REHABILITATION & IMPROVEMENT OF 22.

13km FROM MULAITIVU TO PARANTHAN (A-035)


Consultant
Contractor
Employer
Road Development Authority

Central Engineering Consultancy Bureau

CATIC/KDESH

SITE MEASUREMENT SHEET


(To be completed daily)
Contract No

:RDA/NRRP/CGF/C11

Bill Item

Road No

:A-035 (30+000-52.13)km

Description :

Location

: 49+640~50+000

Reference

Sheet No

Date

Chainage

Sketch

Nos

Length
(m)

409 (3)

Trench Excavation for


Cross Shoulder Drain

:
:

28.08.2012

Width (m) Depth (m)

Volume (no)

200 mm

200 mm

Drain Length = 1.25 m


49+760~50+
000 LHS

Excavation of drain

25

0.750

0.200

0.200

0.75

49+640~
49+750 LHS

Excavation of drain

12

0.750

0.200

0.200

0.36

49+960~50+
000 RHS

Excavation of drain

0.750

0.200

0.200

0.15

49+760 ~
49+800 RHS

Excavation of drain

0.750

0.200

0.200

0.15

Total Quantity
Contractor's
Representative

Consultant's
Technical Officer

Checked by
Site Engineer

1.41

Recommended by
Resident Engineer

REHABILITATION & IMPROVEMENT OF 22.13km FROM MULAITIVU TO PARANTHAN (A-035)


Consultant
Contractor
Employer
Road Development Authority

Central Engineering Consultancy Bureau

CATIC/KDESH

SITE MEASUREMENT SHEET


(To be completed daily)
Contract No

:RDA/NRRP/CGF/C11

Bill Item

Road No

:A-035 (30+000-52.13)km

Description :

Location

: 36+880 ~ 36+920 LHS

Reference

Sheet No

Date
Sketch

Chainage

3.3 (13)

Road way Excavation


unsuitable soil

301 (4)
:

31.03.2013

Nos

Length
(m)

17.700

4.600

0.324

26.380

16.000

4.300

0.365

25.112

Width (m) Depth (m)

Volume (m3)

4.4m

Depth average - 0.324 m

Depth average - 0.365 m

Total Quantity
Contractor's
Representative

Consultant's
Technical Officer

Checked by
Site Engineer

51.49

Recommended by
Resident Engineer

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Clearing and Grubbing

IPC NO. 23

Pay Item

201(1)

Sheet No :

Date

PERIOD ENDING 31.05.2013

Bill No. 2.1.1

Name of Road: Mulaithivu - Paranthan Road

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
030
040
060
080
100
120
140
160
180
200
220
240
248

(m)
a
000
020
010
020
020
020
020
020
020
020
020
020
020
020
008

As per CS
As per C/S
Area
Avg. Area
Area
LHS
RHS
LHS
RHS
LHS
RHS
b
c d=(b1+b2)/2e=(c1+c2)/2 f=axd
g=axe
2.386
5.507
5.528
0.000
0.000
0.000
0.000
0.000
0.000
6.004
5.568
6.228
6.145
5.818
0.000

5.748
5.694
5.800
0.000
0.000
0.000
0.000
0.000
0.000
6.183
6.368
6.369
6.181
6.238
0.000

0.000
3.947
5.518
0.000
0.000
0.000
0.000
0.000
0.000
3.002
5.786
5.898
6.187
5.982
2.909

0.000
5.721
5.747
0.000
0.000
0.000
0.000
0.000
0.000
3.092
6.276
6.369
6.275
6.210
3.119

0.000
78.930
55.175
0.000
0.000
0.000
0.000
0.000
0.000
60.040
115.720
117.960
123.730
119.630
23.621

0.000
114.420
57.468
0.000
0.000
0.000
0.000
0.000
0.000
61.830
125.510
127.370
125.500
124.190
25.326

Volume
LHS
RHS
f=axd
g=axe
0.000
78.930
55.175
0.000
0.000
0.000
0.000
0.000
0.000
60.040
115.720
117.960
123.730
119.630
23.621

0.000
114.420
57.468
0.000
0.000
0.000
0.000
0.000
0.000
61.830
125.510
127.370
125.500
124.190
25.326

0.000
193.350
112.643
0.000
0.000
0.000
0.000
0.000
0.000
121.870
241.230
245.330
249.230
243.820
48.947

Total Qty
Previous Paid Quantity (new area)

1456.420
0.000

Balance Quantity

1456.420

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

JECT

ENDING 31.05.2013

Remarks

MENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Trim,level and compact road bed

IPC NO. 22

Pay Item

204(1)

Sheet No :

Date

PERIOD ENDING 30.04.2013

Bill No. 3.3.12

Name of Road: Mulaithivu - Paranthan Road

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

(m)
a

As per CS
As per C/S
Area
Avg. Area
Area
LHS
RHS
LHS
RHS
LHS
RHS
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
g=axe

000
2.386 5.748
020
5.507 5.694
020
5.549 5.905
020
5.742 6.709
020
6.164 6.637
020
5.717 5.779
020
5.793 5.964
020
5.99 6.133
020
6.004 6.183
020
5.568 6.368
020
6.228 6.369
020
6.145 6.181
020
5.818 6.238
008
0.000 0.000
Deduct boulder fill area

0.000
3.947
5.528
5.646
5.953
5.941
5.755
5.892
5.997
5.786
5.898
6.187
5.982
2.909

0.000
5.721
5.800
6.307
6.673
6.208
5.872
6.049
6.158
6.276
6.369
6.275
6.210
3.119
10.000

0.000
78.930
110.560
112.910
119.060
118.810
115.100
117.830
119.940
115.720
117.960
123.730
119.630
23.621
120.000

0.000
114.420
115.990
126.140
133.460
124.160
117.430
120.970
123.160
125.510
127.370
125.500
124.190
25.326

Volume
LHS
RHS
f=axd
g=axe
0.000
78.930
110.560
112.910
119.060
118.810
115.100
117.830
119.940
115.720
117.960
123.730
119.630
23.621

0.000
114.420
115.990
126.140
133.460
124.160
117.430
120.970
123.160
125.510
127.370
125.500
124.190
25.326

0.000
193.350
226.550
239.050
252.520
242.970
232.530
238.800
243.100
241.230
245.330
249.230
243.820
48.947
-1200.000

1697.43

CONTRACTOR'S REPRESENTATIVE

CONSULTANT'
TECHNICAL OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

ROJECT

and compact road bed

NDING 30.04.2013

Remarks

MMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Bill No. 3.1.4

Roadway excavation ,unsuitable soi


road bed

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 23
Sheet No :

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

As per CS
Area

(m)
a

LHS
b

000
020
020
020
020
020
020
020
020
020
020
020
020
008

0.355
0.856
12.187
9.913
5.801
6.063
4.622
4.332
1.634
3.331
1.746
1.102
1.222
0.000

