Applied Science University

Quantity Take Off


Dr. Ayman A. Abu Hammad

Topical Overview

Chapter 1: Site Preparation


Chapter 2: Soil and Site Exploration
Chapter 3: Excavation
Chapter 4: Foundations Work
Chapter 5: Wood Formwork
Chapter 6: Steel Rebar
Chapter 7: Concrete
Chapter 8: Building structures
Chapter 9: Walls Construction
Chapter 10: Brick Works
Chapter 11: Masonry (Stone)
Chapter 12: Stair Wells

Foundations rebar fabrication

Letter of intent
Planning:
Schedule
Project team
Subcontractors
Suppliers
Submittals
workforce
Site electricity,
access roads,
phone line,
water, heat
Cars

Notice to
proceed

Excavation:
1- Bulk Exc.
2- Trimming

RC
foundations
forms- rebar

Dismantle
slab 1 forms

Retaining
Walls, fence
2- Weeks

Floor X

Civil Works

Found. wall
cast
Compacted
backfill

Masonry
Slab # 1 cast

Slab # 1
forms- rebar

Cast column
& walls
RC walls:
forms-rebar
cast

Tile

Foundations
RC cast
Found. Wall
forms- rebar

Side walks

Plaster

Paint

Blinding
forms- cast

Columns
forms- rebar

E&M rough

Doors-wind.

Foundations
center lines

2-3-4

Finishing

Partition
walls- block
work

Mobilization:
Site offices
Off. furniture
Computer, phone,
Workers residence
Cement-agg.-rebar
Sto.
Tools & equip.
Security fence

Floor on
grade: rebarcast

Rebar Take-off Rules

Steel diameters are:

Rebar Standard Lengths are:

4, 5, 6, 7, 12m.

Overlap standard distance is= 40*max Diameter for tension, 50*max Diameter for
compression.
Cover distance = 0.005m in foundations only and 0.025m otherwise.
Stirrup key is 0.1 *2= 0.2m
Rebar order format is as follows:

8, 10, 12, 14, 16, 18mm.

Calculated Number Standard Diameter/ Standard Length

Rebar volume is negligible in concrete quantity take-off.


AGGREGATE REBAR DATA FOR SIMILAR DIAMETERS AND LENGTHS ONLY!
FOR TONNAGE ESTIMATION MULTIPLY THE NUMBER BY THE LENGTH BY THE
UNIT WEIGHT OF BAR.
SHOULD TRANSLATE TAKE-OFF NUMBERS ON THE A-CADS.
Rebar Steps:

Foundations: Strip, Isolated, Tie beams, FW


Floors, Columns, Walls, Retaining Walls, lintels
Slabs: P Beams, S Beams, Double Rib, Wall Beams, Ribs

4 D12mm/1m
Wall height=3m
5 D14mm/1m
5D16mm/1m
0.35m
0.4m 0.25m

7 D14mm/1m
3.5m
4.8m

0.25m 0.4m

3.5mx4.5mx3m interior dim.


Overlap=40*max diam.= 0.64m
Reservoir

Foundation:

Stirrups:
[(4.8-0.05)*2]+[(0.35-0.05)*2]+0.2= 10.3m
Res. Length=4.5+0.65+0.65=5.8m
[5.8*5]+1= 29 +1=30 stirrup
30D16/5m+30D16/6m
Longitudinal:

6m

Top bars= 4.8*7= 34 bar, length= 4.5+0.65+0.65=5.8m 6m


68D14/6m

Walls:
Vertical:

length= 2.95m+0.35+0.20= 3.5m


Wall perimeter={2*(3.5+[0.25 C-C])}+{2*(4.5+[0.25C-C])}= 17m
Number of longitudinal bars= 17m*8bars per meter= 136 bar
136D12/7m

Longitudinal:

Short wall length= 3.5+(0.25*2)= 4m


Long wall length= 4.5+(0.25*2)= 5m
Number of longitudinal bars= 3m*10*2= 60
120D14/4m
120D14/5m

5m
0.64

Concrete for Water Reservoir


Concrete of Foundations

volume

Water reservoir
Blinding

5.0

6.0

0.1

3.0

RC

4.8

5.8

0.35

9.7

17.0

0.3

3.0

12.8

Walls
Rebar of foundation
w ater reserv

LengthCount
foundation stirrups

10.3 6m

29.0 29Q16/6

5m

29.0 29Q16/5

foundation longitudinal12.3 6m

34.0 34Q14/6

7m

34.0 34Q14/7

Walls vertical rebar 17.00 3.65


Wall longitudinal rebar

136 136Q12/4

4m

60 60Q14/4

5m

60 60Q14/5

68Q12/7

Isolated Foundation
2.5m*3m*0.45m &
Column0.25m*0.6m. FWH=1.3m

Stirrups:

Longitudinal:

(2*[(2.5-0.05)+(0.45-0.05)])+0.2=
5.9m6m
Number of stirrups= 3m*5stirrups
per meter= 15+1=16
16D16/6m
(2*[(3.00-0.05)+(0.450.05)*2])+0.2= 6.9m7m
Number of stirrups=
2.5m*7stirrups per meter= 18
17D14/7m

Column C1:

Column Dowels:
length=1.3+0.45+0.3+(overlap=40
*16mm=0.65m)= 2.70m 3m
8D16mm/3m 4D16mm/6m
C1 above FL= 3.12(12 stones
height)+0.3(slab)+0.64(overlap)=
4m
8D16/4m

0.65 overlap
8D16mm
Wall height=1.3m

7D8mm/1m

5D16mm/1m
0.45m

7 D14mm/1m

1.125m 0.25m 1.125m


2.5m

Civil Drawings (Foundations Drawings)


A
1

Civil Drawings (Foundations Drawings)


A
1

TB

TB

f1c1

f1c1
TB

TB

TB

TB

A
Civil9.5Drawings (Foundations
6
S1-1
Drawings)

4.00

S1-1
7 S2-2

TB

TB

TB

f1c1

3.5
S2-2

f1c1

4.6

3.5

TB

TB

6
S1-1

5
9.50

S1-1

TB
4

S2-2

TB

4
S3-3

S2-2

TB

5
S3-3
7

S2-2
13m

3.7

5m

Strip Footings
0.2

0.3
5Q12/1m
6*16mm/1m

0.40

5*14mm/1m

0.50

10*12mm

0.60
0.10

0.10
0.10

1.4

0.10

12*14mm

0.10

0.10

1.6

S1-1 (Stair Case)

S2-2 (Stone)
0.2
5*12mm/1m

0.50

6*12mm

0.10
0.10

1m

0.10

S3-3 (Balcony)

Strip foundations Rebar S1-S1


S1-S1: 2 strips /6m& 2 strips/ 3m=3 strips
length 6m
Stirrup length: [(1.4 -0.05)*2+(0.5-0.05)*2] +
0.2= 3.80= 4.00m
Stirrup count (compute length of foundation
center to center): [(6m-1.4)*2+ (3-1.4)*2]=12m
Count= 12*5 stirrups/m= 60
60Q12/4m
Longitudinal rebar: 3*10 Q12/6= 30Q12/6m

S2-S2

Longitudinal Rebar:

2*3stripsQ12/5=
12*3stripsQ14/5=

6Q12/5
36Q14/5

4 strips of length 7m

2Q12/4
12Q14/4

3 strips of length = 5m

0.3

1 strip of length 4m

2*4Q12/7=
12*4Q14/7=

8Q12/7
48Q14/7

Stirrups:
1) [(1.6-0.05)*2+(0.6-0.05)*2]+0.2= 5m
2) [(1-0.05)*2+(0.3-0.05)*2)]+0.2= 2.6= 3
S1-S1 length Center to center= 38m

1) 38*6Q16/5= 228Q16/5m
2) 38*5Q12/3= 190Q12/3= 95Q12/6

5Q12/1m
6*16mm/1m

0.40
0.60
0.10

12*14mm

0.10

0.10

1.6
S2-2 (Stone)

Square
Isolated
Footings
0.3
1.3m

6*16mm/1m two way

3.2m

5*8mm/1m
6*14mm

0.20
0.60
0.10

0.50
CW1
0.10

2.6m

0.10

F1
5*8mm/1m

5*12mm/1m
0.60

6*12mm

6*16mm

0.30
0.60
C1

0.30
Tie Beam TB

Concrete of Foundations
Water reservoir
Blinding
RC
Walls

volume
Subtotal

5
4.8
17

6
5.8
0.3

0.1
0.35
3

3
9.7
12.8

3.4
2.6
0.3

2.8
3.2
0.6

0.1
0.6
1.3

0.952
4.992
0.234

Isolated F1

blinding
RC
FW

Strip

blinding 1-1
blinding 2-2
blinding 3-3

12.4
39.3
7.7

1.6
1.8
1.2

0.1
0.1
0.1

1.984
7.074
0.924

S1-S1
S2-S2
S3-S3
FW

12.4
39.3
7.7
59.4

1.4
1.6
1
0.3

0.5
0.6
0.5
1.3

8.68
37.728
3.85
23.166

TB

blinding
TB

15.4
15.4

0.5
0.3

0.1
0.6

0.77
2.772

Columns

2
0.3
0.6
3.12
1.1232
Slab Volume
rib block count
1 block volume
block volume
Concrete volume
39
273 0.01848 5.04504 33.95496
Blinding 15
14.704
RC 25
137.877

