PSPC Terms of Listing

Appendix A

LISTING CRITERIA FOR PUBLIC SECTOR PANELS OF CONSULTANTS (PSPC)


ARCHITECTURAL (AR) CONSULTANCY FIRMS
(i) Common Criteria for All AR Panels
All entities applying for AR panels must be licensed with the Board of Architects, with the exception of Sole Proprietorships and Partnerships*.
(*Note: Limited Liability Partnerships and Limited Partnerships must be licensed with the Board of Architects.)

(ii) Specific Criteria for Each AR Panel


Panel AR04
(a) 1 registered professional with the Board of Architects, supported by 1 professional with recognised professional qualifications1

Panel AR03
(a) (b) (c) 2 registered professionals with the Board of Architects Expected to have completed a project S$1.5M and above (within the past 5 years) 1 technical or professional staff has attended the course on Code of Practice on Buildable Design conducted by BCA2

Panel AR02
(a) (b) (c) (d) (e) (f) 3 registered professionals with the Board of Architects Expected to have completed a project $5M and above (within the past 5 years) 1 technical or professional staff has attended the course on Code of Practice on Buildable Design conducted by BCA2 1 technical or professional staff has successfully completed the Certification Course for Green Mark Manager (GMM) conducted by BCA2 1 technical or professional staff has successfully completed the Certification Course for Universal Design (UD) Assessor conducted by BCA 2,3 Obtained ISO 9001:2008 certification in the discipline applied for

Panel AR01
(a) (b) (c) (d) (e) (f) (g) (h) 4 registered professionals with the Board of Architects Expected to have completed a project $15M and above (within the past 5 years) 1 technical or professional staff has attended the course on Code of Practice on Buildable Design conducted by BCA2 1 technical or professional staff has successfully completed the Certification Course for Green Mark Manager (GMM) conducted by BCA2 1 technical or professional staff has successfully completed the Certification Course for Universal Design (UD) Assessor conducted by BCA 2,3 Obtained ISO 9001:2008 certification in the discipline applied for Obtained ISO 14001:2004 certification in the discipline applied for Insured with a Professional Indemnity Insurance (PII) of at least $0.5M
Firms Track Record Panel Personnel
(one such project completed within past 5 years)

Course Requirement Buildable Design Green Mark Manager

ISO Cert
(in discipline applied for)

Universal Design 3 Assessor


(wef 1 Apr 2013)

ISO 9001:2008

ISO 14001:2004

Professional Indemnity Insurance

AR04 AR03 AR02 AR01


1

1P (+1P)1 2P 3P 4P

$1.5M $5M $15M

Yes Yes Yes

Yes Yes

Yes Yes

Yes Yes

Yes

$0.5M

______________________________________________________

The professional should have a relevant recognised degree in Architecture, which could be referenced from the Board of Architects. For firms that do not satisfy this requirement, the firms are to submit a confirmation letter on successful placement for the course. The relevant Certificate of Accomplishment (Buildable Design) / Certificate of Successful Completion (Green Mark Manager/Universal Design Assessor) is to be furnished upon successful completion of the course. The Universal Design Assessor course requirement is only applicable to AR01 and AR02 listing from 1 Apr 2013 onwards.

-1-

Public Sector Panels of Consultants

Mar 2013

PSPC Terms of Listing

Appendix A

CIVIL & STRUCTURAL (CS) ENGINEERING CONSULTANCY FIRMS


(i) Common Criteria for All CS Panels All entities applying for CS panels must be licensed with the Professional Engineers Board, with the exception of Sole Proprietorships and Partnerships*.
(*Note: Limited Liability Partnerships and Limited Partnerships must be licensed with the Professional Engineers Board.)

(ii) Specific Criteria for Each CS Panel


Panel CS04 (a) 1 registered professional with the Professional Engineers Board, supported by 1 professional with recognised professional qualifications4 Panel CS03 (a) 2 registered professionals with the Professional Engineers Board (b) Expected to have completed a project $1.5M and above (within the past 5 years) (c) 1 technical or professional staff has attended the course on Code of Practice on Buildable Design conducted by BCA 5 Panel CS02 (a) 3 registered professionals with the Professional Engineers Board (b) Expected to have completed a project $5M and above (within the past 5 years) (c) 1 technical or professional staff has attended the course on Code of Practice on Buildable Design conducted by BCA 5 (d) Obtained ISO 9001:2008 certification in the discipline applied for Panel CS01 (a) 4 registered professionals with the Professional Engineers Board (b) Expected to have completed a project $15M and above (within the past 5 years) (c) 1 technical or professional staff has attended the course on Code of Practice on Buildable Design conducted by BCA 5 (d) Obtained ISO 9001:2008 certification in the discipline applied for (e) Obtained ISO 14001:2004 certification in the discipline applied for (f) Insured with a Professional Indemnity Insurance (PII) of at least $0.5M
Firms Track Record Panel Personnel
(one such project completed within past 5 years)