RHS
c

Avg. Area

Total Quantity
Previous paid Quantity IPC 10
Previous paid Quantity IPC 11
Balance Quantity for this IPC

0.000
0.606
6.522
11.050
7.857
5.932
5.343
4.477
2.983
2.483
2.539
1.424
1.162
0.611

0.000
0.858
5.906
9.269
5.886
5.118
5.412
4.617
3.250
1.538
1.072
1.014
0.945
0.472

301(4)

Date

PERIOD ENDING 31.05.2013

As per C/S
Area

LHS
RHS
LHS
d=(b1+b2)/2e=(c1+c2)/2 f=axd

0.832
0.884
10.927
7.611
4.161
6.075
4.748
4.486
2.013
1.062
1.082
0.946
0.943
0.000

Pay Item

0.000
12.110
130.430
221.000
157.140
118.640
106.850
89.540
59.660
49.650
50.770
28.480
23.240
4.961

Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
17.160
118.110
185.380
117.720
102.360
108.230
92.340
64.990
30.750
21.440
20.280
18.890
3.829

0.000
12.110
130.430
221.000
157.140
118.640
106.850
89.540
59.660
49.650
50.770
28.480
23.240
4.961

0.000
17.160
118.110
185.380
117.720
102.360
108.230
92.340
64.990
30.750
21.440
20.280
18.890
3.829

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

TH PROJECT

Roadway excavation ,unsuitable soil

PERIOD ENDING 31.05.2013

V m3

0.000
29.270
248.540
406.380
274.860
221.000
215.080
181.880
124.650
80.400
72.210
48.760
42.130
8.790

1953.950
-744.408
-382.01
827.532
827.532

Remarks

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

prepare sub grade in cut areas

Pay Item

301(7)

Date

PERIOD ENDING 31.05.2013

Bill No. 3.1.7

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 23
Sheet No :

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

(m)
a

As per CS
Area
LHS
b

Avg. Area

As per C/S
Area

RHS
LHS
RHS
LHS
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd

000
2.386 5.748
020
5.507 5.694
020
5.549 5.905
020
5.742 6.709
020
6.164 6.637
020
5.717 5.779
020
5.793 5.964
020
5.99 6.133
020
6.004 6.183
020
5.568 6.368
020
6.228 6.369
020
6.145 6.181
020
5.818 6.238
008
0.000 0.000
Deduct boulder fill area

0.000
3.947
5.528
5.646
5.953
5.941
5.755
5.892
5.997
5.786
5.898
6.187
5.982
2.909

0.000
5.721
5.800
6.307
6.673
6.208
5.872
6.049
6.158
6.276
6.369
6.275
6.210
3.119
10.000

0.000
78.930
110.560
112.910
119.060
118.810
115.100
117.830
119.940
115.720
117.960
123.730
119.630
23.621
120.000

Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

m2

0.000
114.420
115.990
126.140
133.460
124.160
117.430
120.970
123.160
125.510
127.370
125.500
124.190
25.326

0.000
78.930
110.560
112.910
119.060
118.810
115.100
117.830
119.940
115.720
117.960
123.730
119.630
23.621

0.000
114.420
115.990
126.140
133.460
124.160
117.430
120.970
123.160
125.510
127.370
125.500
124.190
25.326

0.000
193.350
226.550
239.050
252.520
242.970
232.530
238.800
243.100
241.230
245.330
249.230
243.820
48.947
-1200.000

Total Qty
Previous Paid Quantity (new area)

1697.427
0.000

Balance Quantity

1697.427

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CT

grade in cut areas

ING 31.05.2013

Remarks

MENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Embankment Construction Type 2

Pay Item

304(3)

Date

PERIOD ENDING 31.05.2013

Bill No. 3.3.13

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 23
Sheet No :

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

(m)
a
000
020
020
020
020
020
020
020
020
020
020
020
020
008

As per CS
Area
LHS
b
0.328
1.258
8.291
6.656
3.899
2.889
2.422
2.640
2.012
2.300
2.932
1.690
1.055
0.000

Total Quantity
Previous paid Quantity IPC 10
Previous paid Quantity IPC 11
Balance Quantity for this IPC

Avg. Area

As per C/S
Area

RHS
LHS
RHS
LHS
c
d=(b1+b2)/2e=(c1+c2)/2 f=axd
3.345
1.471
8.241
5.564
4.069
2.994
2.714
2.907
2.747
2.386
2.466
1.620
1.234
0.000

0.000
0.793
4.775
7.474
5.278
3.394
2.656
2.531
2.326
2.156
2.616
2.311
1.373
0.528

0.000
2.408
4.856
6.903
4.817
3.532
2.854
2.811
2.827
2.567
2.426
2.043
1.427
0.617

0.000
15.860
95.490
149.470
105.550
67.880
53.110
50.620
46.520
43.120
52.320
46.220
27.450
4.283

Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

V m3

0.000
48.160
97.120
138.050
96.330
70.630
57.080
56.210
56.540
51.330
48.520
40.860
28.540
5.010

0.000
15.860
95.490
149.470
105.550
67.880
53.110
50.620
46.520
43.120
52.320
46.220
27.450
4.283

0.000
48.160
97.120
138.050
96.330
70.630
57.080
56.210
56.540
51.330
48.520
40.860
28.540
5.010

0.000
64.020
192.610
287.520
201.880
138.510
110.190
106.830
103.060
94.450
100.840
87.080
55.990
9.293

1552.273
-226.8
-1027.97
297.503
297.503

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CT

nt Construction Type 2

DING 31.05.2013

Remarks

MENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Embankment Construction Type 1

Pay Item

304(2)

Date

PERIOD ENDING 31.05.2013

Bill No. 3.3.13

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 23
Sheet No :

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

(m)
a
000
020
020
020
020
020
020
020
020
020
020
020
020
008

As per CS
Area
LHS
b
0.611
0.693
2.678
2.821
2.705
2.075
2.113
2.057
2.707
2.678
2.707
2.707
2.707
0.000

Total Quantity
Prevous paid Quantity IPC 23
Balance Quantity for this IPC

Avg. Area

As per C/S
Area

RHS
LHS
RHS
LHS
c
d=(b1+b2)/2
e=(c1+c2)/2 f=axd
0.731
0.909
2.707
2.799
2.707
1.919
2.196
2.029
2.707
2.707
2.707
2.707
2.706
0.000

0.000
0.652
1.686
2.750
2.763
2.390
2.094
2.085
2.382
2.693
2.693
2.707
2.707
1.354

0.000
0.820
1.808
2.753
2.753
2.313
2.058
2.113
2.368
2.707
2.707
2.707
2.707
1.353

0.000
13.040
33.710
54.990
55.260
47.800
41.880
41.700
47.640
53.850
53.850
54.140
54.140
10.990

Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
16.400
36.160
55.060
55.060
46.260
41.150
42.250
47.360
54.140
54.140
54.140
54.130
10.986

