and sealines Bonaccia Gas Field Development Project - production platform and sealines Daria B - drilling and production platform Alto Adriatico project - unmanned production platforms: Ada A and Giuditta, Chioggia A, B and C Alto Adriatico Project - BEAF 4 slots standard production platforms Campagna Mare 1993 Adriatic Sea - platforms and sealines Platine Project - S.CO.O.TER.OIL unmanned platform Platforms Installation in Adriatic Sea Platforms and Sealines Installation Rospo Mare C - platform and sealine Rospomare RSMC Platform Barbara F - eight legged jacket - unmanned DP platform Luna B and Giovanna Platforms Hewett Platform - Block 48/29A Barbara F - eight legged jacket - unmanned DP platform (gas) Research project for prestressed concrete platform

Agip Agip

Agip Agip Agip Agip Agip Elf

ITALY (contd)

Elf Italiana Agip Agip Agip Agip Eni Eni Agip Agip

Porto Corsini C Gas Platform - height pile jacket unmanned platform Engineering Services Barbara D Drilling and Production Remote Control Gas Platform Pennina 1 - eight pile jacket unmanned drilling/production platform Armida, Pennina and Barbara D Topsides Barbara C - eight pile jacket - unmanned DP platform Nilde Oil Field Development - single point mooring and sealines PCW-C Platform Adriatic Sea Project - PCC Gas Platform Adriatic Sea Project - PCW A Platform Engineering Services Engineering Services Fabrication and T&I Engineering Services EPC Engineering Services Engineering Services Engineering Services

Agip Agip Agip Agip Agip Agip

101

MAJOR ENGINEERING & project REFERENCES (by Country)

CLIENT PROJECT
Montedison Agip Mila Project - production platform Saf Project - automation technology development for offhsore unmanned extraction platforms Adriatic Sea Project - Basil gas production platform Adriatic Sea Project - Barbara and Barbara B Gas Production and Drilling Platform Adriatic Sea Project - Porto Corsini Gas Production and Drilling Platform Adriatic Sea Project - Fulvia Production Platform Adriatic Sea Project - Emma Production Platform Adriatic Sea Project - Diana Gas Production and Drilling Platform Adriatic Sea Project - Flavia Production Platform + C105 Adriatic Sea Project - Giulia Production Platform Adriatic Sea Project - Fratello Cluster/Fratello Est 2/Fratello Nord 1/2 Production Platform Adriatic Sea Project - Ada Gas Production Platform Adriatic Sea Project - Squalo Production Platform Adriatic Sea Project - Anemone and Anemone 2 Platforms Platforms and Sealines - Risers instalaltion Adriatic Sea Project - David Gas Production Platform Adriatic Sea Project - Antonella Gas Drilling and Production Platform Adriatic Sea Project - Angela Drilling and Production Platform Adriatic Sea Project - Azalea Gas Production Platform Luna Project - Offshore Gas Drilling/Production Platform Adriatic Sea Project - Armida Gas Production and Drilling Platform Platforms Installation - Adriatic Sea Revamping of Drilling Platforms

SCOPE OF WORK ON STREAM


Engineering Services Engineering Services Engineering Services Engineering Services 1985 1983 1983 1982

Agip Agip

Agip

Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services Engineering Services T&I Engineering Services Engineering Services

1982 1981 1981 1981 1980 1980 1979 1979 1979 1979 1978 1978 1976

Agip Agip Agip

Agip Agip

ITALY (contd)

Agip

Agip Agip Agip Agip Agip Agip

Agip

Engineering Services Engineering Services Engineering Services Engineering Services T&I T&I

1975 1975 1974 1973 1971 1971

Agip Agip Agip

Agip Agip

102

CLIENT
Agip

PROJECT
Adriatic Sea Project - Cervia Gas Production and Drilling Platform Adriatic Sea Project - Amelia Gas Production and Drilling Platform Drilling and Production Platforms - Adriatic Sea Adriatic Sea Project - Porto Garibaldi Gas Production and Drilling Platform Adriatic Sea Project - Agostino Gas Production and Drilling Platform Platforms Installation - Adriatic Sea Drilling and Production Platforms - Adriatic Sea Drilling and Production Platforms - Adriatic Sea Adriatic Sea Project - Porto Corsini Ovest Gas Production and Drilling Platform Adriatic Sea Project - Ravenna Gas Production and Drilling Platform Drilling and Production Platform - offshore Sicily Drilling and Production Platforms - Adriatic Sea Adriatic Sea Project - Cesenatico Gas Production and Drilling Platform Platform Installation - offshore Sicily