Course Requirement Buildable Design


5

ISO Cert
(in discipline applied for)

ISO 9001:2008

ISO 14001:2004

Professional Indemnity Insurance

CS04 CS03 CS02 CS01

1P (+1P)4 2P 3P 4P

$1.5M $5M $15M

Yes Yes Yes

Yes Yes

Yes

$0.5M

______________________________________________________

4 5

The professional should have a relevant recognised degree in Civil/Structural Engineering, which could be referenced from the Professional Engineers Board. For firms that do not satisfy this requirement, the firms are to submit a confirmation letter on successful placement for the course. The Certificate of Accomplishment (Buildable Design) is to be furnished upon successful completion of the course.

-2-

Public Sector Panels of Consultants

Mar 2013

PSPC Terms of Listing

Appendix A

MECHANCIAL & ELECTRICAL (ME) ENGINEERING CONSULTANCY FIRMS


(i) Common Criteria for All ME Panels All entities applying for ME panels must be licensed with the Professional Engineers Board, with the exception of Sole Proprietorships and Partnerships*.
(*Note: Limited Liability Partnerships and Limited Partnerships must be licensed with the Professional Engineers Board.)

(ii) Specific Criteria for Each ME Panel


Panel ME04 (a) 1 registered professional with the Professional Engineers Board, supported by 1 professional with recognised professional qualifications6 Panel ME03 (a) 2 registered professionals with the Professional Engineers Board (b) Expected to have completed a project $1.5M and above (within the past 5 years) Panel ME02 (a) 3 registered professionals with the Professional Engineers Board (b) Expected to have completed a project $5M and above (within the past 5 years) (c) 1 technical or professional staff has successfully completed the Certification Course for Green Mark Manager (GMM) conducted by BCA7 (d) Obtained ISO 9001:2008 certification in the discipline applied for Panel ME01 (a) 4 registered professionals with the Professional Engineers Board (b) Expected to have completed a project $15M and above (within the past 5 years) (c) 1 technical or professional staff has successfully completed the Certification Course for Green Mark Manager (GMM) conducted by BCA 7 (d) Obtained ISO 9001:2008 certification in the discipline applied for (e) Obtained ISO 14001:2004 certification in the discipline applied for (f) Insured with a Professional Indemnity Insurance (PII) of at least $0.5M
Firms Track Record Panel Personnel
(one such project completed within past 5 years)

Course Requirement Green Mark Manager


7

ISO Cert
(in discipline applied for)

ISO 9001:2008

ISO 14001:2004

Professional Indemnity Insurance

ME04 ME03 ME02 ME01

1P (+1P)6 2P 3P 4P

$1.5M $5M $15M

Yes Yes

Yes Yes

Yes

$0.5M

______________________________________________________

6 7

The professional should have a relevant recognised degree in Mechanical/Electrical Engineering, which could be referenced from the Professional Engineers Board. For firms that do not satisfy this requirement, the firms are to submit a confirmation letter on successful placement for the course. The Certificate of Successful Completion (Green Mark Manager) is to be furnished upon successful completion of the course.

-3-

Public Sector Panels of Consultants

Mar 2013

PSPC Terms of Listing

Appendix A

QUANTITY SURVEYING (QS) CONSULTANCY FIRMS


(i) Specific Criteria for Each QS Panel
Panel QS04 (a) 1 degree holder8 supported by 1 diploma holder9 Panel QS03 (a) 2 degree holders8, 1 of whom is expected to have completed a project above $1.5M (within the past 5 years) as a project QS (b) Firm is expected to have completed a project $1.5M and above in the past 5 years Panel QS02 (a) 3 degree holders8, 1 of whom is expected to have completed a project above $5M (within the past 5 years) as a project QS (b) Firm is expected to have completed a project $5M and above in the past 5 years (c) Obtained ISO 9001:2008 certification in the discipline applied for Panel QS01 (a) 4 degree holders8, 1 of whom is expected to have completed a project above $15M (within the past 5 years) as a project QS (b) Firm is expected to have completed a project $15M and above in the past 5 years (c) Obtained ISO 9001:2008 certification in the discipline applied for (d) Obtained ISO 14001:2004 certification in the discipline applied for
Firms Track Record
(one such project completed within past 5 years)

ISO Cert
(in discipline applied for)

Panel

Personnel

8, 9

Firm & 1 Personnel completed as QS before

ISO 9001:2008

ISO 14001:2004

QS04 QS03 QS02 QS01

1 Deg + 1 Dip 2 Deg 3 Deg 4 Deg

$1.5M $5M $15M

Yes Yes

Yes

______________________________________________________

8 9

Degree holder in Architecture, Building, Construction-related Engineering or equivalent Diploma holder in Architecture, Building, Construction-related Engineering or equivalent