0.000
13.040
33.710
54.990
55.260
47.800
41.880
41.700
47.640
53.850
53.850
54.140
54.140
10.990

0.000
16.400
36.160
55.060
55.060
46.260
41.150
42.250
47.360
54.140
54.140
54.140
54.130
10.986

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT E

N NORTH PROJECT

Embankment Construction Type 1

PERIOD ENDING 31.05.2013

m2

V m3

0.000
29.440
69.870
110.050
110.320
94.060
83.030
83.950
95.000
107.990
107.990
108.280
108.270
21.977

0.000
29.440
69.870
110.050
110.320
94.060
83.030
83.950
95.000
107.990
107.990
108.280
108.270
21.977

1130.227
-791.159
339.068
339.068

Remarks

RECOMMENDED BY RESIDENT ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Sub base as compacted in position

Pay Item

401(1)

Date

PERIOD ENDING 30.06.2013

Bill No. 4.1.1

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 24
Sheet No :

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

(m)
a
000
020
020
020
020
020
020
020
020
020
020
020
020
008

As per CS
Area
LHS
b
0.585
1.185
1.185
1.185
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
0.000

Avg. Area

As per C/S
Area

RHS
LHS
RHS
LHS
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
0.754
1.185
1.185
1.185
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
0.000

0.293
0.885
1.185
1.185
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
0.593

0.377
0.970
1.185
1.185
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
0.593

0.000
17.700
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

m2

0.000
19.390
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

0.000
17.700
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

0.000
19.390
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

0.000
37.090
47.400
47.400
47.420
47.440
47.440
47.440
47.440
47.440
47.440
47.440
47.440
9.630

568.46

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT ENG

PROJECT

s compacted in position

NDING 30.06.2013

V m3

0.000
37.090
47.400
47.400
47.420
47.440
47.440
47.440
47.440
47.440
47.440
47.440
47.440
9.630

568.460

Remarks

MMENDED BY RESIDENT ENGINEER

Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
4.4.13
Road No: A035 From 30+000-52+130km
Description :
Bituminous Prime Coat using MC 30
Name of Road: Mulaithivu - Paranthan Road
at 1 litre per m2
IPC NO. 25
Pay Item
:
501 (1)
Sheet No : PR/01
Date
:
PERIOD ENDING 31.07.2013
As per CS
As per C/S
Up to this Month
Length
Area
Avg. Area
Area
Area
Chainage
Remarks
m2
(m)
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
a
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd g=axe f=axd
g=axe
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
35

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
0

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Total Qty
Previous Paid Quantity IPC 23
Previous Paid Quantity IPC 24
Balance Quantity
CONTRACTOR'S
REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.000
-592

CHECKED BY SITE
ENGINEER

3358.000
3358.000
RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
4.4.13
Road No: A035 From 30+000-52+130km
Description :
Bituminous Prime Coat using MC 30

Name of Road: Mulaithivu - Paranthan Road


at 1 litre per m2
IPC NO. 25
Pay Item
:
501 (1)
Sheet No : PR/02
Date
:
PERIOD ENDING 31.07.2013
As per CS
As per C/S
Up to this Month
Length
Area
Avg. Area
Area
Area
Chainage
Remarks
m2
(m)
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
a
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd g=axe f=axd
g=axe
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Total Qty
Previous Paid Quantity IPC 23
Previous Paid Quantity IPC 24
Balance Quantity

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.000
-553.000

CHECKED BY SITE
ENGINEER

0.000
RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
4.4.13
Road No: A035 From 30+000-52+130km
Description
Bituminous
:
Prime Coat using MC 30
Name of Road: Mulaithivu - Paranthan Road
at 1 litre per m2

IPC NO. 25
Sheet No : PR/03
Length
Chainage

51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51

(m)
a

Pay Item
:
501 (1)
Date
PERIOD
:
ENDING 31.07.2013
As per CS
As per C/S
Up to this Month
Avg. Area
Area
Area
Area
m2
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd g=axe f=axd
g=axe

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Remarks

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

Total Qty

3950.000

Previous Paid Quantity IPC 16


Balance Quantity

3239.000
711.000
711.000

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
4.4.13
Road No: A035 From 30+000-52+130km
Description :
Bituminous Prime Coat using MC 30

Name of Road: Mulaithivu - Paranthan Road


at 1 litre per m2
IPC NO. 25
Pay Item
:
501 (1)
Sheet No : PR/04
Date
:
PERIOD ENDING 31.07.2013
Chainage
Length As per CS
As per C/S
Up to this Month
Remarks
Area
Avg. Area
Area
Area
m2
(m)
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
a
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
g=axe f=axd
g=axe
51 500
51 520
51 540
51 560
51 580
51 600
51 620
51 640
51 660
51 680
51 700
51 720
51 740
51 760
51 780
51 800
51 820
51 840
51 860
51 880
51 900
51 920
51 940
51 960
51 980
52
0
Total Qty

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Previous Paid Quantity IPC 16


Balance Quantity

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
0.000
0.000
3634.000
3021.750
612.250
612.250

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
4.4.13
Road No: A035 From 30+000-52+130km
Description :
Bituminous Prime Coat using MC 30
Name of Road: Mulaithivu - Paranthan Road
at 1 litre per m2
IPC NO. 25
Pay Item
:
501 (1)

Sheet No : PR/05
Length
Chainage

49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
50

(m)
a

500
0
520
20
540
20
560
20
580
20
591
20
600
20
620
20
640
20
660
20
680
20
700
20
720
20
740
20
760
20
780
20
800
20
830
20
840
20
860
20
880
20
900
20
920
20
940
20
960
20
980
20
0
20
Total Qty

Date
:
PERIOD ENDING 31.07.2013
As per CS
As per C/S
Up to this Month
Remarks
Area
Avg. Area
Area
Area
m2
LHS
RHS
LHS
RHS
LHS
RHS
LHS
RHS
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd g=axe f=axd
g=axe
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
0.000
0.000
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
0.000
0.000
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
0.000
0.000
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Previous Paid Quantity IPC 16


Balance Quantity

0.000
0.000
0.000
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
79.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3713.000
2587.250

1125.750
CONTRACTOR'S
REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

at using MC 30

at using MC 30

at using MC 30

at using MC 30

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Dense graded Aggregate Base

IPC NO. 25

Pay Item

405 (1)

Sheet No : ABC/01

Date

PERIOD ENDING 31.07.2013

4.1.4

Name of Road: Mulaithivu - Paranthan Road

Length
Chainage

33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
34

500
512
520
540
560
580
591
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
000

(m)
a
0
12
20
20
20
20
11
9
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
0.963
0.963
0.963
0.963
0.963
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692

0.963
0.963
0.963
0.963
0.963
0.963
0.963
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692

As per C/S
Volume

Up to this Month
Volume

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
11.556
19.260
19.260
19.260
13.840
7.612
6.228
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

