Note Sub:ChangeinspecificationofMultistageCentrifugalpumpwithmotorfortheprojectHFCV/BARC/12 Reg:ItemswithtagNos:P1HFTF01 P2HFTF01 M1HFTF01 M2HFTF01 TheSpecificationofmultistagecentrifugalpumpwithmotorhasbeenrevisedasfollows.

ows. Specification RevisedValue originalValue MaximumFlowRate 60m3/hr 70m3/hr MaximumHead 75bar 80bar Thedetailedrevisedspecificationisattachedherewith(Encl1). ThesechangeshavebeenapprovedbyBARC.Therelevantcommunicationdocumentsalsoattached (Encl2). MPRforthisitemwasalreadyissuedbasedonanearlierdesignrevision.Thedetailsareasfollows. MPRNo:139 MPRDate:04.09.2012 ItisintendedtorefloatthisMPRformultistagecentrifugalpumpbyamendingitwithrevised specification. DirectormaykindlyapprovetorefloattheMPRwithnecessarychanges. JameshBabuM,JE Dr.SRammohan,CRE Director Encl1:DetailedSpecificationforMultistageCentrifugalpumpwithMotor Encl2:CopiesofrelevantemailCommunicationheldwithBARC

(Encl1)
Sl No Item description

Testing and Supply of Pump with Motor: TAG number :


Type : Shaft Orientation : Head developed by the pump/ shut off head: Flow at maximum required pressure : Operating flow and pressure range : Temperature : Fluid medium : Speed : Sealing : Details for gland packing and other static seals : Noise level : Lubricating system for the pump : Details of base plate, foundation requirements and anchoring : Details of suction and NPSH : Hydraulic performance Acceptance tests : Hydrostatic test : Dynamic balance test : Set of special erecting and commissioning tools : Nominal Suction Size :
1
1

P1-HFTF-01 & P2-HFTF-01


Multi Stage Centrifugal Pump Horizontal To be specified 60 m /hr 60 m /hr and 75 bar 80C DM Water 3000 rpm Gland Packing To be provided Noise Level Less than 85 dB To be specified To be provided Flooded suction Required as per ISO 9906 or ANSI/HI 14.6 or any other relevant standards To be specified 2 (65 mm) #150(ANSI B16.5) 2 (50 mm) #600(ANSI B16.5)
3 3

Nominal Delivery Size : MOC : (SS304/SS316) Casing : Impeller : Diffuser : Acoustic enclosures : Name plate : Spares START-UP SPARES :

ASTM A351 CF8 /CF8M or equivalent If required As per the tag number Specified List and Quantity to be specified separately for 1 year operation

Electric motor: Tag No.(M1-HFTF-01 & M2-HFTF-01)


Type : Power : Voltage : Frequency: Insulation : Number of poles : Full load speed: Mounting :
1

3 Induction motor 250kW (or suitable for above pump) 415 10V 50Hz Class F 2 3000rpm Horizontal foot mounting

: Tests will be witnessed by FCRI or its representatives

Note: Complete catalogue, brochures and technical specifications has to be specified and supplied along with each items. Please Quote seperately for each items

(Encl 2)
From: To: Subject: Date: Ram Mohan S jamesh Babu M Fwd: RE: HFCV - Main pump procurement = reg. 13 March 2014 14:53:56

Regards, Dr. Rammohan S, Fluid Control Research Institute, Kanjikode West, Palakkad - 678623 0491-2566120/206/ extn. 1119 ; 09446346850
9446346850Rammohan13-03-2014

--- Original message follows --Subject: RE: HFCV - Main pump procurement = reg. From: "N L SONI" <nlsoni@barc.gov.in> To: "'Ram Mohan S'" <s.rammohan@fcriindia.com> CC: "saurabh@barc.gov.in" <saurabh@barc.gov.in> Date: 13-03-2014 15:34

DEAR SHRI RAMMOHAN S., A MEETING WAS HELD TODAY AT BARC AND ACCEPTED YOUR PROPOSAL FOR TWO MAIN PUMPS OF HFTF. FORMAL LETTERS FOLLOWS.