SCOPE OF WORK ON STREAM


Engineering Services 1971

Agip

Engineering Services T&I Engineering Services

1971 1970 1970

Agip Agip

Agip

Engineering Services T&I T&I T&I Engineering Services

1970 1969 1968 1968 1968

ITALY (contd)

Agip Agip Elf Italiana Agip

Agip

Engineering Services T&I T&I Engineering Services T&I

1968 1967 1967 1965 1961

Agip Agip Agip

Agip CNR International (Cote d'Ivoire) Ranger Oil Cote d'Ivoire Apache L.D.C. Agip KCO

IVORY COAST

West Espoir Development - wellhead platform and sealines Espoir Field Development - wellhead platform and sealines Foxtrot Development - gas production platform and sealines Kashagan Field Development Project - Experimental Programme hook-up and commissioning of facilities Kashagan Field Development Project - Experimental Programme piles and flares Aktote and Kairan Project - post evaluation phase Aktote and Kairan Development Project

EPIC EPIC T&I

2006 2001 1999

EPIC

Under Execution

KAZAKHSTAN

Agip KCO

Fabrication and T&I Feasibility Study Feasibility and Constructability Study

Under Execution 2006 2005

Agip KCO Agip KCO

103

MAJOR ENGINEERING & project REFERENCES (by Country)

CLIENT PROJECT
Mellitah Oil & Gas Eni E&P Agip Gas Agip Oil Libyan Branch Co. Sabratha Platform Production Enhancement Project Phase 1 Further Field Development in Block NC-41 Western Libya Gas Project - Sabratha Platform Bouri Field removal of rig A and enhacement of rig B on DP4 platform

SCOPE OF WORK ON STREAM


EPIC Pre-feasibility Study EPIC Basic and Detail Engineering 2010 2009 2006 2003

LYBIA

Compagnies des Petroles Total Libye Agip Oil Elf Aquitaine Lybie Elf EP Agip Name OGTT Agip Name Nippon Oil

BD-1 Platform Debottlenecking of Bouri Production Facilities Elf Libye 137B Field - wellhead platform and flowlines Impact Study for Connection of 137 B Field to Bouri Field Western Libya Gas Project - Offshore Gas Development NC41 Bouri Field Development Helang Project - processing platform Cakerawala Project Transportation and Installation of Platforms MNLG-DUA Platforms Project Suriya-B Wellhead Platform and Pipeline Project Bumi, Bulan and Suriya Wellhead Platforms and Interfield Lines

EPIC Conceptual Study FEED Feasibility Study Feasibility Study EPIC T&I T&I T&I T&I T&I T&I

2002 2002 2000 1998 1996 1988 2003 2002 1996 1996 Under Execution 2008

MALAYSIA Malaysia-Thailand JDA

Carigali-Triton Operating Company Sarawak Shell Berhard Shell Sarawak Carigali Hess Kencana HL

Pemex

KUIL-A, TSIMIN-A, TSIMIN-B and MALOOB-D Platforms PG-ZAAP-C Project - power generation platform

T&I T&I

Under Execution 2011

MEXICO

Dragados Offshore de Mexico / Dragados Offshore Dragados Offshore de Mexico / Dragados Offshore

HA-LT-01 Project - living quarter platform

T&I

2011

104

CLIENT
Pemex

PROJECT
KU-MALOOB-ZAAP Field Development - production platforms topsides and living quarter platforms Cantarell EPC - 78B (AKAL-L) - production platform, flare and bridge structures Cantarell EPC-1 Phase 1 - platform jackets Zawtika Platform Yetagun Project - Andaman Sea Ofon Phase II - EPCI 8 Project Amenan Field Development - facilities extension East Area Project EPC2A Yoho Development Projects EPC2 Okono/Okpoho Gas Export Agbara Gas Export Ofon 2 Epci 5 Living Quarters Ofon 2 Epci 5 Modifications and Tie-in Activities Okpoho and Okono Fields Development wellhead platform and sealines Amenam Field Development Oml 100 - Upgrade of Edikan and Odudu Platforms Amenam Amp 2 GAS Production Platform, Bridges and Flare Amenam Living Quarter