0.000
11.556
19.260
19.260
19.260
19.260
10.593
6.228
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

0.000
11.556
19.260
19.260
19.260
13.840
7.612
6.228
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

0.000
11.556
19.260
19.260
19.260
19.260
10.593
6.228
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

Total Qty
Previous Paid Quantity (IPC 16,19,21,22)
Previous Paid Quantity (IPC 24,)
Balance Quantity

CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'
TECHNICAL OFFICER

This Month

Remarks
V m3Cum. V m3

0.000
23.112
38.520
38.520
38.520
33.100
18.205
12.456
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
756.033
-691.000
65.033

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Dense graded Aggregate Base

IPC NO. 25

Pay Item

405 (1)

Sheet No : ABC/02

Date

PERIOD ENDING 31.07.2013

4.1.4

Name of Road: Mulaithivu - Paranthan Road

Length
Chainage

35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

(m)
a
0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

As per C/S
Volume

Up to this Month
Volume

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

0.000
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820

0.000
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820

Total Qty
Previous Paid Quantity IPC ,19
Previous Paid Quantity IPC ,23
Balance Quantity
CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'
TECHNICAL OFFICER

This Month

Remarks
V m3Cum. V m3

0.000
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
27.640
691.000
-207.300
0.000
483.700
483.70

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD

Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Dense graded Aggregate Base

IPC NO. 25

Pay Item

405 (1)

Sheet No : ABC/03

Date

4.1.4

Name of Road: Mulaithivu - Paranthan Road

Length
Chainage

36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

(m)
a

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

As per C/S
Volume

PERIOD ENDING 31.07.2013

Up to this Month
Volume

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691
0.691

0.000
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820

0.000
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820

Total Qty
Previous Paid Quantity
Previous Paid Quantity (IPC 23)
Balance Quantity
CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'
TECHNICAL OFFICER

This Month

Remarks
V m3Cum. V m3

0.000
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820
13.820

this IPC
50%
Balance
after
complete

345.500
0.000
345.500
345.50
CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

4.1.4
Dense graded Aggregate Base

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 25
Sheet No : ABC/04

Length
Chainage

49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
50

(m)
a

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
000

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692

0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692
0.692

Pay Item

Date

As per C/S
Volume

405 (1)
PERIOD ENDING 30.06.2013

Up to this Month
Volume

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

0.000
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

0.000
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

0.000
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840
13.840

Total Qty
Previous Paid Quantity
Balance Quantity

This Month

Remarks
V m3Cum. V m3

0.000
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
27.680
692.000
-607.840

This IPC
50%
balance,
after
complete

84.160

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Sub base as compacted in position

IPC NO. 25

Pay Item

401(1)

Sheet No : ABC/05

Date

PERIOD ENDING 31.07.2013

Bill No. 4.1.1

Name of Road: Mulaithivu - Paranthan Road

Length
Chainage

(m)

Avg. Area
LHS

RHS

As per C/S
Area
LHS

RHS

Volume
LHS

RHS

m2

Remarks
V m3

Chainage

m2
a

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

000
020
020
020
020
020
020
020
020
020
020
020
020
008

d=(b1+b2)/2e=(c1+c2)/2
0.293
0.885
1.185
1.185
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
0.593

0.377
0.970
1.185
1.185
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
1.186
0.593

f=axd

g=axe

f=axd

g=axe

0.000
17.700
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

0.000
19.390
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

0.000
17.700
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

0.000
19.390
23.700
23.700
23.710
23.720
23.720
23.720
23.720
23.720
23.720
23.720
23.720
4.815

Remarks
V m3

0.000
37.090
47.400
47.400
47.420
47.440
47.440
47.440
47.440
47.440
47.440
47.440

511.39
CONTRACTOR'S
REPRESENTATIVE

CONSULTANT'
TECHNICAL OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

REHABILITATION & IMPROVEMENT OF 22.13km FROM MULAITIVU TO PARANTHAN (A-035)


Consultant
Contractor
Employer
Road Development Authority

Central Engineering Consultancy Bureau

CATIC/KDESH

SITE MEASUREMENT SHEET


(To be completed daily)
Contract No

:RDA/NRRP/CGF/C11

Bill Item

Road No

:A-035 (30+000-52.13)km

Description :

Grade C 25 concreate

Location

:43/5

Reference

1001 (3)

Sheet No

Date
Sketch

Chainage

Length
(m)

Nos

6.2(20)

:
:

30.06.2013

Width (m) Depth (m)

4
5

6
3

5
3
3

3
5
2
1

2. Base

Total Quantity

11.700

5.900

0.300

Contractor's
Representative

Consultant's
Technical Officer

Checked by
Site Engineer

Recommended by
Resident Engineer

REHABILITATION & IMPROVEMENT OF 22.13km FROM MULAITIVU TO PARANTHAN (A-035)


Consultant
Contractor
Employer
Road Development Authority

Central Engineering Consultancy Bureau

CATIC/KDESH

SITE MEASUREMENT SHEET


(To be completed daily)
Contract No

:RDA/NRRP/CGF/C11

Bill Item

: 6.2(20)

Road No

:A-035 (30+000-52.13)km

Description

: Grade C 25 concrete

Location

: 53/1

Reference

: 1001 (3)

Sheet No

Date

: 30.06.2013

Sketch

Chainage

Length
(m)

Nos

Width (m) Depth (m)

4
6

6
3

3
5
2
1

3.Side Wall

11.700

0.200

1.000

4. Deck

11.700

2.400

0.250

11.700

0.150

0.150

5.Taper Shell Inside

Deduct previous paid in IPC 16

4*1/2

Total Quantity
Contractor's
Representative

Consultant's
Technical Officer

Checked by
Site Engineer

Recommended by
Resident Engineer

REHABILITATION & IMPROVEMENT OF 22.13km FROM MULAITIVU TO PARANTHAN (A-035)


Consultant
Contractor
Employer
Road Development Authority

Central Engineering Consultancy Bureau

CATIC/KDESH

SITE MEASUREMENT SHEET


(To be completed daily)
Contract No

:RDA/NRRP/CGF/C11

Bill Item

: 6.2(20)

Road No

:A-035 (30+000-52.13)km

Description

: Grade C 25 concrete

Location

48/2

Reference

: 1001 (3)

Sheet No

Date

: 30.06.2013

Sketch

Chainage

Length
(m)

Nos

Width (m) Depth (m)

4
6

6
3

3
5
2
1

2 Base

11.700

1.400

0.200

Total Quantity
Contractor's
Representative

Consultant's
Technical Officer

Checked by
Site Engineer

Recommended by
Resident Engineer

Consultant

Contractor

Central Engineering Consultancy Bureau

CATIC/KDESH

Employer
Road Development Authority

SITE MEASUREMENT SHEET


(To be completed daily)
Contract No

:RDA/NRRP/CGF/C11

Bill Item

: 6.2(20)

