You are on page 1of 13

Sociedad Minera Cerro Verde S.A.A.

Primary Sulfide Project


Project No. PSP108

Insulation Aislamiento
Construction Specification No. C-CS-20-008
Rev. C 22 June 2005

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 1 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO This document has been revised as indicated below. Changes after revision 0 are identified by vertical bars at the right side of the page, with additions being underlined. Please replace all pages of this specification and destroy the superceded copies. English is the prevailing language of this document. Rev No. C Originator (name/initials) Hernan Alvarez Rev Date 22Jun05 Revision Description Issued for Tender/Approval

New Issue

Entire Specification Re-issued

APPROVALS FLUOR Project Manager: Engineering Manager: Area Project Engineer: Lead Discipline Engineer: Process Approval: Brad Matthews Reza Sherkat Hernan Alvarez

ORIGINAL SIGNED BY DATE CLIENT DATE

22Jun05 22Jun05 22Jun05

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 2 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO Table of Contents 1. 1.1 1.2 1.3 1.4 1.5 1.6 2. 2.1 2.2 3. 3.1 3.2 3.3 3.4 4. 1. 1.1 1.2 1.3 1.4 1.5 1.6 2. 2.1 2.2 3. 3.1 3.2 3.3 3.4 4. GENERAL ...................................................................................................................................................3 Summary ......................................................................................................................................................3 References...................................................................................................................................................3 Submittals.....................................................................................................................................................3 Quality Assurance ........................................................................................................................................4 Safety Precaution.........................................................................................................................................4 Delivery, Storage, And Handling..................................................................................................................4 PRODUCTS ................................................................................................................................................4 Manufacturers ..............................................................................................................................................4 Materials.......................................................................................................................................................4 EXECUTION................................................................................................................................................5 Preparation...................................................................................................................................................5 Installation ....................................................................................................................................................5 Protection .....................................................................................................................................................6 Cleaning .......................................................................................................................................................6 ATTACHMENTS .........................................................................................................................................6 GENERALIDADES .....................................................................................................................................8 Resumen ......................................................................................................................................................8 Referencias ..................................................................................................................................................8 Remisiones ..................................................................................................................................................8 Aseguramiento de la Calidad.......................................................................................................................9 Precaucin de Seguridad.............................................................................................................................9 Entrega, Almacenamiento y Manipulacin ..................................................................................................9 PRODUCTOS..............................................................................................................................................9 Fabricantes ..................................................................................................................................................9 Materiales.....................................................................................................................................................9 EJECUCIN..............................................................................................................................................10 Preparacin................................................................................................................................................10 Instalacin ..................................................................................................................................................10 Proteccin ..................................................................................................................................................11 Limpieza .....................................................................................................................................................11 Anexos......................................................................................................................................................12

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 3 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 1. GENERAL 1.1 Summary A. Scope of Specification This specification includes but does not necessarily limit materials and labor to furnish, unload, store, and install fibrous insulation for a complete, operational system. B. Related Specifications The following specifications prescribe items of related Work: C-CS-20-005 C-CS-20-006 C-CS-20-010 C-CS-20-018 C-CS-20-020 Cold Formed Metal Framing Rough Carpentry Metal Siding and Roofing Gypsum Wallboard Systems Acoustical Panel Ceilings

Coordinate Work prescribed by this specification with Work prescribed by the above listed specifications. 1.2 References The publications listed below form part of this specification. Each publication shall be the latest revision and addendum in effect on the date this specification is issued for construction unless noted otherwise. Except as modified by the requirements specified herein or the details of the drawings, Work included in this specification shall conform to the applicable provisions of these publications. 1.3 ASTM (American Society for Testing and Materials) CFR (Code of Federal Regulations) CPSC (Consumer Product Safety Commission) FS (Federal Specification) NIST (National Institute of Standards and Technology)

Submittals A. Product Data Submit Manufacturer's product literature and installation instructions for each type of insulation and vapor retarder material required. B. Certified Test Reports With product data, submit copies of certified test reports showing compliance with specified performance values, including R values, densities, compression strengths, fire performance characteristics, perm ratings, water absorption ratings, and similar properties.