N.L. SONI HEAD, FLUID POWER & TRIBOLOGY SECTION, BHABHA ATOMIC RESEARCH CENTRE, R.T.D., HALL-3, TROMBAY, MUMBAI, 400085, INDIA PHONE (0) 022 25593980 PHONE (RES) 022 64522965 MOBILE 09224293690 FAX - 022 25505151 E MAIL - nlsoni@barc.gov.in;nlsoni@hotmail.com


From: Ram Mohan S [mailto:s.rammohan@fcriindia.com] Sent: Thursday, March 06, 2014 11:35 AM To: N L SONI Cc: saurabh@barc.gov.in Subject: Fwd: HFCV - Main pump procurement = reg.

--- Original message follows --Subject: HFCV - Main pump procurement = reg. From: Ram Mohan S <s.rammohan@fcriindia.com> To: "N L SONI" <nlsoni@barc.gov.in>

(Encl 2)
CC: "saurabh@barc.gov.in" <saurabh@barc.gov.in>, "customer care" <customercre@fcriindia.com> Date: 05-03-2014 9:29

sir, Please find attached request for changing the operating paramter specification of the Main pump of HFTF. Kindly inform your consent at the earliest. Regards,

Dr. Rammohan S, Fluid Control Research Institute, Kanjikode West, Palakkad - 678623 0491-2566120/206/ extn. 1119 ; 09446346850
9446346850Rammohan05-03-2014

(Encl 2)

FCRI/BARC/HFCV/SRM/ Shri. N. L. Soni, Head, Fluid Power & Tribology Section, Bhabha Atomic Research Centre, R.T.D., Hall-3, Trombay, Mumbai, 400085, India

Sub. Main Pump specification - HFTF In the HFTF facility two pumps connected in parallel, provide the required flow at the operating pressure. A booster pump is also provided at the inlet of the main pumps. The booster pump is provided with a flow rate of 140 m 3/h at 3 bar pressure. The Main pump generate the required flow and _pressure for the smooth operation of the loop during testing. The maximum pressure and flow rate requirements for HFCV, for flow capacity tests as per the 1 procedures are 62.9 bar@ 22m3/hand 110m3/h @ 58.7 bar(for both valves together). The permanent pressure drop due to all components other than HFCV, CVl & CV2 at rated flow is less than2 bar (ref: Design Basis Report-High Pressure High Flow Test Facility (HFTF) Rev#14.). The control valves CV2 and CVl are provided to create the required pressure at the upstream of the HFCV under test. Considering these factors, two identical pumps having a delivery pressure of 70bar@60m3/h should suffice the test requirement. As per the specification approved by BARC, the pressure and flow 3 requirements of the pumps are 75 bar@ 70m /h. Two separate attempts were made to procure pumps with the above specification (75 bar.@ 70m /h). Unfortunately only one party has quoted with the above specification with all wetted parts in Stainless steel with a delivery time of 7 months as these pumps are not in their standard range. It is requested that the operating parameters of the pumps may be modified as 60m3/h @ 75 bar instead of 7Sm 3/h @75 bar. All these pumps have a delivery period exceeding 5 months as they are not standard models. The HQ curve of the second party quoted for both the above tenders is also attached here with. This 3 pump can develop 60m3/h @ 75 bar. This can develop 70m /h @ 72 bar (please refer attached pump curve) and will operate at best efficiency point (BEP). Also the Booster pump is capable of delivering 3 bar line pressure. Thus testing of an HFCV can be done with a single pump itself as anticipated in the MOU. It is requested that you may consider the above case and intimate the modification in the pump specification so as to proceed with tendering with modified specifications.
3

..

Dr. Rammohan S Chief Research Engineer.

$~

mm

~~ MGMT.SYS.
RvAC492

FCRI A RESOURCE FOR INDUSTRY


A Premier Institute in S. Asia for R&D on Flow Products, Testing and Calibration as per ISO/SIS/ANSI Standards, Software, CFD fo r Design and Sel:ction and Noise & Vibration Analysis of Flow Elements, Specialised Training, Post Graduate D1ploma in Flow Measurements and Control Instrumentation.

Customer Care:!! 91-491-2569010: ~ customercare@fcrilndla.com

You might also like