Road No

:A-035 (30+000-52.13)km

Description

: Grade C 25 concrete

Location

46/1

Reference

: 1001 (3)

Sheet No

Date

: 30.06.2013

Sketch

Chainage

Length
(m)

Nos

Width (m) Depth (m)

4
6

6
3

3
5
2
1

1.Key wall
2 Base

3.800

0.300

0.600

0.700

0.300

0.200

11.700

2.400

0.250

3.side wall

11.700

0.200

0.800

4.deck

11.700

2.400

0.250

12.750

0.150

0.150

5.Tapershell inside

4*1/2

Privious paid in IPC 14

Total Quantity
Contractor's
Representative

Consultant's
Technical Officer

Checked by
Site Engineer

Recommended by
Resident Engineer

AN (A-035)
Contractor

CATIC/KDESH

Grade C 25 concreate

30.06.2013
Volume
(m3)

20.709

20.71

ommended by
ident Engineer

AN (A-035)
Contractor

CATIC/KDESH

Grade C 25 concrete

30.06.2013
Volume
(m3)

4.680
7.020
0.527

-11.01

1.22

ommended by
ident Engineer

AN (A-035)
Contractor

CATIC/KDESH

Grade C 25 concrete

30.06.2013
Volume
(m3)

3.276

17031

3.28

ommended by
ident Engineer

Contractor

CATIC/KDESH

Grade C 25 concrete

30.06.2013
Volume
(m3)

1.368
0.168
7.020

45864

3.744
7.020
0.574
-14.890

5.00

ommended by
ident Engineer

70052.5

REHABILITATION & IMPROVEMENT OF 22.13km FROM MULAITIVU TO PARANTHAN (A-035)


Consultant
Contractor
Employer
Road Development Authority

Central Engineering Consultancy Bureau

CATIC/KDESH

SITE MEASUREMENT SHEET


(To be completed daily)
Contract No

:RDA/NRRP/CGF/C11

Bill Item

Road No

:A-035 (30+000-52.13)km

Description :

Clering and reshape


earth drains

Location

36+980 to 38+435

Reference

1301(1)

Sheet No

Date
Nos

Length
(m)

RHS

1005

RHS

85

Sketch

Chainage

36+890
37+895

38+350
38+435

1090

Total Quantity

:
:

5.4 (14)

30.04.2013

Width (m) Depth (m)

Contractor's
Representative

Consultant's
Technical Officer

Checked by
Site Engineer

Recommended by
Resident Engineer

AN (A-035)
Contractor

CATIC/KDESH

Clering and reshape


earth drains

30.04.2013
Volume
(m3)

1090.00

ommended by
ident Engineer

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No : RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Boulder packing for

Pay Item

304(4)

Date

PERIOD ENDING 30.04.2013

Bill No. 3.3.15

Name of Road: Mulaithivu - Paranthan Road

soft ground treatment

IPC NO. 11
Sheet No :

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240

As per CS
Area

(m)
a

LHS
b

0
10
10
20
20
20
20
20
10
20
20
20
20

0.000
0.000
2.055
1.791
3.028
2.412
1.733
2.190
0.000
0.000
0.000
0.000
0.000

Total Quantity
Previous paid Quantity IPC 11
Balance Quantity for this IPC

RHS
c
0.000
0.000
1.929
1.909
2.351
2.568
1.988
2.453
0.000
0.000
0.000
0.000
0.000

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
0.000
0.000
1.028
1.923
2.410
2.720
2.073
1.962
1.095
0.000
0.000
0.000
0.000

0.000
0.000
0.965
1.919
2.130
2.460
2.278
2.221
1.227
0.000
0.000
0.000
0.000

As per C/S
Volume

.
Volume

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
0.000
10.275
38.460
48.190
54.400
41.450
39.230
10.950
0.000
0.000
0.000
0.000

0.000
0.000
9.645
38.380
42.600
49.190
45.560
44.410
12.265
0.000
0.000
0.000
0.000

0.000
0.000
10.275
38.460
48.190
54.400
41.450
39.230
10.950
0.000
0.000
0.000
0.000

0.000
0.000
9.645
38.380
42.600
49.190
45.560
44.410
12.265
0.000
0.000
0.000
0.000

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDEN
ENGINEER

H PROJECT

Boulder packing for


soft ground treatment

PERIOD ENDING 30.04.2013

.
V m3

0.000
0.000
19.920
76.840
90.790
103.590
87.010
83.640
23.215
0.000
0.000
0.000
0.000

485.005
-362.960
122.045
122.05

Remarks

9.41E+10

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/01

Date

Length
Chainage

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
31

500
520
540
560
580
600
620
640
660
680
700
735
740
750
760
780
800
820
840
860
880
900
920
940
960
980
000

m
a

As per CS
Area
LHS
b

0
0.000
20
0.000
20
0.000
20
0.000
20
0.000
20
0.000
20
0.000
20
0.000
20
0.000
20
0.000
20
0.000
5
3.950
10
3.950
10
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

RHS
c
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.975
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
9.875
39.500
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
19.750
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
9.875
39.500
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/02

Date

Length
Chainage

31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

m
a

As per CS
Area
LHS
b

20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

RHS
c
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/03

Date

Length
Chainage

31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980

As per CS
Area

m
a

LHS
b

RHS
c

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

1.975
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

1.975
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

32

000

20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950

3.950

3.950

CONSULTANT' TECHNICAL OFFICER

79.000

79.000

79.000

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/04

Date

Length
Chainage

32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400

As per CS
Area

m
a

LHS
b

RHS
c

20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

32
32
32
32
32

420
440
460
480
500

20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950

CONSULTANT' TECHNICAL OFFICER

79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/05

Date

Length
Chainage

32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820

As per CS
Area

m
a

LHS
b

RHS
c

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

1.975
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

1.975
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

32
32
32
32
32
32
32
32
33

840
860
880
900
920
940
960
980
000

20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

CONSULTANT' TECHNICAL OFFICER

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26
Sheet No : AC/06

Length
Chainage

33
33
33
33
33
33
33
33
33
33
33
33
33
33
33

000
020
040
060
080
100
120
140
160
180
200
220
240
249.15
249.15

As per CS
Area

m
a

LHS
b

RHS
c

20
20
20
20
20
20
20
20
20
20
20
20
20
9.15
0

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
5.500

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
5.500

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
4.725

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
4.725

Pay Item

Date

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
36.143
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
36.143
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
36.143
0.000

33
33
33
33
33
33
33
33
33
33
33
33
33

260.00
280
300
320
340
360
380
400
420
440
460
480
500

10.85
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
20
5.500
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500