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 4 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 1.4 Quality Assurance A. Maximum Allowable Asbestos Content Provide insulations composed of mineral fibers or mineral ores which contain less than 0.25 percent by weight of asbestos of any type or mixture of types occurring naturally as impurities as determined by polarized light microscopy test according to Appendix A of 40 CFR 763. 1.5 Safety Precaution Special Fiberglass Insulation Precaution: The U.S. Department of Labor's OSHA (Occupational Safety and Health Administration) has directed Manufacturers to identify it as a potential carcinogen on warning labels and provide information on MSDS (Material Safety Datasheets) required by the agency's hazard communication standard. Installers shall follow all precautions indicated on product labels, MSDS sheets, as well as handling/installation procedures recommended by the Manufacturer. 1.6 Delivery, Storage, And Handling A. B. C. 2. Do not expose insulation to sunlight, except for any period necessary to install and conceal. Protect from ignition at all times. Remove damp, wet, or contaminated insulation from site.

PRODUCTS 2.1 Manufacturers 2.2 Certainteed Corporation Knauf Johns Manville Owens Corning Fiberglas Corporation Thermafiber Owens Corning DOW Chemical

Materials A. Batt Insulation 1. Unfaced Glass Fiber Blanket Batt (Type I) Thermal insulation produced by combining glass fibers with thermosetting resins to comply with ASTM C665 for Type I (blankets without membrane facing) comply with ASTM E136, and ASTM E84 flame spread of 25 and smoke developed of 50. 2. Faced Glass Fiber Blanket Batt (Type III) Thermal insulation produced by combining glass fibers of type described below with thermosetting resins to comply with ASTM C665 for Type III, Class A; foil-scrim-Kraft vapor-retarder membrane on 1 face, respectively. Insulation only must comply with ASTM E136 and flame spread of 25 and smoke developed of 50. All flame spread ratings must be conducted according to ASTM E84.

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 5 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 3. Loose Glass Fiber Glass fibers processed to comply with ASTM C764; Type 1 for pneumatic installation; and Type 2 for poured installation. Comply with flame spread of 5 and smoke developed of 5 according to ASTM E84. B. Vapor Retarders 1. Polyethylene A 6 mil polyethylene film with laboratory tested vapor transmission rating of 0.6 perms, flame spread 25, and smoke development 50, natural color. 2. Metal Foil / Paper A 0.3 mil reflective aluminum foil laminated with scrim reinforcing to plastic coated Kraft paper; laboratory tested vapor transmission rating of 0.03 perms, with flame spread of 25 and smoke development of 50. 3. EXECUTION 3.1 Preparation Remove substances harmful to insulations or vapor retarders, including removal of projections which might puncture vapor retarders. 3.2 Installation A. General 1. Extend insulation full thickness as shown over entire area to be insulated. Cut and fit tightly around obstructions, and fill voids with insulation. Remove projections which interfere with placement. Apply a single layer of insulation of required thickness, unless otherwise shown or required to make up total thickness and R value required. Set vapor retarder faced units with vapor retarder to warm side of construction, except as otherwise indicated. Do not obstruct ventilation spaces, except for firestopping. Tape joints and ruptures in vapor retarder, and seal each continuous area of insulation to surrounding construction if more air-tight installation is required. Cut insulation to fit into narrow spaces and stuff glass fiber insulation into small voids and cavity spaces where shown. Blow loose fill glass fiber insulation into enclosed spaces and over ceiling surfaces as shown. Install insulation in accordance with its coverage chart. Make certain that the minimum thickness and number of bags 1.000 ft are blown for the specified R value. Refer to drawings for type and extent of insulation.

2. 3.

4. 5.

6. B.

Stud Wall Systems Install faced, full width (400 mm or 600 mm) blankets to friction fit.

C.

Ceiling Install unfaced blankets parallel to ceiling support system.

