You are on page 1of 55

TECHNICAL TRAINING

2007

Technical Training 2007

SYSTEM & CONTROL

Technical Training 2007

Outlook of MDS

Technical Training 2007

MDS Multi Split System

Technical Training 2007

Piping System between ID & EXV

EXV BOX

Refnet

Technical Training 2007

Piping System between ID, EXV & OD

Technical Training 2007

Piping System between ID & EXV

Technical Training 2007

Outlook of Refnet

I.D.15.8

I.D.12.7

I.D.9.53

Technical Training 2007

I.D.6.35

Unit & Piping Selection


Indoor Unit CCD 10/15 CKD 10/15 WMD 10/15 CCD 20 CKD 20 CED20 WMD 20 CCD 25 CKD 25 CED 25/28 WMD 25 CKD 30/40/50 CCD 30/40/50/60 CED 40/50/62 EXV Box Model MEX-16-2SAP-A MEX-16-2SAP-B MEX-20-2SAP-A MEX-20-2SAP-B MEX-20-3SAP-A MEX-20-3SAP-B MEX-25-3SAP-A
1 unit 2 units 1 unit 2 units

Technical Training 2007

Installation of EXV
Direction of installation Connect to ID PCB

OUT
IN

Inlet (connect to OD)

Outlet (connect to ID)

Technical Training 2007

Installation of Distributor & Refnet


Outdoor unit

Branch header

Indoor unit Controller

Outdoor unit

Branch joint

Branch header

Indoor unit Controller

Technical Training 2007

Installation of Distributor & Refnet


Outdoor unit

Branch header Mistake Mistake Mistake

Indoor unit Controller

Strictly NO branch after distributor

Technical Training 2007

Sensor Location
T_out

T_mid

FAN

T_in

Gas(H) -----Liquid(H) -----Gas(L) ------

EXV

Technical Training 2007

Sensor Location
T_out

T_mid

FAN

T_in

Gas(H) -----Liquid(H) -----Gas(L) ------

EXV

Technical Training 2007

MDS - R22 Series


Capacity Range:

8HP ~ 32HP
8/10/12HP 15HP

18/20/22/24HP

26HP

28/30/32HP

Technical Training 2007

MDS - R22 Series


MDS 260/280/300/320B/BR
Master Slave

MDS 260B(R) = MDS120B(R)M+MDS150B(R)S MDS 280B(R) = MDS150B(R)M+MDS130B(R)S MDS 300B(R) = MDS150B(R)M+MDS150B(R)S

MDS 320B(R) = MDS160B(R)M+MDS160B(R)S


* Unit ordered as system, but shipped as 2 separate units

Technical Training 2007

Balance Pipe

Balance pipe

Technical Training 2007

Liquid Pipe

Liquid pipe

Technical Training 2007

Gas Pipe

Gas pipe

Technical Training 2007

Gas Pipe Connection

Pump out the air in balance pipe

Ensure the pipe is clean before installing

Technical Training 2007

Refrigerant Circuit Diagram


TH2 4WVa ST2 BV2

CV2 HEX F HEX B HS CJ1 O/S TH12

CJ2

LS

TH3

CV1 TH1 Comp FIX Comp DIG TH11

ACC
BV3

TH8 Gas(H) -----Liquid(H) ----Gas(L) -----Oil pipe ----CV3

EXV1

TH9

SCC CP

EXV4 Drier

TH10

ST1 BV1

Only for heat pump

Technical Training 2007

Refrigerant Circuit Diagram


TH2 4WVa

ST2 BV2

CV2 HEX F HEX B O/S TH12

CJ2 LS

TH3

HS CJ1

CV1 TH1 ACC Comp DIG TH11 EXV4 CP

TH8

Comp FIX

BV3

Gas(H) -----Liquid(H) ----Gas(L) -----Oil pipe -----

CV3

EXV1

TH9

SCC

TH10

ST1

BV1

Drier

Technical Training 2007

Exploded View of MDS


Digital compressor TH12 Fix compressor

HP LS Oil separator TH10 TH9 TH2

Accumulator

Drier

EXV4

TH11

EXV1

Ball valve

Technical Training 2007

Subcool Control
MDSB subcool MDS-A subcool
Discharge pressure Tc = 50 C

Suction pressure

Te = 5 C H MDSA MDSB

Technical Training 2007

Subcool Control

SCC to increase Subcool Temp

Minimize the performance reduction on long piping

Prevent liquid R22 flash

Long piping High COP

Reduce EXV noise

Technical Training 2007

MDS-B PCB

Additional Extension Board (MCU) from MDS180B(R) and above

Technical Training 2007

Temperature Sensor:
TH3/TH5/TH7 TH12/TH11/TH10/TH9 TH8/TH4/TH2 TH1

Technical Training 2007

Pressure Sensor:
LS HS

Technical Training 2007

Power Supply & Protection Device

Transformer output (two way)

Compressor Overload

High pressure Switch

power supply (Single phase)

Technical Training 2007

Output of Control Board


PWM valve

4 Way Valve

Compressor

EXV (Heating)

EXV1

EXV4

Technical Training 2007

DIP Switch Setting ~ OD


S1: # of connected ID S2: Addresses of the OD
On(1) Off(0) S3: Capacity of OD Communication port

12345678

12345678

On(1)

Off(0)

1234

On(1) Off(0)