5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500

5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500

CONSULTANT' TECHNICAL OFFICER

59.675
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000

59.675
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000

59.675
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/07

Date

Length
Chainage

33
33
33
33
33
33
33
33
33

500
520
540
560
580
600
620
640
660

As per CS
Area

m
a

LHS
b

RHS
c

0
20
20
20
20
20
20
20
20

5.500
5.500
3.950
3.950
3.950
3.950
3.950
3.950
3.950

5.500
5.500
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
2.750
5.500
4.725
3.950
3.950
3.950
3.950
3.950
3.950

2.750
5.500
4.725
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

1.975
110.000
94.500
79.000
79.000
79.000
79.000
79.000
79.000

1.975
110.000
94.500
79.000
79.000
79.000
79.000
79.000
79.000

0.000
110.000
94.500
79.000
79.000
79.000
79.000
79.000
79.000

33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
34

680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
000

20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

CONSULTANT' TECHNICAL OFFICER

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/08

Date

Length
Chainage

34
34
34
34
34

000
020
040
060
080

As per CS
Area

m
a

LHS
b

RHS
c

20
20
20
20
20

3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

0.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000

34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34

100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

CONSULTANT' TECHNICAL OFFICER

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/09

Date

Length
Chainage

34

500

As per CS
Area

m
a

LHS
b

RHS
c

3.950

3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975

1.975

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

1.975

1.975

0.000

34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
35

520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
000

20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

CONSULTANT' TECHNICAL OFFICER

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : AC/10

Date

Length
Chainage

As per CS
Area

Avg. Area

As per C/S
Area

Up to this Month
Area

Chainage

35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
504.775
507.225

m
a

LHS
b

20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
20
3.950
24.775
8.025
2.45
8.025
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

RHS
c
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
8.025
8.025

LHS
RHS
d=(b1+b2)/2 e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
8.025

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
8.025

CONSULTANT' TECHNICAL OFFICER

LHS
f=axd

RHS
g=axe

LHS
f=axd

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
97.861
19.661

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
97.861
19.661

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
97.861
19.661

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26
Sheet No : AC/11
As per CS
Length
Area
Chainage
(m)
LHS
RHS
a
b
c
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Pay Item
Date
As per C/S
Area
LHS
RHS
f=axd
g=axe

:
:

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Up to this Month
Area
LHS
f=axd

Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :
Name of Road: Mulaithivu - Paranthan Road
IPC NO. 26
Pay Item
:
Sheet No : AC/12
Date
:
Up to this Month
As per CS
As per C/S
Length
Area
Area
Avg. Area
Area
Chainage
LHS
(m)
LHS
RHS
LHS
RHS
LHS
RHS
f=axd
a
b
c
d=(b1+b2)/2e=(c1+c2)/2 f=axd
g=axe
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
52

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
0
Total Qty

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
0
0

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.95

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000
0.000
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000
0.000
0.000

Previous Paid Quantity


Balance Quantity

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE
ENGINEER

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000
0.000
0.000

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :
Name of Road: Mulaithivu - Paranthan Road
IPC NO. 26
Pay Item
:
Sheet No : AC/13
Date
:
Up to this Month
As per CS
As per C/S
Length
Area
Area
Avg. Area
Area
Chainage
LHS
(m)
LHS
RHS
LHS
RHS
LHS
RHS
f=axd
a
b
c
d=(b1+b2)/2e=(c1+c2)/2 f=axd
g=axe
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
50

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
0
Total Qty

0
0
0
0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

Previous Paid Quantity


Balance Quantity

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.95
3.95
3.95

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
0.000
0.000
0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :
Name of Road: Mulaithivu - Paranthan Road
IPC NO. 26
Pay Item
:
Sheet No : AC/14
Date
:
Up to this Month
As per CS
As per C/S
Length
Area
Area
Avg. Area
Area
Chainage
LHS
(m)
LHS
RHS
LHS
RHS
LHS
RHS
f=axd
a
b
c
d=(b1+b2)/2e=(c1+c2)/2 f=axd
g=axe
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

Total Qty
Previous Paid Quantity

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Balance Quantity

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :
Name of Road: Mulaithivu - Paranthan Road
IPC NO. 26
Pay Item
:
Sheet No : AC/15
Date
:
Up to this Month
As per CS
As per C/S
Length
Area
Area
Avg. Area
Area
Chainage
LHS
(m)
LHS
RHS
LHS
RHS
LHS
RHS
f=axd
a
b
c
d=(b1+b2)/2e=(c1+c2)/2 f=axd
g=axe
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
51

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
0
Total Qty

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

Previous Paid Quantity


Balance Quantity

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
19.750
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

m2

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
9.875
39.500
59.250
118.500
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
2123.13
(1,475.7)
647.41

Remarks

647.41
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe
0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

m2

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
(3,302.3)
647.75

Remarks

647.75
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

Remarks

79.000

158.000
3950.00
(474.0)
3476.00

3476.00
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

Remarks

79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

3950.00
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

Remarks

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

3950.00
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
36.143
0.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
72.285
0.000

Remarks

59.675
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000

119.350
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
4727.64
4727.64

4727.64
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
110.000
94.500
79.000
79.000
79.000
79.000
79.000
79.000

0.000
220.000
189.000
158.000
158.000
158.000
158.000
158.000
158.000

Remarks

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
4043.00
4043.00

4043.00
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000

Remarks

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

3950.00
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000

0.000

Remarks

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

3950.00
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
m2

Remarks

RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
97.861
19.661

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
195.723
39.323
4027.05

Remarks

4027.05

4027.05
RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness

Asphalt concrete in wearing course


50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

Remarks

3950.000
-3634.00
316.000

RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000
0.000
0.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
0.000
0.000
0.000
3476.000

Remarks

(2,923.00)
553.000

RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
0.000
0.000
0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3476.000
(2,780.80)
695.200

Remarks

RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

3950.000
-3160.00

Remarks

790.000

RECOMMENDED BY RESIDENT
ENGINEER

NORTH PROJECT
4.5.21
Asphalt concrete in wearing course
50mm compacted thickness
506 (1)
PERIOD ENDING 31.08.2013

Up to this Month
Area
RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.000

Remarks

(3,333.80)
616.200

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

4.4.15

Bituminous Tack Coat Catio


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No : TC/01

Date

Length
Chainage

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
31

500
520
540
560
580
600
620
640
660
680
700
720
740
750
760
780
800
820
840
860
880
900
920
940
960
980
000

m
a

As per CS
Area
LHS
b

RHS
c

0
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
20
0.000
0.000
10
3.950
0.000
10
3.950
0.000
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

502 (1)

PERIOD ENDING 31.08.2013

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
19.750
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
29.625
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
19.750
39.500
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
29.625
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY R
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Bituminous Tack Coat Catio


grade CRS1 at 0.3 liter/m2

IPC NO. 26

Pay Item

502 (1)

Sheet No : TC/02

Date

PERIOD ENDING 31.08.2013

4.4.15

Name of Road: Mulaithivu - Paranthan Road

Length
Chainage

31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

m
a

As per CS
Area
LHS
b

RHS
c

20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY R
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