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 6 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO D. Separate Vapor Retarders 1. Extend vapor retarder to extremities of areas to be protected from vapor transmission. Secure in place with adhesives or other anchorage system as indicated. Extend vapor retarder to cover miscellaneous voids in insulated substrates, including those spaces which have been stuffed with insulation. Seal vertical joints in vapor retarders over framing by lapping no less than 2 wall studs. Fasten vapor retarders to framing at top, end, and bottom edges, at perimeter of wall openings, and at lap joints; space fasteners 400 mm on center. Seal overlapping joints in vapor retarders with adhesives according to vapor retarder Manufacturer's printed direction. Seal butt joints and fastener penetrations with tape of type recommended by vapor retarder Manufacturer. Locate all joints over framing members or other solid substrates. Firmly attach vapor retarders to substrates with mechanical fasteners or adhesives as recommended by vapor retarder Manufacturer. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with cloth or aluminized tape of type recommended by vapor retarder Manufacturer to create an air-tight seal between penetrating objects and vapor retarder. Repair any tears or punctures in vapor retarders immediately before concealment by other work. Cover with tape or another layer of vapor retarder.

2.

3.

4.

5. 3.3 Protection

Protect installed insulation and vapor retarders from harmful weather exposures and from possible physical abuses, where possible, by nondelayed installation of concealing work or, where that is not possible, by temporary covering or enclosure. 3.4 Cleaning After completion of work of this section, remove from jobsite associated debris, tools, and equipment of this trade. Site to be ready for next sub-trade. 4. ATTACHMENTS Not applicable. End of Specification

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 7 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO Este documento ha sido revisado como se indica a continuacin. Los cambios despus de la revisin 0 se identifican por las barras verticales en el lado derecho de la pgina, con los adicionales estando subrayados. Por favor reemplace todas las pginas de sta especificacin y destruya las copias precedentes. El ingls es la lengua que prevalece de este documento. Rev. No. C Origen (nombre/iniciales) Hernn lvarez Fecha Rev. 22Jun05 Descripcin de la Revisin Emitido para Cotizacin /Aprobacin

Nueva Edicin

Especificacin Totalmente Reeditada

APROBACIONES FLUOR Gerente de Proyecto: Gerente de Ingeniera: Ingeniero de Proyecto del rea: Ingeniero Jefe de la Disciplina: Aprobacin del Proceso: Brad Matthews Reza Sherkat Hernan Alvarez

ORIGINAL FIRMADO POR FECHA CLIENTE FECHA

22Jun05 22Jun05 22Jun05

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 8 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 1. GENERALIDADES 1.1 Resumen A. Alcance de la Especificacin Esta especificacin incluye pero no necesariamente limita los materiales y el trabajo para suministrar, descargar, almacenar e instalar aislamiento fibroso para un sistema operacional completo. B. Especificaciones Relacionadas Las siguientes especificaciones prescriben tems de trabajo relacionado: C-CS-20-005 C-CS-20-006 C-CS-20-010 C-CS-20-018 C-CS-20-020 Estructuras de Metal Conformadas en Fro Carpintera Gruesa Recubrimientos Metlicos para Paredes y Techos Sistemas de Paneles para Pared de Yeso Cielos Rasos de Paneles Acsticos

Coordinar el Trabajo indicado por sta especificacin con el Trabajo prescrito por las especificaciones listadas anteriormente. 1.2 Referencias Las publicaciones listadas a continuacin forman parte de esta especificacin. Cada especificacin deber ser de la ltima revisin y adenda vigente a la fecha que esta especificacin es publicada o emitida para construccin, a menos que se indique de otra manera. Excepto como lo modificado por los requerimientos especificados en este documento o los detalles de los planos. El Trabajo incluido en esta especificacin deber estar conforme a las provisiones aplicables de estas publicaciones. 1.3 ASTM (Sociedad Americana de Ensayos y Materiales) CFR (Cdigo de Regulaciones Federales) CPSC (Comisin de Seguridad de Productos del Consumidor) FS (Especificacin Federal) NIST (Instituto Nacional de Estndares y Tecnologa)

Remisiones A. Datos de Producto Remitir la literatura del producto del Fabricante, y las instrucciones de instalacin para cada tipo de aislamiento y material del retardador de gases requerido. B. Reportes de Pruebas Certificados Con los datos del producto, remitir copias de los reportes de pruebas certificados, mostrando la conformidad con los valores de desempeo especificado, incluyendo los valores R, densidades, esfuerzos a la compresin, caractersticas de desempeo contra el fuego, clasificaciones de permanencia, ratios de absorcin de agua y propiedades similares.

