You are on page 1of 1

DREDGING CORPORATION OF INDIA LTD VISAKHAPATNAM

Revision: 0 SUB: REVISION ACKNOWLEDGEMENT SHEET S M S CHECKLISTS Date : 15-05-2011 CHECKLIST : Ref : 11.4.2 of SMM DOC -- 019 Page: 1 of 1

REVISION ACKNOWLEDGEMENT SHEET TO The Designated Person This is to acknowledge that the following revisions have been received and the corrected pages have been inserted in the SMS Manual. The old pages have been removed & destroyed. CONTROLLED COPY HOLDER NUMBER: NAME: Sl. No. Sec No. 0.5 0.6 1.0 3.0 11.0 Page No. All All All All All Edition No. 4 4 4 4 4 Revision No. SMS MANUAL TITLE: SMM/CMA/SOM

Date

Revision Description

Safety Management Manual 1. 2. 3. 4. 5. 5 1 2 5 3 01.02.13 01.02.13 01.02.13 01.02.13 01.02.13 Revisions recorded Documents updated Sec.1.3 modified Sec.3.2.1, 3.3.4, 3.3.7 modified Sec.11.3.1, 11.3.2 modified

Company Procedure Manual 6. 7. 8. 0.4 3.0 8.0 All All All 4 4 4 6 4 1 01-02-13 01-02-13 01-02-13 Revisions recorded Sec. 3.9 modified Sec.8.4.2.3 modified

Contingency Manual Ashore 9. 10. 11. 12. 0.4 2.0 4.0 5.0 All All All All 5 5 5 5 6 3 3 5 01.02.13 01.02.13 01.02.13 01.02.13 Revisions recorded Sec.2.5.2 modified Sec.4.2 modified Contents updated

Shipboard Operations Manual 13. 14. 15. 16. 0.4 2.0 3.0 10 All All All All 4 4 4 4 6 2 3 1 01.02.13 01.02.13 01.02.13 01.02.13 Revisions Recorded Sec.2.5.3 and 2.5.4 modified Sec.3.7.5 modified Sec.10.2.4 and 10.3 modified

Date:

Signature of Custodian of the Controlled Copy

NOTE: 1. This sheet shall be forwarded by all controlled copy holders to the DP after the revisions to SMS Manuals as indicated in the Revision Record Sheet & detailed above have been incorporated.

You might also like