4.4.15

Bituminous Tack Coat Catio


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

Sheet No :TC/04

Date

Length
Chainage

31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31
31

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980

As per CS
Area

m
a

LHS
b

RHS
c

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

502 (1)

PERIOD ENDING 31.08.2013

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

LHS
f=axd

RHS
g=axe

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

32

000

20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950

3.950

CONSULTANT' TECHNICAL OFFICER

79.000

79.000

79.000

79.000

RECOMMENDED BY R
ENGINEER

CHECKED BY SITE ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

4: .4.15

Road No: A035 From 30+000-52+130km

Description :Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

502
: (1)

Sheet No : TC/05

Date

: ERIOD ENDING 31.08.2013


P

Length
Chainage

32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400

As per CS
Area

m
a

LHS
b

RHS
c

20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

32
32
32
32
32

420
440
460
480
500

20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950

79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

3950.00
CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

4: .4.15

Road No: A035 From 30+000-52+130km

Description :Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

502
: (1)

Sheet No : TC/06

Date

: ERIOD ENDING 31.08.2013


P

Length
Chainage

32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32
32

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820

As per CS
Area

m
a

LHS
b

RHS
c

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

RHS
g=axe

m2

1.975
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

1.975
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

32
32
32
32
32
32
32
32
33

840
860
880
900
920
940
960
980
000

20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

3950.00
RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26
Sheet No : AC/07

Length
Chainage

33
33
33
33
33
33
33
33
33
33
33
33
33
33
33

000
020
040
060
080
100
120
140
160
180
200
220
240
249.15
249.15

As per CS
Area

m
a

LHS
b

RHS
c

20
20
20
20
20
20
20
20
20
20
20
20
20
9.15
0

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
5.500

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
5.500

4: .4.15

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
4.725

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
4.725

Pay Item

502
: (1)

Date

: ERIOD ENDING 31.08.2013


P

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
36.143
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
36.143
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
36.143
0.000

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
72.285
0.000

33
33
33
33
33
33
33
33
33
33
33
33
33

260.00
280
300
320
340
360
380
400
420
440
460
480
500

10.85
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
20
5.500
5.500
Total Qty
Previous Paid Quantity
Balance Quantity

5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500

5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500
5.500

59.675
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000

59.675
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000

59.675
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000
110.000

119.350
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
4727.64
4727.64

4727.64
CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

4: .4.15

Road No: A035 From 30+000-52+130km

Description :Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

502
: (1)

Sheet No : TC/08

Date

: ERIOD ENDING 31.08.2013


P

Length
Chainage

33
33
33
33
33
33
33
33
33

500
520
540
560
580
600
620
640
660

As per CS
Area

m
a

LHS
b

RHS
c

0
20
20
20
20
20
20
20
20

5.500
5.500
3.950
3.950
3.950
3.950
3.950
3.950
3.950

5.500
5.500
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
2.750
5.500
4.725
3.950
3.950
3.950
3.950
3.950
3.950

2.750
5.500
4.725
3.950
3.950
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

RHS
g=axe

m2

1.975
110.000
94.500
79.000
79.000
79.000
79.000
79.000
79.000

1.975
110.000
94.500
79.000
79.000
79.000
79.000
79.000
79.000

0.000
110.000
94.500
79.000
79.000
79.000
79.000
79.000
79.000

0.000
220.000
189.000
158.000
158.000
158.000
158.000
158.000
158.000

33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
33
34

680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
000

20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
4043.00
4043.00

4043.00
CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :Bituminous Tack Coat Cationc Emulsion

4: .4.15
grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

502
: (1)

Sheet No : TC/09

Date

: ERIOD ENDING 31.08.2013


P

Length
Chainage

34
34
34
34
34

000
020
040
060
080

As per CS
Area

m
a

LHS
b

RHS
c

20
20
20
20
20

3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000

0.000
158.000
158.000
158.000
158.000

34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34

100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

3950.00
CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

4: .4.15

Road No: A035 From 30+000-52+130km

Description :Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

502
: (1)

Sheet No : TC/10

Date

: ERIOD ENDING 31.08.2013


P

Length
Chainage

34

500

As per CS
Area

m
a

LHS
b

RHS
c

3.950

3.950

Avg. Area
LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975

1.975

As per C/S
Area

Up to this Month
Area

LHS
f=axd

RHS
g=axe

RHS
g=axe

m2

1.975

1.975

0.000

0.000

34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
35

520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
000

20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
Total Qty
Previous Paid Quantity
Balance Quantity

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
3950.00

3950.00
CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

4: .4.15

Road No: A035 From 30+000-52+130km

Description :Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26

Pay Item

502
: (1)

Sheet No : TC/11

Date

: ERIOD ENDING 31.08.2013


P

Length
Chainage

As per CS
Area

Avg. Area

As per C/S
Area

Up to this Month
Area
m2

Chainage

35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
504.775
507.225

m
a

LHS
b

RHS
c

20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
20
3.950
3.950
24.775
8.025
8.025
2.45
8.025
8.025
Total Qty
Previous Paid Quantity
Balance Quantity

LHS
RHS
d=(b1+b2)/2e=(c1+c2)/2
1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
8.025

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
8.025

LHS
f=axd

RHS
g=axe

RHS
g=axe

m2

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
97.861
19.661

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
97.861
19.661

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
97.861
19.661

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
195.723
39.323
4027.05
4027.05

4027.05
CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
4.4.15
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :
Bituminous Tack Coat Catio
grade CRS1 at 0.3 liter/m2

Name of Road: Mulaithivu - Paranthan Road


IPC NO. 26
Sheet No : TC/12
As per CS
Length
Area
Avg. Area
Chainage
(m)
LHS
RHS
LHS
RHS
a
b
c d=(b1+b2)/2
e=(c1+c2)/2
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

Bituminous Tack Coat Catio


grade CRS1 at 0.3 liter/m2

Pay Item
Date
As per C/S
Area
LHS
RHS
f=axd
g=axe

:
:

LHS
f=axd

RHS
g=axe

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

502 (1)

PERIOD ENDING 31.08.2013

Up to this Month
Area

Total Qty
Previous Paid Quantity
Balance Quantity

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY R
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
4.4.15
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :
Bituminous Tack Coat Catio
grade CRS1 at 0.3 liter/m2
Name of Road: Mulaithivu - Paranthan Road
502 (1)
IPC NO. 26
Pay Item
:
PERIOD ENDING 31.08.2013
Sheet No : TC/13
Date
:
Up to this Month
As per CS
As per C/S
Length
Area
Area
Avg. Area
Area
Chainage
LHS
RHS
(m)
LHS
RHS
LHS
RHS
LHS
RHS
f=axd
g=axe
a
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
g=axe
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
52