-4-

Public Sector Panels of Consultants

Mar 2013

PSPC Terms of Listing

Appendix A

PROJECT MANAGEMENT (PM) CONSULTANCY FIRMS


(i) Specific Criteria for Each PM Panel (applicable to listings till 31 Mar 2013)
Panel PM02 (a) 3 degree holders10, 1 of whom is expected to have completed a project $3M and above (within the past 5 years) as Project PM11 Panel PM01 (a) 4 degree holders10, 1 of whom is expected to have completed a project $50M and above (within the past 5 years) as Project PM11 (b) Firm must have completed at least 3 projects as project manager, each is expected to be $8M and above in the past 5 years (c) Obtained ISO 9001:2008 certification in the discipline applied for (d) Obtained ISO 14001:2004 certification in the discipline applied for

Track Records
(No. of projects completed within past 5 years)

ISO Cert
(in discipline applied for)

Panel

Personnel

10

Firm

1 Personnel completed as 11 PM before

ISO 9001:2008

ISO 14001:2004

PM02 PM01

3 Deg 4 Deg

3x $8mil

$3mil $50mil

Yes

Yes

______________________________________________________

10 11

Degree holder in Architecture, Building, Construction-related Engineering or equivalent Project PM refers to appointment by client/developer to provide solely project management services -5Public Sector Panels of Consultants

Mar 2013

PSPC Terms of Listing

Appendix A (ii) Specific Criteria for Each PM Panel (applicable to listings from 1 Apr 2013)
Panel PM04
(a) (b) 1 degree holder12 supported by 1 diploma holder13 1 of the above 2 personnel expected to have completed a project $3M and above (within the past 5 years) as Project PM12

Panel PM03
(a) (b) (c) 2 degree holders12, 1 of whom is expected to have completed a project S$10M and above (within the past 5 years) as Project PM14 Firm must have completed at least 3 projects as project manager, each is expected to be S$10M and above (within the past 5 years) Obtained ISO 9001:2008 certification in the discipline applied for

Panel PM02
(a) (b) (c) (d) (e) (f) (g) 3 degree holders12, 1 of whom is expected to have completed a project $30M and above (within the past 5 years) as Project PM14 Firm must have completed at least 3 projects as project manager, each is expected to be $30M and above (within the past 5 years) 1 project manager has attended the course on Code of Practice on Buildable Design conducted by BCA15 1 project manager has successfully completed the Certification Course for Green Mark Manager (GMM) conducted by BCA13 1 project manager has successfully completed the Certification Course for Universal Design (UD) Assessor conducted by BCA15, 16 Obtained ISO 9001:2008 certification in the discipline applied for Obtained ISO 14001:2004 certification in the discipline applied for

Panel PM01
(a) (b) (c) (d) (e) (f) (g) 4 degree holders12, 2 of whom are expected to have completed 1 project $65M and above (within the past 5 years) as Project PM14 Firm must have completed at least 3 projects as project manager, each is expected to be $65M and above (within the past 5 years) 1 project manager has attended the course on Code of Practice on Buildable Design conducted by BCA 15 1 project manager has successfully completed the Certification Course for Green Mark Manager (GMM) conducted by BCA15 1 project manager has successfully completed the Certification Course for Universal Design (UD) Assessor conducted by BCA15, 16 Obtained ISO 9001:2008 certification in the discipline applied for Obtained ISO 14001:2004 certification in the discipline applied for
Firms Track Record Panel Personnel
12, 13

(No. of projects completed within past 5 years)

Course Requirement Buildable Design Green Mark Manager

15

ISO Cert
(in discipline applied for)

Firm

Personnel completed as PM 14 before

Universal Design 16 Assessor


(wef 1 Apr 2013)

ISO 9001:2008

ISO 14001:2004

PM04 PM03 PM02 PM01

1 Deg + 1 Dip 2 Deg 3 Deg 4 Deg

3x $10mil 3x $30mil 3x $65mil

1x $3mil 1x $10mil 1x $30mil 2x $65mil

Yes Yes Yes

Yes Yes

Yes Yes

Yes Yes Yes

Yes Yes

______________________________________________________

12 13

Degree holder in Architecture, Building, Construction-related Engineering or equivalent Diploma holder in Architecture, Building, Construction-related Engineering or equivalent 14 Project PM refers to appointment by client/developer to provide solely project management services 15 For firms that do not satisfy this requirement, the firms are to submit a confirmation letter on successful placement for the course. The relevant Certificate of Accomplishment (Buildable Design) / Certificate of Successful Completion (Green Mark Manager/Universal Design Assessor) is to be furnished upon successful completion of the course. 16 The Universal Design Assessor course requirement is only applicable to PM01 and PM02 listing from 1 Apr 2013 onwards.