SCOPE OF WORK ON STREAM


T&I 2007

MEXICO (contd)

Dragados Offshore de Mexico/ Dragados Offshore Pemex SMOE Texaco Myanmar Total Nigeria Elf Petroleum Nigeria Mobil Producing Nigeria Mobil Producing Nigeria Eni E&P Eni E&P Total E&P Total E&P Agip Energy & Natural Resources

T&I T&I T&I T&I EPIC EPIC EPIC EPIC Feasibility Study Feasibility Study Basic Engineering Detail Engineering EPIC EPIC Basic Engineering Basic Engineering Detail Engineering and Procurement Services Technical Services Conceptual Study and Basic Design EPIC EPIC Feasibility and Conceptual Design, FEED

2003 1999 Under Execution 1999 Under Execution 2007 2006 2006 2006 2006 2006 2006 2003 2003 2003 2003 2002 2002 2001 1999 1999 1999

NIGERIA

MYANMAR

Elf Petroleum Nigeria EPNL (Total) EPNL (Total) Eiffel for EPNL (Total)

EPNL (Total) Agip Energy & Natural Resources Mobil Producing Nigeria Mobil Producing Nigeria Agip

Amenam Amp 1 Platform Okono/Okpoho Fields Iodho Q and E Revamping Project - platform topsides Oso 2y-2 Development Project Abo Field Development

105

MAJOR ENGINEERING & project REFERENCES (by Country)

CLIENT PROJECT
Elf Nigeria Ofon Project

SCOPE OF WORK ON STREAM


Detail Engineering, Procurement and Commissioning Services 1998 Engineering Services T&I EPIC EPIC T&I EPIC T&I EPIC EPIC Detail Engineering and Procurement Services EPIC Detail Engineering and Procurement Services EPIC EPIC EPIC EPIC EPIC 1998 1997 1997 1997 1997 1996 1996 1995 1994 1994 1993 1993 1992 1992 1992 1991 1988

Shell Chevron Nigeria Mobil Producing Nigeria Mobil Producing Nigeria

Obigbo Soku Flowstation Escravos Gas Project Phase 1 Development Oso NGL Topsides Installation Usari Development Project - production, wellhead and riser platforms; sealines Usari Topsides Ngo Field Development - platform and sealines Unam C and D, Edop E and Asasa A and B Wellhead Platforms and Sealines Ubit Expansion Project - production and compression platforms Ubit Expansion Project - platforms and sealines IME - Edikan Development

Mobil Producing Nigeria Liberty Technical Services Mobil Producing Nigeria

Mobil Producing Nigeria

NIGERIA (contd)

Mobil Producing Nigeria ETPM/McDermott

Elf Petroleum Nigeria ETPM/McDermott

Platform and Sealine for IME Edikan AFIA Odudu Development

Elf Petroleum Nigeria Mobil Producing Nigeria Mobil Producing Nigeria Mobil Producing Nigeria Agip Energy & Natural Resources Agip

Odudu Odpi Afia Afd1 Drilling and Production Platforms Edop C, D and 12 Wellhead Platforms Oso Field Condensate Development Facilities Ubit-I and Ubit-B Drilling Platforms and Sealines Agbara Production Platform Agbara DP 1-4 pile jacket drilling and PP-4 pile jacket production platforms

Engineering Services

1987

Agip Energy & Natural Resources

Agbara Drilling Platform

EPIC

1986

106

CLIENT
ConocoPhillips Skandinavia ConocoPhillips Skandinavia

PROJECT
Eldfisk II - wellhead, process and accommodation platform The Greater Ekofisk Area Development - living quarters, bridge support and wellhead platforms Ekofisk 2/4-S Jacket and Tripod Removal Gudrun Sigrun Development Project - Gudrun platform Gullfaks A - drilling facilities change-out Valemon Topsides and Flare Valhall Re-development Project - production platform Valhall Jacket Repair and Topside Installation Kvitebjorn PDQ Platform K5PK Compression Platform Valhall Water Injection Platform Hanze Integrated Production Deck Jade Platform Huldra Phase 1 - platform jacket Huldra Phase 2 - platform topsides Oseberg Sor Platform Asgard B - semisubmersible platform topsides Oseberg Gass (D) Platform Eldfisk - 2/7E platform Oseberg OST Platform Ekofisk 2/4J platform jacket Phase 1