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 9 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 1.4 Aseguramiento de la Calidad A. Contenido Mximo Permisible de Asbestos Proveer aislamientos compuestos de fibras minerales o menas minerales las cuales contengan menos del 0.25 por ciento por peso de asbestos de cualquier tipo ocurridos naturalmente como impurezas, como se determina por la prueba al microscopio de luz polarizada de acuerdo con el Apndice A de 40 CFR 763. 1.5 Precaucin de Seguridad Precaucin especial con el aislamiento de fibra de vidrio: El departamento de trabajo de U.S. OSHA (Administracin de Salud y Seguridad Ocupacional) ha ordenado a los fabricantes identificarlo como un agente cancergeno potencial en etiquetas de advertencia y proveer informacin en MSDS (Hojas de datos de seguridad del material) requerido por el estndar de comunicacin de riesgos de la agencia. Los instaladores debern seguir todas las precauciones indicadas en las etiquetas del producto, hojas MSDS, as como los procedimientos de manipulacin/instalacin recomendados por el fabricante. 1.6 Entrega, Almacenamiento y Manipulacin A. B. C. 2. No exponer el aislamiento a la luz del sol, excepto por cualquier periodo necesario para instalar y encubrir. Proteger de la ignicin en todo momento. Retirar del lugar el aislamiento hmedo, mojado o contaminado.

PRODUCTOS 2.1 Fabricantes 2.2 Corporacin Certainteed Knauf Johns Manville Corporacin de Fibra de Vidrio Owens Corning Thermafiber Owens Corning Qumica DOW

Materiales A. Aislamiento en Lmina 1. Lmina o Manta de Fibra de Vidrio no Revestida (Tipo I) El aislamiento trmico producido por la combinacin de fibras de vidrio con resinas termo curadas, de conformidad con ASTM C665 para el Tipo I (Mantas sin membrana de revestimiento) de acuerdo con ASTM E136, y ASTM E84 dispersin de llamas de 25 y desarrollo de humo de 50.

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 10 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 2. Lmina o Manta de Fibra de Vidrio Revestida (Tipo III) El aislamiento trmico producido por combinar fibras de vidrio del tipo descrito a continuacin con resinas termocuradas para cumplir con ASTM C665 para el Tipo III, Clase A; membrana retardadora de gases de malla - lmina metlica -papel Kraft en una cara, respectivamente. El aislamiento slo tiene que cumplir con ASTM E316 y dispersin de flamas de 25 y desarrollo de humo de 50. Todos los ratios de dispersin de llamas debern ser conducidos de acuerdo a ASTM E84. 3. Fibra de Vidrio Suelta Las fibras de vidrio procesadas para cumplir con ASTM C764; Tipo 1 para instalaciones neumticas; y Tipo 2 para instalaciones vertidas. Cumpliendo con la dispersin de llamas de 5 y desarrollo de humos de 5 de acuerdo con ASTM E84. B. Retardadores de Gases 1. Polietileno Una capa de polietileno de 6 mil con ratios de transmisin de gases probados en laboratorio de 0.6 permanencias, dispersin de llamas de 25 y desarrollo de humo de 50, color natural. 2. Papel / Lmina de Metal Una hoja reflexiva de aluminio laminado de 0.3 mil con gasa de reforzamiento al papel Kraft revestido de plstico; ratios de transmisin de gases probados en laboratorio de 0.03 permanencias, con dispersin de llamas de 25 y desarrollo de humo de 50. 3. EJECUCIN 3.1 Preparacin Retirar las sustancias nocivas para los aislamientos o retardadores de gases, incluyendo la remocin de proyecciones, las cuales puedan perforar los retardadores de gases. 3.2 Instalacin A. Generalidades 1. Extender el espesor completo del aislamiento como se muestra sobre el rea completa a ser aislada. Cortar y entallar ajustadamente alrededor de las obstrucciones, llenar los vacos con aislamiento. Retirar las proyecciones, que interfieran con la colocacin. Aplicar una capa simple de aislamiento del espesor requerido, a menos que se muestre o requiera de otra manera para construir el espesor completo y el valor R requerido. Fijar las unidades revestidas del retardador de gases con el lado revestido hacia el lado caliente de la construccin, excepto que se indique de otra manera. No obstruir los espacios de ventilacin, excepto por corta fuegos. Encintar las juntas y rupturas en los retardadores de gases y sellar cada rea continua de aislamiento de la construccin circundante, si se requiere de una instalacin ms hermetizada. Cortar el aislante para entallar en espacios estrechos y rellenar con aislamiento de fibra de vidrio los pequeos espacios vacos y cavidades donde se presenten.