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
0
Total Qty

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.95

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
0.000

Previous Paid Quantity


Balance Quantity

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE
ENGINEER

RECOMMENDED BY R
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
4.4.15
Contract No :RDA/RNIP/PRP1/C11
Bill Item
:
Road No: A035 From 30+000-52+130km
Description :
Bituminous Tack Coat Catio
grade CRS1 at 0.3 liter/m2
Name of Road: Mulaithivu - Paranthan Road
502 (1)
IPC NO. 26
Pay Item
:
PERIOD ENDING 31.08.2013
Sheet No : TC/14
Date
:
Up to this Month
As per CS
As per C/S
Length
Area
Area
Avg. Area
Area
Chainage
LHS
RHS
(m)
LHS
RHS
LHS
RHS
LHS
RHS
f=axd
g=axe
a
b
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
g=axe
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
50

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
0
Total Qty

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.95
3.95
3.95

Previous Paid Quantity


Balance Quantity

3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

1.975
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950
3.950

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

0.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000
79.000

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY R
ENGINEER

PROJECT

Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

PERIOD ENDING 31.08.2013

p to this Month
m2

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
19.750
39.500
108.625
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
2063.88
(1,844.0)
219.88

Remarks

219.88
RECOMMENDED BY RESIDENT
ENGINEER

PROJECT

Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

PERIOD ENDING 31.08.2013

p to this Month
m2

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.00
(3,002.0)
948.00

Remarks

948.00
RECOMMENDED BY RESIDENT
ENGINEER

PROJECT

Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

PERIOD ENDING 31.08.2013

p to this Month
m2

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

Remarks

158.000
3950.00
(513.0)
3437.00

3437.00
RECOMMENDED BY RESIDENT
ENGINEER

ECT

Tack Coat Cationc Emulsion


at 0.3 liter/m2

ING 31.08.2013

Remarks

MENDED BY RESIDENT
ENGINEER

ECT

Tack Coat Cationc Emulsion


at 0.3 liter/m2

ING 31.08.2013

Remarks

MENDED BY RESIDENT
ENGINEER

ECT

Tack Coat Cationc Emulsion


at 0.3 liter/m2

ING 31.08.2013

Remarks

MENDED BY RESIDENT
ENGINEER

ECT

Tack Coat Cationc Emulsion


at 0.3 liter/m2

ING 31.08.2013

Remarks

MENDED BY RESIDENT
ENGINEER

ECT

Tack Coat Cationc Emulsion


at 0.3 liter/m2

ING 31.08.2013

Remarks

MENDED BY RESIDENT
ENGINEER

ECT

Tack Coat Cationc Emulsion


at 0.3 liter/m2

ING 31.08.2013

Remarks

MENDED BY RESIDENT
ENGINEER

ECT

Tack Coat Cationc Emulsion


at 0.3 liter/m2

ING 31.08.2013

Remarks

Remarks

MENDED BY RESIDENT
ENGINEER

PROJECT

Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

PERIOD ENDING 31.08.2013

p to this Month
m2

Remarks

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000

3950.000
-3634.00
316.000

RECOMMENDED BY RESIDENT
ENGINEER

Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

PERIOD ENDING 31.08.2013

p to this Month
m2

Remarks

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
0.000
3792.000
(3,081.00)
711.000

RECOMMENDED BY RESIDENT
ENGINEER

PROJECT

Bituminous Tack Coat Cationc Emulsion


grade CRS1 at 0.3 liter/m2

PERIOD ENDING 31.08.2013

p to this Month
m2

0.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
158.000
3950.000
(3,634.00)
316.000

Remarks

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Bill No. 4.3.7


Earthen Shouder as compacted
in position

Name of Road: Mulaithivu - Paranthan Road


IPC NO .24
Sheet No :

Length
Chainage

36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36

000
020
040
060
080
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500

As per CS
Area

(m)
a

LHS
b

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

Avg. Area

0.000
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

0.000
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

Date

As per C/S
Volume

RHS
LHS
RHS
LHS
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

Pay Item

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

409(1)
PERIOD ENDING 30.06.2013

Up to this Month
Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

V m3

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

0.000
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040

Total Qty
Previous Paid Quantity
This IPC Quantity 70% of total

176.00
123.20
123.20

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Bill No. 4.3.7


Earthen Shouder as compacted
in position

Name of Road: Mulaithivu - Paranthan Road


IPC NO .23
Sheet No :

Length
Chainage

36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36
36

500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
000

As per CS
Area

(m)
a

LHS
b

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

Avg. Area

0.000
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

0.000
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

Date

As per C/S
Volume

RHS
LHS
RHS
LHS
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176
0.176

Pay Item

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

409(1)
PERIOD ENDING 31.05.2013

Up to this Month
Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

V m3

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

0.000
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520
3.520

0.000
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040
7.040

Total Qty
Previous Paid Quantity
This IPC Quantity 70% of total

176.00
123.20
123.20

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

CHINESE GOVERNMENT FUNDED REHABILITATION OF ROADS IN NORTH PROJECT


AGREED MEASUREMENT RECORD
Contract No :RDA/RNIP/PRP1/C11

Bill Item

Road No: A035 From 30+000-52+130km

Description :

Bill No. 4.3.7


Earthen Shouder as compacted
in position

Name of Road: Mulaithivu - Paranthan Road


IPC NO .24

Pay Item

409(1)

Sheet No :

Date

PERIOD ENDING 30.06.2013

Length
Chainage

52
52
52
52
52
52
52
52
52
52
52
52
52
52

000
020
040
060
080
100
120
140
160
180
200
220
240
248

As per CS
Area

(m)
a

LHS
b

0
20
20
20
20
20
20
20
20
20
20
20
20
8.1

0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177

Avg. Area

As per C/S
Volume

RHS
LHS
RHS
LHS
c d=(b1+b2)/2
e=(c1+c2)/2 f=axd
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177

Total Qty
Previous Paid Quantity
This IPC Quantity 70% of total

0.000
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177

0.000
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177
0.177

0.000
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
1.434

Up to this Month
Volume

RHS
g=axe

LHS
f=axd

RHS
g=axe

V m3

0.000
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
1.434

0.000
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
1.434

0.000
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
3.540
1.434

0.000
7.080
7.080
7.080
7.080
7.080
7.080
7.080
7.080
7.080
7.080
7.080
7.080
2.867

87.83
61.48
61.48

CONTRACTOR'S REPRESENTATIVE

CONSULTANT' TECHNICAL
OFFICER

CHECKED BY SITE ENGINEER

RECOMMENDED BY RESIDENT
ENGINEER

OJECT

Shouder as compacted

ENDING 30.06.2013

Remarks

MMENDED BY RESIDENT
ENGINEER

OJECT

Shouder as compacted

ENDING 31.05.2013

Remarks

MMENDED BY RESIDENT
ENGINEER

OJECT

Shouder as compacted

ENDING 30.06.2013

Remarks

MMENDED BY RESIDENT
ENGINEER