A_in B_in A_pc B_pc

Technical Training 2007

ID PCB
Communication port (ID-OD) B
A

Stepping motor

EXV

Communication port (MC301 Controller)

T_room

T_in/T_mid/T_out

Float Switch

Signal Receiver

Technical Training 2007

ID PCB
Fan motor H/M/L-speed)
Auxiliary heater Fuse

Power supply (single phase L) Power supply (single phase N)

Transformer

Technical Training 2007

DIP Switch Setting ~ ID


SW1: Function setting SW2: ID address setting On(1) Off(0) SW3: Model setting On(1) Off(0)

12345678

12345678

123456

Off(0)

On(1)

Technical Training 2007

Connection between ID PCB & MC301

ID PCB MC301 controller

Credit Card controller

Technical Training 2007

MC301 Controller
LED indicator

Receiver ON / OFF

Temperature UP / DOWN

Mode

Timer Fan speed Auxiliary heater

Sleep

Technical Training 2007

Connection of Assembly LED

RECEIVER

Technical Training 2007

Connection between ID & OD


MDS080~240

Ain Bin Apc Bpc OD PCB B A

ID PCB

Technical Training 2007

Wiring Diagram MDS 030A(R)

Technical Training 2007

Connection between ID & OD


MDS260/280/300/320
MDS260= MDS120BRM+MDS150BRS MDS280= MDS150BRM+MDS130BRS MDS300= MDS150BRM+MDS150BRS Ain Bin Apc Bpc

Ain Bin Apc Bpc

MDS320= MDS160BRM+MDS160BRS

MDS120/150/160BRM

MDS130/150/160BRS

Indoor Units

Technical Training 2007

Wiring Diagram MDS 260/280/300/320B(R)

Technical Training 2007

Connection to Monitoring Software


RS485

Gateway

RS232
Computer

Ain Bin Apc Bpc

1. Display ID status & error history 2. Monitor & Control 3. Daily, Weekly & Holiday timer setting

Monitoring

Outdoor units

Indoor units

Technical Training 2007

Monitoring Software

Centralize Control

Technical Training 2007

Monitoring Software

Centralize Control

Technical Training 2007

Monitoring Software

Centralize Control

Technical Training 2007

Monitoring Software

Centralize Control

Technical Training 2007

Power Consumption Monitoring

Power Allocator Qty 4 Power

HUB

1. Collect & record system running status 2. Collect & record system power consumption 3. Allocate power consumption for individual ID Power Monitoring of Electric Power consumption Outdoor units Qty <= 8

Indoor units

Technical Training 2007

ID Fan Control
Normal Cooling/Heating
Fan Speed Auto Fan Operation Manual Fan operation High Speed T 3 C Fan Speed Set Medium Speed 3 C T 2 C by Controller Low Speed 2 C T T = | Room Temperature - Set Temperature |

Hot Keep (Heating Cycle Only)


During Heat mode, Fan Speed will modulate according to Tmid

Fan Speed
Set by Controller LOW STOP 18 22 24 30

Tmid (C)

Technical Training 2007

ID EXV Control
4WVa LS TH12 BV2

HEX

Keep superheat of system

Tsh = T12 - Te
Saturation Temp

Cooling:
If
EXV1

Condition 1: Tsh_out < 8 C Condition 2: Tsh_out < 12 C Condition 3: Tsh_out > 12 C

Technical Training 2007

ID EXV Control
T_out

Cooling:
T_mid

If

Condition 1: Tsh_out < 8 C Condition 2: Tsh_out < 12 C Condition 3: Tsh_out > 12 C

T_in

Keep superheat of ID
Action 1: Tsh_in = A Action 2: Tsh_in = A 1 Action 3: Tsh_in = A 2

EXV

A = 3 C

Technical Training 2007

Out PCB Control


4WVa
LS TH12 BV2

HEX

EXV1/2 :
1. For Heating Only 2. Keep superheat of system Tsh = T12 - Te

EXV4 :
EXV1

Saturation Temp

1. Only for cooling 2. Keep subcool (Target @ 12 C) Tsc = TH9 - TH10

TH9

SCC

EXV4

TH10

ST1

BV1

CP

Drier

Technical Training 2007

OD Fan Control

Fan Speed

HIGH LOW STOP High Pressure (bar) 12 15 16 18

Technical Training 2007

OD Fan Control

Fan Speed Mode A B C D E

A B C D E

30% STOP LOW LOW LOW HIGH

60% LOW LOW LOW HIGH HIG

60% LOW LOW HIGH HIGH HIGH

Ambient Temperature (C)


1 2 5.5 6.5 12 15 16 18

Technical Training 2007

Defrost Control
Defrost starts when:
1. Heating for 25 minutes first time and the point (TH8,TH12) be in area for 3 minutes
2. Heating for 45 minutes after the first defrost and the point (TH8,TH12) be in area for 3 minutes
-5 -10 -15 -20 Defrost diagram

B (6,-6) C
Ts

(12,-6)

A
(-15,-24)
TH8 ( )

Defrost will terminate if:


1. High pressure is more than 19 bar
-30

-25 -30 -20

-10

10

20

2. Defrost operation has been carried for 10 minutes

3. Defrost operation has been carried for 2 minutes and TH9 is more than 15 C

Ambient Temp

Technical Training 2007

Thank You

Technical Training 2007

You might also like