PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +11.

85
TAHAP I
PAGAR PROYEK SOLDIER PILE PAGAR PROYEK SOLDIER PILE DRILL RIG

TAHAP II

EL + 11.85 300

EL + 11.85

300

SOLDIER PILE

SOLDIER PILE

POSISI GROUND ANCHOR PAGAR PROYEK

POSISI GROUND ANCHOR

TAHAP III
SOLDIER PILE DRILL RIG EL + 11.85 300

Casing

Drill hole
Drill rod

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +22


TAHAP IV
SOLDIER PILE

PAGAR PROYEK

TAHAP V

DRILL RIG
EL + 11.85 300 GROUND ANCHOR TENDON 300

water

Casing

EL + 11.85

Drill rod
Drill Hole

PAGAR PROYEK

TAHAP VI

PAGAR PROYEK Hope tremie

TAHAP VII

Grout

EL + 11.85
Ground anchor tendon 300 Ground anchor tendon 300

EL + 11.85

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +22


TAHAP VIII
Casing

PAGAR PROYEK

PAGAR PROYEK

TAHAP X

DRILL RIG
11.85 300 Completed Ground Anchor 300

Hydraulic stressing jack EL + 11.85

PAGAR PROYEK

TAHAP IX
PAGAR PROYEK Anchor Braket

TAHAP IX

Anchor Braket

EL + 11.85
300

EL + 11.85

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +18,5


TAHAP I
PAGAR PROYEK SOLDIER PILE PAGAR PROYEK SOLDIER PILE

TAHAP II

EL + 11.85

EL + 11.85 DRILL RIG

EL + 7.35 300 300 SOLDIER PILE EL + 7.35

SOLDIER PILE POSISI GROUND ANCHOR PAGAR PROYEK

POSISI GROUND ANCHOR

TAHAP III
SOLDIER PILE

DRILL RIG EL + 7.35 300

Casing
Drill hole Drill rod

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +18,5


TAHAP IV
SOLDIER PILE

PAGAR PROYEK

TAHAP V

DRILL RIG

water

Casing 300 Drill rod Drill Hole

EL + 7.35
GROUND ANCHOR TENDON 300

EL + 7.35

PAGAR PROYEK

TAHAP V

PAGAR PROYEK

TAHAP VII

Hope tremie

Grout

EL + 7.35 Ground anchor tendon 300 Ground anchor tendon 300

EL + 7.35

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +18,5


TAHAP VIII TAHAP X

PAGAR PROYEK

PAGAR PROYEK

Casing Hydraulic stressing jack EL + 7.35 300

DRILL RIG EL + 7.35 300 Completed Ground Anchor

PAGAR PROYEK

PAGAR PROYEK

TAHAP IX

TAHAP IX

Anchor Braket

Anchor Braket EL + 7.35

EL + 7.35 300

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +15


TAHAP I
PAGAR PROYEK SOLDIER PILE PAGAR PROYEK SOLDIER PILE

TAHAP II

EL + 22 SOLDIER PILE EL + 18,5

EL + 22

SOLDIER PILE EL + 18,5 DRILL RIG

EL + 15 POSISI GROUND ANCHOR

EL + 15

300 POSISI GROUND ANCHOR

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +15

PAGAR PROYEK SOLDIER PILE

TAHAP III

PAGAR PROYEK SOLDIER PILE

TAHAP IV

EL + 22 SOLDIER PILE EL + 18,5 DRILL RIG EL + 15 300 POSISI GROUND ANCHOR Drill hole Drill rod

EL + 22 SOLDIER PILE EL + 18,5 DRILL RIG EL + 15 300 POSISI GROUND ANCHOR

EL + 15 Drill hole Drill rod

EL + 15

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +15

PAGAR PROYEK SOLDIER PILE

TAHAP V

PAGAR PROYEK SOLDIER PILE

TAHAP IV

EL + 22 SOLDIER PILE EL + 18,5 water EL + 15

EL + 22 SOLDIER PILE EL + 18,5 HOPE TREMIE EL + 15 300

EL + 15 Drill hole Drill rod 300 POSISI GROUND ANCHOR

EL + 15 Drill hole Drill rod

POSISI GROUND ANCHOR

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +15

PAGAR PROYEK SOLDIER PILE

TAHAP VII

PAGAR PROYEK SOLDIER PILE

TAHAP VIII

EL + 22 SOLDIER PILE EL + 18,5 GROUT EL + 15 300 GROUND ANCHOR TENDON COMPLETED GROUND ANCHOR

EL + 22 SOLDIER PILE EL + 18,5 GROUT DRILL RIG

EL + 15

EL + 15 300

EL + 15

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +15

PAGAR PROYEK SOLDIER PILE

TAHAP IX

PAGAR PROYEK SOLDIER PILE

TAHAP X

EL + 22 SOLDIER PILE EL + 18,5 DRILL RODS

EL + 22 SOLDIER PILE EL + 18,5 DRILL RODS

Anchor Braket EL + 15 300 EL + 15 EL + 15 300 EL + 15

PROSES PEKERJAAN PEMASANGAN GROUND ANCHOR PADA LEVEL +15

PAGAR PROYEK SOLDIER PILE

TAHAP IX

EL + 22 SOLDIER PILE EL + 18,5 DRILL RODS

EL + 15 300

EL + 15