SCOPE OF WORK ON STREAM


T&I T&I T&I T&I T&I T&I T&I T&I Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution 2010 2003 2003 T&I T&I T&I T&I T&I T&I T&I EPC T&I EPIC T&I T&I 2003 2002 2001 2001 2001 2001 2000 2000 1999 1999 1998 1997

Statoil Statoil Statoil Statoil BP Norge BP Statoil TotalFinaElf Aker Stord Hyundai Heavy Industries

NORWAY

Phillips Petroleum Co. Statoil Statoil Norsk Hydro Produksjon Statoil Norsk Hydro Produksjon Phillips Petroleum Co. Norway Norsk Hydro Produksjon Phillips Petroleum Company Norway Phillips Petroleum Company Norway Saga Petroleum BP Exploration Statoil

Ekofisk 2/4J Topsides Phase 2 Varg Field Development - wellhead platform Andrew Project Sleipner Vest SLT Gas Treatment Platform

T&I T&I T&I T&I

1997 1997 1996 1996

107

MAJOR ENGINEERING & project REFERENCES (by Country)

CLIENT PROJECT
Elf Norge Elf Norge Elf Norge Phillips Petroleum Company Norway Statoil Froy Wellhead Platform Phase 2 Froy Wellhead Platform Phase 3 Froy Wellhead Platform Template Phase 1 "J" Block Judy Wellhead Platform Sleipner Vest SLB Wellhead Platform Europipe 16/11E Riser Platform Bruce Area Development Markham J6A platform Embla Field Development Oseberg 2 Topsides Gyda Platform Veslefrikk Platform Ekofisk Field - drilling and production platform Kutubu Petroleum Platform

SCOPE OF WORK ON STREAM


T&I T&I T&I T&I T&I T&I T&I T&I T&I T&I T&I T&I T&I T&I 1995 1995 1995 1995 1995 1994 1992 1992 1992 1991 1990 1989 1971 1992

NORWAY (contd) PAPUA NEW GUINEA

Statoil Britoil Lasmo-Ultramar Exploration Phillips Petroleum Company Norway Norsk Hydro Produksjon BP Development Statoil Phillips Petroleum Company Norway Chevron Niugini PTY

SMOE

PS-1K Platform Rasgas Field Development Qatar Europe LNG Project - Project Definition Phase offshsore portion Lebada Est Eocene Gas Field Development

T&I FEED Engineering Services

2005 2000 1993

QATAR

Rasgas Qatar Europe LNG Co.

108

ROMANIA

Petrom R.A.

Detail Engineering, FEED, follow up of Procurement activities for EPC Project 1997

CLIENT
RUSSIA
Samsung Heavy Industries

PROJECT
Sakhalin II Phase 2 Development Project

SCOPE OF WORK ON STREAM


EPIC 2007

Saudi Aramco

Al Wasit Gas Program - Arabiyah and Hasbah Offshore Platforms, Pipelines and Cables Maintain Potential Facilities Long Term Agreement - Arabiyah, Hasbah, Abu Safa and Zuluf Fields - 5 plaform jackets Maintain Potential Facilities Long Term Agreement - Hasbah, Arbiyah and Karan Fields - 11 platform jackets Maintain Potential Facilities Long Term Agreement - Safaniya and Berri Fields - platform jackets and mezzanine decks Maintain Potential Facilities Long Term Agreement - Zuluf Field platforms, jackets and flowlines and Safaniya Field trunkline Safaniya GOSP-4 Project - accomodation, tie-in, bridge and production platforms Zuluf Field Project - compression platform FA Platform

EPIC

Under Execution

Saudi Aramco

Fabrication and T&I

Under Execution

Saudi Aramco

SAUDI ARABIA

Fabrication and T&I

2011

Saudi Aramco

Fabrication and T&I

2011

Saudi Aramco

Fabrication and T&I

2010

Saudi Aramco

EPIC EPIC T&I

1993 1984 1991

Saudi Aramco

SOUTH AFRICA

Mossgas

UTE ACS - Cobra Castoro

SPAIN

Castor Underground Gas Storage Development Project wellhead platform Alga 1600 Project Third Transmission Pipeline Project offshore platform system Bongkot Field Development Project Phase III C package 2 - platforms and sealines Bongkot Phase B 3 - wellhead platforms and sealines Galeota Point - platform and sealines installation

T&I Basic Design and FEED

2010 2007

Repsol/Initec PTT Exploration and Prodution Public Co.