2. 3.

4.

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 11 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 5. Soplar el aislamiento de relleno de fibra de vidrio suelto en los espacios confinados y sobre las superficies de cielo raso como se muestra. Instalar el aislamiento de acuerdo con su carta de cobertura. Asegrese que el espesor mnimo y nmero de bolsas 1.000 ft sean soplados para el valor R especificado. Refirase a los planos para el tipo y extensin de aislamiento.

6. B.

Sistemas de Parantes de Pared Instalar mantas de ajuste a friccin, revestidas, de ancho completo (400mm 600mm).

C.

Cielo Raso Instalar mantas no revestidas paralelas al sistema de soporte del cielo raso.

D.

Retardadores de Gases Separados 1. Extender los retardadores de gases a las extremidades de las reas a ser protegidas de la transmisin de gases. Asegurar en el lugar con adhesivos u otro sistema de anclaje como se indica. Extender el retardador de gases para cubrir los vacos miscelneos en sustratos aislados, incluyendo aquellos espacios, los cuales han sido rellenados con aislante. Sellar las juntas verticales en los retardadores de gases sobre la estructura, traslapando no menos de 2 parantes de pared. Sujetar los retardadores de gases en los bordes superior, final e inferior de la estructura, al permetro de las aberturas de pared y en las juntas de traslape; espaciar los sujetadores 400mm entre centros. Sellar las juntas superpuestas en los retardadores de gases con adhesivos de acuerdo a la indicacin impresa del fabricante del retardador. Sellar las juntas a tope y las penetraciones de sujetadores con cinta del tipo recomendado por el fabricante del retardador. Ubicar todas las juntas sobre los miembros de la estructura u otros sustratos slidos. Sujetar firmemente los retardadores de gases a los sustratos con sujetadores mecnicos o adhesivos como los recomendados por el fabricante del retardador de gases. Sellar las juntas causadas por tubos, conductos, cajas elctricas e tems similares que penetren los retardadores de gases con trapo o cinta aluminizada del tipo recomendado por el fabricante del retardador de gases para crear un sello hermtico entre los objetos penetrantes y el retardador de gases. Reparar cualquier rasgadura o perforacin en los retardadores de gases inmediatamente antes de encubrirlo por otro trabajo. Cubrir con cinta u otra capa de retardador de gases.

2.

3.

4.

5. 3.3 Proteccin

Proteger el aislamiento instalado y los retardadores de gases de las exposiciones nocivas al clima y de posibles abusos fsicos, donde sea posible, al no retrasar la instalacin del trabajo de encubrimiento o, donde esto no sea posible, por el revestido o cercado provisional. 3.4 Limpieza Despus de completar el trabajo de esta seccin, retirar del lugar de trabajo los desechos, herramientas y equipo asociado a este oficio. El lugar estar listo para el siguiente sub-oficio.

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL

Client Name: Project Name: Project Number:

Sociedad Minera Cerro Verde S.A.A. Primary Sulfide Project PSP108

Specification C-CS-20-008 Page 12 of 12 Rev. C

FLUOR
Mining & Minerals

INSULATION AISLAMIENTO 4. ANEXOS No aplicable. Fin de la Especificacin

Z:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-008 INSULATION\C-CS-20-008 INSULATION.DOC

ARCHITECTURAL