Slab

Civil Drawings (Roof Drawings) 4


14-18-24
40

SB

2*10
2*10

2*12/3m

SB

B2
CR

SB

B1

B1

SB

B1
SB

B2

B2
2*10

SB

B2

B1

SB

SB

SB

SB

SB

0.20

DR
DR
SB

B3

B3

B1
10*16/4
2*18/7
7*16/5
4*14/12
6*16/6
B2
12*16/4
8*16/7
8*14/5
8*14/6
B3
8*18/8
4*14/6
3*14/6

3*18/3.5m
5*16
3*14

8*16
6*16

3m

5*16/4m

5m

4*16 5*16/2.5m 4*16


4*14
5.5m

2*8/20cm
5*16
4*14

0.3

2.5m

1.00m
B1 (1:15)

B1 (1:100)

0.3

*8/20cm
6*16

4*16 6*16/4m

0.30m
SB (1:15)

4*14

0.3

5. m
0.3

4*16

*8/20cm
4*16

4m

B2 (1:100)

0.30m
DR&CR (1:15)

8*18/8
4*14

Roof Details

5. m
B3 (1:100)

6*14
2.5m

0.3

2*8/20cm
6*16
B1
4*14
10*16/4
1.00m 2*18/7
7*16/5
B2 (1:15)
4*14/12
6*16/6
B2
2*8/20cm
12*16/4
6*16
4*14
8*16/7
8*14/5
1.00m 8*14/6
B3 (1:15)
B3
8*18/8
4*14/6

16

8Q16
Slab
Rebar
5-1.5-1.5+0.64+0.64=3.3==3.5

3Q14

6Q16

3m

4Q14
5.5m

1+0.35=3.45==3.5

5Q16/6
5 2Q18/5
5 7Q16/7
5 3Q14/6
2Q16/5

5.5-1.85-1.9+0.64+0.

5+0.4+0.35=5.75==6

0.7
4Q14/3
4Q14/6
6Q16/6
3Q14/3.5

B1 (1:100)
Lower
2Q14/6
4Q14/6
6Q16/6
2Q14/7

5.5+0.15+0.4=6

0.8
6Q14/6
6Q16/6
2Q14/7

3.5

3.00

2.5

2.5

5.0
3.7

4.35

1.1

2.9

Masonry Types:

Zawyah: 1 Lm per piece


Silah: Araqa & Kalb: 1 Lm per piece
Dustour: 2 Lm per piece
Marabee: 4 Lm per piece
Roukh: 1 Lm per piece
Arch: 3 Lm per piece
Balcony: each 1 Lm is taken as 2 Lm
Burtash: each 1 Lm is taken as 4 Lm

1.00

2.00

1.00

1.00

1.00

1.00

0.50 1.00

1.00

Masonry Take off


Regular Masonry Take Off:

4*(9.5-[1+4*0.25])= 30 LM
10 (9.5-[5+10*0.25]= 20 LM
2(9.5-[5+2*0.25]= 8 LM
11(9.5-[2*0.25]= 99 LM

Masonry Pieces Take Off:


Lintels (Burtash)= 2*(2.2) + 6*(1.20) = 4.4+7.2= 11.60
LM
Corner Stones= 27*2= 54
Opening corner stone= (10*7)+18= 88

Quantity Takeoff: Steel Estimating


Steel bar standard diameters: 8mm, 10mm,
12mm, 14, 16, 18, 20, 32
Steel bar standard lengths: 4, 5, 6, 7, 12
Steel overlapping follow rule 40 * Q
If you have two bars of 10mm and 16mm, find
the overlap distance?
Select the higher diameter and multiply with
40= 16*40=640=64cm

Distinguish between different types of steel

Working Example: Bathroom


Quantity & Pricing:
Given information:

3.6*2*3

Window: 0.7*1.00

Door: 0.8*2.1

Bath tub: 0.7*

Ceramic:

Ceramic labor cost

Ceramic Floor: 2.9*2= 6m2


walls: 11.2*3= 33.6 (33.6-[0.7+(0.8*2.1)])= 31.2 +2.7*0.15= 0.405 31.2+0.405= 31.6 Plaster quantity
Ceramic walls quantity= 31.6-0.7= 30.9m2

12KD for blinding= 12KD


20KD*3days= 60KD
Joint filling: 1*12KD skilled rate= 12KD

Ceramic material cost= 3KD/m2 *37m2= 111KD


Total Cost= 111+12+60+12= 195KD
Plaster:= 31.6m2
Plaster material (fine aggregate) cost= 31.6*0.02*1.1= 0.7m2 *2KD= 1.4KD
Plaster cement cost (1:3 means 10 cement bags per m3)= 7bags* 1.350= 9.450
Labor cost:2days*20KD=40KD
Total cost= 1.4+9.5+ 40= 51KD