EPIC

2006

THAILAND

PTT Exploration and Prodution Public Co. Total

EPIC T&I T&I

2005 1997 1993

TRINIDAD

Amoco / Brown & Root

109

MAJOR ENGINEERING & project REFERENCES (by Country)

CLIENT PROJECT
Eni Tunisia Eni Tunisia Baraka Field - platform and sealines Maamoura Platform and Sealines Zinnia Plant Updating - Baraka Development Ashtart Field - ASPF3 Platform Ashtart Oil Field - Gas Lift Project and General Revamping new platform Britannia Mono Column and Compression Module Elgin B Wellhead Platform Jacket Golden Eagle PUQ and Wellhead Platform Auk Development - Block 30/16 UK North Sea Jasmine Development Project - wellhead, accomodation and process platforms West Franklin Wellhead Platform Jacket Buzzard Enhancement Project - production platform Buzzard Platforms Clair Phase I Development Project Bleo Holm Project - FPSO topsides Elgin and Franklin Wellhead Jacket Installation Captain Field WPP Platform Erskine Field Development - platform jacket Captain Field Development Project - wellhead protection platform and sealines

SCOPE OF WORK ON STREAM


T&I EPIC Feasibility Study Fabrication and T&I Engineering Services T&I EPIC T&I T&I T&I EPIC T&I T&I T&I EPIC EPIC T&I EPIC EPIC 2010 2010 2007 1995 1986 Under Execution Under Execution Under Execution Under Execution Under Execution Under Execution 2010 2006 2004 1999 1997 1996 1996 1996

TUNISIA UNITED KINGDOm

Eni E&P SEREPT SEREPT

ConocoPhillips Elf Exploration UK Nexen Petroleum UK Talisman ConocoPhillips Elf Exploration UK Nexen Petroleum UK EniCanada UK BP Bluewater Engineering Elf Exploration UK Texaco North Sea UK Texaco North Sea UK Texaco North Sea UK

Brown & Root Highland Fabricators Elf Enterprise Caledonia Total Oil Marine BP Exploration Chevron UK Hyde Project Alliance Agip UK

Amoco Davy Bessemer Monotower Platforms Claymore Accommodation Platform Project (CAP) Dunbar Integrated Deck Hyde Alliance Project - production platform Alba Field Development - Alba Northern Platform Hyde Platform Tiffany Field Development

T&I T&I EPC T&I T&I T&I T&I

1995 1995 1994 1993 1993 1993 1992

110

CLIENT
UNITED KINGDOm (contd)
Amoco Exploration Company Amoco Exploration Company Agip UK Volker Stevin Aerospace

PROJECT
Central Graben Development Central Graben Development - Lomond Integrated Deck T-Block Project Phase 1 - drilling/production platform British Aerospace Platforms

SCOPE OF WORK ON STREAM


T&I PC Engineering Services T&I 1992 1992 1990 1989

BP Exploration & Production Williams Field Services - Gulf Coast Company ConocoPhillips

Mad Dog Drilling Rig Replacement Project Gulstar FPS - platform topsides Magnolia Tendons and Integrated Platform Magnolia TLP Piles Diana Hoover Project - spar and flowlines Mobile Bay Expansion and Extension Project Grand Isle Offshore Project - production platform Bien Dong 1 Development Project Block 12W - Chim Sao Development Project wellhead platform and sealines Topaz Development Project - wellhead platform and pipelines Pearl Development Project - platform and sealines White Tiger Central Compression Platform Development of a new offshore field connected to an existing onshore LNG plant

T&I T&I T&I T&I T&I T&I Engineering Services T&I T&I T&I T&I EPIC Screening Study

Under Execution Under Execution 2004 2004 2000 1998 1994 Under Execution 2011 2010 2009 1997 2009

USA VIETNAM

ConocoPhillips Exxon Company Usa Transco Agip Petroleum Company PTSC PTSC

Petronas Carigali PTSC Petechim Confidential

111

NOTES

112

People, Skills, Equipment.


Saipem S.p.A. Via Martiri di Cefalonia, 67 - 20097 San Donato Milanese, Milan - Italy Tel. +39.02.520.1 - Fax +39.02.520.44415 saipem.com - A subsidiary of Eni S.p.A.

03.2012