You are on page 1of 3

Project :

Request For Inspection (RFI) for


Final GALVANIZATION

S. No

Description

Order

Mark

SS-L-207

Date :

11/11/2013

CLIENT :

PETRO RABIGH

List No :

Gl-207-08 -Rev,0

Weight

Remarks

Qty

Project: PETRO RABIGH PROJECT

SS-L-207
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001
SS-L-207-R310SK01-0001

BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM
BEAM

B101

178.80

B123

14.40

B126

15.60

B142

424.60

B143

400.40

B168

402.50

B175

298.10

B179

274.60

B192

138.50

B193

248.00

B103

26.00

B104

28.20

B114

134.80

B142

424.60

B144

322.00

B152

505.80

B155

179.10

B156

288.20

B164

521.60

B167

416.00

B168

402.50

B172

736.00

B175

596.20

B177

260.40

B179

274.60

B186

22.50

B191

342.60

B192

277.00

B193

620.00

B200

158.00

B212

72.10

C103

851.90

C105

838.80

C106

424.80

C107

412.40

C108

402.10

C109

402.10

C113

2,700.60

B113

190.70

B147

193.30

B148

540.70

B180

233.40

B185

138.00

B202

35.00

B204

77.80

B218

170.70

B262

302.50

B304

167.60

B309

28.80

67

17,799

GRAND TOTAL (KG)

QC. Engineer
Name

MR : Mohamed Barbary

Signature
Date

Client
Name
Signature

11/11/2013

Date

Client

FORM No.: HHE-QC -FO-039

INSPECTION NOTIFICATION
(No.29 Rev 0)

Notification Date:16/12/2013
Page No : 1of 1
Project No. : SS-L-207

We request your attendance to inspect the following works :


1.Type Of Inspection
PIM "Pre Inspetion Meeting
Stage of Inspection(in process inspection)
Final Inspection

2.Inspection

First

Second

Fourth

Third

3.Purchase Order
PO 0180001050

P.O. No.

Order No.

ITP No.(Rev):

026 - PL - 107 (Rev. 02)

Drawing No.(Rev)

ITP Step No.

VII.2 Final Visual Inspection (After


Galvanization)

Client Inspection
Activity:

Hold Point

Inspection/Test dates

19-Dec-13

Inspection/Test Time

Phone

562720888

E-mail

A.Abed El-Baset

Contact Person

9.00 AM
ahmed.basset@energyaksa.com

Fax

Rabigh - Yanbu High Way Exit 927 Industrial Zone Aramco Road.

Address
4.Details Of Inspection:

VII.2 Final Visual Inspection (After Galvanization)

ITEM NO

INSPECTION ACTIVITY
(SEE ABBREVATION)

DESCRIPTION

P.O QTY

INSP.QTY BAL QTY

Weight of
inspection

As per attached list no 207-GL-0

PIM :Pre-Inspection Meeting


NDE :Non-Destructive Examination

MI :Material Inspection
SI :Shipping (Packing) Inspection

VI / DI :Visual/Dimension Inspection
Doc. :Documents Review

Energya QA/QC Engineer


Name

MR : Mohamed Barbary

Signature
Date

11/11/2013

HT :Hydrostatic Test
PI :Painting Inspection

TR

PETRO RABIGH

Name

Name

Signature

Signature

Date

Date

FORM No.: HHE-QC -FO-039

Notification Date:16/12/2013
Page No : 1of 1
Project No. : SS-L-207

owing works :

Hold Point
9.00 AM
ahmed.basset@energyaksa.com

igh Way Exit 927 Industrial Zone Aramco Road.

tion)

HEAT NO

As per attached list no 207-GL-0

spection

VI / DI :Visual/Dimension Inspection
Doc. :Documents Review

HT :Hydrostatic Test
PI :Painting Inspection

TR

PETRO RABIGH

You might also like